IR 05000289/2015005

From kanterella
Revision as of 07:20, 6 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
ROP-16 Mid-Cycle Assessment Letter for Three Mile Island Nuclear Station, Unit 1 (Report 05000289/2015005)
ML15229A109
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/01/2015
From: Kennedy S R
NRC/RGN-I/DRP/PB6
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
KENNEDY, SR
References
IR 2015005
Download: ML15229A109 (5)


Text

September 1, 2015

Mr. Bryan Hanson Senior Vice President, Exelon Generation President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2015005)

Dear Mr. Hanson:

On August 13, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Three Mile Island Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014, through June 30, 2015assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Three Mile Island Nuclear Station, Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Three Mile Island Nuclear Station, Unit 1 during the most recent (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. In addition to baseline inspections, the NRC will perform Temporary Instruction (TI) 2515-Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The on-site portion of the audit was completed at Three Mile Island and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above performing TI 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans. In accordance with Title 10 of the Code of Federal RegulationsPublic Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5046 with any questions you have regarding this letter.

Sincerely,/RA/ Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-289 License Nos.: DPR-50

Enclosure:

Three Mile Island Nuclear Station Inspection/Activity Plan cc w/encl: Distribution via ListServ