December 29, 2006LICENSEE: Entergy Nuclear Operations, Inc.FACILITY:Pilgrim Nuclear Power Station
SUBJECT:
SUMMARY
OF CONFERENCE CALL ON DECEMBER 12, 2006, WITHENTERGY NUCLEAR OPERATIONS, INC., REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)The U.S. Nuclear Regulatory Commission (NRC) staff conducted a conference call with EntergyNuclear Operations, Inc., (Entergy or the applicant) regarding the Pilgrim license renewal application (LRA) to discuss information sent to the NRC in response to requests for additional information (RAI) and to address other license renewal issues. The conference call was conducted on Tuesday, December 12, 2006, between 12:30 p.m. and 1:30 p.m., at 11555 Rockville Pike, Rockville, MD 20852. The list of participants is shown in the enclosure. The following is a summary of the conference call:The NRC Pilgrim Project Manager provided an introduction and began discussing the subjects to be covered in the conference: NRC staff considers the response to Pilgrim RAI 2.3.3.9-8 incomplete; NRC staff feels RAI 2.4.3-1 trash racks and traveling screens require aging management programs; request that Entergy justify the RAI 2.4.3-1 jib crane being considered out of scope of license renewal; concurrence that RAI 2.4.5-1 transmission towers are included in LRA Table 2.4-5; NRC staff requires the applicant to make a commitment to boiling water reactor vessel and internals program (BWRVIP)-94 and BWRVIP-76; discuss the core shroud tie rod upper bracket material and repair; discuss the validity of using one time inspections to assess reduction of fracture toughness in cast austenitic stainless steel (CASS) components; discuss RAI B.1.3-2 exception to NUREG 1800 AMP XI.M6. Discussion of RAI 2.3.3.9-8, resulted in the Entergy action to assess whether fire suppressionsystems for several transformers are within scope. Discussions regarding the trash racks, traveling screens and the jib crane resulted in an Entergy explanation as to why these components are considered out of scope. The discussion of the transmission towers resulted in the confirmation that the towers are represented in LRA table 2.4-5. Entergy stated that the commitment to BWRVIP-94 is reflected in Entergy procedure ENN-DC-135 and that a commitment to BWRVIP-76 will be addressed in a pending LRA amendment. Entergy explained that the core shroud tie rod upper bracket will be replaced in the April 2007, Pilgrim re-fueling outage. Entergy took an action to research LRA inconsistencies regarding the inspection for reductionof fracture toughness of CASS piping and pump casings. Entergy stated that exception 1 to GALL AMP XI.M6 need not be deleted from the LRA as a result of discussions with the NRC staff during this conference call. The applicant had an opportunity to comment on the meeting summary./RA/Perry Buckberg, Project ManagerLicense Renewal Branch A Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-293
Enclosure:
List of Participantscc w/encl: See next page
ML063480053C:\FileNet\ML063480053.wpdOFFICELA:DLRPM:RLRA:DLRBC:RLRA:DLROGCNAMESFigueroaPBuckbergLLundSUttal DATE12/18/0612/18/0612/21/0612/26/06 Note to Entergy Nuclear Operations, Inc., from P. Buckberg Dated December 29, 2006
SUBJECT:
SUMMARY
OF CONFERENCE CALL ON DECEMBER 12, 2006, WITHENTERGY NUCLEAR OPERATIONS, INC., REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)HARD COPYDLR R/FE-MAIL: JFairRWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)
SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva
RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff
PBuckberg SHoffman SUttal JShea JDavis CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1 Pilgrim Nuclear Power Station cc:Regional Administrator, Region IU. S. Nuclear Regulatory Commission
475 Allendale Road King of Prussia, PA 19406-1415Senior Resident InspectorU. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station P.O. Box 867 Plymouth, MA 02360Chairman, Board of Selectmen11 Lincoln Street Plymouth, MA 02360ChairmanNuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360Chairman, Duxbury Board of SelectmenTown Hall 878 Tremont Street Duxbury, MA 02332Office of the CommissionerMassachusetts Department of Environmental Protection One Winter Street Boston, MA 02108Office of the Attorney GeneralOne Ashburton Place 20th Floor Boston, MA 02108MA Department of Public HealthRadiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129Secretary of Public SafetyExecutive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399Mr. William D. MeinertNuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426Mr. Michael A. BalduzziSite Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508Mr. Stephen J. BethayDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508Mr. Bryan S. FordManager, Licensing Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Pilgrim Nuclear Power Station cc:-2-Mr. John T. HerronSr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. Oscar LimpiasVice President, Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. Christopher SchwarzVice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCannDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Ms. Charlene D. FaisonManager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. Michael D. Lyster5931 Barclay Lane Naples, FL 34110-7306Mr. Michael J. ColombDirector of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Ms. Stacey LousteauTreasury Department Entergy Services, Inc.
639 Loyola Avenue New Orleans, LA 70113Mr. James Sniezek5486 Nithsdale Drive Salisbury, MD 21801Mr. Travis C. McCulloughAssistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. James RossNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708Plymouth Public LibraryAttn: Dinah O'Brien 132 South Street Plymouth, MA 02360Duxbury Free LibraryATTN: Ms. Elaine Winquist 77 Alden Street Duxbury, MA 02332
Kingston Public Library ATTN: Reference Librarian 6 Green Street Kingston, MA 02364Ms. Mary LampertDuxbury Nuclear Advisory, Chair Pilgrim Watch, Director 148 Washington Street Duxbury, MA 02332 LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATIONDecember 12, 2006PARTICIPANTSAFFILIATIONPerry BuckbergU.S. Nuclear Regulatory Commission (NRC)Raj AuluckNRC Ganesh CheruvenkiNRC Naeem IqbalNRC James DavisNRC Susan LaneNRC Peter WenNRC Phil QuallsNRC James MedoffNRC Doug EllisEntergy Nuclear Operations, Inc. (Entergy)
Fred MogoleskoEntergy Alan CoxEntergy Ray Pace Entergy Abdolreza AhrabliEntergy David Lach Entergy Steve Burke EntergyENCLOSURE