IR 05000338-12-012, 05000339-12-012, on 10/28/2011, North Anna Power Station, Units 1 & 2 - Notification of Conduct of a Triennial Fire Protection Baseline Inspection
ML12235A291
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 08/17/2012
From: Mark King
NRC/RGN-II/DRS/EB2
To: Heacock D
Virginia Electric & Power Co (VEPCO)
References
IR-12-012
Download: ML12235A291 (9)


See also: IR 05000338/2012012

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

August 17, 2012

Mr. David A. Heacock

President and Chief Nuclear Officer

Virginia Electric and Power Company

Dominion Nuclear

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT: NORTH ANNA POWER STATION, UNITS 1 AND 2 - NOTIFICATION OF

CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

(NRC INSPECTION REPORT NOS. 05000338/2012012 AND

05000339/2012012)

Dear Mr. Heacock:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a triennial fire protection baseline inspection at the North Anna

Power Station, Units 1 and 2, in November and December 2012. The inspection team will be

led by Mr. McKenzie Thomas, a Senior Reactor Inspector from the NRC Region II Office. The

team will be composed of personnel from the Region II Office. The inspection will be conducted

in accordance with Inspection Procedure 71111.05T, the NRCs triennial fire protection baseline

inspection procedure, dated October 28, 2011. Inspection of circuit analysis is included in the

inspection procedure.

On August 15, 2012, during a telephone conversation between Mr. Donald Taylor, North Anna

Licensing Supervisor, and Mr. Thomas, our respective staffs confirmed arrangements for a

three-day information gathering onsite visit and a two-week onsite inspection. The schedule for

the inspection is as follows:

  • Information gathering visit: November 6-8, 2012
  • Week 1 of onsite inspection: November 26-30, 2012
  • Week 2 of onsite inspection: December 10-14, 2012

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the North Anna Power Station fire

protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,

and mitigating strategies to address Section B.5.b of NRC Order EA-02-026, Order for Interim

Safeguards and Security Compensatory Measures, dated February 25, 2002, and Title 10 of

the Code of Federal Regulations (10 CFR) 50.54(hh)(2). The types of documents the team will

be interested in reviewing, and possibly obtaining, are listed in Enclosures 1 and 2. Please

contact Mr. Thomas at (404) 997-4673 prior to preparing copies of the materials listed in the

Enclosures. The inspection team will try to minimize your administrative burden by specifically

identifying those documents required for inspection preparation.

D. Heacock 2

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space; specific documents to be made available to the team in their

office space; arrangements for unescorted site access (including, as necessary, radiation

protection training, security, safety and fitness for duty requirements); and the availability of

knowledgeable plant engineering and licensing organization personnel to serve as points of

contact during the inspection.

We request that during the inspection weeks you ensure that copies of analyses, evaluations or

documentation regarding the implementation and maintenance of the North Anna Power Station

fire protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection are

those documents which establish that your fire protection program satisfies NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance. For the

B.5.b portion of the inspection, those documents implementing your mitigating strategies and

demonstrating the management of your commitments for the strategies are of specific interest.

Also, personnel should be available at the site during the inspection who are knowledgeable

regarding those plant systems required to achieve and maintain safe shutdown conditions from

inside and outside the control room (including the electrical aspects of the relevant post-fire safe

shutdown analyses), reactor plant fire protection systems and features, and the North Anna

Power Station fire protection program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, under control number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Thomas at (404) 997-4673, or me at (404) 997-4511.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

D. Heacock 3

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Michael F. King, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-338, 50-339

License Nos.: NPF-4, NPF-7

Enclosures: 1. Triennial Fire Protection Inspection Support Documentation

2. Mitigating Strategies Support Documentation

cc w/encls: (See page 4)

