IR 05000277/2017006

From kanterella
Revision as of 21:21, 17 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Annual Assessment Letter for Peach Bottom Atomic Power Station Units 2 and 3 -(Report 05000277-2017006 and 05000278-2017006 Report 05000277-2017402 and 05000278-2017402 Report 05000277-2017501 and 05000278-2017501)
ML18047A006
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/28/2018
From: James Krafty
Reactor Projects Region 1 Branch 4
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Krafty J
Shared Package
ML18046A367 List:
References
IR 2017006, IR 2017402, IR 2017501
Download: ML18047A006 (7)


Text

[Type here]

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 2018 Mr. Bryan Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfiel d Road Warrenville, I L 60555 SUBJEC T: ANNUAL ASSESSMENT LETTER FOR PEAC H BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 - (REPORT 05000 277/ 20170 06 AND 05000278/2017 006 REPORT 05000277/2017402 AND 05000278/2017402 REPORT 05000277/2017501 AND 05000278/2017501)

Dear Mr. Hanson:

The NRC has completed its end-of-cycle performance assessment of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

Additionally, the NRC plans to conduct Inspection Procedure 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plant and 71003, Post Approval Site Inspection For License Renewal at Unit 2." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the

NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5120 with any questions you may have regarding this letter.

Sincerely,

/RA/ James A. Krafty , Acting Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277 and 50-278 License Nos.

DPR-44 and DPR-56 Enclosure:

Inspection/Activit y Plan

ML18047A006 SUNSI ReviewNon-SensitiveSensitivePublicly AvailableNon-PubliclyAvailableOFFICE RI/DRP RI/DRP NAME SBarber JKrafty DATE 2/28/18 /218 Peach Bottom

01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

Annual Sample - Structural Monitoring Program

2, 3 01/29/2018

02/02/2018

IP 71152 000748 Problem Identification and Resolution

RAD MONITORING INSTRU Mod 05

2, 3 03/26/2018

03/30/2018

IP 71124.05

000729 Radiation Monitoring Instrumentation

TRIENNIAL FIRE PROTECTION

2, 3 04/02/2018

04/06/2018

IP 71111.05T

000696 Fire Protection (Triennial)

2, 3 04/16/2018

04/20/2018

IP 71111.05T

000696 Fire Protection (Triennial)

EP EXERCISE INSPECTION

2, 3 04/16/2018

04/20/2018

IP 71114.01

000716 Exercise Evaluation

RAD HAZARD & ALARA Mods 01, 02

2, 3 04/23/2018

04/27/2018

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

2, 3 04/23/2018

04/27/2018

IP 71124.02

000726 Occupational ALARA Planning and Controls

ISFSI LOADING CAMPAIGN INSPECTION

2, 3 05/14/2018

05/18/2018

IP 60855.1

000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

OCCUPATIONAL DOSE ASSESSMENT Mod 04

2, 3 05/21/2018

05/25/2018

IP 71124.04

000728 Occupational Dose Assessment

ACCESS CONTROL, EQUIP PERF, TRAINING

2, 3 08/06/2018

08/10/2018

IP 71130.02

000734 Access Control

2, 3 08/06/2018

08/10/2018

IP 71130.04

000736 Equipment Performance, Testing, and Maintenance

2, 3 08/06/2018

08/10/2018

IP 71130.07

000739 Security Training

2, 3 08/06/2018

08/10/2018

IP 71151 001338 Performance Indicator Verification

2, 3 08/06/2018

08/10/2018

IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations

REMP Mod 07

2, 3 09/17/2018

09/21/2018

IP 71124.07

000731 Radiological Environmental Monitoring Program

Unit 2 ISI

2 10/22/2018

10/26/2018

IP 71111.08G

000701 Inservice Inspection Activities - BWR

2/8/2018 5:03:26 PM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Peach Bottom

01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03

2, 3 10/29/2018

11/02/2018

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

2, 3 10/29/2018

11/02/2018

IP 71124.02

000726 Occupational ALARA Planning and Controls

2, 3 10/29/2018

11/02/2018

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

UNIT 2 - LICENSE RENEWAL PHASE 4

2 11/26/2018

11/30/2018

IP 71003 000687 Post-Approval Site Inspection for License Renewal

RAD SAFETY Mods 01, 02, 03,04, PI (OR01, PR01)

