Information Notice 1997-29, Containment Inspection Rule

From kanterella
Revision as of 13:07, 31 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Containment Inspection Rule
ML031060003
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Crane  Entergy icon.png
Issue date: 05/30/1997
From: Slosson M M
Office of Nuclear Reactor Regulation
To:
References
IN-97-029, NUDOCS 9705290064
Download: ML031060003 (9)


K)UNITED STATES NUCLEAR REGULATORY

COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, D.C. 20555-0001 May 30, 1997 NRC INFORMATION

NOTICE 97-29: CONTAINMENT

INSPECTION

RULE

Addressees

All holders of operating

licenses or construction

permits for nuclear power reactors.

Purpose

The U.S. Nuclear Regulatory

Commission (NRC) is issuing this information

notice to clarify for addressees

the containment

inspection

rule in accordance

with 10 CFR 50.55a(a), which in part endorses Subsections

IWE and IWL of Section Xl of the American Society of Mechanical

Engineers'

Boiler and Pressure Vessel Code (ASME Code). The rule became effective

on September

9, 1996. It is expected that recipients

will review the information

for applicability

to their facilities

and consider actions, as appropriate.

However, suggestions

contained

in this information

notice are not NRC requirements;

therefore, no specific action or written response is required.Description

of Circumstances

In a Federal Register, dated August 8, 1996 (61 FR 41303), the NRC amended its regulations (rule) to incorporate

by reference

the 1992 Edition and Addenda of Subsections

IWE and IWL of Section Xl of the ASME Code. Subsections

IWE and IWL give the requirements

for inservice

inspection (ISI) of Class CC (concrete

containments), and Class MC (metallic

containments)

of light-water-cooled

power plants. The amended rule became effective

on September

9, 1996; it requires the licensees

to incorporate

the new requirements

into their ISI plans and to complete the first containment

inspection

within five years (i.e., no later than September

9, 2001). Any repair or replacement (RIR) activity to be performed

on containments

after the effective

date of September

9, 1996, has to be carried out in accordance

with the respective

requirements

of Subsections

IWE and IWL.Recognizing

the potential

industry concern related to the immediate

implementation

of the rule for R/R activities, the Nuclear Energy Institute (NEI) wrote a letter to NRC (Reference

1)indicating

a general industry interpretation

of the rule that all containment

ISI activities, including

R/R activities

should be effective

from September

9, 2001. The NRC responded

to the NEI letter (Reference

2) stating that all R/R activities

within the scope of Subsections

IWE and IWL of the code conducted

after September

9, 1996, must be conducted

in accordance

with these subsectio#WO°& l o9 7-O49 970t-S 10,004 6 1-M O Pll_________________l_

q C.-

IN 97-29 May 30, 1997 Additionally, the staff stated (Reference

2) that 10 CFR 50.55a(3)

permits the Director of the Office of Nuclear Reactor Regulation

at his discretion

to grant relief from the requirements

of 10 CFR 50.55a to licensees

who submit a justifiable

need to use an alternative

that provides an acceptable

level of safety or who encounter

extreme hardship or unusual difficulty

without a compensating

increase in the level of quality or safety. In general, the staff stated that with proper justification, relief requests from compliance

with the RJR requirements

of Subsections

IWE and IWL for a period of about one year from September

9, 1996, would appear to be reasonable.

Although NEI sent the response from NRC to many of the addressees, the NRC staff is issuing this information

notice to inform all addressees

about the NRC staff position.Discussion

As discussed

above, addressees

are required to implement

the rule for all containment- related R/R activities

to be conducted

after September

9, 1996. Even though a licensee is able to demonstrate

hardship or unusual difficulties

in the immediate

implementation

of the rule, the licensee has to demonstrate

that other procedures

utilized for R/R activities

will ensure adequate safety of the containments

and that proper quality assurance

requirements

have been implemented.

In some of the relief requests that the staff has reviewed, licensees

have reported appropriate "hardship

and unusual difficulties" reasons for postponing

the implementation

of the rule, but did not describe the effectiveness

of the procedures

they plan to use during the relief period. Without such information, the staff has no way of concluding

that the quality and safety of containment

RIR activities

are adequate.

K> IN 97-29 May 30, 1997 This information

notice requires no specific action or written response.

