Ufsar/Selected Licensee Commitments Change
ML14189A100
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/26/2014
From: Batson S L
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ONS-2014-092
Download: ML14189A100 (21)


Text

D UKE Scott L. Batson ENERGY. Oconee Nuclear Staton Duke Energy ONOI VP 1 7800 Rochester Hwy Seneca, SC 29672 ONS-2014-092 o: 864.873.3274 f 864.873.4208 Scoft.Batson@duke-energy.com June 26, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2746

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station Docket Numbers 50-269, 50-270, and 50-287 UFSAR/Selected Licensee Commitments Change Pursuant to 10 CFR 50.71 (e), please find attached the latest revision to the Oconee Nuclear Station Selected Licensee Commitments (SLC) Manual. This document constitutes Chapter 16 of the Updated Final Safety Analysis Report (UFSAR).Any questions regarding this information should be directed to Steve Newman, Regulatory Affairs, at (864) 873-4388.I certify that I am a duly authorized officer of Duke Energy Carolinas, LLC, and that the information contained herein accurately represents changes made to Chapter 16 of the UFSAR since the previous submittal.

I declare under penalty of perjury that the foregoing is true and correct. Executed on June 26, 2014.Sincerely, Scott L. Batson Vice President Oconee Nuclear Station Attachment www.duke-energy.com I -., U. S. Nuclear Regulatory Commission June 26, 2014 Page 2 cc: Mr. Victor McCree, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. James R. Hall, Senior Project Manager (ONS)(By electronic mail only)U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8G9A Rockville, MD 20852-2746 Mr. Eddy Crowe Senior Resident Inspector Oconee Nuclear Station DUKE Oconee Nuclear Station ENERGY, Duke Eneigy 7800 Rochester Hwy Seneca, SC 29672 June 26, 2014 Re: Oconee Nuclear Station Selected Licensee Commitments (SLC) Manual Change Revision Date: 06/13/2014 Please replace the corresponding pages in your copy of the Oconee SLC Manual as follows: REMOVE THESE PAGES INSERT THESE PAGES List of Effective Pages (LOEP) 1- 13 List of Effective Pages (LOEP) 1- 13 SLC Pages 16.9.22-1 thru 4 SLC Pages 16.9.22-1 thru 4 If you have any questions concerning the contents of this SLC Manual update, contact Steve Newman (864) 873-4388.Yris Wasik Regulatory Affairs Manager www.duke-energy.com Attachment Oconee Nuclear Station Revised Selected Licensee Commitments Manual Pages Oconee Nuclear Station Selected Licensee Commitments Revised 06/13/14 List of Effective Pages Paae Revision Date LOEP 1 06/13/14 LOEP 2 02/10/14 LOEP 3 04/21/14 LOEP 4 04/08/14 LOEP 5 12/31/12 LOEP 6 02/10/14 LOEP 7 11/08/13 LOEP 8 11/08/13 LOEP 9 06/13/14 LOEP 10 11/14/13 LOEP 11 05/14/14 LOEP 12 05/01/14 LOEP 13 05/01/14 16.0-1 02/10/14 16.0-2 02/10/14 16.0-3 02/10/14 16.0-4 02/10/14 16.0-5 