Mid-Cycle Assessment Letter for Turkey Point Nuclear Generating Station Unit 3 and Unit 4 - NRC Inspection Report 05000250/2016005 and 05000251/2016005
ML16244A285
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/2016
From: Ladonna Suggs
NRC/RGN-II/DRP/RPB3
To: Nazar M
Florida Power & Light Co
References
IR 2016005
Download: ML16244A285 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 31, 2016 Mano Nazar, President, Nuclear Division and CNO Florida Power & Light Co.

Mail Stop: NT3/JW 15430 Endeavor Drive Jupiter, FL 33478

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR GENERATING STATION UNIT 3 AND UNIT 4

- NRC INSPECTION REPORT 05000 250/20 16 00 5 AND 05000 251/20 16 00 5

Dear Mr. Nazar:

On August 9, 2016

, the Nuclear Regulatory Commission (N RC) completed its mid-cycle performance review of Turkey Point Nuclear Generating Station Unit 3 and Unit 4. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 3 0, 201 6. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Turkey Point Nuclear Generating Unit 3 and Unit 4 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Turkey Point Nuclear Generating Station Unit 3 and Unit 4 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection schedule of the inspection plan are tentative and may be revised at the end-of-cycle performance review.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans."

In Staff Requirements Memorandum

- SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 4 04-997-4539 with any questions you have regarding this letter.

Sincerely,

/RA/ LaDonna B. Suggs, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.:

50-250, 50-251 License Nos.:

DPR-31, DPR-41 Enclosure:

Turkey Point Inspection/Activity Plan (0 9/01/20 16 - 06/30/2018

)

cc: Distribution via Listserv

__________________

__ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE LFP1 LJB4 NAME LPressley LSuggs DATE 8/25/2016 8/29/2016 E-MAIL COPY?

YES NO YES NO Letter to Mano Nazar from LaDonna B. Suggs dated August 31, 2016 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR GENERATING STATION UNIT 3 AND UNIT 4

- NRC INSPECTION REPORT 05000 250/20 16 00 5 AND 05000 251/20 16 00 5 DISTRIBUTION

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)

Page 1 of 2 08/31/2016 07:01:43 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteTurkey PointInspection / Activity Plan 09/01/2016-06/30/2018OL EXAM-INITIAL LICENSE EXAM 3 3 TURKEY POINT AUGUST 2016 INITIAL EXAM AT POWER FACILITIES V23476 08/22/2016 09/02/2016 TFPI-TRIENNIAL FIRE PROTECTION INSPECTION 5 3, 4 IP Fire Protection [Triennial]7111105T 10/31/201611/04/2016 3, 4 IP Fire Protection [Triennial]7111105T11/28/2016 12/02/2016 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 3, 4 IP Heat Sink Performance7111107T11/28/2016 12/02/2016 RP-RP PUBLIC RAD SAFETY BASELINE 2 3, 4 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 12/12/2016 12/16/2016 3, 4 IP Radiological Environmental Monitoring Program71124.07 12/12/2016 12/16/2016 3, 4 IP Performance Indicator Verification71151 12/12/2016 12/16/2016 EP-EP EXERCISE 6 3, 4 IP Exercise Evaluation7111401 02/20/2017 02/24/2017 3, 4 IP Emergency Action Level and Emergency Plan Changes7111404 02/20/2017 02/24/2017 3, 4 IP Exercise Evaluation - Scenario Review7111408 02/20/2017 02/24/2017 3, 4 IP Performance Indicator Verification71151 02/20/2017 02/24/2017 ISI-UNIT 3 IN-SERVICE INSPECTION 1 3 IP Inservice Inspection Activities - PWR7111108P 04/03/2017 04/07/2017 SGISI-UNIT 3 SG IN-SERVICE INSPECTION 1 3 IP Inservice Inspection Activities - PWR7111108P 04/10/2017 04/14/2017 CDBI-COMPONENT DESIGN BASIS INSPECTION 7 3, 4 IP Component Design Bases Inspection7111121 06/26/2017 06/30/2017 3, 4 IP Component Design Bases Inspection7111121 07/17/2017 07/21/2017 3, 4 IP Component Design Bases Inspection7111121 07/31/2017 08/04/2017 3, 4 IP Component Design Bases Inspection7111121 08/14/2017 08/18/2017OL RQ-REQUAL INSPECTION 2 3, 4 IP Licensed Operator Requalification Program7111111B 09/18/2017 09/22/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 3 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIES V23492 09/25/2017 09/29/2017 ISI-UNIT 4 IN-SERVICE INSPECTION 1 4 IP Inservice Inspection Activities - PWR7111108P 10/09/2017 10/13/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 3 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/16/2017 10/20/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/31/2016 07:01:43 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteTurkey PointInspection / Activity Plan 09/01/2016-06/30/2018 RP-RP OCCUPATIONAL INSPECTION WEEK 1 3 3, 4 IP Occupational ALARA Planning and Controls71124.02 10/16/2017 10/20/2017 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/16/2017 10/20/2017 3, 4 IP Occupational Dose Assessment71124.04 10/16/2017 10/20/2017 3, 4 IP Radiation Monitoring Instrumentation71124.05 10/16/2017 10/20/2017 3, 4 IP Performance Indicator Verification71151 10/16/2017 10/20/2017 SGISI-UNIT 4 SG IN-SERVICE INSPECTION 1 4 IP Inservice Inspection Activities - PWR7111108P 10/16/2017 10/20/2017OL EXAM-INITIAL LICENSE EXAM 3 3 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIES V23492 10/23/201711/10/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 2 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.0111/13/201711/17/2017 3, 4 IP Occupational ALARA Planning and Controls71124.0211/13/201711/17/2017 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/13/201711/17/2017 3, 4 IP Occupational Dose Assessment71124.0411/13/201711/17/2017 3, 4 IP Radiation Monitoring Instrumentation71124.0511/13/201711/17/2017 3, 4 IP Performance Indicator Verification7115111/13/201711/17/2017 EP-EP PROGRAM INSPECTION 3 3, 4 IP A lert and Notification System Testing7111402 01/22/2018 01/26/2018 3, 4 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 01/22/2018 01/26/2018 3, 4 IP Emergency Action Level and Emergency Plan Changes7111404 01/22/2018 01/26/2018 3, 4 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 01/22/2018 01/26/2018 3, 4 IP Performance Indicator Verification71151 01/22/2018 01/26/2018 RP-RP PUBLIC INSPECTION 2 3, 4 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 01/29/2018 02/02/2018 3, 4 IP Radiological Environmental Monitoring Program71124.07 01/29/2018 02/02/2018 3, 4 IP Occupational Exposure Control Effectiveness71151-OR01 01/29/2018 02/02/2018 3, 4 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 01/29/2018 02/02/2018 MODS-PLANT MODIFICATIONS INSPECTION 3 3, 4 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 01/29/2018 02/02/2018 3, 4 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 02/12/2018 02/16/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.