If you have any questions

about the information

in this notice, please contact the technical

contacts listed below or the appropriate

Office of Nuclear Reactor Regulation (NRR) project manager.Marylee M. Slosson, Acting Director Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Technical

contacts:

Seung Lee, NRR 301-415-2737 E-mail: sjl@nrc.gov

Hans Ashar, NRR 301-415-2851 E-mail: hgaenrc.gov

References

1. Letter from Alex Marion (NEI) to Brian Sheron (NRC), "Interpretation

of Amended 10 CFR 50.55a," dated 09119/96 (Accession

No. 9704180074).

2. Letter from Gus Lainas (NRC) to Alex Marion (NEI), "Implementation

of Containment

Inspection

Rule," dated 11/06/96 (Accession

No. 9611130161).

Attachment:

List of Recently Issued NRC Information

Notices kit C- i4"( & p a

Attachment

IN 97-29 May 30, 1997 0 LIST OF RECENTLY ISSUED NRC INFORMATION

NOTICES Information

Date of Notice No. Subject Issuance Issued to 97-28 97-27 Elimination

of Instrument

Response Time Testing Under the Requirements

of 10 CFR 50.59 Effect of Incorrect Strainer Pressure Drop on Available

Net Positive Suction Head Degradation

in Small-Radius U-Bend Regions of Steam Generator

Tubes 05/30/97 05/16/97 05/19/97 All holders of OLs or CPs All holders of OLs or CPs for light-water

power reactors, except those licensees

who have per-manently ceased operations

and have certified

that fuel has been permanently

removed from the reactor vessel All holders of OLs or CPs for pressurized-water

reactors 97-26 87-10, Sup. 1 Potential

for Water Hammer During Restart of Residual Heat Removal Pumps Dynamic Range Uncertain- ties in the Reactor Vessel Level Instrumentation

05/15/97 05/09/97 All holders of OLs or CPs for boiling-water

reactors All holders of OLs or CPs for Westinghouse

pressurized- water reactors 97-25 OL = Operating

License CP = Construction

Permit

IN 97-29 May 30, 1997 This information

notice requires no specific action or writterd response.

If you have any questions

about the information

in this notice, please contact the technical

contacts listed below or the appropriate

Office of Nuclear Reactor Regulation (NRR) project manager.original signed by S.H. Weiss for Marylee M. Slosson, Acting Director Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Technical

contacts: Seung Lee, NRR 301-415-2737 E-mail: sjl@nrc.gov

Hans Ashar, NRR 301-415-2851 E-mail: hga@nrc.gov

References

1. Letter from Alex Marion (NEI) to Brian Sheron (NRC), "Interpretation

of Amended 10 CFR 50.55a," dated 09/19196 (Accession

No. 9704180074).

2. Letter from Gus Lainas (NRC) to Alex Marion (NEI), "Implementation

of Containment

Inspection

Rule," dated 11/06/96 (Accession

No. 9611130161).

Attachment:

List of Recently Issued NRC Inforrnation

Notices Tech Editor has reviewed and concurred

on 4/17/97 DOCUMENT NAME: 97-29.IN To receive a copy of this document, kndlcata hI the box: *C' -Copy w/o attachmentlenclosure

'E' -Copy wlattachmentlenclosure

'N' -No copy OFFICE TECH CONTS I C:PECB:DRPM

AD:DRPM:NRR, o1. Li NAME SLee* AChaffee*

MSos;TGreene* _ _ _ _DATE 04/22/97 05/15/97 05/2.3/97 IV OFFICIAL RECORD COPY

IN 97-XX May XX, 1997 This information

notice requires no specific action or written response.

If you have any questions

about the information

in this notice, please contact the technical

contacts listed below or the appropriate

Office of Nuclear Reactor Regulation (NRR) project manager.Marylee M. Slosson, Acting Director Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Technical

contacts: Seung Lee, NRR (301) 415-2737 E-mail: sjl~nrc.gov

Hans Ashar, NRR (301) 415-2851 E-mail: hga~nrc.gov

References

1. Letter from Alex Marion (NEI) to Brian Sheron (NRC), "Interpretation

of Amended 10 CFR 50.55a," dated 09/19/96 (Accession

No. 9704180074).

2. Letter from Gus Lainas (NRC) to Alex Marion (NEI), "Implementation

of Containment

Inspection

Rule," dated 11/06/96 (Accession

No. 9611130161).