_________________________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE RA RA

NAME MTHOMAS MKING

DATE 8/17/2012 8/17/2012 8/ /2012 8/ /2012 8/ /2012 8/ /2012 8/ /2012

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

D. Heacock 4

cc w/encls: Michael M. Cline

Mr. Gerald T. Bischof Director

Site Vice President Virginia Department of Emergency Services

North Anna Power Station Management

Virginia Electric & Power Company Electronic Mail Distribution

Electronic Mail Distribution

Executive Vice President

Fred Mladen Old Dominion Electric Cooperative

Director, Station Safety & Licensing Electronic Mail Distribution

Virginia Electric and Power Company

Electronic Mail Distribution County Administrator

Louisa County

Michael Crist P.O. Box 160

Plant Manager Louisa, VA 23093

North Anna Power Station

Virginia Electric & Power Company Doug Smith

Electronic Mail Distribution President

(Public Correspondence Only)

Lillian M. Cuoco, Esq. Lake Anna Civil Association

Senior Counsel Electronic Mail Distribution

Dominion Resources Services, Inc.

Electronic Mail Distribution

Tom Huber

Director, Nuclear Licensing & Operations

Support

Inssbrook Technical Center

Electronic Mail Distribution

Virginia State Corporation Commission

Division of Energy Regulation

P.O. Box 1197

Richmond, VA 23209

Attorney General

Supreme Court Building

900 East Main Street

Richmond, VA 23219

Senior Resident Inspector

North Anna Power Station

U.S. Nuclear Regulatory Commission

P.O. Box 490

Mineral, VA 23117

Donald R. Taylor

Licensing Supervisor

North Anna Power Station

P. O. Box 402

Mineral, VA 23117-0402

D. Heacock 5

Letter to David A. Heacock from Michael F. King dated August 17, 2012.

SUBJECT: NORTH ANNA POWER STATION, UNITS 1 AND 2 - NOTIFICATION OF

CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

(NRC INSPECTION REPORT NOS. 05000338/2012012 AND

05000339/2012012)

Distribution w/encls:

RIDSNRRDIRS

PUBLIC

RidsNrrPMNorthAnna Resource

Triennial Fire Protection Program Supporting Documentation

Note: This is a broad list of the documents the NRC inspection team may be interested in

reviewing, and possibly obtaining, during the information-gathering site visit. The current

version of these documents is expected unless specified otherwise. Electronic media is

preferred, if readily available. (The preferred file format is searchable .pdf files on CDROM.

The CDROM should be indexed and hyperlinked to facilitate ease of use. Please provide

5 copies of each CDROM submitted.) Information in lists should contain enough information to

be easily understood by someone who has knowledge of the technology. The lead inspector

will discuss specific information needs with the licensee staff and may request additional

documents.

1. The current version of the fire protection program and fire hazards analysis.

2. Corrective action closeouts as part of operator manual actions corrective actions.

3. List of identified fire induced circuit failure configurations for select fire areas.

4. Corrective actions for fire-induced circuit failures, both single and multiple spurious

actuations for select fire areas.

5. Cable routing for components and equipment credited for safe shutdown for select fire

areas.

6. List of protected safe shutdown train equipment for select fire areas.

7. Current versions of the fire protection program implementing procedures (e.g.,

administrative controls, surveillance testing, and fire brigade).

8. Fire brigade training program and pre-fire plans.

9. Post-fire safe shutdown systems and separation analysis.

10. Post-fire alternative shutdown analysis.

11. Piping and instrumentation diagrams showing the components used to achieve and

maintain hot standby and cold shutdown for fires outside the control room and those

components used for those areas requiring alternative shutdown capability.

12. Plant layout and equipment drawings which identify the physical plant locations of hot

standby and cold shutdown equipment.

13. Plant layout drawings which identify plant fire area delineation, areas protected by

automatic fire suppression and detection, and the locations of fire protection equipment.

14. Plant layout drawings which identify the general location of the post-fire emergency

lighting.

Enclosure 1

2

15. Plant operating procedures which would be used and describe shutdown from inside

the control room with a postulated fire occurring in any plant area outside the control

room, procedures which would be used to implement alternative shutdown capability in

the event of a fire in the control or cable spreading room.

