Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: CNL-16-008, Update on Progress of Facility Modifications for MSIV Leak Rate, CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report, CNL-18-124, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports, CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report, ML15282A189, ML16085A301, ML16105A297, ML16105A441, ML16168A026, ML16176A316, ML16189A343, ML17062A390, ML17062A403, ML17181A450
|
MONTHYEARML15282A1892015-08-31031 August 2015 ANP-3372NP, Revision 1, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design Project stage: Other ML15282A2252015-08-31031 August 2015 ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues Project stage: Request ML15282A1822015-08-31031 August 2015 ANP-3403NP, Revision 2, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3, Attachment 9 Project stage: Request ML15282A1932015-08-31031 August 2015 ANP-3385NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2, and 3 Extended Power Uprate (EPU) ATRIUM-10 Fuel Assemblies, Licensing Report Project stage: Request ML15282A2362015-08-31031 August 2015 NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis Project stage: Request ML15282A1902015-08-31031 August 2015 ANP-3404NP, Revision 2, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate Project stage: Request ML15282A2232015-08-31031 August 2015 ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 - Summary of Responses to Request for Additional Information, Extension for Use of Atrium 10XM Fuel for Extended Power Uprate Project stage: Supplement ML15282A1882015-08-31031 August 2015 ANP-3342NP, Revision 1, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design Project stage: Request ML15282A1872015-08-31031 August 2015 ANP-3384NP, Revision 3, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (Epu) Project stage: Request ML15282A1852015-08-31031 August 2015 ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu) Project stage: Request ML15282A1922015-08-31031 August 2015 ANP-3386NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) Atrium 10XM Fuel Assemblies, Licensing Report Project stage: Request ML15282A1842015-08-31031 August 2015 ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu) Project stage: Request ML15282A1522015-09-21021 September 2015 Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate Project stage: Request ML15282A2402015-09-21021 September 2015 Startup Test Plan Project stage: Request ML15282A2222015-09-21021 September 2015 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology Project stage: Request ML15282A2412015-09-21021 September 2015 List and Status of Plant Modifications Project stage: Request ML15282A1812015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 Project stage: Request ML15282A2352015-09-21021 September 2015 RHR Heat Exchange K-values Utilities in EPU Containment Analyses Project stage: Request 05000259/LER-2015-002, Regarding High Pressure Coolant Injection System Inoperable Due to Slow Containment Isolation Valve Closing Time2015-09-21021 September 2015 Regarding High Pressure Coolant Injection System Inoperable Due to Slow Containment Isolation Valve Closing Time Project stage: Request CNL-15-249, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information2015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information Project stage: Supplement CNL-15-250, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 72015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 7 Project stage: Supplement CNL-15-261, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information2015-12-18018 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information Project stage: Supplement ML16032A0442016-02-0101 February 2016 Fws to NRC, Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location for Browns Ferry EPU Project stage: Request ML16041A3072016-02-18018 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16040A2322016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16041A0222016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16049A4632016-02-29029 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-045, Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information2016-03-0909 March 2016 Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information Project stage: Supplement ML16062A0722016-03-15015 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-048, Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)2016-03-24024 March 2016 Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) Project stage: Response to RAI ML16084A3202016-03-25025 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-055, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information2016-03-28028 