SONGS Meeting Summary 11-30-12
ML12339A084
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/30/2012
From: Ryan Lantz
NRC/RGN-IV/DRP/RPB-D
To: Peter Dietrich
Southern California Edison Co
References
Download: ML12339A084 (3)


Text

November 30, 2012 Pete Dietrich Senior Vice President and

Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128

SUBJECT:

MEETING

SUMMARY

FOR PUBLIC MEETING WITH SOUTHERN CALIFORNIA EDISON

Dear Mr. Dietrich:

On October 9, 2012, NRC personnel met with representatives of Southern California Edison and other public stakeholders at the St. Regis Monarch Beach Hotel in Dana Point, CA. The meeting was held to present and discuss the NRC's current regulatory oversight status of San Onofre Nuclear Generating Station, as well as allow a forum in which interested stakeholders could discuss their perspectives on the future operations of the plant.

During the meeting, the NRC heard from a number of stakeholders who were in support of future operations of the facility. Views expressed by these stakeholders included: lack of a safety-significant problem at the plant, the safe operating history of the utility, and the state's need for the electrical power and jobs provided by the plant.

The NRC also heard from stakeholders who were generally in opposition to future operation of the facility. Views expressed by these stakeholders included: demand for a public hearing before future operations, insistence on a license amendment, high cost associated with repair or operation of the plant, lack of trust in the utility and/or the NRC, and various related environmental concerns.

The NRC's mission, by law, is to license and regulate the nation's civilian use of certain nuclear materials in order to ensure the adequate protection of public health and safety, promote the common defense and security, and to protect the environment. On October 4, 2012, the NRC staff received Southern California Edison's letter of response to the March 27, 2012, Confirmatory Action Letter. The NRC will not ma ke a decision regarding future operation of SONGS Unit 2 until a thorough evaluation of th is material has been completed. The NRC will independently determine whether or not the information, analysis and actions provided by Edison constitute a solid technical basis for the resumption of power operation.

The meeting was recorded and copies of the recorded video, as well as written transcripts of the meeting will be made available on the NRC's website at http://www.nrc.gov/info-finder/reactor/songs/tube-degradation.html. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511

Southern California Edison In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRC's public web site at www.nrc.gov/reading-rm/adams.html.

Sincerely, /RA/ Ryan E. Lantz, Chief Project Branch D Division of Reactor Projects

Docket Nos.: 50-361, 50-362 License Nos.: NPF-10, NPF-15

Southern California Edison Electronic distribution

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) DRP Acting Deputy Director (Barry.Westreich@nrc.gov)

DRS Acting Director (Tom.Blount@nrc.gov)

DRS Acting Deputy Director (Jeffrey.Clark@nrc.gov)

Senior Resident Inspector (Greg.Warnick@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Branch Chief, DRP/D (Ryan.Lantz@nrc.gov) SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov) Senior Project Engineer (Nick.Taylor@nrc.gov)

Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Randy.Hall@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Facilitator(fxcameo@gmail.com)

EDO Coordinator (Cayetano.Santos@nrc.gov)

State Liaison Officer (Bill.Maier@nrc.gov)

OEMail Resource

File located: S:\DRP\DRPDIR\_SONGS\MS Songs 10092012.docx SUNSI Review Completed: Yes ADAMS: Yes No Initials: NHT Publicly Available Non-Publicly Available Sensitive Non-Sensitive C:DRP/D D: DRS C:DRP/D D: DRP RELantz TBlount RELantz KKennedy /RA/ /JClark for/ /NTaylor for/ /BWestreich for/

11/14/2012 11/14/2012 11/14/2012 12/4/12 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax