IR 05000443/2018005
| ML18228A567 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 08/28/2018 |
| From: | Bower F L Reactor Projects Branch 3 |
| To: | Nazar M NextEra Energy Seabrook |
| References | |
| IR 2018005 | |
| Download: ML18228A567 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406
-2713 August 28, 2018 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy Seabrook, LLC Mail Stop: EX/JB 700 Universe Blvd.
Juno Beach, FL 33408
SUBJECT: SEABROOK STATION, UNIT NO. 1 UPDATED INSPECTION PLAN (INSPECTION REPORT 05000 443/20 18005)
Dear Mr. Nazar:
The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 , for Seabrook Station, Unit 1 (Seabrook). The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to baseline inspections, the NRC will also be performing Inspection Procedure (IP) 81311 , "Physical Security Requirements for Independent Spent Fuel Storage Installations." Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
As previously noted in the February 28, 201 8, annual assessment letter (Reports 05000443/2017006, 05000443/2017402, and 05000443/2017501; ADAMS Accession No. ML18053A751) regarding the Alkali
-Silica Reaction (ASR) concrete issues, the NRC will continue to provide focused oversight of NextEra's assessment of ASR progression in Seabrook's concrete structures using baseline inspection Problem Identification and Resolution (PI&R) annual samples. While tentative dates for these ongoing inspections are included in the attached inspection schedule, we understand that your schedule is subject to change. We will coordinate closely with your ASR project management staff to select the most appropriate opportunities to inspect your activities.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5200 with any questions you have regarding this letter.
Sincerely,
/RA/ Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects Docket No. 50
-443 License No. NPF-86 Enclosure:
Seabrook Inspection Plan cc: Distribution via ListServ SUBJECT: SEABROOK STATION, UNIT NO. 1 UPDATED INSPECTION PLAN (INSPECTION REPORT 05000443/2018005)
DATED AUGUST 28, 2018 DISTRIBUTION w/encl:
(via e-mail) DLew, RA (R1ORAMAIL Res)
JGiessner, DRA (R1ORAMAIL Res)
RLorson, DRP (R1DRPMAIL Res)
DPelton, DRP (R1DRPMAIL Res
) JYerokun, DRS (R1DRSMAIL Res BWelling, DRS (R1DRSMAIL RES)
FBower, DRP CLally, DRP MDraxton, DRP SGhrayeb, DRP PCataldo, DRP, SRI PMeier, DRP, RI ACass, DRP, Resident AA JBowen, RI, OEDO RidsNrrPMSeabrook Resource RidsNrrDorlLpl1 Resource ROPreports Resource DRS Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource DOCUMENT NAME:
G:\DRP\BRANCH3\Assessment
\ROP 19\Mid-Cycl e\Letters\Seabrook\ROP 19 Inspection Plan Letter SB_FINAL.docx ADAMS ACCESSION NUMBER:
ML18228A565 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRS RI/DRP NAME CLally/CML via email PMeier/PAM via email MGray FBower DATE 8/15/18 8/15/18 8/16/18 8/28/18 OFFICIAL RECORD CO PY Seabrook 07/01/2018 - 06/30/2020
Unit Start End Activity CAC Title Staff Count
1 07/16/2018
07/20/2018
000742 Material Control and Accounting (MC&A)
PI&R BIENNIAL
1 07/23/2018
07/27/2018
IP 71152B 000747 Problem Identification and Resolution
08/06/2018
08/10/2018
IP 71152B 000747 Problem Identification and Resolution
RADWASTE
1 08/20/2018
08/24/2018
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
Transportation
1 09/10/2018
09/28/2018
000708 Operability Determinations and Functionality Assessments
09/10/2018
09/14/2018
IP 71152 000748 Problem Identification and Resolution
UNIT 1 INSERVICE INSPECTION
1 10/08/2018
10/19/2018
000702 Inservice Inspection Activities - PWR
1 10/15/2018
10/19/2018
000725 Radiological Hazard Assessment and Exposure Controls
10/15/2018
10/19/2018
000726 Occupational ALARA Planning and Controls
10/15/2018
10/19/2018
IP 71151 000746 Performance Indicator Verification
1 01/28/2019
02/01/2019
000730 Radioactive Gaseous and Liquid Effluent Treatment
