Annual Assessment Letter for Millstone Power Station, Units 2 and 3 (Report 05000336/2017006 and 05000423/2017006, Report 05000336/2017402 and 05000423/2017402, Report 05000336/2017501 and 05000423/2017501)
ML18058A050
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/28/2018
From: Daniel Schroeder
Reactor Projects Branch 2
To: Stoddard D
Dominion Energy
Schroeder D
References
IR 2017006, IR 2017402, IR 2017501
Download: ML18058A050 (7)


Text

ary 28, 2018

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR MILLSTONE POWER STATION, UNITS 2 AND 3 (REPORT 05000336/2017006 AND 05000423/2017006, REPORT 05000336/2017402 AND 05000423/2017402, REPORT 05000336/2017501 AND 05000423/2017501)

Dear Mr. Stoddard:

The NRC has completed its end-of-cycle performanc e assessment of Millstone Power Station, Units 2 and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Millstone Power Station, Units 2 and 3, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your

facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should

circumstances warrant any changes.

In addition to the baseline inspections, the NRC will conduct Inspection Procedure (IP) 60855.1,

"Operation of an Independent Spent Fuel Storage Installation (ISFSI) at Operating Plants," and IP 92702, "Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution

Confirmatory Orders." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5262 with any questions you have regarding this letter.

Sincerely,

/RA/ Daniel L. Schroeder, Chief Reactor Projects Branch 2 Division of Reactor Projects

Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49 Enclosure:

Inspection Activity Plan Report

cc w/encl: Distribution via ListServ

ML18058A050 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer DSchroeder DATE 2/27/18 2/28/18

Millstone 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RADIATION SAFETY - ALARA 1 2, 3 01/22/2018 01/26/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls ACCESS AUTHORIZATION AND CONTROL, SGI, FFD 2 2, 3 02/12/2018 02/16/2018 IP 71130.01 000733 Access Authorization 2, 3 02/12/2018 02/16/2018 IP 71130.06 000738 Protection of Safeguards Information 2, 3 02/12/2018 02/16/2018 IP 71130.08 000740 Fitness For Duty Program 2, 3 06/18/2018 06/22/2018 IP 71130.01 000733 Access Authorization 2, 3 06/18/2018 06/22/2018 IP 71130.02 000734 Access Control 2, 3 06/18/2018 06/22/2018 IP 71130.06 000738 Protection of Safeguards Information 2, 3 06/18/2018 06/22/2018 IP 71130.08 000740 Fitness For Duty Program 2, 3 06/18/2018 06/22/2018 IP 71151 001338 Performance Indicator Verification 2, 3 06/18/2018 06/22/2018 IP 92702 001436 Followup On Corrective Actions For Violations And Deviations EP EXERCISE INSPECTION 4 2, 3 03/19/2018 03/23/2018 IP 71114.01 000716 Exercise Evaluation ISFSI LOADING CAMPAIGN INSPECTION 2 2, 3 04/15/2018 04/21/2018 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants DBAI - Team 7 2, 3 04/16/2018 04/20/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

2, 3 04/30/2018 05/04/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

RADIATION SAFETY - AIRBORNE 1 2, 3 06/04/2018 06/08/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation CYBER FULL IMP 4 2, 3 07/16/2018 07/20/2018 IP 71130.10P 000741 Cyber Security 2, 3 07/30/2018 08/03/2018 IP 71130.10P 000741 Cyber Security MILLSTONE 2 INITIAL OL EXAM 4 2 07/23/2018 07/27/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2 09/10/2018 09/21/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

2/15/2018 10:01:25 AMPage 1 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report Millstone 01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

