IR 05000400/2015006
| ML16062A158 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/02/2016 |
| From: | Hopper G T NRC/RGN-II/DRP/RPB4 |
| To: | Waldrep B C Carolina Power & Light Co |
| References | |
| IR 2015006 | |
| Download: ML16062A158 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
-1257 March 2, 2016 Benjamin Site Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd.
M/C HNP01 New Hill, NC 27562
-0165
SUBJECT: ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT
- NRC INSPECTION REPORT 05000400/2015006
Dear Mr. Waldrep:
On February 10, 2016, the NRC completed its end
-of-cycle performance review of the Shearon Harris Nuclear Power Plant.
The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 20 15 through December 31, 20 15. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, the Shearon Harris Nuclear Power Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Shearon Harris Nuclear Power Plant during the most recent quarter was within the Licensee Response Column of the NRC
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31
, 20 17. Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid
-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non
-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
-Design-Basis External Events." This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond
-design-basis external event. Additionally, the Commission issued Order EA
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." This Order requires licensees to have a reliable means of remotely monitoring wide
-range spent fuel pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyon d-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Shearon Harris Nuclear Power Plant, and the information gathered will aid staff in development of the safety evaluation for the site.
The NRC staff has receive d the final compliance letter for the site. Once the final safety evaluation is issued , the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 191:
Inspection of the Licensee
's Responses to Mitigation Strategies Order EA-12-049, Spent Fuel Pool Instrumentation Order EA
-12-051 and Emergency Preparedness Information requested by NRC in March 12, 2012.
In accordance with 10 CFR 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4645 with any questions you have regarding this letter.
Sincerely,
/RA/
George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects
Docket Nos.:
50-400 License Nos.:
NPF-63 Enclosure:
Harris Inspection/Activity Plan
(3/1/2016 - 12/31/2017)
cc Distribution via ListServ
___________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE DXW4 JSD GTH NAME D. Jackson J. Dodson G. Hopper DATE 2/24/2016 2/25/2016 2/29/2016 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO Letter to Benjamin from George T. Hopper dated March 2, 2016
SUBJECT: ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT
- NRC INSPECTION REPORT 05000400/2015006 DISTRIBUTION
- D. Gamberoni, RII S. Price, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource ROPassessment Resource ROPreports Resource
Institute of Nuclear Power Operations (INPO)
Page 1 of 2 03/02/2016 08:08:14 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site HarrisInspection / Activity Plan 03/01/2016
-12/31/2017ASM EP-2016 EP ASM & RES BASELINE 3 1 IP Drill Evaluation7111406 01/01/2016 12/31/2016TI-191-MITIGATING STRATEGIES 1 1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 05/09/2016 05/13/2016 EP-EP PROGRAM INSPECTION 3 1 IP A lert and Notification System Testing7111402 05/23/2016 05/27/2016 1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 05/23/2016 05/27/2016 1 IP Emergency Action Level and Emergency Plan Changes7111404 05/23/2016 05/27/2016 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 05/23/2016 05/27/2016 1 IP Performance Indicator Verification71151 05/23/2016 05/27/2016 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1 IP Heat Sink Performance7111107T 06/13/2016 06/17/2016OL EXAM-INITIAL LICENSE EXAM PREP 3 1 HARRIS JULY 2016 INITIAL EXAM AT POWER FACILITIESS V23474 06/13/2016 06/17/2016OL EXAM-INITIAL LICENSE EXAM 3 1 HARRIS JULY 2016 INITIAL EXAM AT POWER FACILITIESS V2347407/11/2016 07/22/2016 ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 IP Inservice Inspection Activities - PWR7111108P 10/17/2016 10/21/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 1 2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/17/2016 10/21/2016 1 IP Occupational ALARA Planning and Controls71124.02 10/17/2016 10/21/2016 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/17/2016 10/21/2016 1 IP Occupational Dose Assessment71124.04 10/17/2016 10/21/2016 1 IP Radiation Monitoring Instrumentation71124.05 10/17/2016 10/21/2016 1 IP Performance Indicator Verification71151 10/17/2016 10/21/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 2 3 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/31/201611/04/2016 1 IP Occupational ALARA Planning and Controls71124.02 10/31/201611/04/2016 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/31/201611/04/2016 1 IP Occupational Dose Assessment71124.04 10/31/201611/04/2016 1 IP Radiation Monitoring Instrumentation71124.05 10/31/201611/04/2016 1 IP Performance Indicator Verification71151 10/31/201611/04/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2 03/02/2016 08:08:14 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site HarrisInspection / Activity Plan 03/01/2016
-12/31/2017 CDBI-COMPONENT DESIGN BASIS INSPECTION 7 1 IP Component Design Bases Inspection7111121 01/30/2017 02/03/2017 1 IP Component Design Bases Inspection7111121 02/27/2017 03/03/2017 1 IP Component Design Bases Inspection7111121 03/13/2017 03/17/2017 1 IP Component Design Bases Inspection7111121 03/27/2017 03/31/2017 EP-EP EXERCISE 6 1 IP Exercise Evaluation7111401 04/24/2017 04/28/2017 1 IP Emergency Action Level and Emergency Plan Changes7111404 04/24/2017 04/28/2017 1 IP Exercise Evaluation - Scenario Review7111408 04/24/2017 04/28/2017 1 IP Performance Indicator Verification71151 04/24/2017 04/28/2017 RP-RP PUBLIC RAD SAFETY BASELINE 4 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 07/17/2017 07/21/2017 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 07/17/2017 07/21/2017 1 IP Radiological Environmental Monitoring Program71124.07 07/17/2017 07/21/2017 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 07/17/2017 07/21/2017 1 IP Performance Indicator Verification71151 07/17/2017 07/21/2017OL RQ-REQUAL INSPECTION 2 1 IP Licensed Operator Requalification Program7111111B 08/07/201708/11/2017 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 1 IP Problem Identification and Resolution71152B09/11/2017 09/15/2017 1 IP Problem Identification and Resolution71152B 09/25/2017 09/29/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.