Annual Sample - ASR
1 02/04/2019
02/08/2019
IP 71152 001339 Problem Identification and Resolution
EP PROGRAM INSPECTION
1 04/08/2019
04/12/2019
000717 Alert and Notification System Testing
04/08/2019
04/12/2019
000718 Emergency Response Organization Staffing and Augmentation System
04/08/2019
04/12/2019
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
04/08/2019
04/12/2019
IP 71151 001397 Performance Indicator Verification
DESIGN BASES ASSURANCE INSP - TEAMS
1 04/15/2019
04/19/2019
000713 Design Bases Assurance Inspection (Teams)
8/14/2018 12:18:18 PM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Seabrook 07/01/2018 - 06/30/2020
Unit Start End Activity CAC Title Staff Count
DESIGN BASES ASSURANCE INSP - TEAMS
1 04/29/2019
05/03/2019
000713 Design Bases Assurance Inspection (Teams)
ACCESS CONTROL, PROTECTIVE STRATEGY, TSR
1 04/22/2019
04/26/2019
000734 Access Control
04/22/2019
04/26/2019
000737 Protective Strategy Evaluation
04/22/2019
04/26/2019
000743 Review of Power Reactor Target Sets
04/22/2019
04/26/2019
IP 71151 001338 Performance Indicator Verification
1 05/13/2019
05/17/2019
000725 Radiological Hazard Assessment and Exposure Controls
05/13/2019
05/17/2019
000726 Occupational ALARA Planning and Controls
05/13/2019
05/17/2019
000727 In-Plant Airborne Radioactivity Control and Mitigation
05/13/2019
05/17/2019
000729 Occupational Dose Assessment
05/13/2019
05/17/2019
000729 Radiation Monitoring Instrumentation
1 07/15/2019
07/19/2019
000731 Radiological Environmental Monitoring Program
CYBER FULL IMP
1 07/15/2019
07/19/2019
000741 Cyber Security
07/29/2019
08/02/2019
000741 Cyber Security
Annual Sample - ASR
1 08/05/2019
08/09/2019
IP 71152 000748 Problem Identification and Resolution
1 09/09/2019
09/13/2019
000725 Radiological Hazard Assessment and Exposure Controls
09/09/2019
09/13/2019
000726 Occupational ALARA Planning and Controls
09/09/2019
09/13/2019
000727 In-Plant Airborne Radioactivity Control and Mitigation
09/09/2019
09/13/2019
000729 Occupational Dose Assessment
09/09/2019
09/13/2019
000729 Radiation Monitoring Instrumentation
1 11/18/2019
11/22/2019
000725 Radiological Hazard Assessment and Exposure Controls
11/18/2019
11/22/2019
000726 Occupational ALARA Planning and Controls
8/14/2018 12:18:18 PM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Seabrook 07/01/2018 - 06/30/2020
Unit Start End Activity CAC Title Staff Count
1 11/18/2019
11/22/2019
000727 In-Plant Airborne Radioactivity Control and Mitigation
11/18/2019
11/22/2019
000729 Occupational Dose Assessment
11/18/2019
11/22/2019
000729 Radiation Monitoring Instrumentation
11/18/2019
11/22/2019
IP 71151 000746 Performance Indicator Verification
SEABROOK REQUAL INSP W/ P/F RESULTS
1 12/09/2019
12/13/2019
000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)
12/09/2019
12/13/2019
000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
Access Authorization and Control, FFD, SGI Control, and ISFSI
1 01/27/2020
01/31/2020
000733 Access Authorization
01/27/2020
01/31/2020
000734 Access Control
01/27/2020
01/31/2020
000738 Protection of Safeguards Information
01/27/2020
01/31/2020
000740 Fitness For Duty Program
01/27/2020
01/31/2020
IP 71151 001338 Performance Indicator Verification
01/27/2020
01/31/2020
IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations
Radwaste
1 02/03/2020
02/07/2020
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
Transportation
ISI - UNIT 1
1 04/06/2020
04/17/2020
000702 Inservice Inspection Activities - PWR
1 05/11/2020
05/15/2020
000725 Radiological Hazard Assessment and Exposure Controls
05/11/2020
05/15/2020
000726 Occupational ALARA Planning and Controls
FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS
1 06/15/2020
06/19/2020
000735 Contingency Response - Force-On-Force Testing
8/14/2018 12:18:18 PM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report