Updated Inspection Plan for Indian Point Nuclear Generating, Units 2 and 3 (Report 05000247/2017005 and 05000286/2017005)
ML17240A020
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 08/28/2017
From: Greives J E
Reactor Projects Branch 2
To: Vitale A
Entergy Nuclear Operations
Greives J E
References
IR 2017005
Download: ML17240A020 (6)


Text

August 28, 2017

Mr. Anthony Vitale Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, General Services Building P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT: UPDATED INSPECTION PLAN FOR INDIAN POINT NUCLEAR GENERATING, UNITS 2 AND 3 (REPORT 05000247/2017005 AND 05000286/2017005)

Dear Mr. Vitale:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Indian Point Nuclear Generating, Units 2 and 3. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to normal baseline inspections, the NRC will be performing Inspection Procedure 60845, "Operation of Inter-Unit Fuel Transfer Canister and Cask System," and Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/ Staffing/Multi-Unit Dose Assessment Plans." Please contact me at 610-337-5120 with any questions you have regarding this letter.

Sincerely,/RA/ Jonathan E. Greives, Acting Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64

Enclosure:

Inspection Plan

cc: Distribution via ListServ