IR 05000369/2016006

From kanterella
Revision as of 00:10, 13 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Annual Assessment Letter for McGuire Nuclear Station, Units 1 & 2 -Nrc Inspection Report 05000369/2016006 and 05000370/2016006
ML17060A199
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/01/2017
From: Ehrhardt F J
NRC/RGN-II/DRP/RPB1
To: Capps S D
Duke Energy Carolinas
References
IR 2016006
Download: ML17060A199 (5)


Text

March 1, 2017

Steven Site Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985

SUBJECT: ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000369/2016006 AND 05000370/2016006

Dear Mr. Capps:

The NRC has completed its end-of-cycle performance assessment of McGuire Nuclear Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016 through December 31, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The NRC determined the performance at McGuire Nuclear Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. The NRC will conduct Temporary Instruction 2515/192, "Inspection of the Licensee's Interim Compensatory Measures Associated with the Open Phase Condition (OPC) Design Vulnerabilities in Electric Power Systems," in March 2017. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,/RA/ Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17

Enclosure:

McGuire Inspection/Activity Plan (03/01/2017 - 12/31/2018) cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000369/2016006 AND 05000370/2016006 March 1, 2017 DISTRIBUTION: M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO) ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP NAME JWorosilo FEhrhardt DATE 2/ 16 /2017 2/17/2017 OFFICIAL AGENCY RECORD Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteMcGuireInspection / Activity Plan03/01/2017-12/31/2018Page 1 of 202/28/2017 06:54:35RP-RAD HAZARDS11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0104/03/201704/07/2017ISI-UNIT 2 IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P04/10/201704/14/2017SGISI-UNIT 2 SG IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P04/17/201704/21/2017RP-RP PUBLIC RAD SAFETY BASELINE31,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/05/201706/09/20171,2 IPRadiological Environmental Monitoring Program71124.0706/05/201706/09/20171,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0806/05/201706/09/20171,2 IPPerformance Indicator Verification7115106/05/201706/09/2017EP-EP EXERCISE31,2 IPExercise Evaluation711140108/07/201708/11/20171,2 IPEmergency Action Level and Emergency Plan Changes711140408/07/201708/11/20171,2 IPExercise Evaluation - Scenario Review711140808/07/201708/11/20171,2 IPPerformance Indicator Verification7115108/07/201708/11/2017ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P10/02/201710/06/2017SGISI-UNIT 1 SG IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P10/09/201710/13/2017DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAM)61,2 IPComponent Design Bases Inspection (Teams)7111121M01/22/201801/26/20181,2 IPComponent Design Bases Inspection (Teams)7111121M02/12/201802/16/20181,2 IPComponent Design Bases Inspection (Teams)7111121M02/26/201803/02/2018OL EXAM-INITIAL LICENSE EXAM PREP31 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIESV2351103/19/201803/23/2018OL EXAM-INITIAL LICENSE EXAM31 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIESV2351104/16/201804/27/2018TFPI-TRIENNIAL FIRE PROTECTION INSPECTION51,2 IPFire Protection - NFPA 805 (Triennial)7111105X04/30/201805/04/20181,2 IPFire Protection - NFPA 805 (Triennial)7111105X05/14/201805/18/2018EP-EP PROGRAM INSPECTION31,2 IPAlert and Notification System Testing711140206/18/201806/22/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteMcGuireInspection / Activity Plan03/01/2017-12/31/2018Page 2 of 202/28/2017 06:54:35EP-EP PROGRAM INSPECTION31,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140306/18/201806/22/20181,2 IPEmergency Action Level and Emergency Plan Changes711140406/18/201806/22/20181,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140506/18/201806/22/20181,2 IPPerformance Indicator Verification7115106/18/201806/22/2018OL RQ-REQUAL INSPECTION21,2 IPLicensed Operator Requalification Program7111111B06/18/201806/22/2018HS-TRIENNIAL HEAT SINK PERFORMANCE11,2 IPHeat Sink Performance7111107T06/25/201806/29/2018PI&R-PROBLEM IDENTIFICATION AND RESOLUTION41,2 IPProblem Identification and Resolution71152B07/24/201807/28/20181,2 IPProblem Identification and Resolution71152B08/07/201808/11/2018ISI-UNIT 2 IN-SERVICE INSPECTION2 2 IPInservice Inspection Activities - PWR7111108P09/24/201809/28/2018RP-RP OCCUPATIONAL - WEEK 131,2 IPRadiological Hazard Assessment and Exposure Controls71124.0109/24/201809/28/20181,2 IPOccupational ALARA Planning and Controls71124.0209/24/201809/28/20181,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0309/24/201809/28/20181,2 IPOccupational Dose Assessment71124.0409/24/201809/28/20181,2 IPRadiation Monitoring Instrumentation71124.0509/24/201809/28/20181,2 IPOccupational Exposure Control Effectiveness71151-OR0109/24/201809/28/20181,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0109/24/201809/28/2018RP-RP OCCUPATIONAL - WEEK 221,2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/15/201810/19/20181,2 IPOccupational ALARA Planning and Controls71124.0210/15/201810/19/20181,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/15/201810/19/20181,2 IPOccupational Dose Assessment71124.0410/15/201810/19/20181,2 IPRadiation Monitoring Instrumentation71124.0510/15/201810/19/20181,2 IPOccupational Exposure Control Effectiveness71151-OR0110/15/201810/19/20181,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0110/15/201810/19/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.