IR 05000220-10-003, 05000410-10-003, on 04/01/2010 - 06/30/2010, Nine Mile Point Nuclear Station, Units 1 and 2, Refueling and Other Outage Activities
ML102150109
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 08/03/2010
From: Glenn Dentel
Reactor Projects Branch 1
To: Belcher S
Nine Mile Point
References
IR-10-003
Download: ML102150109 (35)


Text

UNITED NUCLEAR REGULATORY REGION 475 ALLENDALE KING OF PRUSSIA, PA August 3, 2010 Mr. Sam Vice President Nine Mile Nine Mile Point Nuclear Station, P.O. Box Lycoming, NY NINE MILE POINT NUCLEAR STATION -NRC INTEGRATED REPORT 05000220/2010003 AND

Dear Mr. Belcher:

On June 30, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Nine Mile Point NUclear Station Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on July 23,2010, with you and members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed . personnel.

This report documents one self-revealing finding of very low safety significance (Green). This finding was determined to involve a violation of NRC requirements.

However, because of the very low safety significance and because it is entered into your corrective action program (CAP), the NRC is treating the finding as a non-cited violation (NCV) consistent with Section VLA1 of the NRC Enforcement Policy. If you .contest the NCV noted in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, AnN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 0001; and the NRC Senior Resident Inspector at Nine Mile Point Nuclear Station. In addition, jf you disagree with the cross-cutting aspect assigned to the finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I, and the NRC Senior Resident Inspector at Nine Mile Point Nuclear Station. In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure.

and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at htto:flwww.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room}.

Sincerely, IRAJ Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects DISTRIBUTION:

S. Sloan, DRP M. Dapas, DRA (R10RAMAIL RESOURCE)

K. Kolaczyk, DRP, SRI D. Lew, DRP (R1DRPMAIL RESOURCE)

D. Dempsey, DRP, RI K. Kolek, DRP, AA J. Clifford.

DRP (R1DRPMAIL RESOURCE)

D. Bearde, DRS D. Roberts, DRS (R1DRSMaii P. Wilson, DRS (R1DRSMaii Resource)

RidsNrrDorlLpl1-1 Resource L. Trocine, RI OEDO ROPReportsResource@nrc.gov G. Dentel, DRP N. Perry, DRP J. Hawkins, DRP SUNSI Review Complete:

NP (Reviewer's Initials)

ML102150109 DOCUMENT NAME: G:\DRP\BRANCH1\NINE MILE POINnREPORTS\2009-2010 INSPECT[ON REPORTS\IR 003\(DRAFT)

IR 2010*003.DOC After declaring this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, indicate in the box: *C* =Copy without attachment/enclosure

'E' =Copy wilh allachmenVenclosure

  • N' =No copy OFF1CE RfJDRP I Ihp RflDRP I RIIDRP I NAME EKnutson/]h per phone with EK NPerry/np GDentel/gd DATE P7130/10 07/29f10 07130110 OFFICIAL RECORD COPY Docket No.: License No.: Report No.: Licensee:

Facility:

Location:

Dates: Inspectors:

Approved By: 1 U.S. NUCLEAR REGULATORY COMMISSION REGION I 50-220,50-410 DPR-63, NPF-69 05000220/2010003; 05000410/2010003 Nine Mile Point Nuclear Station, LLC (NMPNS) Nine Mile Point, Units 1 and 2 Oswego, NY April 1 through June 30, 2010 E. Knutson, Senior Resident Inspector D. Dempsey, Resident Inspector N. Perry, Senior Project Engineer J. Furia, Senior Health PhysiCist E. Gray, Senior Reactor Inspector J. Krafty, Resident Inspector B. Haagensen, Resident Inspector S. Sloan, Project Engineer D. Molteni, Operations Engineer Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Enclosure TABLE OF

SUMMARY OF FINDINGS

............................................................................................................

REPORT DETAILS

REACTOR SAFETY

.............................................................................................................. 1 R01 Adverse Weather Protection

...................................................................................... 1 R04 Equipment Alignment

.................................................................................................. 1 R05 Fire Protection

............................................................................................................ iR08 Inservice Inspection Activities

...................................................................................... 1 R11 Licensed Operator Requalification Program ............................................................... 1 R 12 Maintenance Effectiveness

........................................................................................ 1 R 13 Maintenance Risk Assessments and Emergent Work Control ................................... 1 R 15 Operability Evaluations

............................................................................................. 1 RiB Plant Modifications

................................................................................................... 1 R19 Post-Maintenance Testing ........................................................................................ 1 R20 Refueling and Other Outage Activities

..................................................................... 1 R22 Surveillance Testing ................................................................................................. 2. RADIATION SAFETy ..........................................................................................................

2RS1 Radiological

Hazard Assessment and Exposure Controls ........................................

2RS2 Occupational

ALARA Planning and Controls .............................................................

2RS7 Radiological

Environmental Monitoring Program

OTHER ACTIVITIES

............................................................................................................ 40A1 Performance Indicator Verification

........................................................................... 40A2 Problem Identification and Resolution

...................................................................... 40A3 Followup of Events and Notices of Enforcement Discretion

...................................... 40A6 Meetings ................................................................................................................... ATTACHMENT:

=SUPPLEMENTAL

INFORMATION=

KEY POINTS OF CONTACT

.....................................................................................................

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

..........................................................

LIST OF DOCUMENTS