02/10/14 16.0-6 02/10/14 16.1-1 10/15/07 16.2-1 3/27/99 16.2-2 3/27/99 16.2-3 3/27/99 16.3-1 3/27/99 16.5.1-1 11/26/12 16.5.1-2 11/26/12 16.5.1-3 11/26/12 16.5.2-1 11/15/12 16.5.2-2 11/15/12 16.5.2-3 11/15/12 16.5.2-4 Delete 5/11/99 16.5.2-5 Delete 5/11/99 16.5.3-1 02/21/07 16.5.3-2 02/21/07 16.5.3-3 02/21/07 16.5.4-1 11/15/12 16.5.4-2 11/15/12 16.5.5-1 Delete 5/16/09 16.5.5-2 Delete 5/16/09 16.5.5-3 Delete 5/16/09 16.5.5-4 Delete 5/16/09 LOEP 1 Oconee Nuclear Station Selected Licensee Commitments Revised 06/13/14 List of Effective Pages Pa e Revision Date 16.5.5-5 Delete 5/16/09 16.5.6-1 Delete 02/10/14 16.5.6-2 Delete 02/10/14 16.5.7-1 12/13/06 16.5,7-2 12/13/06 16.5.7-3 12/13/06 16.5.7-4 12/13/06 16.5.7-5 12/13/06 16.5.7-6 12/13/06 16.5.8-1 01/31/07 16.5.8-2 01/31/07 16.5.8-3 01/31/07 16.5.8-4 01/31/07 16.5.8-5 01/31/07 16.5.8a-1 5/19/05 16.5.8a-2 5/19/05 (Delete)16.5.8a-3 5/19/05 (Delete)16.5.9-1 11/15/12 16.5.9-2 11/15/12 16.5.10-1 10/8/03 16.5.10-2 10/8/03 16.5.11-1 1/31/00 16.5.12-1 3/27/99 16.5.13-1 3/27/99 16.5.13-2 12/01/99 16.5.13-3 12/01/99 16.6.1-1 07/23/12 16.6.1-2 07/23/12 16.6.1-3 07/23/12 16.6.1-4 07/23/12 16.6.1-5 Delete 16.6.2-1 01/31/07 16.6.2-2 01/31/07 16.6.2-3 01/31/07 16.6.2-4 01/31/07 16.6.2-5 01/31/07 16.6.2-6 01/31/07 16.6.2-7 01/31/07 16.6.2-8 Delete 16.6.2-9 Delete 16.6.2-10 Delete LOEP 2 Oconee Nuclear Station Selected Licensee Commitments Revised 06/13/14 List of Effective Pages Pa e Revision Date 16.6.2-11 Delete 16.6.2-12 Delete 16.6.3-1 11/15/12 16.6.4-1 11/15/12 16.6.4-2 11/15/12 16.6.4-3 11/15/12 16.6.4-4 11/15/12 16.6.4-5 11/15/12 16.6.4-6 11/15/12 16.6.5-1 12/14/00 16.6.6-1 11/15/12 16.6.7-1 3/27/99 16.6.8-1 3/27/99 16.6.9-1 11/15/12 16.6.9-2 11/15/12 16.6.10-1 11/15/12 16.6.10-2 11/15/12 16.6.10-3 11/15/12 16.6.11-1 11/15/12 16.6.11-2 11/15/12 16.6.12-1 11/15/12 16.6.12-2 11/15/12 16.6.12-3 11/15/12 16.6.12-4 5/17/05 (Delete)16.6.12-5 Delete 16.6.12-6 Delete 16.6.12.7 Delete 16.6.13-1 03/31/08 16.6.13-2 03/31/08 16.6.13-3 03/31/08 16.6.14-1 04/21/14 16.6.14-2 04/21/14 16.6.14-3 04/21/14 16.6.14-4 04/21/14 16.6.15-1 11/15/12 16.6.15-2 11/15/12 16.7.1-1 11/15/12 16.7.1-2 11/15/12 16.7.2-1 11/15/12 16.7.2-2 11/15/12 16.7.2-3 11/15/12 LOEP 3 Oconee Nuclear Station Selected Licensee Commitments Revised 06/13/14 List of Effective Pages Pa e Revision Date 16.7.3-1 11/15/12 16.7.3-2 11/15/12 16.7.4-1 7/14/05 16.7.4-2 7/14/05 16.7.4-3 7/14/05 16.7.5-1 11/15/12 16.7.5-2 11/15/12 16.7.5-3 11/15/12 16.7.5-4 11/15/12 16.7.6-1 04/08/14 16.7.6-2 04/08/14 16.7.6-3 04/08/14 16.7.6-4 04/08/14 16.7.7-1 11/15/12 16.7.7-2 11/15/12 16.7.8-1 3/27/99 16.7.8-2 3/27/99 16.7.9-1 10/23/03 16.7.10-1 11/15/12 16.7.10-2 11/15/12 16.7.11-1 11/15/12 16.7.11-2 11/15/12 16.7.11-3 11/15/12.16.7.12-1 6/30/04 16.7.12-2 6/30/04 16.7.13-1 12/05/12 16.7.13-2 12/05/12.16.7.13-3 12/05/12 16.7.14-1 