November 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant
ML043630341
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/10/2004
From: Marlow T
Constellation Energy Group, Ginna
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML043630341 (2)


Text

Thomas A. Marlow R.E. Ginna Nuclear Power Plant, LLC Plant General Manager 1503 Lake Road Ontario, NewYork 14519-9364 585.771.3000 Constellation Energy Generation Group December 10, 2004 US Nuclear Regulatory Commission Document Control Desk Attn:

Robert Clark Project Directorate l-1 Washington, DC 20555

Subject:

Monthly Report for November 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of November 2004.

Very truly your,%,

Thomas A. Marlow Plant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop 0-8-C2)

Project Directorate 1-1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-244 Ginna 1 December 06,2004 John V. Walden.

585-771-3588 November 2004

1.

Design Electrical Rating

2. Maximum Dependable Capacity (MWe-Net) 470.00 480.00
3.

Number of Hours the Reactor was Critical

4. Number of Hours Generator On-line
5. Reserve Shutdown Hours
6.

Net Electrical Energy Generated (MWHrs)

This Month 720.00 720.00 0.00 358,159.00 Yr-to-Date 7,994.58 7,989.53 0.00 3,938,109.80 Cumulative 254,992.80 251,775.23 8.50 115,135,610.8 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours) Reason I Down 2 Comments

SUMMARY

The unit operated at full power for the entire month of November. Average power for the month was 99.7%.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

Page 1 of 1