Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2018005)
ML18240A309
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/28/2018
From: Karla Stoedter
NRC/RGN-III
To: Dean Curtland
NextEra Energy Duane Arnold
References
IR 2018005
Download: ML18240A309 (6)


Text

August 28, 2018

SUBJECT:

UPDATED INSPECTION PL AN FOR DUANE ARNOLD ENERGY CENTER (REPORT 05000331/2018005)

Dear Mr. C urtland:

The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 for the Duane Arnold Energy Center. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revis ed. The NRC will contact you as soon as possible to discuss changes to the inspection plan s hould circumstanc es warrant any changes. In additi on to t he baseline inspection , an inspecti on of T I-193, "Reliable Hardened Containment Vents , i s pl anned for t he week o f July 26, 2019. In addition, w e pl an to perform Inspection Procedure 60855.1, "Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants,"

t he w eek o f February 3, 2020.

D. Curtland-2- This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Please contact me at 630-829-9731 with any questions you have regarding this letter.

Sincerely,

/RA/ Karla Stoedter, Chief Branch 1 Division of Reactor Projects Docket No. 50-331 License No. DPR-49 Enclosure:

Inspection Plan cc: Distribution via LISTSERV

D. Curtland-3- Letter to Dean Curtland from Karla Stoedter dated August 28, 2018 SUBJECT: UPDATED INSPECTION PLAN FOR DUANE ARNOLD ENERGY CENTER (REPORT 05000 331/2018005) DISTRIBUTION

Christopher Cook RidsNrrDorlLpl3 RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML18240A309 OFFICE RIII NAME KStoedter:lg DATE 8/28/2018 OFFICIAL RECORD COPY

Duane Arnold

09/01/2018 - 06/30/2020

Unit Start End Activity CAC Title Staff Count

INSERVICE INSPECTION

1 09/04/2018

09/27/2018

IP 71111.08G

000701 Inservice Inspection Activities (BWR)

RADIATION PROTECTION BASELINE INSPECTION

1 09/10/2018

09/14/2018

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

09/10/2018

09/14/2018

IP 71124.02

000726 Occupational ALARA Planning and Controls

09/10/2018

09/14/2018

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

09/10/2018

09/14/2018

IP 71124.04

000728 Occupational Dose Assessment

SECURITY BASELINE INSPECTION

1 09/17/2018

09/21/2018

IP 71130.02

000734 Access Control

09/17/2018

09/21/2018

IP 71151 001338 Performance Indicator Verification

FORCE-ON-FORCE PLANNING & EXERCISE WEEK

1 11/05/2018

11/09/2018

IP 71130.03

000735 Contingency Response - Force-On-Force Testing

11/26/2018

11/30/2018

IP 71130.03

000735 Contingency Response - Force-On-Force Testing

RADIATION PROTECTION BASELINE INSPECTION

1 11/26/2018

11/30/2018

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

11/26/2018

11/30/2018

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

11/26/2018

11/30/2018

IP 71124.04

000728 Occupational Dose Assessment

RADIATION PROTECTION BASELINE INSPECTION

1 02/11/2019

02/15/2019

IP 71124.05

000729 Radiation Monitoring Instrumentation

BIENNIAL PI&R INSPECTION

1 02/25/2019

03/15/2019

IP 71152B 000747 Problem Identification and Resolution

SECURITY BASELINE INSPECTION

1 03/04/2019

03/08/2019

IP 71130.02

000734 Access Control

2019 DAEC Exam

1 03/10/2019

03/15/2019

OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

04/07/2019

04/19/2019

EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

RADIATION PROTECTION BASELINE INSPECTION

1 04/22/2019

04/26/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

8/21/2018 8:56:56 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Duane Arnold

09/01/2018 - 06/30/2020

Unit Start End Activity CAC Title Staff Count

EP BASELINE INSPECTION / PI VERIFICATION

1 04/29/2019

05/03/2019

IP 71114.02

000717 Alert and Notification System Testing

04/29/2019

05/03/2019

IP 71114.03

000718 Emergency Response Organization Staffing and Augmentation System

04/29/2019

05/03/2019

IP 71114.05

000720 Correction of Emergency Preparedness Weaknesses and Deficiencies

04/29/2019

05/03/2019

IP 71151 001397 Performance Indicator Verification

SECURITY BASELINE INSPECTION

1 05/22/2019

05/24/2019

IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations

RELIABLE HARDENED CONTAINMENT VENTS TI-193

1 07/22/2019

07/26/2019

TI 2515/193

000511 Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard

to Reliable Hardened Containment Vents Capable of Operation under Severe Accident

Conditions

RADIATION PROTECTION BASELINE INSPECTION

1 08/12/2019

08/16/2019

IP 71124.06

000730 Radioactive Gaseous and Liquid Effluent Treatment

08/12/2019

08/16/2019

IP 71124.07

000731 Radiological Environmental Monitoring Program

SECURITY BASELINE INSPECTION

1 09/09/2019

09/13/2019

IP 71130.07

000739 Security Training

09/09/2019

09/13/2019

IP 71151 001338 Performance Indicator Verification

TRIENNIAL 50.59 INSPECTION

1 09/16/2019

09/20/2019

IP 71111.17T

000709 Evaluations of Changes, Tests, and Experiments

RADIATION PROTECTION BASELINE INSPECTION

1 10/21/2019

10/25/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

BIENNIAL REQUAL PROGRAM INSPECTION

1 11/18/2019

11/22/2019

IP 71111.11B

000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

DESIGN BASES ASSURANCE INSPECTION (TEAM)

1 01/13/2020

01/17/2020

IP 71111.21M

000713 Design Bases Assurance Inspection (Teams)

01/27/2020

01/31/2020

IP 71111.21M

000713 Design Bases Assurance Inspection (Teams)

8/21/2018 8:56:56 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Duane Arnold

09/01/2018 - 06/30/2020

Unit Start End Activity CAC Title Staff Count

ISFSI Cask Loading Inspection 1Q2020

1 02/03/2020

02/07/2020

IP 60855.1

000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

RP Baseline Inspection

1 03/09/2020

03/13/2020

IP 71124.08

000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and

Transportation

SECURITY BASELINE INSPECTION

1 03/16/2020

03/20/2020

IP 71130.08

000740 Fitness For Duty Program

03/16/2020

03/20/2020

IP 71151 001338 Performance Indicator Verification

RP Baseline Inspection

1 05/04/2020

05/08/2020

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

05/04/2020

05/08/2020

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

05/04/2020

05/08/2020

IP 71124.04

000729 Occupational Dose Assessment

SECURITY BASELINE INSPECTION

1 05/04/2020

05/08/2020

IP 71130.04

000736 Equipment Performance, Testing, and Maintenance

8/21/2018 8:56:56 AM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report