November 30, 2012 Pete Dietrich Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
SUBJECT:
MEETING
SUMMARY
FOR PUBLIC MEETING WITH SOUTHERN CALIFORNIA EDISON
Dear Mr. Dietrich:
On October 9, 2012, NRC personnel met with representatives of Southern California Edison and other public stakeholders at the St. Regis Monarch Beach Hotel in Dana Point, CA. The meeting was held to present and discuss the NRCs current regulatory oversight status of San Onofre Nuclear Generating Station, as well as allow a forum in which interested stakeholders could discuss their perspectives on the future operations of the plant.
During the meeting, the NRC heard from a number of stakeholders who were in support of future operations of the facility. Views expressed by these stakeholders included: lack of a safety-significant problem at the plant, the safe operating history of the utility, and the states need for the electrical power and jobs provided by the plant.
The NRC also heard from stakeholders who were generally in opposition to future operation of the facility. Views expressed by these stakeholders included: demand for a public hearing before future operations, insistence on a license amendment, high cost associated with repair or operation of the plant, lack of trust in the utility and/or the NRC, and various related environmental concerns.
The NRCs mission, by law, is to license and regulate the nations civilian use of certain nuclear materials in order to ensure the adequate protection of public health and safety, promote the common defense and security, and to protect the environment. On October 4, 2012, the NRC staff received Southern California Edisons letter of response to the March 27, 2012, Confirmatory Action Letter. The NRC will not make a decision regarding future operation of SONGS Unit 2 until a thorough evaluation of this material has been completed. The NRC will independently determine whether or not the information, analysis and actions provided by Edison constitute a solid technical basis for the resumption of power operation.
The meeting was recorded and copies of the recorded video, as well as written transcripts of the meeting will be made available on the NRCs website at http://www.nrc.gov/info-finder/reactor/songs/tube-degradation.html.
UNITED STATES NUCLEAR REGULATORY COMMISSION RE G IO N I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511
Southern California Edison In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Ryan E. Lantz, Chief Project Branch D Division of Reactor Projects Docket Nos.: 50-361, 50-362 License Nos.: NPF-10, NPF-15
Southern California Edison Electronic distribution:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Acting Deputy Director (Barry.Westreich@nrc.gov)
DRS Acting Director (Tom.Blount@nrc.gov)
DRS Acting Deputy Director (Jeffrey.Clark@nrc.gov)
Senior Resident Inspector (Greg.Warnick@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)
SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)
Senior Project Engineer (Nick.Taylor@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Randy.Hall@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Facilitator(fxcameo@gmail.com)
EDO Coordinator (Cayetano.Santos@nrc.gov)
State Liaison Officer (Bill.Maier@nrc.gov)
OEMail Resource File located: S:\\DRP\\DRPDIR\\_SONGS\\MS Songs 10092012.docx SUNSI Review Completed: Yes ADAMS: Yes No Initials: NHT Publicly Available Non-Publicly Available Sensitive Non-Sensitive C:DRP/D D: DRS C:DRP/D D: DRP RELantz TBlount RELantz KKennedy
/RA/
/JClark for/
/NTaylor for/
/BWestreich for/
11/14/2012 11/14/2012 11/14/2012 12/4/12 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax