Submittal of the Updated Final Safety Analysis Report (Revision 26), Fire Protection Program (Revision 21), and Reference Drawings
ML17108A393
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/06/2017
From: David Helker
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17130A259 List: ... further results
References
Download: ML17108A393 (27)


Text

ihiP"

, ev Exelon Generatio-n 200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50.71 (e)(4) 10 CFR 54.37(b)

April 6, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRG Docket Nos. 50-277 and 50-278

SUBJECT:

Submittal of the Updated Final Safety Analysis Report (Revision 26),

Fire Protection Program (Revision 21 ), and Reference Drawings In accordance with 10 CFR 50.71 (e)(4) and 10 CFR 50.4(b)(6), enclosed is Revision 26 of the Updated Final Safety Analysis Report (UFSAR) and Revision 21 of the Fire Protection Program (FPP) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The enclosed UFSAR and FPP revision copies are being provided to the U.S. Nuclear Regulatory Commission (NRG) iri electronic format on CD-ROM. The electronic versions of the UFSAR and FPP are being submitted in their entirety and are total replacement copies.

10 CFR 50. 71 (e)(2) requires that changes made under the provisions of 10 CFR 50.59 but not previously submitted to the NRG be included in UFSAR updates. Changes to the FPP are to be evaluated in accordance with PBAPS, Units 2 and 3, License Condition 2.C.(4).

Attachment 1 to this letter identifies UFSAR changes made under the provisions of 10 CFR 50.59 not previously submitted and included in Revision 26 of the UFSAR. Attachment 1 also identifies those changes to the FPP evaluated in accordance with License Condition 2.C.(4) and included in Revision 21 of the FPP.

10 CFR 50.71 (e)(4) stipulates that revisions to the UFSAR and associated FPP must reflect changes made up to a maximum of six months prior to the submittal. As a result, Revision 26 of the UFSAR and Revision 21 of the FPP for PBAPS, Units 2 and 3, reflect changes at least up to December 31, 2016.

Also enclosed is a CD-ROM containing copies of drawings currently referenced but not included in the PBAPS, Units 2 and 3, UFSAR.

  • The following enclosures contain the CD-ROMs with the updated files for the UFSAR, FPP, and Reference Drawings in PDF format.
  • Enclosure 1 - PBAPS, Units 2 and 3, UFSAR Revision 26 I FPP Revision 21 (files)
  • Enclosure 2 - PBAPS, Units 2 and 3, UFSAR I FPP Reference Drawings (files)

U.S. Nuclear Regulatory Commission Submittal of PBAPS UFSAR Revision 26 FPP Revision 21 Reference Drawings April 6, 2017 Page2 In addition, pursuant to the requirements of 10 CFR 54.37(b) and the guidance specified in Regulatory Issue Summary 2007-16, Revision 1, "Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses, "the UFSAR update required by 10 CFR 50.71 (e) must include any Structures, Systems, or Components (SSCs) newly identified that would have been subject to an aging management review or evaluation of Time-Limited Aging Analyses (TLAA) in accordance with 10 CFR 54.21. The UFSAR update must describe how the licensee will manage the effects of aging in order to effectively maintain the intended function(s) of newly-identified SSCs. An evaluation was completed to determine whether any newly-identified SSCs existed in support of submitting UFSAR Revision 26 and FPP Revision 21 for PBAPS, Units 2 and 3. This evaluation involved reviewing pertinent documentation for the period subsequent to the last PBAPS biennial UFSAR I FPP revisions.

As a result of this review, Attachment 2 provides a summary report consistent with the requirements of 10 CFR 54.37(b) on how the effects of aging on a newly-identified Structure, System, or Component (SSCs) will be managed, and summarizes the corresponding changes that are made in Revision 26 of the UFSAR. This report discusses newly identified SSC listed below that were installed in the plant at the time of the license renewal for PBAPS, Units 2 and 3, and were not previously evaluated, and the newly identified TLAA.

