Updated Inspection Plan (Inspection Report 05000443/2019005)
ML19235A066
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 08/28/2019
From: Brice Bickett
Division Reactor Projects I
To: Moul D
Florida Power & Light Co
References
IR 2019005
Download: ML19235A066 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 August 28, 2019 Mr. Don Moul Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company Mail Stop: NT3/JW 15430 Endeavor Drive Jupiter, FL 33478 SUBJECT: SEABROOK STATION UPDATED INSPECTION PLAN (INSPECTION REPORT 05000443/2019005)

Dear Mr. Moul:

The enclosed inspection plan lists the inspections scheduled through June 30 , 20 21 , for Seabrook Station, Unit 1 (Seabrook).

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

Additionally, NRC Region I plans to conduct an inspection per Inspection Procedure 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations at your facility during the period.

You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, "Recommendations for Modifying the Reactor Oversight Process Engineering Inspections"), and other changes to the baseline inspection program described in SECY-19-0067, "Recommendations for Enhancing the Reactor Oversight Process." Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC

's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room

). Please contact me at (610) 337-5312 with any questions you have regarding this letter.

Sincerely,

/RA/ Brice A. Bickett, Chief Project Branch 3 Division of Reactor Projects Docket No.

50-443 License No. NPF-86 Enclosure:

Seabrook Inspection Plan cc: Distribution via ListServ SUBJECT: SEABROOK STATION, UNIT NO. 1 UPDATED INSPECTION PLAN (INSPECTION REPORT 05000443/2019005)

DATED AUGUST 28, 2019 DISTRIBUTION w/encl:

(via e-mail) DLew, RA (R1ORAMAIL Res)

RLorson, DRA (R1ORAMAIL Res)

DCollins, DRP (R1DRPMAIL Res)

BWelling, DRP (R1DRPMAIL Res

) JYerokun, DRS (R1DRSMAIL Res PKrohn, DRS (R1DRSMAIL Res

) MYoung, DRP BBickett, DRP PFinney, DRP SGhrayeb, DRP PCataldo, DRP, SRI TDaun, DRP, RI ACass, DRP, Resident AA DDodson, RI, OEDO RidsNrrPMSeabrook Resource RidsNrrDorlLpl1 Resource ROPreports Resource DRS Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource DOCUMENT NAME:

S:\ROP Assessment Meetings

\ROP-20 Second Quarter Process

\Branch 3\ROP20 Seabrook MC Letter.docx ADAMS ACCESSION NUMBER:

ML19235A066 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME BLin BBickett DATE 8/19/19 8/23/1 9 OFFICIAL RECORD CO PY Seabrook 07/01/2019 - 06/30/2021

Unit Start End Activity CAC Title Staff Count

HP

1 07/22/2019

07/26/2019

IP 71124.05

000729 Radiation Monitoring Instrumentation

71124.01 Radiological Hazard Assessment and Exposure Controls

1 08/19/2019

08/23/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

HP Radiological Environmental Monitoring Program .07 and PIs

1 09/09/2019

09/13/2019

IP 71124.07

000731 Radiological Environmental Monitoring Program

CYBER FULL IMP

1 10/07/2019

10/11/2019

IP 71130.10P

000741 Cyber Security

10/28/2019

11/01/2019

IP 71130.10P

000741 Cyber Security

SEABROOK REQUAL INSP W/ P/F RESULTS

1 12/01/2019

12/06/2019

IP 71111.11A

000703 Licensed Operator Requalification Program and Licensed Operator Performance

12/01/2019

12/06/2019

IP 71111.11B

000704 Licensed Operator Requalification Program and Licensed Operator Performance

SB-Access Authorization and Control, Fitness for Duty, and ISFSI

1 01/27/2020

01/31/2020

IP 71130.01

000733 Access Authorization

01/27/2020

01/31/2020

IP 71130.02

000734 Access Control

01/27/2020

01/31/2020

IP 71130.08

000740 Fitness For Duty Program

01/27/2020

01/31/2020

IP 71151 001338 Performance Indicator Verification

01/27/2020

01/31/2020

IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations

Radwaste

1 02/03/2020

02/07/2020

IP 71124.08

000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and

Transportation

ISI - UNIT 1

1 04/06/2020

04/17/2020

IP 71111.08P

000702 Inservice Inspection Activities (PWR)

HP

1 04/06/2020

04/10/2020

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

04/06/2020

04/10/2020

IP 71124.02

000726 Occupational ALARA Planning and Controls

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS

1 06/15/2020

06/19/2020

IP 71130.03

000735 Contingency Response - Force-On-Force Testing

8/22/2019 11:35:56 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Seabrook 07/01/2019 - 06/30/2021