RADIATION SAFETY - DOSIMETRY

2, 3 09/10/2018

09/14/2018

IP 71124.04

000728 Occupational Dose Assessment

PI&R BIENNIAL

2, 3 09/10/2018

09/14/2018

IP 71152B 000747 Problem Identification and Resolution

2, 3 09/24/2018

09/28/2018

IP 71152B 000747 Problem Identification and Resolution

RADIATION SAFETY - RAD HAZ & PIV

2, 3 10/01/2018

10/05/2018

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

2, 3 10/01/2018

10/05/2018

IP 71124.02

000726 Occupational ALARA Planning and Controls

2, 3 10/01/2018

10/05/2018

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

2, 3 10/01/2018

10/05/2018

IP 71151 000746 Performance Indicator Verification

UNIT 2 INSERVICE INSPECTION

2 10/08/2018

10/19/2018

IP 71111.08P

000702 Inservice Inspection Activities - PWR

MS2 REQUAL INSP WITH P/F RESULTS

2 12/03/2018

12/07/2018

IP 71111.11A

000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual

12/03/2018

12/07/2018

IP 71111.11B

000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial ACCESS CONTROL, EQUIP PERF, TRAINING

2, 3 01/14/2019

01/18/2019

IP 71130.02

000734 Access Control

2, 3 01/14/2019

01/18/2019

IP 71130.04

000736 Equipment Performance, Testing, and Maintenance

2, 3 01/14/2019

01/18/2019

IP 71130.07

000739 Security Training

2, 3 01/14/2019

01/18/2019

IP 71151 001338 Performance Indicator Verification

50.59 Process

2, 3 02/04/2019

02/08/2019

IP 71111.17T

000709 Evaluations of Changes, Tests, and Experiments

RADIATION SAFETY-RAD HAZ

2, 3 04/15/2019

04/19/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

2, 3 04/15/2019

04/19/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

2, 3 04/15/2019

04/19/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

2/15/2018 10:01:25 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Millstone 01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

INSERVICE INSPECTION - UNIT 3

3 04/22/2019

05/03/2019

IP 71111.08P

000702 Inservice Inspection Activities - PWR

RADWASTE

2, 3 06/03/2019

06/07/2019

IP 71124.08

000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and

Transportation

RADIATION SAFETY-INSTRUMENTS

2, 3 06/24/2019

06/28/2019

IP 71124.05

000729 Radiation Monitoring Instrumentation

TRIENNIAL FIRE PROTECTION

2, 3 07/22/2019

07/26/2019

IP 71111.05T

000696 Fire Protection (Triennial)

2, 3 08/05/2019

08/09/2019

IP 71111.05T

000696 Fire Protection (Triennial)

RADIATION SAFETY - REMP

2, 3 07/22/2019

07/26/2019

IP 71124.07

000731 Radiological Environmental Monitoring Program

EP PROGRAM INSPECTION

2, 3 08/05/2019

08/09/2019

IP 71114.02

000717 Alert and Notification System Testing

2, 3 08/05/2019

08/09/2019

IP 71114.03

000718 Emergency Response Organization Staffing and Augmentation System

2, 3 08/05/2019

08/09/2019

IP 71114.05

000720 Correction of Emergency Preparedness Weaknesses and Deficiencies

2, 3 08/05/2019

08/09/2019

IP 71151 001397 Performance Indicator Verification

MILLSTONE 3 INITIAL OL EXAM

3 08/05/2019

08/09/2019

OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

09/09/2019

09/20/2019

EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

PROTECTIVE STRATEGY AND TARGET SET REVIEW

2, 3 08/19/2019

08/23/2019

IP 71130.05

000737 Protective Strategy Evaluation

2, 3 08/19/2019

08/23/2019

IP 71130.14

000743 Review of Power Reactor Target Sets

MS3 REQUAL INSP WITH P/F RESULTS

3 08/26/2019

08/30/2019

IP 71111.11A

000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual

08/26/2019

08/30/2019

IP 71111.11B

000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial 2/15/2018 10:01:25 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Millstone 01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

Heat Sink

2, 3 09/16/2019

09/20/2019

IP 71111.07T

000700 Heat Sink Performance -Triennial

Radiation Safety - RETS & PIV

2, 3 10/21/2019

10/25/2019

IP 71124.06

000730 Radioactive Gaseous and Liquid Effluent Treatment

2, 3 10/21/2019

10/25/2019

IP 71151 000746 Performance Indicator Verification

2/15/2018 10:01:25 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report