12/13/2006 Summary of Perry Public Exit Meeting Regarding the Results of the NRC Confirmatory Action Letter Followup Inspections
ML063490175
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/15/2006
From: Duncan E R
NRC/RGN-III/DRP/RPB6
To:
References
Download: ML063490175 (5)


Text

December 15, 2006LICENSEE:FirstEnergy Nuclear Operating CompanyFACILITY:Perry Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF THE DECEMBER 13, 2006, PUBLIC EXIT MEETING TODISCUSS THE RESULTS OF NRC CONFIRMATORY ACTION LETTER FOLLOWUP INSPECTIONS THAT REVIEWED THE EFFECTIVENESS OF LICENSEE ACTIONS IN THE AREAS OF HUMAN PERFORMANCE, SUPPLEMENTAL INSPECTION PROCEDURE 95002 ISSUES, AND CORRECTIVE ACTION PROGRAM On December 13, 2006, the Nuclear Regulatory Commission (NRC) held a public exit meetingat the Quail Hollow Resort in Painesville, Ohio. The meeting was between NRC Region III andFirstEnergy Nuclear Operating Company (FENOC) management to discuss the results of the NRC's Confirmatory Action Letter (CAL) Followup inspections of the Human Performance, Supplemental Inspection Procedure 95002 Issues, and Corrective Action Program areas. The meeting notice, NRC presentation, and licensee presentation can be found in the Agencywide Document Access and Management System (ADAMS) as ML062900484, ML063490027, andML063490024, respectively. A list of principal NRC and licensee meeting participants can befound in the attached Enclosure.The NRC began the meeting with a review of Perry's performance since entering the Multiple/Repetitive Degraded Cornerstone column of the NRC's Action Matrix. This was followed by an overview of the CAL and a brief summary of the results of previous CAL followup inspection activities. The results of the subject inspections were then discussed.

FENOC then responded to the NRC's assessment and discussed the progress of improvement efforts at Perry. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and FENOC representatives.Sincerely,/RA/Eric R. Duncan, ChiefBranch 6 Division of Reactor ProjectsDocket No. 50-440License No. NPF-58

Enclosure:

As Stated DISTRIBUTION:See next page December 15, 2006LICENSEE:FirstEnergy Nuclear Operating CompanyFACILITY:Perry Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF THE DECEMBER 13, 2006, PUBLIC EXIT MEETING TODISCUSS THE RESULTS OF NRC CONFIRMATORY ACTION LETTER FOLLOWUP INSPECTIONS THAT REVIEWED THE EFFECTIVENESS OF LICENSEE ACTIONS IN THE AREAS OF HUMAN PERFORMANCE, SUPPLEMENTAL INSPECTION PROCEDURE 95002 ISSUES, AND CORRECTIVE ACTION PROGRAM On December 13, 2006, the Nuclear Regulatory Commission (NRC) held a public exit meetingat the Quail Hollow Resort in Painesville, Ohio. The meeting was between NRC Region III andFirstEnergy Nuclear Operating Company (FENOC) management to discuss the results of the NRC's Confirmatory Action Letter (CAL) Followup inspections of the Human Performance, Supplemental Inspection Procedure 95002 Issues, and Corrective Action Program areas. The meeting notice, NRC presentation, and licensee presentation can be found in the Agencywide Document Access and Management System (ADAMS) as ML062900484, ML063490027, andML063490024, respectively. A list of principal NRC and licensee meeting participants can befound in the attached Enclosure.The NRC began the meeting with a review of Perry's performance since entering theMultiple/Repetitive Degraded Cornerstone column of the NRC's Action Matrix. This was followed by an overview of the CAL and a brief summary of the results of previous CAL followup inspection activities. The results of the subject inspections were then discussed.

FENOC then responded to the NRC's assessment and discussed the progress of improvement efforts at Perry. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and FENOC representatives.Sincerely,/RA/Eric R. Duncan, Chief Branch 6 Division of Reactor ProjectsDocket No. 50-440License No. NPF-58

Enclosure:

As Stated DISTRIBUTION:See next pageDOCUMENT NAME: C:\FileNet\ML063490175.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copywith attach/encl "N" = No copyOFFICERIIINRIIINNAMEEDuncan for RRuiz:dtpEDuncanDATE12/150612/15/06 OFFICIAL RECORD COPY FirstEnergy Nuclear Operating Companycc w/encl:G. Leidich, President and Chief Nuclear Officer - FENOCJ. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight Director, Site Operations Director, Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health FirstEnergy Nuclear Operating CompanyDISTRIBUTION

DXC1 TEB TJW2 RidsNrrDirsIrib GEG KGO GLS MEF1 DRPIII DRSIII PLB1 TXN EnclosurePrincipal Meeting Participants NRCM. Satorius, Director, Division of Reactor ProjectsE. Duncan, Chief, Branch 6, Division of Reactor Projects M. Franke, Senior Resident Inspector, Perry T. Wengert, Project Manager, Office of Nuclear Reactor RegulationFirstEnergy Nuclear Operating CompanyL. Pearce, Vice President, PerryB. Allen, Director, Site Operations, Perry A. Cayia, Director, Performance Improvement, Perry M. Wayland, Director, Maintenance, Perry