  • Refueling Water Storage Tank
  • Torus Dewatering Tank Dike
  • Hoists

- Radwaste Building Demineralizer Hoist

- Dewatering Building Coffing Hoist

- Unit 3 One-Ton Crane (over Repair Area)

  • Unit 3 Jet Pump Riser Repair Clamps (TLAA) includes file directory structure information identifying directory path, filename, and size of the individual files on the enclosed CDs.

As required by 10CFR50.71 (e)(2)(i), I certify that to the best of my knowledge, Revision 26 of the UFSAR and Revision 21 of the FPP accurately reflect information and analyses submitted to the NRC, or prepared pursuant to NRC requirements as described above.

If you have any questions or require further information, please contact Richard Gropp at (610) 765-5557.

Respectfully, David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC

U.S. Nuclear Regulatory Commission Submittal of PBAPS UFSAR Revision 26 FPP Revision 21 Reference Drawings April 6, 2017 Page 3 Attachments: 1. Changes Made Under the Provisions of 10 CFR 50.59 and License Condition 2.C.(4)

2. Summary of Newly Identified Items in Accordance with 10 CFR 54.37(b)
3. Electronic File Directory Structure

Enclosures:

1. PBAPS, Units 2 and 3, UFSAR Revision 26 I FPP Revision 21
2. UFSAR I FPP Reference Drawings cc: w/ Attachment and Enclosures Regional Administrator, Region I, USNRC USNRC Senior Resident Inspector, PBAPS USNRC Senior Project Manager NRR, PBAPS R.R. Janati, Commonwealth of Pennsylvania S. T. Gray, State of Maryland Page 1 of 4 Changes Made Under the Provisions of 10 CFR 50.59 and License Condition 2.C.(4) 10 CFR 50.71 (e)(2)(ii) requires that revisions to the Updated Final Safety Analysis Report (UFSAR) include changes made under the provisions of 10 CFR 50.59, but not previously submitted to the NRC. Changes to the Fire Protection Program (FPP) are to be evaluated in accordance with Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, License Condition 2.C.(4). Accordingly, the list below identifies changes included in Revision 26 of the PBAPS, Units 2 and 3, UFSAR or Revision 21 of the PBAPS FPP that were not previously submitted to the NRC. Some exceptions have been noted.

Change Number Revision Description 2012-0016\ I} Revise various UFSAR sections related to Unit 3 Residual Heat Removal 00 (ECRs 11-00376, 11-00496) (RHR) loop cross-tie modification work.

2012-022\l) Revise various UFSAR sections related to Unit 3 RHR loop cross-tie 00 (ECRs 11-00376, 11-00496) modification work.

2012-024 Revise various FPP sections related to Unit 3 RHR loop cross-tie modification 00 (ECR 11-00376) work.

2013-022\ l) Revise various FPP sections related to Unit 3 RHR loop cross-tie modification 00 (ECR 11-00496) work.

2014-004( 1) Revise various UFSAR sections related to Unit 3 replacement of Reactor 00 Recirculation System Motor Generator (MG) sets with Adjustable Speed (ECR 13-00338)

Drives (ASDs).

Revise UFSAR Appendix C related to Unit 3 replacement of Reactor 2014-005 00 Recirculation System Motor Generator (MG) Sets with Adjustable Speed (ECR 14-00356)

Drives (ASDs).

2014-008 Revise UFSAR Table 7.4.1 for Unit 3 related to High Pressure Coolant 00 (ECR 12-00339) Injection System instrumentation.

2014-013 Revise various UFSAR sections for Unit 3 related to implementation of 00 (ECR 13-00049) Extended Power Uprate (EPU).

2014-022 Revise UFSAR Table 11.8.2 for Unit 3 related to replacement of Feedwater 00 (ECR 13-00359) System heater work.

2014-023 Revise various UFSAR sections to include supplemental Global Nuclear Fuels 00 (ECR 12-00045) (GNF) criticality analysis for Spent Fuel Pool.

2014-024 Revise UFSAR Table 11.8.2 for Unit 3 related to replacement of Reactor Feed 00 (ECR 11-00375) Pump Turbine (RFPT) work.

Revise UFSAR Chapter 3 for Unit 3 related to replacement of original Steam 2014-025 00 Dryer equipment with new Replacement Steam Dryer designed for EPU (ECR 12-00327) conditions.

2014-031 Revise UFSAR Chapter 1 for Unit 3 related to the High Pressure (HP) turbine 00 (ECR 14-00087) steam flow path for the new HP rotor designed for EPU conditions.

2014-032 Revise various UFSAR and FPP sections related to the listing of safety 00 (ECR 11-00252) valves.

2014-036 Revise various UFSAR tables for Unit 3 related to the changes in the 00 (ECRs 14-00082, 14-00083) Condensate System pump and motor ratings.

Revise UFSAR Chapter 9 to include a description of the Resin Dewatering 2014-037 00 Facility.

2014-041 Revise various FPP sections to reflect changes in fire hazards materials listed 00 (ECR 15-00002) and fire severity classification of certain fire areas.

2014-043 Revise various FPP sections for Unit 3 to include information related to new 00 (ECR 13-00134) Motor Control Center (MCC) units.

2014-049 Revise various UFSAR sections for Unit 3 to include information related to the 00 (ECR 14-00222) addition of two Condensate System filter demineralizers.

Revise various FPP sections for Unit 3 to include information related to the 2014-050 00 addition of four new rooms and two new smoke detectors in the Turbine (ECR 14-00221)

Buildinq.

Revise UFSAR Chapter 9 to include information regarding procedural controls related to compliance with 10 CFR 20 and 40 CFR 190 limits and description 2015-001 00 of the original Steam Dryer stored outside the Low Level Radioactive Waste

. Storaae Facilitv (LLRWSFl.

Page 2 of 4 Change Number Revision Description 2015-003 Revise UFSAR Chapter 7 to update information related to the cask loading 00 (ECR 14-00322) area and the cooling period for preselected spent fuel bundles.

2015-004\l) Revise UFSAR Chapter 8 diesel loading table information for Unit 3 in 00 (ECRs 11-00496, 11-00378) support of the RHR loop cross-tie modification work.

2015-005 Revise UFSAR Chapter 7 information in support of upgrades for the Unit 2 00 (ECR 14-00420} Pressure Regulator and Turbine-Generator Control Svstem.

2015-006\l) Revise various FPP sections related to Unit 3 RHR loop cross-tie 00 (ECR 11-00496) modification work.

2015-007 Revise various FPP sections for Unit 3 to include information related to new 00 (ECR 11-00376) MCC units in support of the RHR loop cross-tie modification work.

Revise various UFSAR sections for Unit 3 to delete the Reactor Protection 2015-009 00 System () and Primary Containment Isolation System (PCIS) reactor scram (ECR 11-00376) and isolation uoon receipt of Main Steam Line hiah radiation trio sianals.

2015-014 Revise UFSAR Chapter 7 to add information regarding the confirmation 00 (ECR 11-00051) density algorithm and automatic backup stabilitv protection.

2015-015 Revise various UFSAR sections to support EPU implementation.

00 (ECR 13-00243) 2015-016 Revise FPP Section 6 to provide clarifying information related to protection 00 (ECR 15-00150) between circuits of concern and Fire Safe Shutdown (FSSD) circuits.

Revise UFSAR Chapter 7 to include information regarding Average Power 2015-017 Range Monitor (APRM) and Operating Power Range Monitor (OPMRM) 00 (ECR 15-00091) setpoints and description required to implement Maximum Extended Load Limit Line Analvsis Plus (MELLLA+).

2015-018 Revise various UFSAR sections to reflect information in support of 00 (ECR 12-00422) implementation of MELLLA+.

2015-019 Revise UFSAR Appendix H to include information in support of 00 (ECRs 10-00478, 13-00243) implementation of EPU (Amendment Nos. 293/296).

2015-020 Revise FPP Section 5 to address an administrative discrepancy and clarify 00 (ECR 15-00220) information to match with existing plant condition.