2, 3 12/10/2018

12/14/2018

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

2, 3 12/10/2018

12/14/2018

IP 71124.02

000726 Occupational ALARA Planning and Controls

2, 3 12/10/2018

12/14/2018

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

2, 3 12/10/2018

12/14/2018

IP 71124.04

000728 Occupational Dose Assessment

2, 3 12/10/2018

12/14/2018

IP 71151 000746 Performance Indicator Verification

EQ PROGRAM

2, 3 01/14/2019

01/18/2019

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

2, 3 01/28/2019

02/01/2019

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

PEACH BOTTOM INITIAL OL EXAM

2, 3 01/28/2019

02/01/2019

OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2, 3 02/25/2019

03/08/2019

EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

EP PROGRAM INSPECTION

2, 3 03/04/2019

03/08/2019

IP 71114.02

000717 Alert and Notification System Testing

2, 3 03/04/2019

03/08/2019

IP 71114.03

000718 Emergency Response Organization Staffing and Augmentation System

2, 3 03/04/2019

03/08/2019

IP 71114.05

000720 Correction of Emergency Preparedness Weaknesses and Deficiencies

2, 3 03/04/2019

03/08/2019

IP 71151 001397 Performance Indicator Verification

PB REQUAL INSP WITH P/F RESULTS

2, 3 03/11/2019

03/15/2019

IP 71111.11A

000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual 2, 3 03/11/2019

03/15/2019

IP 71111.11B

000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial 2/8/2018 5:03:26 PM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Peach Bottom

01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

CYBER MS8

2, 3 03/18/2019

03/22/2019

IP 71130.10P

000741 Cyber Security

2, 3 04/01/2019

04/05/2019

IP 71130.10P

000741 Cyber Security

ACCESS CONTROL, PROTECTIVE STRATEGY, TSR

2, 3 03/25/2019

03/29/2019

IP 71130.02

000734 Access Control

2, 3 03/25/2019

03/29/2019

IP 71130.05

000737 Protective Strategy Evaluation

2, 3 03/25/2019

03/29/2019

IP 71130.14

000743 Review of Power Reactor Target Sets

2, 3 03/25/2019

03/29/2019

IP 71151 001338 Performance Indicator Verification

RAD EFFLUENTS Mod 06

2, 3 04/15/2019

04/19/2019

IP 71124.06

000730 Radioactive Gaseous and Liquid Effluent Treatment

Triennial Heat Sink

2, 3 05/13/2019

05/17/2019

IP 71111.07T

000700 Heat Sink Performance -Triennial

RAD HAZARD & ALARA Mods 01, 02

2, 3 05/13/2019

05/17/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

2, 3 05/13/2019

05/17/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

PI&R BIENNIAL

2, 3 06/10/2019

06/14/2019

IP 71152B 000747 Problem Identification and Resolution

2, 3 06/24/2019

06/28/2019

IP 71152B 000747 Problem Identification and Resolution

Radwaste

2, 3 07/29/2019

08/02/2019

IP 71124.08

000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and

Transportation

MC&A

2 08/12/2019

08/16/2019

IP 71130.11

000742 Material Control and Accounting (MC&A)

INSERVICE INSPECTION - UNIT 3

3 10/28/2019

11/01/2019

IP 71111.08G

000701 Inservice Inspection Activities - BWR

RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03

2, 3 10/28/2019

11/01/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

2, 3 10/28/2019

11/01/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

2/8/2018 5:03:26 PM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Peach Bottom

01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03

2, 3 10/28/2019

11/01/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

RAD SAFETY Mods 01, 02, 03,04, PI (OR01, PR01)

2, 3 12/02/2019

12/06/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

2, 3 12/02/2019

12/06/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

2, 3 12/02/2019

12/06/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

2, 3 12/02/2019

12/06/2019

IP 71124.04

000729 Occupational Dose Assessment

2, 3 12/02/2019

12/06/2019

IP 71151 000746 Performance Indicator Verification

2/8/2018 5:03:26 PM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report