UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, ILLINOIS 60532
-4352 March 2, 2018 Mr. Robert Craven Plant General Manager NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 SUBJECT: ANNUAL ASSESSMENT LETTER FOR POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 (REPORT 05000266/2017006 AND 05000 301/20 17 00 6) D ear M r. Craven: The NRC has completed its end
-of-cycle performance assessment of Point Beach Nuclear Plant, Units 1 and 2 , reviewing performance indicators (PIs)
, inspection results
, and enforcement actions from January 1, 20 17 through December 31, 20 1 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC concluded that overall performance at your facility preserved public health and safet The NRC determined the performance at Point Beach Nuclear Plant, Units 1 a nd 2 , during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC
's Reactor Oversight Process (ROP) Action Matrix
, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through December 31
, 20 1 This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondenc The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last 12 months of the inspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change The enclosed inspection includes, among other things, a biennial Problem Identification and Resolution team inspection in August 201 The inspection will be conducted in accordance with NRC inspection procedure (IP) 71152, "Problem Identification and Resolution." A triennial team inspection will be conducted in September 2018 using IP 71111.17T, "Evaluations of Changes, Tests and Experiments
."
R. Craven -2- This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Please contact me at 630-829-9833 with any questions you have regarding this lette
Sincerely,
/RA/ Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket Nos. 50
-266 and 50
-301 License Nos. DPR
-24 and DPR
-27 Enclosure:
Inspection Plan cc: Distribution via LISTSERV R. Craven -3- Letter to Robert Craven from Jamnes Cameron dated March 2, 2018 SUBJECT: ANNUAL ASSESSMENT LETTER FOR POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 (REPORT 05000266/2017006 AND 05000 301/2 0 17 00 6) DISTRIBUTION
- Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMPointBeach RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML18058B360 OFFICE RIII NAME JCameron:lg DATE 2/21/2018 OFFICIAL RECORD COPY
07200005 - Point Beach (ISFSI)
03/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
ISFSI Security Inspection
1 07/09/2018
07/13/2018
IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations
2/22/2018 7:56:09 AM
Page
of
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
Point Beach
03/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
RADIATION PROTECTION BASELINE INSPECTION
1, 2 02/26/2018
03/02/2018
000729 Radiation Monitoring Instrumentation
SECURITY BASELINE INSPECTION
1, 2 03/19/2018
03/23/2018
000733 Access Authorization
1, 2 03/19/2018
03/23/2018
IP 71151 001338 Performance Indicator Verification
1, 2 03/19/2018
03/23/2018
IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations
FORCE-ON-FORCE PLANNING & EXERCISE WEEK
1, 2 04/30/2018
05/04/2018
000735 Contingency Response - Force-On-Force Testing
1, 2 05/21/2018
05/25/2018
000735 Contingency Response - Force-On-Force Testing
RADIATION PROTECTION BASELINE INSPECTION
1, 2 06/18/2018
06/22/2018
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
Transportation
ISFSI Cask Loading Inspection
1, 2 06/25/2018
06/29/2018
IP 6085 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
RP Baseline
1, 2 08/13/2018
08/17/2018
000730 Radioactive Gaseous and Liquid Effluent Treatment
1, 2 08/13/2018
08/17/2018
000731 Radiological Environmental Monitoring Program
BIENNIAL PI&R INSPECTION
1 08/13/2018
08/31/2018
IP 71152B 000747 Problem Identification and Resolution
TRIENNIAL 50.59 INSPECTION
1, 2 09/10/2018
09/14/2018
000709 Evaluations of Changes, Tests, and Experiments
BIENNIAL REQUAL PROGRAM INSPECTION
1, 2 09/17/2018
09/21/2018
000704 Licensed Operator Requalification Program and Licensed Operator Performance -
Biennial INSERVICE INSPECTION UNIT 2
2 10/08/2018
11/04/2018
000702 Inservice Inspection Activities - PWR
2/22/2018 7:56:09 AM
Page
of
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
Point Beach
03/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
RADIATION PROTECTION BASELINE INSPECTION
1, 2 10/22/2018
10/26/2018
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 10/22/2018
10/26/2018
000726 Occupational ALARA Planning and Controls
1, 2 10/22/2018
10/26/2018
IP 71151 000746 Performance Indicator Verification
EP BASELINE INSPECTION / PI VERIFICATION
1, 2 11/05/2018
11/09/2018
000717 Alert and Notification System Testing
1, 2 11/05/2018
11/09/2018
000718 Emergency Response Organization Staffing and Augmentation System
1, 2 11/05/2018
11/09/2018
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
1, 2 11/05/2018
11/09/2018
IP 71151 001397 Performance Indicator Verification
SECURITY BASELINE INSPECTION
1, 2 11/05/2018
11/09/2018
000734 Access Control
1, 2 11/26/2018
11/30/2018
000736 Equipment Performance, Testing, and Maintenance
SECURITY BASELINE INSPECTION
1, 2 03/11/2019
03/15/2019
000734 Access Control
INSERVICE INSPECTION UNIT 1
1 03/23/2019
04/19/2019
000702 Inservice Inspection Activities - PWR
RADIATION PROTECTION BASELINE INSPECTION
1, 2 04/01/2019
04/05/2019
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 04/01/2019
04/05/2019
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 04/01/2019
04/05/2019
000729 Occupational Dose Assessment
PHASE 4
1, 2 04/15/2019
04/19/2019
IP 71003 000687 Post-Approval Site Inspection for License Renewal
EP EXERCISE INSPECTION / PI VERIFICATION
1 05/13/2019
05/17/2019
000716 Exercise Evaluation
05/13/2019
05/17/2019
000721 Drill Evaluation
05/13/2019
05/17/2019
IP 71151 001397 Performance Indicator Verification
CYBER SECURITY INSPECTION
1 06/03/2019
06/21/2019
000741 Cyber Security
2/22/2018 7:56:09 AM
Page
of
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
Point Beach
03/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
2019 PBNPS Exam
1, 2 06/10/2019
06/15/2019
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1, 2 07/14/2019
07/26/2019
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
DBA PROGRAM
1, 2 06/24/2019
07/12/2019
000714 Design Bases Assurance Inspection (Programs)
RP Baseline
1, 2 09/16/2019
09/20/2019
000726 Occupational ALARA Planning and Controls
1, 2 09/16/2019
09/20/2019
IP 71151 000746 Performance Indicator Verification
SECURITY BASELINE INSPECTION
1, 2 09/16/2019
09/20/2019
000738 Protection of Safeguards Information
1, 2 09/16/2019
09/20/2019
000739 Security Training
1, 2 09/16/2019
09/20/2019
IP 71151 001338 Performance Indicator Verification
TRIENNIAL HEAT SINK INSPECTION
1, 2 09/30/2019
10/04/2019
000700 Heat Sink Performance -Triennial
TRIENNIAL FIRE PROTECTION INSPECTION
1 10/07/2019
11/08/2019
000697 Fire Protection - NFPA 805 (Triennial)
2/22/2018 7:56:09 AM
Page
of
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report