Revise various UFSAR sections for Unit 2 to delete the RPS and PCIS 2015-021 reactor scram and isolation upon receipt of Main Steam Line high radiation 00 (ECR 13-00494) trip sianals.

Revise UFSAR Chapter 2 to update and clarify information on groundwater 2015-022 00 wells.

2015-023( 1) Revise UFSAR Chapter 7 for Unit 3 to address the removal of the low 00 condenser vacuum automatic RFPT trip which will be performed by Operator (ECR 15-00260) manual action.

2015-024 Revise UFSAR Chapter 7 for Unit 3 to include information related to the 00 (ECR 15-00191 l replacement of certain pressure transmitters.

Revise UFSAR Chapter 14 to include updated information related to the time 2015-025 00 limits for secondary containment hatches to be opened following a reactor (ECR 15-00313) shutdown and the associated radioloaical dose conseauences.

Revise UFSAR Chapter 8 for Unit 3 to include updated information related to 2015-027 00 the replacement of the Motor-Generator (MG) set ventilation supply fans and (ECR 13-00040) exhaust fans.

2015-028( 1) Revise UFSAR Chapter 15 to remove information pertaining to 10 CFR 50, 00 Appendix J testing for a selection of RHR and Core Spray (CS) isolation (ECR 15-00314) valves.

Revise various UFSAR sections to reflect information from the Unit 3 Cycle 2015-029 00 21 reload review and primarily reflects changes as a result of the new (ECR 13-00330)

Pressure Reaulator and Power Load Unbalance out-of-service analvsis.

Revise FPP Section 5 to inclu.de updated information related to diesel generator bay fire areas resulting from the issuance of Amendment Nos. 255 2015-030 00 and 258 for converting the automatic C02 fire suppression system to manual.

2015-031 Revise UFSAR Chapter 7 to reconcile changes between Unit 2 and Unit 3 00 (ECR 13-00049} instruments resulting from EPU implementation.

2015-032 Revise various UFSAR sections to reflect Standby Liquid Control (SLC) 00 (ECR 15-00430) system design basis description changes.

Page 3 of 4 Change Number Revision Description Revise various UFSAR sections to include additional information and detail 2016-002 00 related to the Remote Shutdown Svstem (RSS) desiQn basis 2016-003 Revise various UFSAR sections to reconcile changes between Unit 2 and Unit 00 lECR 10-00478) 3 resulting from EPU implementation.

2016-004 Revise UFSAR Chapter 7 to reflect upgrading Barksdale pressure transmitters 00 (ECR 15-00333) tb Rosemount pressure transmitters and trip units.

Revise U FSAR Chapter 10 to delete the listed exception for the drywall head 2016-005 00 strongback load tests.

Revise UFSAR Chapter 2 to include information regarding the current 2016-006 00 RadioloQical Environmental MonitorinQ Promam (REMP).

Revise UFSAR Chapter 7 for Unit 2 to reflect the removal of the low condenser 2016-007 00 vacuum automatic reactor feed pump turbine trip which will be performed by (ECR 16-00027)

Operator manual action.

2016-008 Revise various UFSAR sections for Unit 2 to reflect replacement of 00 (ECR 15-00378) Recirculation System MG sets with ASDs.

Revise UFSAR Table 5.2.2 related to the CS nozzle penetration information 2016-009 00 listed.

2016-010 Revise various FPP sections for Unit 2 to reflect replacement of Recirculation 00 (ECR 15-00378) System MG sets with ASDs.

2016-011 Revise UFSAR Chapter 8 diesel loading table information.

00  ;

(ECR 16-00005) 2016-012 Revise UFSAR Chapter 9 to include information regarding fuel channel 00 (ECR 15-00331) processing and storage in the Low Level Radwaste (LLRW) facility.

2016-014 Revise various FPP sections for Unit 2 to reflect removal of trash and 00 (ECR 15-00376) sprinklers from certain areas on elevation 135'.

2016-015 Revise UFSAR Table 4.2.4 to include updated information related to locations 00 (ECR 15-00451) for cycle-based fatigue monitoring.