March 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information Project stage: Supplement ML16089A1372016-03-29029 March 2016 NRR E-mail Capture - Correction to Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16064A2862016-04-0404 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16091A0712016-04-0707 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A3012016-04-11011 April 2016 Regulatory Audit Plans for April 19 - 21, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-069, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information2016-04-14014 April 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information Project stage: Supplement ML16102A3392016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A0792016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16104A2452016-04-20020 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16105A2972016-04-21021 April 2016 Regulatory Audit Plan for May 3-4, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other ML16105A4412016-04-27027 April 2016 Regulatory Audit Plan for May 10-11, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-077, For Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information2016-04-27027 April 2016 For Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information Project stage: Supplement ML16119A4402016-05-0606 May 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16119A1332016-05-0606 May 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (SNPB-RAI) Project stage: RAI CNL-16-079, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information2016-05-11011 May 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information Project stage: Supplement ML16120A0722016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16124B1062016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16124A9322016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16123A3352016-05-16016 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2016-03-29
[Table View] |
Text
Browns Ferry Nuclear Plant Extended Power Uprate License Amendment Request NRC Public Meeting Gerry Doyle Director EPU July 19, 2016
BFN EPU - Agenda Introductions G Doyle Extended Power Uprate (EPU) Background D Green EPU Overview P Donahue License Amendment Request (LAR) Review D Green
- Request for Additional Information (RAI) Status
- Status of Safety Evaluation Input Questions/Comments G Doyle Browns Ferry EPU License Amendment Request l 2
BFN EPU - Introductions Gerry Doyle - Director, EPU Pete Donahue - EPU Engineering Manager Dan Green - EPU Licensing Manager Ed Schrull - Fleet Licensing Manager Browns Ferry EPU License Amendment Request l 3
BFN EPU - Background Browns Ferry is pursuing a power uprate Current Licensed Thermal Power: 3458 MWt Extended Power Uprate Power: 3952 MWt Constant Pressure Power Uprate 1050 psia Steam Dome Pressure Maximum Extended Load Line Limit Analyses power/flow map is retained Feedwater and Steam Flow Increased Browns Ferry EPU License Amendment Request l 4
BFN EPU - Background Previous EPU LARs withdrawn on September 18, to be replaced by new consolidated EPU LAR in September 2014 October 2015 October 2014 Fuel Safety Analysis Report Pre-application meeting on October 14 with NRC January 2015 Pre-application meeting for 10 CFR 50.46c on January 15 April 2015 Pre-application meeting for Startup Test Plan on April 7 Pre-application meeting for Replacement Steam Dryers on April 22 Pre-application meeting for Containment Accident Pressure Credit Elimination on May 12 May 2015 Pre-application meeting for PRA on May 21 June 2015 Pre-application meeting for Flow Induced Vibration Monitoring on June 9 September 2015 BFN EPU LAR submitted on September 21 January 2016 NRC acceptance letter issued on January 11 Browns Ferry EPU License Amendment Request l 5
BFN EPU - Background Browns Ferry EPU Project Team Goals
- Present NRC with high quality LAR consistent with NRC Review Standard RS-001, Review Standard for Extended Power Uprates
- Receive a minimum number of NRC RAIs
- Resolve CAP credit issues
- Install RSDs on all three Browns Ferry Units
- Facilitate smooth transition to EPU for Plant Operations Browns Ferry EPU License Amendment Request l 6
BFN EPU - Overview Browns Ferry EPU License Amendment Request l 7