Unit Start End Activity CAC Title Staff Count

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS

1 07/06/2020

07/10/2020

IP 71130.03

000735 Contingency Response - Force-On-Force Testing

SEABROOK INITIAL OL EXAM

1 07/05/2020

07/11/2020

OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

08/02/2020

08/15/2020

EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

TRIENNIAL FIRE PROTECTION

1 07/27/2020

07/31/2020

IP 71111.05T

000696 Fire Protection

08/10/2020

08/14/2020

IP 71111.05T

000696 Fire Protection

HP

1 08/17/2020

08/21/2020

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

08/17/2020

08/21/2020

IP 71124.02

000726 Occupational ALARA Planning and Controls

08/17/2020

08/21/2020

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

08/17/2020

08/21/2020

IP 71124.04

000728 Occupational Dose Assessment

08/17/2020

08/21/2020

IP 71124.05

000729 Radiation Monitoring Instrumentation

SEABROOK EP EXERCISE INSPECTION

1 09/28/2020

10/02/2020

IP 71114.01

000716 Exercise Evaluation

09/28/2020

10/02/2020

IP 71114.04

000719 Emergency Action Level and Emergency Plan Changes

09/28/2020

10/02/2020

IP 71151 001397 Performance Indicator Verification

PI&R Biennial Team Inspection

1 10/19/2020

10/23/2020

IP 71152B 000747 Problem Identification and Resolution

11/02/2020

11/06/2020

IP 71152B 000747 Problem Identification and Resolution

HP

1 11/02/2020

11/06/2020

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

11/02/2020

11/06/2020

IP 71124.02

000726 Occupational ALARA Planning and Controls

11/02/2020

11/06/2020

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

11/02/2020

11/06/2020

IP 71124.04

000728 Occupational Dose Assessment

11/02/2020

11/06/2020

IP 71124.05

000729 Radiation Monitoring Instrumentation

HP

1 01/25/2021

01/29/2021

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

8/22/2019 11:35:56 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Seabrook 07/01/2019 - 06/30/2021

Unit Start End Activity CAC Title Staff Count

HP

1 01/25/2021

01/29/2021

IP 71124.02

000726 Occupational ALARA Planning and Controls

01/25/2021

01/29/2021

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

01/25/2021

01/29/2021

IP 71124.04

000728 Occupational Dose Assessment

01/25/2021

01/29/2021

IP 71124.05

000729 Radiation Monitoring Instrumentation

Access Control, Equipment Testing and Maintenance, Training

1 02/22/2021

02/26/2021

IP 71130.02

000734 Access Control

02/22/2021

02/26/2021

IP 71130.04

000736 Equipment Performance, Testing, and Maintenance

02/22/2021

02/26/2021

IP 71130.07

000739 Security Training

02/22/2021

02/26/2021

IP 71151 001338 Performance Indicator Verification

DESIGN BASIS ASSURANCE INSPECTION - POWER OPERATED VALVE

1 02/28/2021

03/06/2021

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

03/14/2021

03/20/2021

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

RETS

1 03/15/2021

03/19/2021

IP 71124.06

000730 Radioactive Gaseous and Liquid Effluent Treatment

Evaluations of Changes, Tests and Experiments

1 05/16/2021

05/22/2021

IP 71111.17T

000709 Evaluations of Changes, Tests, and Experiments

Seabrook EP Program Inspection

1 06/14/2021

06/18/2021

IP 71114.02

000717 Alert and Notification System Testing

06/14/2021

06/18/2021

IP 71114.03

000718 Emergency Response Organization Staffing and Augmentation System

06/14/2021

06/18/2021

IP 71114.04

000719 Emergency Action Level and Emergency Plan Changes

06/14/2021

06/18/2021

IP 71114.05

000720 Maintenance of Emergency Preparedness

06/14/2021

06/18/2021

IP 71151 001397 Performance Indicator Verification

8/22/2019 11:35:56 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report