11/15/12 16.7.14-2 11/15/12 16.7.14-3 11/15/12 16.7.14-4 11/15/12 16.7.15-1 04/08/14 16.7.15-2 04/08/14 16.7.15-3 04/08/14 16.8.1-1 8/09/01 16.8.1-2 8/09/01 16.8.2-1 2/10/05 16.8.2-2 2/10/05 LOEP 4 Oconee Nuclear Station Selected Licensee Commitments Revised 06/13/14 List of Effective Pages Page Revision Date 16.8.3-1 10/20/09 16.8.3-2 10/20/09 16.8.3-3 10/20/09 16.8.3-4 10/20/09 16.8.3-5 10/20/09 16.8.3-6 10/20/09 16.8.3-7 10/20/09 16.8.4-1 2/10/05 16.8.4-2 2/10/05 16.8.4-3 2/10/05 16.8.4-4 2/10/05 16.8.4-5 Delete 2/10/05 16.8.4-6 Delete 2/10/05 16.8.4-7 Delete 2/10/05 16.8.4-8 Delete 2/10/05 16.8.4-9 Delete 9/25/04 16.8.5-1 07/23/12 16.8.5-2 07/23/12 16.8.5-3 07/23/12 16.8.5-4 Delete 12/21/04 16.8.5-5 Delete 12/21/04 16.8.6-1 01/04/07 16.8.6-2 01/04/07 16.8.6-3 01/04/07 16.8.7-1 1/31/00 16.8.8-1 1/31/00 16.8.9-1 6/21/05 16.8.9-2 6/21/05 16.8.9-3 6/21/05 16.8.9-4 6/21/05 16.9.1-1 12/05/12 16.9.1-2 12/05/12 16.9.1-3 12/05/12 16.9.1-4 12/05/12 16.9.1-5 12/05/12 16.9.1-6 12/05/12 16.9.2-1 12/31/12 16.9.2-2 12/31/12 16.9.2-3 12/31/12 16.9.2-4 12/31/12 16.9.2-5 12/31/12 LOEP 5 Oconee Nuclear Station Selected Licensee Commitments Revised 06/13/14 List of Effective Pages Page Revision Date 16.9.2-6 12/31/12 16.9.3-1 12/31/12 16.9.3-2 12/31/12 16.9.4-1 11/11/13 16.9.4-2 11/11/13 16.9.4-3 11/11/13 16.9.4-4 11/11/13 16.9.4-5 11/11/13 16.9.4-6 11/11/13 16.9.4-7 11/11/13 16.9.4-8 11/11/13 16.9.4-9 11/11/13 16.9.5-1 12/31/12 16.9.5-2 12/31/12 16.9.5-3 12/31/12 16.9.5-4 12/31/12 16.9.5-5 12/31/12 16.9.6-1 02/10/14 16.9.6-2 02/10/14 16.9.6-3 02/10/14 16.9.6-4 02/10/14 16.9.6-5 02/10/14 16.9.6-6 02/10/14 16.9.6-7 02/10/14 16.9.6-8 02/10/14 16.9.6-9 02/10/14 16.9.6-10 02/10/14 16.9.6-11 02/10/14 16.9.7-1 07/23/12 16.9.7-2 07/23/12 16.9.7-3 07/23/12 16.9.7-4 07/23/12 16.9.7-5 07/23/12 16.9.7-6 07/23/12 16.9.7-7 07/23/12 16.9.7-8 07/23/12 16.9.7-9 Delete 16.9.8-1 2/15/06 16.9.8-2 2/15/06 16.9.8-3 Delete 2/15/06 16.9.8-4 Delete LOEP 6 Oconee Nuclear Station Selected Licensee Commitments Revised 06/13/14 List of Effective Pages Paae 16.9.8-5 16.9.8-6 16.9.8-7 16.9.8a-1 16.9.8a-2 16.9.8a-3 16.9.9-1 16.9.9-2 16.9.9-3 16.9.9-4 16.9.10-1 16.9.10-2 16.9.11-1 16.9.11-2 16.9.11-3 16.9.11-4 16.9.11-5 16.9.11-6 16.9.11-7 16.9.11-8 16.9.11 a-1 16.9.11 a-2 16.9.11 a-3 16.9.11a-4 16.9.11a-5 16.9.11a-6 16.9.11a-7 16.9.11 a-8 16.9.11 a-9 16.9.11 a-10 16.9.11a-11 16.9.11a-12 16.9.11a-13 16.9.11 a-14 16.9.11 a-15 16.9.11 a-16 16.9.12-1 16.9.12-2 16.9.12-3 16.9.12-4 16.9.12-5 Revision Date Delete Delete Delete 2/7/05 2/7/05 2/7/05 11/15/12 11/15/12 11/15/12 11/15/12 1/12/04 1/12/04 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 11/15/12 Deleted 3/10/08 12/01/13 12/01/13 12/01/13 12/01/13 12/01/13 LOEP 7 Oconee Nuclear Station Selected Licensee Commitments Revised 06/13/14 List of Effective Pages Page Revision Date 16.9.12-6 12/01/13 