Forwards Rev 1 to Surry Units 1 & 2 IST Programs for Pumps & Valves. Rev Includes Summary of Changes Made to Programs Since Last Changes Were Submitted to NRC by Ltr Dtd 951012. Review of Rev 1 Changes to Relief Request P-11,requested
ML18152B807
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/04/1998
From: Hartz L
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18151A194 List:
References
98-223, NUDOCS 9805110039
Download: ML18152B807 (2)


Text

~

e l'...* '-'* * * "** ,..,.

VIRGINIA ELECTRIC AND POWER COMPANY RicuMOND, VIRGINIA 23261 May 4, 1998 United States Nuclear Regulatory Commission Serial No.98-223 Attention: Document Control Desk NL&OS/GDM RO' Washington, D.C. 20555 Docket No. 50-280 50-281 License No. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS.1 AND 2 INSERVICE TESTING PROGRAM, REVISION 1 Please find enclosed Revision 1 to the Surry Units 1 and 2 lnservice Testing (1ST)

Programs for Pumps and Valves. A summary of changes is provided for each unit's 1ST Program. These summaries include descriptions of changes made to the 1ST Programs since the last changes were submitted to the NRC by letter dated October 12, 1995.

We request that the NRC review the Revision 1 changes to Relief Request P-11 for Surry Unit 1. NRC approval is necessary before these changes can be implemented.

The remaining changes to the 1ST Programs are within the provisions of the Code and require no NRC approval for implementation. The Surry Units 1 and 2 1ST programs and summaries of changes are included in Attachments 1 and 2, respectively.

If you have any questions concerning the 1ST program changes, please contact us. . !I Very truly yours, /I l+-t) l.l:z_.

t J"- r 1 L. N. Hartz Vice President - Nuclear Engineering and Services Attachments

. . - -.- - ,. *' .. ,.. *--~ ""t 9805110039 980504 . ' - -- *---

PDR ADOCK 05000280 p PDR

e cc: U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station Commitment Summary:

1. As stated in the 1ST Program, Relief Request P Emergency Service Water Pumps 1-SW-P-1A, B, and C Tests will be conducted every month within the tide level limits of the pump reference curve, and flow will be compared to acceptance criteria based on the reference curve and specified ranges. For full flows that enter the alert range, the test data will be trended and corrective action taken if the trend evaluation determines that the flow will decrease below the required action range before the next monthly test.