December 15, 2006 LICENSEE:

FirstEnergy Nuclear Operating Company FACILITY:

Perry Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF THE DECEMBER 13, 2006, PUBLIC EXIT MEETING TO DISCUSS THE RESULTS OF NRC CONFIRMATORY ACTION LETTER FOLLOWUP INSPECTIONS THAT REVIEWED THE EFFECTIVENESS OF LICENSEE ACTIONS IN THE AREAS OF HUMAN PERFORMANCE, SUPPLEMENTAL INSPECTION PROCEDURE 95002 ISSUES, AND CORRECTIVE ACTION PROGRAM On December 13, 2006, the Nuclear Regulatory Commission (NRC) held a public exit meeting at the Quail Hollow Resort in Painesville, Ohio. The meeting was between NRC Region III and FirstEnergy Nuclear Operating Company (FENOC) management to discuss the results of the NRCs Confirmatory Action Letter (CAL) Followup inspections of the Human Performance, Supplemental Inspection Procedure 95002 Issues, and Corrective Action Program areas. The meeting notice, NRC presentation, and licensee presentation can be found in the Agencywide Document Access and Management System (ADAMS) as ML062900484, ML063490027, and ML063490024, respectively. A list of principal NRC and licensee meeting participants can be found in the attached Enclosure.

The NRC began the meeting with a review of Perrys performance since entering the Multiple/Repetitive Degraded Cornerstone column of the NRCs Action Matrix. This was followed by an overview of the CAL and a brief summary of the results of previous CAL followup inspection activities. The results of the subject inspections were then discussed.

FENOC then responded to the NRCs assessment and discussed the progress of improvement efforts at Perry. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and FENOC representatives.

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

As Stated DISTRIBUTION:

See next page

December 15, 2006 LICENSEE:

FirstEnergy Nuclear Operating Company FACILITY:

Perry Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF THE DECEMBER 13, 2006, PUBLIC EXIT MEETING TO DISCUSS THE RESULTS OF NRC CONFIRMATORY ACTION LETTER FOLLOWUP INSPECTIONS THAT REVIEWED THE EFFECTIVENESS OF LICENSEE ACTIONS IN THE AREAS OF HUMAN PERFORMANCE, SUPPLEMENTAL INSPECTION PROCEDURE 95002 ISSUES, AND CORRECTIVE ACTION PROGRAM On December 13, 2006, the Nuclear Regulatory Commission (NRC) held a public exit meeting at the Quail Hollow Resort in Painesville, Ohio. The meeting was between NRC Region III and FirstEnergy Nuclear Operating Company (FENOC) management to discuss the results of the NRCs Confirmatory Action Letter (CAL) Followup inspections of the Human Performance, Supplemental Inspection Procedure 95002 Issues, and Corrective Action Program areas. The meeting notice, NRC presentation, and licensee presentation can be found in the Agencywide Document Access and Management System (ADAMS) as ML062900484, ML063490027, and ML063490024, respectively. A list of principal NRC and licensee meeting participants can be found in the attached Enclosure.

The NRC began the meeting with a review of Perrys performance since entering the Multiple/Repetitive Degraded Cornerstone column of the NRCs Action Matrix. This was followed by an overview of the CAL and a brief summary of the results of previous CAL followup inspection activities. The results of the subject inspections were then discussed.

FENOC then responded to the NRCs assessment and discussed the progress of improvement efforts at Perry. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and FENOC representatives.

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

As Stated DISTRIBUTION:

See next page DOCUMENT NAME: C:\\FileNet\\ML063490175.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N

RIII N

NAME EDuncan for RRuiz:dtp EDuncan DATE 12/1506 12/15/06 OFFICIAL RECORD COPY

FirstEnergy Nuclear Operating Company cc w/encl:

G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight Director, Site Operations Director, Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health

FirstEnergy Nuclear Operating Company DISTRIBUTION:

DXC1 TEB TJW2 RidsNrrDirsIrib GEG KGO GLS MEF1 DRPIII DRSIII PLB1 TXN

Enclosure Principal Meeting Participants NRC M. Satorius, Director, Division of Reactor Projects E. Duncan, Chief, Branch 6, Division of Reactor Projects M. Franke, Senior Resident Inspector, Perry T. Wengert, Project Manager, Office of Nuclear Reactor Regulation FirstEnergy Nuclear Operating Company L. Pearce, Vice President, Perry B. Allen, Director, Site Operations, Perry A. Cayia, Director, Performance Improvement, Perry M. Wayland, Director, Maintenance, Perry