16.9.12-7 12/01/13 16.9.12-8 12/01/13 16.9.12-9 12/01/13 16.9.12-10 12/01/13 16.9.12-11 12/01/13 16.9.12-12 12/01/13 16.9.12-13 12/01/13 16.9.12-14 12/01/13 16.9.12-15 12/01/13 16.9.12-16 12/01/13 16.9.12-17 12/01/13 16.9.12-18 12/01/13 16.9.12-19 Deleted 12/01/13 16.9.12-20 Deleted 12/01/13 16.9.12-21 Deleted 12/01/13 16.9.12-22 Deleted 12/01/13 16.9.13-1 01/31/07 16.9.13-2 01/31/07 16.9.13-3 01/31/07 16.9.13-4 01/31/07 16.9.14-1 10/28/04 16.9.14-2 10/28/04 16.9.15-1 3/27/99 16.9.15-2 3/27/99 16.9.15-3 3/27/99 16.9.16-1 4/01/08 16.9.16-2 4/01/08 16.9.16-3 4/01/08 16.9.17-1 5/23/01 16.9.17-2 3/27/99 16.9.18-1 11/15/12 16.9.18-2 11/15/12 16.9.18-3 11/15/12 16.9.18-4 11/15/12 16.9.18-5 11/15/12 16.9.18-6 11/15/12 16.9.18-7 11/15/12 16.9.18-8 11/15/12 16.9.18-9 11/15/12 16.9.18-10 11/15/12 LOEP 8 Oconee Nuclear Station Selected Licensee Commitments Revised 06/13/14 List of Effective Pages Paae Revision Date 16.9.18-11 11/15/12 16.9.18-12 11/15/12 16.9.18-13 11/15/12 16.9.18-14 11/15/12 16.9.18-15 11/15/12 16.9.18-16 11/16/12 16.9.19-1 3/31/05 16.9.19-2 3/31/05 16.9.20-1 05/28/14 16.9.20-2 05/28/14 16.9.20-3 05/28/14 16.9.20-4 05/28/14 16.9.20-5 05/28/14 16.9.21-1 07/09/09 16.9.21-2 07/09/09 16.9.21-3 07/09/09 16.9.21-4 07/09/09 16.9.22-1 06/13/14 16.9.22-2 06/13/14 16.9.22-3 06/13/14 16.9.22-4 06/13/14 16.10.1-1 11/15/12 16.10.1-2 11/15/12 16.10.1-3 Deleted 9/18/03 16.10.2-1 12/2/03 16.10.2-2 12/2/03 16.10.3-1 3/27/99 16.10.3-2 3/27/99 16.10.4-1 11/15/12 16.10.5-1 Deleted 8/24/04 16.10.6-1 3/27/99 16.10.7-1 4/29/99 16.10.7-2 4/29/99 16.10.7-3 1/31/00 16.10.7-4 4/29/99 16.10.7-5 4/29/99 16.10.7-6 4/29/99 16.10.7-7 4/29/99 16.10.7-8 4/29/99 16.10.7-9 4/29/99 16.10.8-1 11/27/06 LOEP 9 Oconee Nuclear Station Selected Licensee Commitments Revised 06/13/14 List of Effective Pages Page Revision Date 16.10.8-2 11/27/06 16.10.8-3 11/27/06 16.10.8-4 11/27/06 16.10.8-5 11/27/06 16.10.9-1 11/25/09 16.10.9-2 11/25/09 16.10.9-3 11/25/09 16.10.9-4 11/25/09 16.10.9-5 11/25/09 16.11.1-1 3/15/11.16.11.1-2 3/15/11 16.11.1-3 3/15/11 16.11.1-4 3/15/11 16.11.1-5 3/15/11 16.11.1-6 3/15/11 16.11.1-7 3/15/11 16.11.2-1 1/31/00 16.11.2-2 3/27/99 16.11.2-3 1/31/00 16.11.2-4 3/27/99 16.11,2-5 1/31/00 16.11,2-6 1/31/00 16.11.3-1 11/20/08 16.11.3-2 11/20/08 16.11.3-3 11/20/08 16.11.3-4 11/20/08 16.11.3-5 11/20/08 16.11.3-6 11/20/08 16.11.3-7 11/20/08 16.11.3-8 11/20/08 16.11.3-9 11/20/08 16.11.3-10 11/20/08 16.11.3-11 11/20/08 16.11.3-12 11/20/08 16.11.3-13 11/20/08 16.11.3-14 11/20/08 16.11.3-15 11/20/08 16.11.3-16 11/20/08 16.11.3-17 11/20/08 16.11.3-18 11/20/08 16.11.3-19 11/10/04 (Deleted)LOEP 10 Oconee Nuclear Station Selected Licensee Commitments Revised 06/13/14 List of Effective Pages Page Revision Date 16.11.4-1 11/08/13 16.11.4-2 11/08/13 16.11.4-3 11/08/13 16.11.4-4 11/08/13 16.11.4-5 11/08/13 16.11.4-6 11/08/13 16.11.4-7

