IR 05000334/2018006
| ML19064B365 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 03/04/2019 |
| From: | Matt Young NRC/RGN-I/DRP/PB6 |
| To: | Bologna R FirstEnergy Nuclear Operating Co |
| References | |
| IR 2018006 | |
| Download: ML19064B365 (7) | |
Text
March 4, 2019
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT S 05000334/2018006 AND 05000412/2018006)
Dear Mr. Bologna ,
The NRC has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018 , through December 31, 201 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC concluded that overall performance at your facility preserved public health and safet The NRC determined the performance at Beaver Valley Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRC's Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program,"
because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Beaver Valley Power Station, Units 1 and The enclosed inspection plan lists the inspections scheduled through December 31, 202 This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondenc The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, "Recommendations for Modifying the Reactor Oversight Process Engineering Inspections"). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 202 In a letter (ML18115A007) dated April 25, 2018, pursuant to 10 CFR 50.82(a)(1)(i), you notified the NRC of your intent to permanently cease power operations at Beaver Valley Unit 1 by May 31, 2021 and Beaver Valley Unit 2 by October 31, 202 Therefore, the inspection schedule is tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change R. Bologna 2 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5205 with any questions you have regarding this lette
Sincerely,
/RA/ Matt hew Young, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-334 and 50-412 License Nos.: DPR-66 and NPR-73 Enclosure:
Beaver Valley Inspection Plan
ML19064B365 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SShaffer/DRP MYoung/DRP DATE 2/26/19 2/27/19 Beaver Valley
01/01/2019 - 12/31/2020
Unit Start End Activity CAC Title Staff Count
RAD SAFETY 01,02,03,04
1, 2 02/25/2019
03/01/2019
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 02/25/2019
03/01/2019
000726 Occupational ALARA Planning and Controls
1, 2 02/25/2019
03/01/2019
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 02/25/2019
03/01/2019
000728 Occupational Dose Assessment
PI&R BIENNIAL
1, 2 03/04/2019
03/08/2019
IP 71152B 000747 Problem Identification and Resolution
1, 2 03/18/2019
03/22/2019
IP 71152B 000747 Problem Identification and Resolution
FORCE-ON-FORCE PLANNING AND EXERCISES
1, 2 03/25/2019
03/29/2019
000735 Contingency Response - Force-On-Force Testing
1, 2 04/15/2019
04/19/2019
000735 Contingency Response - Force-On-Force Testing
EQ PROGRAM
1, 2 04/29/2019
05/03/2019
000714 Design Bases Assurance Inspection (Programs)
1, 2 05/20/2019
05/24/2019
000714 Design Bases Assurance Inspection (Programs)
BV2 REQUAL INSP WITH P/F RESULTS
2 05/05/2019
05/10/2019
000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)
05/05/2019
05/10/2019
000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
EP PROGRAM INSPECTION
1, 2 06/10/2019
06/14/2019
000717 Alert and Notification System Testing
1, 2 06/10/2019
06/14/2019
000718 Emergency Response Organization Staffing and Augmentation System
1, 2 06/10/2019
06/14/2019
000720 Maintenance of Emergency Preparedness
1, 2 06/10/2019
06/14/2019
IP 71151 001397 Performance Indicator Verification
RAD SAFETY REMP
1, 2 07/08/2019
07/12/2019
000731 Radiological Environmental Monitoring Program
1, 2 07/08/2019
07/12/2019
IP 71151 000746 Performance Indicator Verification
Triennial Heat Sink
1, 2 07/14/2019
07/20/2019
000700 Heat Sink Performance -Triennial
2/22/2019 9:41:27 AM
Page
of
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
Beaver Valley
01/01/2019 - 12/31/2020
Unit Start End Activity CAC Title Staff Count
ACCESS CONTROL, EQUIP PERF, TRAINING
1, 2 07/22/2019
07/26/2019
000734 Access Control
1, 2 07/22/2019