16. Maintenance and surveillance testing procedures for alternative shutdown capability

and fire barriers, detectors, pumps, and suppression systems.

17. Maintenance procedures which routinely verify fuse breaker coordination in accordance

with the post-fire safe shutdown coordination analysis.

18. A list of significant fire protection and post-fire safe shutdown related design change

packages and evaluations according to Generic Letter 86-10, Implementation of Fire

Protection Requirements.

19. The reactor plant's Individual Plant Examination for External Events (IPEEE), results of

any post-IPEEE reviews, and listings of actions taken/plant modifications conducted in

response to IPEEE information.

20. Organization charts of site personnel (including fire protection staff personnel).

21. If applicable, drawings of potential reactor coolant/recirculation pump lube oil system

leakage points and associated lube oil collection systems.

22. Licensing basis documents for fire protection (safety evaluation reports, pertinent

sections of the final safety analysis report, exemptions, deviations, letters to/from the

NRC regarding fire protection/fire safe shutdown, etc.).

23. Procedures/instructions that control the configuration of the plant's fire protection

program, features, and post-fire safe shutdown methodology and system design.

24. A list of applicable codes and standards related to the design of plant fire protection

features and evaluations of code deviations.

25. Procedures/instructions that govern the implementation of plant modifications,

maintenance, and special operations, and their impact on fire protection.

26. Internal and external self-assessments, audits, peer-assessments or similar reviews

related to post-fire safe shutdown capability or the fire protection program completed

since the previous NRC fire protection triennial inspection.

27. Recent quality assurance surveillances of fire protection activities.

28. A listing of open and closed fire protection condition reports (problem reports/nuclear

condition reports/event analysis reports/problem identification and resolution reports)

since the last triennial inspection.

Enclosure 1

Mitigating Strategies Supporting Documentation

Note: This is a broad list of the documents the NRC inspection team may be interested in

reviewing, and possibly obtaining, during the information gathering site visit. The current

version of these documents is expected unless specified otherwise. Electronic media is

preferred, if readily available. (The preferred file format is searchable .pdf files on CDROM.

The CDROM should be indexed and hyperlinked to facilitate ease of use. Please provide 5

copies of each CDROM submitted.) Information in lists should contain enough information to

be easily understood by someone who has knowledge of the technology. The lead inspector

will discuss specific information needs with the licensee staff and may request additional

documents.

1. A list of all modifications to regulatory commitments made to meet the requirements of

Section B.5.b of NRC Order, EA-02-026, Order for NRC Interim Safeguards and

Security Compensatory Measures, dated February 25, 2002, the subsequently

imposed license conditions, and Title 10 of the Code of Federal Regulations (10 CFR)

50.54(hh)(2).

2. Lists of procedures/guidelines that were revised or generated to implement the

mitigation strategies. These could be extensive damage mitigation guidelines

(EDMGs), severe accident management guidelines (SAMGs), emergency operating

procedures (EOPs), abnormal operating procedures (AOPs), etc.

3. A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12, Revision 2, B.5.b Phase 2 & 3 Submittal Guideline,

issued December 2006, and the site-specific procedures or guidelines used to

implement each strategy.

4. Engineering evaluations/calculations that were used to verify engineering bases for the

mitigation strategies.

5. Piping and instrumentation diagram for systems relied upon in the mitigation strategies.

These could be of the type used for training.

6. A list of modification packages or simplified drawings or descriptions of modifications

that were made to plant systems to implement the mitigation strategies.

7. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.)

required to implement the mitigation strategies.

8. A list of B.5.b strategies, if any, that have implementing details that differ from those

documented in the submittals and the safety evaluation report.

9. A copy of site general arrangement drawing(s) that show the majority of buildings/areas

referenced in B.5.b documents.

10. Training records, training matrix, and lesson plans related to B.5.b.

11. Copies of memoranda of understanding (e.g., with local fire departments) required to

implement any mitigating strategies.

Enclosure 2