.11/08/13 16.11.4-8 11/10/04 (Delete)16.11.5-1 10/30/02 16.11.5-2 10/30/02 16.11.5-3 10/30/02 16.11.5-4 10/30/02 16.11.6-1 11/08/13 16.11.6-2 11/08/13 16.11.6-3 11/08/13 16.11.6-4 11/08/13 16.11.6-5 11/08/13 16.11.6-6 11/08/13 16.11.6-7 11/08/13 16.11.6-8 11/08/13 16.11.6-9 11/08/13 16.11.6-10 11/08/13 16.11.7-1 1/31/00 16.11.7-2 1/31/00 16.11.7-3 3/27/99 16.11.7-4 1/31/00 16.11.8-1 12/21/09 16.11.8-2 12/21/09 16.11.9-1 03/22/10 16.11.9-2 03/22/10 16.11.9-3 03/22/10 16.11.10-1 05/14/14 16.11.10-2 05/14/14 16.11.11-1 3/27/99 16.11.12-1 4/10/03 16.11.12-2 4/10/03 16.11.13-1 3/27/99 16.11.13-2 3/27/99 16.11.14-1 3/27/99 16.11.14-2 3/27199 LOEP 11 Oconee Nuclear Station Selected Licensee Commitments Revised 06/13/14 List of Effective Pages Paqe Revision Date 16.12.1-1 3/27/99 16.12.2-1 5/3/07 16.12.2-2 5/3/07 16.12.3-1 5/1/03 16.12.3-2 5/1/03.16.12.4-1 3/27/99 16.12.5-1 3/27/99 16.12.6-1 11/08/07 16.13.1-1 05/01/14 16.13.1-2 05/01/14 16.13.1-3 05/01/14 16.13.1-4 05/01/14 16.13.1-5 05/01/14 16.13.1-6 05/01/14 16.13.1-7 05/01/14 16.13.1-8 05/01/14 16.13.1-9 05/01/14 16.13.1-10 05/01/14 16.13.2-1 12/15/04 16.13.2-2 Delete 12/15/04 16.13.2-3 Delete 12/15/04 16.13.2-4 Delete 12/15/04 16.13.3-1 12/15/04 16.13.3-2 Delete 12/15/04 16.13.4-1 3/27/99 16.13.5-1 Delete 16.13.5-2 Delete 16.13.6-1 3/27/99 16.13.7-1 12/15/04 16.13.7-2 12/15/04 16.13.8-1 3/27/99 16.13.9-1 3/27/99 16.13.9-2 3/27/99 16.13.10-1 3/27/99 16.13.11-1 3/27/99 16.14.1-1 11/15/12 16.14.2-1 07/23/12 16.14.2-2 07/23/12 16.14.3-1 3/27/99 16.14.4-1 Deleted 3/15/11 16.14.4.a-1 3/15/11 LOEP 12 Oconee Nuclear Station Selected Licensee Commitments Revised 06/13/14 List of Effective Pages Paae Revision Date 16.15.1-1 4/12/06 16.15.1-2 Deleted 4/12/06 16.15.1-3 Deleted 4/12/06 16.15.1-4 Deleted 4/12/06 16.15.1-5 Deleted 4/12/06 16.15.2-1 11/15/12 16.15.2-2 11/15/12 16.15.2-3 11/15/12 16.15.2-4 11/15/12 16.15.2-5 11/15/12 16.15.3-1 11/15/12 16.15.3-2 11/15/12 16.15.3-3 11/15/12 16.15.3-4 11/15/12 16.15.3-5 11/15/12 LOEP 13 Protected Service Water System Unavailability 16.9.22 16.9 AUXILIARY SYSTEMS 16.9.22 Protected Service Water System Unavailability COMMITMENTS:

