ML17208A314

From kanterella
Revision as of 10:29, 8 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Final Const Deficiency Rept Re Hurricane David Damage
Date released: 01/25/2018 Download: ML17208A314


Final Const Deficiency Rept:On 790903,Chicago Bridge & Iron Guyed Derrick Collapsed During Hurricane David,Damaging Reactor Auxiliary & Concrete Shield Bldgs.Caused by Inadequate Securing.New Derrick Will Be Erected 800107
ML17208A315
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/01/1980
From:
FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17208A315 (17)
Forwards Final Const Deficiency Rept Re Hurricane David Damage
ML17208A313
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/01/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17208A313 (3)