Thomas A. Marlow R.E. Ginna Nuclear Power Plant, LLC Plant General Manager 1503 Lake Road Ontario, NewYork 14519-9364 585.771.3000 Constellation Energy Generation Group December 10, 2004 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate l-1 Washington, DC 20555
Subject:
Monthly Report for November 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of November 2004.
Very truly your,%,
Thomas A. Marlow Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop 0-8-C2)
Project Directorate 1-1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT DOCKET NO. 50-244 UNIT NAME Ginna 1 DATE December 06,2004 COMPLETED BY John V. Walden .
TELEPHONE 585-771-3588 REPORTING PERIC November 2004
- 1. Design Electrical Rating 470.00
- 2. Maximum Dependable Capacity (MWe-Net) 480.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 7,994.58 254,992.80
- 4. Number of Hours Generator On-line 720.00 7,989.53 251,775.23
- 5. Reserve Shutdown Hours 0.00 0.00 8.50
- 6. Net Electrical Energy Generated (MWHrs) 358,159.00 3,938,109.80 115,135,610.8 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason I Down 2 Comments
SUMMARY
- The unit operated at full power for the entire month of November. Average power for the month was 99.7%.
1 2 Reason: Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
Page 1 of 1