a. Provide power from alternate power system substation to Protected Service Water (PSW) switchgear.
b. Provide power for required 4160V PSW system loads.c. Provide power for an independent backup source of electrical power to support required SSF system loads.d. Provide required train of DC power for the PSW system.e. Provide normal power supply for required 600/208/120 VAC loads in PSW building.f. Provide required heating and ventilation in the PSW Building.g. Provide capability to power both PSW switchgears from Keowee Hydroelectric Station.h. Provide PSW power to the selected A or B HPI pump motor on each unit.i. Provide PSW power to the required 600/208/120 VAC loads on each unit.APPLICABILITY:

MODES l and 2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Power from alternate power A.1 Log unavailability in NA system substation to the Operations Log.Protected Service Water (PSW) switchgear is unavailable.

B. Power for required 4160V B.1 Log unavailability in NA PSW system loads is the Operations Log.unavailable.

C. Power for an independent C.1 Log unavailability in NA backup source of electrical the Operations Log.power to support required SSF system loads is unavailable.

16.9.22-1 06/13/2014 1

Protected Service Water System Unavailability 16.9.22 CONDITION REQUIRED ACTION COMPLETION TIME D. Required train of DC power D.1 Log unavailability in NA for the PSW system is the Operations Log.unavailable.

E. Normal power for required E.1 Log unavailability in NA 600/208/120 VAC loads in the Operations Log.PSW building is unavailable.

F. Required heating and F.1 Log unavailability in NA ventilation in the PSW the Operations Log.Building is unavailable.

G. Capability to power both G.1 Log unavailability in NA PSW switchgears from the Operations Log.Keowee Hydroelectric Station is unavailable.

NA H. Capability to provide PSW H.1 Log unavailability in power to the selected A or B the Operations Log.HPI pump motors is unavailable.

NA 1. Capability to provide PSW 1.1 Log unavailability in power to the required the Operations Log.600/208/120 VAC loads is unavailable.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 16.9.22.1 N/A N/A 16.9.22-2 06/13/2014 I

Protected Service Water System Unavailability 16.9.22 BASES The purpose of this Selected Licensee Commitment (SLC) is to monitor the performance of the major design features associated with the functions for the Protected Service Water (PSW)System. To monitor performance of these functions, unavailability must be logged.The PSW system and related equipment are being constructed.

As portions of the PSW System and related equipment are completed and placed in service, this SLC will require changes to incorporate the new Maintenance Rule functions to facilitate monitoring of unavailability per the Maintenance Rule Program.COMMITMENTS A. Provide power from alternate power system substation to Protected Service Water (PSW)switchgear (includes power to substation from Fant Black line, and power paths to both PSW switchgears).

If power path through PSW breaker B or power path through PSW breaker D is unavailable, then B7T-01 (B6T-B7T Tie) can be racked in and closed to supply both PSW switchgears to meet this commitment.

B. Provide power for required PSW system loads (includes CT-6 Transformer, breaker B6T-1 (B6T 4160V Feeder), and breaker B6T-2 (PX1 3 Load Center Transformer).