BFN EPU - Overview SCHEDULE MILESTONE TARGET Submit New EPU LAR COMPLETE - 09/21/15 U3 Delivery of FW Hx #3 Shell COMPLETE - 01/06/16 Receive Acceptance Letter from NRC COMPLETE - 01/11/16 NRC Requests for Additional Information (RAIs) - (Start) COMPLETE U2 Delivery of FW Hx #3 Shell COMPLETE - 03/21/16 U3R17 Outage (FW Hx #3 Shell Replacement & Margin Modifications) COMPLETE - 03/27/16 U2 Simulator Model Upgrade COMPLETE NRC Audit - Replacement Steam Dryers Design and Analysis (04/19/16 - 04/21/16) COMPLETE NRC Audit - Containment Accident Pressure Credit Elimination (05/03/16 - 05/05/16) COMPLETE NRC Audit - Spent Fuel Pool Criticality Analysis (05/10/16 - 05/11/16) COMPLETE U3 Simulator Model Upgrade August 2016 NRC Requests for Additional Information (RAIs) - (Completion) November 2016 Receive Draft Safety Evaluation December 2016 ACRS Subcommittee (02/22/17) February 2017 U2R19 Outage (FW Hx #3 Shell Replacement) March 2017 ACRS Full Committee (04/06/17 - 04/08/17) April 2017 Receive Safety Evaluation and License Amendments July 2017 U3 RSD Delivered to BFN October 2017 U3 FW Hx #4 Tube Bundles delivered to BFN (3 Bundles) January 2018 U3R18 Outage (EPU Implementation) March 2018 U1 RSD Delivered to BFN July 2018 U1 FW Hx #4 Tube Bundles delivered to BFN (3 Bundles) August 2018 U1R12 Outage (EPU Implementation) October 2018 U2 RSD Delivered to BFN October 2018 U2 FW Hx #4 Tube Bundles delivered to BFN (3 Bundles) January 2019 U2R20 Outage (EPU Implementation) March 2019 Browns Ferry EPU License Amendment Request l 8
BFN EPU - Overview Status of modifications required to implement EPU Browns Ferry EPU License Amendment Request l 9
BFN EPU - LAR Review RAI Status Total RAIs received - 205 Total RAI responses submitted - 159
- Responses submitted for 159 RAIs
- Development of responses underway for the following RAIs Forty-one NRC RAIs regarding RSDs (subject of NRC audit)
- Responses to Group 2 RAIs to be submitted by 7/29/16
- Responses to Group 3 RAIs to be submitted by 8/5/16 Spent Fuel Pool (SFP) Criticality Safety Analysis (CSA) RAIs (subject of NRC audit)
- Nine additional NRC RAIs regarding SFP CSA received 3/22/16
- Two additional NRC RAIs regarding the SFP Storage Racks Boral Monitoring Program received 3/22/16
- One additional NRC RAI regarding SFP Criticality Technical Specification requirements received 5/12/16
- Responses to all SFP CSA RAIs to be submitted by 7/29/16 Thirty-three NRC RAIs from the Containment Branch received 3/25/16 (subject of NRC audit)
- Responses to Group 2 RAIs (including CAP Credit Elimination Supplement) to be submitted by 7/25/16 One additional NRC RAI regarding Dose Consequence Analyses received 6/27/16
- Response to be submitted by 7/29/16 One additional NRC RAI regarding Probabilistic Risk Assessment received 7/1/16
- Response to be submitted by 8/12/16 Browns Ferry EPU License Amendment Request l 10
BFN EPU - LAR Review NRC Audits
- Regulatory audits allow NRC to more efficiently conduct its review or gain insights on a licensees programs or processes
- Regulatory audits are conducted for the NRC to gain understanding, to verify information, and/or to identify information that will require docketing to support the basis for the licensing or regulatory decision Audits held to facilitate NRC review of EPU LAR
- RSD Design and Analyses April 19 - 21, 2016
- CAP Credit Elimination Analyses May 3 - 5, 2016
- SFP CSA May 10 - 11, 2016 Browns Ferry EPU License Amendment Request l 11
BFN EPU - LAR Review NRC Audits
- RSD Audit Discussed/reviewed 42 RSD RAIs. Responses will be submitted in three groups related to complexity of issues NRC deleted 2.5 RAIs, added one new RAI, and modified five RAIs NRC will require revision to proposed License Condition for RSD power ascension testing and follow-on reporting Follow-up meeting with NRC held 6/23/16 regarding Safety Relief Valve loading RAIs
- CAP Credit Elimination Audit Discussed/reviewed 33 CAP RAIs. Responses will be submitted in two groups NRC modified two RAIs Clarification call with NRC reviewer regarding RHR Heat Exchanger Performance Testing uncertainty calculations held 6/16/16
- SFP CSA Discussed/reviewed 12 RAIs related to SFP CSA NRC added one new RAI associated with SFP Criticality Technical Specification requirements NRC will require License Condition for periodic testing of Boral areal density Browns Ferry EPU License Amendment Request l 12
BFN EPU - LAR Review Status of Safety Evaluation Input
- Draft input to Safety Evaluation due to NRC Project Manager by September 2016
- Draft input from two Technical Branches received by NRC Project Manager to date Browns Ferry EPU License Amendment Request l 13
BFN EPU - Acronym List
- AVSs - Acoustic Vibration Suppressors
- BFN - Browns Ferry Nuclear Plant
- CAP - Containment Accident Pressure
- CSA - Criticality Safety Analysis
- GDC - General Design Criteria
- LAR - License Amendment Request
- NRC - Nuclear Regulatory Commission
- RAI - Request for Additional Information
- RSD - Replacement Steam Dryer
- SFP - Spent Fuel Pool Browns Ferry EPU License Amendment Request l 14
BFN EPU - Questions/Comments Browns Ferry EPU License Amendment Request l 15