IR 05000483/2012009
| ML13025A134 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 01/25/2013 |
| From: | Miller G B NRC/RGN-IV/DRS/EB-2 |
| To: | Heflin A C Union Electric Co |
| References | |
| IR-12-009 | |
| Download: ML13025A134 (11) | |
Text
- 1 - January 25, 2013
Mr. Adam C. Heflin, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT: SUMMARY OF THE PUBLIC MEETING TO DISCUSS THE RESULTS OF THE CALLAWAY NUCLEAR PLANT LICENSE RENEWAL INSPECTION
Dear Mr. Heflin,
This refers to the public meeting conducted in a town house format at the Fulton City Hall, on January 17, 2013, with members of the public. The participants discussed the overall license renewal process and provided the results of the license renewal inspection conducted at Callaway Nuclear Plant, as documented in Inspection Report 05000483/2012009 [ADAMS Accession ML12328A053]. In addition, the participants answered many other questions of general interest related to the Callaway Nuclear Plant.
The attendance list is enclosed with this su mmary (Enclosure 1). A copy of the NRC presentation slides related to the license renewal inspection is also enclosed (Enclosure 2).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and its enclosure, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely,
/RA/
Geoffrey Miller, Chief Engineering Branch 2 Division of Reactor Safety Docket: 50-483 License: NPF-30 Enclosures:
1. Meeting Attendance 2. NRC Presentation Electronic Distribution for Callaway Nuclear Plant Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) Acting DRP Deputy Director (Barry.Westreich@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Resident Inspector (Nestor.Makris@nrc.gov)
Resident Inspector (Zachary.Hollcraft@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov)
Project Engineer, DRP/B (David.You@nrc.gov)
CW Administrative Assistant (Dawn.Yancey@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov) DLR Project Manager (Samuel.cuadradodejesus@nrc.gov) DLR Project Manager (Carmen.Fells@nrc.gov) DLR_RPB1.Resource@nrc.gov OEMail Resource ROPreports
R:\_REACTORS\CW\2013\CWY 2012009-MS LRI Results-gap.doc ML13025A134 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials GAP Publicly Avail Yes No Sensitive Yes No Sens. Type Initials DRS/EB2 C:DRS/EB2 C:DRP/PBB C:DRS/EB2 GPick GMiller NO'Keefe GMiller /RA/ /RA/ /RA/ /RA/ 1/24/13 1/24/13 1/24/13 1/25/13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Enclosure 1 Meeting Attendance List Callaway Nuclear Plant License Renewal Inspection Results Meeting Attendance Enclosure 1 Attendee Affiliation Licensee Scott Bond Ameren Missouri Andrew Burgess Ameren Missouri Bryan Daniels Ameren Missouri Fadi Diya Ameren Missouri Tom Elwood Ameren Missouri Les Kanuckel Ameren Missouri Sarah Kovaleski Ameren Missouri Sharon Merciel Ameren Missouri Jamie Oestreich Ameren Missouri Cleve Reasoner Ameren Missouri David Shafer Ameren Missouri
Public E. Kajai Adelipah Member of public Jordan Allen Member of public Dean Asher Fulton Sun Laurin Atkins Member of Public Sarah Barfield-Graff U.S. Senator Roy Blunt Jane Beetem Missouri Department of Natural Resources Mica Bungsraz Member of public Carson Butts Member of public Barry Cox Member of public Ashley Dupont Member of Public Claire Eubanks Public Service Commission Roger Fischer Member of public Gary Franklin Member of public Lori Harris-Franklin Member of public Chad Gerdes Member of public Igor Meijer Member of Public Sara Hendershot Member of public Tyler Hills Member of public Muris Hummel Member of Public Louis Johnson Member of public Bill Johnson Member of public Gary Jungermann Callaway County Commission Jeremy Ketterer Congressman Luetkemeyer Randy Kleindienst Callaway County Commission Doc Kritzer Callaway County Commission Mejner Kuzsinger Member of public K. Martinez Member of Public Margot McMillen Member of public Shelby Miller Member of public Callaway Nuclear Plant License Renewal Inspection Results Meeting Attendance Enclosure 1 Attendee Affiliation Public (Continued)
Daturs Pepronic Member of public Greg Perry Member of public Mike Peters Member of public Jenna Rynder Member of public Austin Schreck Member of public John Sell Member of Public Ross Senda Member of Public Carson Shaefer Member of Public Sidney Simmons Fulton Sun Garrot Smith Member of public Brookelynn Trent Member of public Kenzie Walsh Member of Public Ivan Wezovic Member of public
NRC Tom Hartman Callaway Senior Resident Inspector Gregory Pick Senior Reactor Inspector Dawn Yancey Callaway Administrative Assistant
Enclosure 2 NRC Presentation Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2