ML043630341
| ML043630341 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 12/10/2004 |
| From: | Marlow T Constellation Energy Group, Ginna |
| To: | Clark R Document Control Desk, NRC/NRR/DLPM/LPD1 |
| References | |
| Download: ML043630341 (2) | |
Text
Thomas A. Marlow R.E. Ginna Nuclear Power Plant, LLC Plant General Manager 1503 Lake Road Ontario, NewYork 14519-9364 585.771.3000 Constellation Energy Generation Group December 10, 2004 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate l-1 Washington, DC 20555
Subject:
Monthly Report for November 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of November 2004.
Very truly your,%,
Thomas A. Marlow Plant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop 0-8-C2)
Project Directorate 1-1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-244 Ginna 1 December 06,2004 John V. Walden.
585-771-3588 November 2004
- 1.
Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net) 470.00 480.00
- 3.
Number of Hours the Reactor was Critical
- 4. Number of Hours Generator On-line
- 5. Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 720.00 720.00 0.00 358,159.00 Yr-to-Date 7,994.58 7,989.53 0.00 3,938,109.80 Cumulative 254,992.80 251,775.23 8.50 115,135,610.8 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours) Reason I Down 2 Comments
SUMMARY
- The unit operated at full power for the entire month of November. Average power for the month was 99.7%.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of 1