August 14, 2008

Mr. Jack Davis Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166

SUBJECT: FERMI POWER PLANT, UNIT 2 INTEGRATED INSPECTION REPORT 05000341/2008003

Dear Mr. Davis:

On June 30, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an integrated inspection at your Fermi Power Plant, Unit 2. The enclosed report documents the inspection findings, which were discussed on July 17, 2008, with you and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and to compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, three NRC-identified findings of very low safety significance were identified. The findings involved violations of NRC requirements. However, because of their very low safety significance, and because the issues were entered into your corrective action program, the NRC is treating the issues as Non-Cited Violations (NCVs) in accordance with Section VI.A.1 of the NRC Enforcement Policy. If you contest the subject or severity of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission - Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532-4352; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the Resident Inspector Office at the Fermi 2 Facility.

J. Davis -2-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/

Ross Telson, Acting Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

Inspection Report 05000341/2008003

w/Attachment:

Supplemental Information cc w/encl: J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators T. Strong, State Liaison Officer Wayne County Emergency Management Division

SUMMARY OF FINDINGS

...........................................................................................................1

REPORT DETAILS

.......................................................................................................................3 Summary of Plant Status...........................................................................................................3

REACTOR SAFETY

....................................................................................3

1R01 Adverse Weather Protection

.....................................................3

1R04 Equipment Alignment

................................................................4

1R05 Fire Protection

...........................................................................6

1R06 Flooding

....................................................................................7

1R11 Licensed Operator Requalification Program

...........................13

1R12 Maintenance Effectiveness

.....................................................13

1R13 Maintenance Risk Assessments and Emergent Work Control

14

1R15 Operability Evaluations

...........................................................15

1R18 Plant Modifications

..................................................................16

1R19 Post-Maintenance Testing

......................................................16

1R22 Surveillance Testing

................................................................17

1EP6 Drill Evaluation

........................................................................18

RADIATION SAFETY

................................................................................18 2OS3 Radiation Monitoring Instrumentation and Protective Equipment (71121.03)............................................................18

OTHER ACTIVITIES

.................................................................................21

==4OA1 Performance Indicator Verification (71151-05)..........................................21

4OA2 Identification and Resolution of Problems

==

....................................22

4OA3 Follow-up of Events and Notices of Enforcement Discretion

.......24

4OA5 Other Activities..........................................................................................26 4OA6

Management Meetings..............................................................................28 4OA7 Licensee-Identified Violations....................................................................29

SUPPLEMENTAL INFORMATION