If power path through CT-6 Transformer with breaker B6T-1 (B6T 4160V Feeder) is unavailable then B7T-01 (B6T-B7T Tie) can be racked in and closed to supply both PSW switchgear to meet this commitment.

C. Provide power for an independent backup source of electrical power to support essential SSF system loads (includes CT-7 Transformer, breaker B7T-2 (B7T 4160V Fdr), breaker B7T-4 (SSF Bus Alt Feed), and breaker OTS1-0 (SSF Alternate Power Supply Bkr). No other 4160V loads on B7T switchgear are required.

If power path through CT-7 Transformer with breaker B7T-2 (B7T 4160V Feeder) is unavailable then B7T-01 (B6T-B7T Tie) can be racked in and closed to supply both PSW switchgear to meet this commitment.

If SLC 16.9.19, "Gravity Induced Reversed Flow to Standby Shutdown Facility (SSF)through a Unit 2 Condensate Cooler" is not met, power must be available to PSW switchgears from Fant Black line to meet this commitment.

D. Provide 125 VDC power to the PSW system (includes one PSW Battery, associated PSW Battery Charger, PSW 125V DC Power Distribution Center (DC01), both PSW Building 125V DC Panels (1 DC and 2DC), and AB 125V DC Panelboards (1 PSWPL2DC, 2PSWPL2DC, and 3PSWPL2DC).

E. Provide normal power supply for required 600/208/120 VAC loads in PSW building (includes PX13 Transformer, PX1 3-5B (PX13 Load center Feeder), PX13-4C (XPSW Normal Feeder Breaker), PSW Manual transfer Switch for XPSW, and MCC XPSW). Alternate Power supply to XPSW from Radwaste does not satisfy commitment.

F. Provide heating and ventilation (QA-1) in the PSW Building (Transformer room AND In-service Battery room) (includes required ductwork, fans, heaters, dampers, supports, and associated system controls).

16.9.22-3 06/13/2014 1

Protected Service Water System Unavailability 16.9.22 G. Capability to power both PSW switchgears from Keowee Hydroelectric Station includes the"A" channel of Keowee Emergency Start Circuitry, one Keowee Hydro Unit and associated KPF switchgear breakers (KHU-1 and KPF-9 or KHU-2 and KPF-10), and power paths to both PSW switchgears.

If power path through KPF-1 1 with PSW breaker A or power path through KPF-12 with PSW breaker C is unavailable, then B7T-01 (B6T-B7T Tie) can be racked in and closed to supply both PSW switchgears to meet this commitment.

H. Capability to provide PSW power to the selected A or B HPI pump motor on each unit includes B6T 4160V breakers, PSW HPI Manual Alignment Switch (locally selected to A or B HPI Pump), PSW Motor Operated Transfer Switch to align PSW power to selected HPI Pump. Includes equipment required to operate selected HPI Pump from Main Control Room.1. Capability to provide PSW power to 600/208/120 VAC loads on each unit includes PX13 600V breaker (PX13-4D, PX13-3C, and PX1 3-3D) to associated 600V MCC, associated 600V MCC(s) (1XPSW, 2XPSWA, 2XPSWB, 3XPSW) and associated 208/120V panel(s)(1KPSW, 2KPSW, 3KPSW). Includes PSW breakers to each unit's HP-139, HP-140, HP-24, HP-26, RC-155, RC-156, RC-157, RC-158, RC-159, and RC-160.Includes PSW Transfer Switches to each unit's HP-24, HP-26, RC-1 55, RC-1 56, RC-1 57, RC-158, RC-159, and RC-160. Includes equipment required to operate components from Main Control Room.ACTIONS When the functions required by COMMITMENTS A, B, C, D, E, F, G, H, or I are not met, the respective Required Action is to log the unavailability of the function.SURVEILLANCE REQUIREMENTS N/A REFERENCES

1. Oconee Nuclear Station TS 3.10.1, "Standby Shutdown Facility," LOEP dated 01/08/2014.
2. Nuclear System Directive NSD-310, "Requirements for the Maintenance Rule," Revision 12, 12/5/12.3. 10CFR50.65, "Maintenance Rule," Federal Register, last updated 08/28/2007.

16.9.22-4 06/13/2014 1