Attachment:

List of Recently Issued NRC Information

Notices OFC PECB:DRPM

ECGB:DE CIECGB:DE

OGC NAME T. Greene* S. Lee* G. Bagchi* S. Treby*DATE 04/22/97 04/22/97 04/24/97 05/06/97 See previous concurrence

OFC CIPECB:DRPM

AD/DRPK 1 NAME A. Chaffee6W

M. Slosson X DATE ij/197 /97 OFFICIAL RECORD 51 97 DOCUMENT NAME: GATAGXINCONT

K> uIN 97-XX May XX, 1997 This information

notice requires no specific action or written response.

If you have any questions

about the information

in this notice, please contact the technical

contact listed below or the appropriate

Office of Nuclear Reactor Regulation (NRR) project manager.Thomas T. Martin, Director Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Technical

contacts: Seung Lee, NRR (301) 415-2737 E-mail: sjlenrc.gov

Hans Ashar, NRR (301) 415-2851 E-mail: hga@nrc.gov

REFERENCES

1. Letter from Alex Marion (NEI) to Brian Sheron (NRC), "Interpretation

of Amended 10 CFR 50.55a," September

19, 1996 (Accession

9704180074).

2. Letter from Gus Lainas (NRC) to Alex Marion (NEI), "Implementation

of Containment

Inspection

Rule," November 6, 1996 (Accession

9611130161).

Attachment:

List of Recently Issued NRC Information

Notices ,no to?'OFC PECB:DRPM

ECGB:DE C/ECGB:DE

OGC NAME T. Greene* S. Lee* G. Bagchi* ffi /DATE 04/22/97 04/22/97 04/24/97 6//97 See previous concurrence

--______[ OFC C/PECB:DRPM

D/DRPM NA A. Chaffee T. MartinlDATE /97 1 197 OFFICIAL RECORD COPY DOCUMENT NAME: G:\TAGXINCONT

IN 97-XX April XX, 1997 This information

notice requires no specific action or written response.

If you have any questions

about the information

in this notice, please contact the technical

contact listed below or the appropriate

Office of Nuclear Reactor Regulation (NRR) project manager.Thomas T. Martin, Director Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Technical

contacts: Seung Lee, NRR (301) 415-2737 E-mail: sjl~nrc.gov

Hans Ashar, NRR (301) 415-2851 E-mail: hga@nrc.gov

REFERENCES

1. Letter from Alex Marion (NEI) to Brian Sheron (NRC), "Interpretation

of Amended 10 CFR 50.55a," dated September

19, 1996 (Accession, 9704180074).

2. Letter from Gus Lainas (NRC) to Alex Marion (NEI), 'Implementation

of Containment

Inspection

Rule," dated November 6, 1996 (Accession

9611130161).

Attachment:

List of Recently Issued NRC Information

Notices OFC PECB:DRPM

l ECGB:DE C SBE ECB:DRPM D/DRPM NAME T. Greene* S. Lee* ij 9 -I j A. Chaffee T. Martin DATE 04/22/97 04/22/97 /97 j / /97* See previous concurrence

I I OFFICIAL RECORD COPY DOCUMENT NAME: G:\TAG\INCONT

IN 97-XX April XX, 1997 This information

notice requires no specific action or written response.

If you have any questions

about the information

in this notice, please contact the technical

contact listed below or the appropriate

Office of Nuclear Reactor Regulation (NRR) project manager.Thomas T. Martin, Director Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Technical

contacts: Seung Lee, NRR (301) 415-2737 E-mail: sjlnrc.gov

Hans Ashar, NRR (301) 415-2851 E-mail: hgaenrc.gov

REFERENCES

1. Letter from Alex Marion (NEI) to Brian Sheron (NRC), "Interpretation

of Amended 10 CFR 50.55a," September

19, 1996 (Accession

xxxxxoxxxx).

2. Letter from Gus Lainas (NRC) to Alex Marion (NEI), "Implementation

of Containment

Inspection

Rule," November 6, 1996 (Accession

9611130161).

Attachment:

List of Recently Issued NRC Information

Notices OFC PECB:DRPM

ECGB:DE C/ECGB:DE

C/PECB:DRPM

D/DRPM NAME T. Greene S. Lee ;;f G. Bagchi A. Chaffee T. Martin DATE 1 97 II 9 7 I //97 1 /97 1 /97 OFFICIAL RECORD COPY]DOCUMENT NAME: G:ITAGUNCONT