07/26/2019
000736 Equipment Performance, Testing, and Maintenance
1, 2 07/22/2019
07/26/2019
000739 Security Training
1, 2 07/22/2019
07/26/2019
IP 71151 001338 Performance Indicator Verification
RAD SAFETY 01,02,03,04
1, 2 08/05/2019
08/09/2019
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 08/05/2019
08/09/2019
000726 Occupational ALARA Planning and Controls
1, 2 08/05/2019
08/09/2019
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 08/05/2019
08/09/2019
000728 Occupational Dose Assessment
50.59 Process
1, 2 08/11/2019
08/17/2019
000709 Evaluations of Changes, Tests, and Experiments
BEAVER VALLEY 2 INITIAL OL EXAM
2 09/01/2019
09/06/2019
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
10/06/2019
10/18/2019
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
INSERVICE INSPECTION - UNIT 1
1 10/20/2019
11/02/2019
000702 Inservice Inspection Activities (PWR)
RAD SAFETY OUT
1, 2 10/28/2019
11/01/2019
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 10/28/2019
11/01/2019
000726 Occupational ALARA Planning and Controls
1, 2 10/28/2019
11/01/2019
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 10/28/2019
11/01/2019
000728 Occupational Dose Assessment
1, 2 10/28/2019
11/01/2019
IP 71151 000746 Performance Indicator Verification
Rad Safety Inspection
1, 2 01/27/2020
01/31/2020
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 01/27/2020
01/31/2020
000726 Occupational ALARA Planning and Controls
1, 2 01/27/2020
01/31/2020
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 01/27/2020
01/31/2020
000728 Occupational Dose Assessment
2/22/2019 9:41:27 AM
Page
of
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
Beaver Valley
01/01/2019 - 12/31/2020
Unit Start End Activity CAC Title Staff Count
BV1 Requal Inspection with P/F Results
1 04/12/2020
04/18/2020
000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)
04/12/2020
04/18/2020
000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
Rad Safety Refuel
1, 2 04/13/2020
04/17/2020
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 04/13/2020
04/17/2020
000726 Occupational ALARA Planning and Controls
1, 2 04/13/2020
04/17/2020
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 04/13/2020
04/17/2020
000728 Occupational Dose Assessment
ISI - UNIT 2
2 04/20/2020
05/01/2020
000702 Inservice Inspection Activities (PWR)
BEAVER VALLEY EP EXERCISE INSPECTION
1, 2 06/08/2020
06/12/2020
000716 Exercise Evaluation
1, 2 06/08/2020
06/12/2020
IP 71151 001397 Performance Indicator Verification
Rad Safety RETS
1, 2 06/22/2020
06/26/2020
000730 Radioactive Gaseous and Liquid Effluent Treatment
1, 2 06/22/2020
06/26/2020
IP 71151 000746 Performance Indicator Verification
Rad Safety Instruments
1, 2 08/17/2020
08/21/2020
000729 Radiation Monitoring Instrumentation
Access Control, Equip Perf, Training
1, 2 09/07/2020
09/11/2020
000734 Access Control
1, 2 09/07/2020
09/11/2020
000736 Equipment Performance, Testing, and Maintenance
1, 2 09/07/2020
09/11/2020
000739 Security Training
1, 2 09/07/2020
09/11/2020
IP 71151 001338 Performance Indicator Verification
DESIGN BASIS ASSURANCE INSPECTION
1, 2 09/14/2020
09/18/2020
000713 Design Bases Assurance Inspection (Teams)
1, 2 09/28/2020
10/02/2020
000713 Design Bases Assurance Inspection (Teams)
2/22/2019 9:41:27 AM
Page
of
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
Beaver Valley
01/01/2019 - 12/31/2020
Unit Start End Activity CAC Title Staff Count
Rad safety Inspection
1, 2 11/16/2020
11/20/2020
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 11/16/2020
11/20/2020
000726 Occupational ALARA Planning and Controls
1, 2 11/16/2020
11/20/2020
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 11/16/2020
11/20/2020
000728 Occupational Dose Assessment
1, 2 11/16/2020
11/20/2020
IP 71151 000746 Performance Indicator Verification
Radwaste
1, 2 11/16/2020
11/20/2020
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
Transportation
2/22/2019 9:41:27 AM
Page
of
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report