Revise UFSAR Appendix H, Section H.1 to provide clarifying reference 2016-016 00 information related to the compliance with General Design Criteria (GOG).

2016-017 Revise UFSAR Chapter 10 related to the use of probabilistic analysis for 00 (ECR 15-00140) hazardous chemical assessments.

Revise UFSAR Table 6.3.1 to change High Pressure Coolant Injection (HPCI) 2016-018 00 uooer pressure value from 1150 psig to 1170 psig.

Revise UFSAR Chapter 6 to reflect changes related to discontinuing use of a 2016-019 00 temporary hose connection and install permanent piping for the HPCI stay-full (ECR 07-00010) function.

2016-020 Revise UFSAR Chapter 7 to reflect changes in the maximum room 00 (ECR 15-00148) temperatures for the Emergency Switchgear and Battery Rooms.

Revise UFSAR Chapter 5 to clarify and describe the basis for the time delay for 2016-021 00 personnel access to and from the secondary containment (blue light door alarms).

Revise UFSAR Chapter to reflect changes to Severe Accident Management 2016-022 00 Procedures (SAMP) based on BWROG Emergency Procedure Guideline and Severe Accident Guideline (EPG/SAG), Revision 3 Quidance.

Revise UFSAR Chapter 7 to update the analytical limits for Average Power 2016-024 00 Range Monitor (APRM) neutron flux-high and neutron flux-high (setdown)

(ECR 16-00248) scram.

Revise UFSAR Appendix Q to address inconsistencies in the methods for 2016-025 00 environmental fatique calculations.

2016-027 Revise UFSAR Chapter 4 to remove the backseat function description for the 00 (ECR 16-00346) Unit 2 "D" Main Steam Isolation Valve (MSIV).

Revise UFSAR Table 5.2.2 to include updated information related to various 2016-031 00 nozzle oenetrations.

Revise FPP Section 2 to clarify information related to the design concentration 2016-033 00 of the Comouter Room C02 svstem.

2017-002 Revise UFSAR Chapter 5 to include updated information to permit the RHR 00 (16-00241) room unit-cooler inoperability during operating Modes 4 and 5.

Page 4 of 4 Change Number Revision Description Revise UFSAR Appendix Q to include cross-reference information related to 2017-003 00 license renewal commitment action trackinq items.

Revise UFSAR Chapter 8 to reflect Emergency Diesel Generator (EOG) fuel oil 2017-004 00 transfer manual actions resultinq from issuance of Amendment Nos. 311/315).

Revise UFSAR Appendix Q to reflect changes resulting from 10 CFR 54.37(b) 2017-006 00 review.

,11 ..

- The changes 1dent1f1ed were described m the PBAPS Biennial 10 CFR 50.59 and 10 CFR 72.48 Report submitted by letter dated January 27, 2017.

Page 1 of 2 Summary of Newly Identified Items in Accordance with 10 CFR 54.37(b)

For holders of a renewed operating license, 10 CFR 54.37(b) requires that newly identified Structures, Systems, or Components (SSCs) be included in the Final Safety Analysis Report (FSAR) update required by 10 CFR 50.71 (e), describing how the effects of aging will be managed.

Newly identified SSCs are those SSCs that were installed in the plant at the time of license renewal for PBAPS Units 2 and 3, but were not evaluated as part of the License Renewal Application (LRA), as discussed in Regulatory Issue Summary 2007-16, "Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses." As part of this 10 CFR 50.71 (e) update, four newly identified items are being reported under 10 CFR 54.37(b). Each of these items, and the associated UFSAR impact, is summarized below.

1) The Refueling Water Storage Tank (RWST) was not in scope for the first license renewal. The Extended Power Uprate (EPU) project eliminated reliance on Containment Accident Pressure (CAP) in Emergency Core Cooling System pump net positive suction head evaluations. In order to support elimination of reliance on CAP credit, the volume of water in the RWST is required to supplement the water in the in-scope Condensate Storage Tank (CST) for the Appendix Rand ATWS events. The RWST and the SSCs necessary to establish a flowpath to transfer the supplemental volume to the CST are now credited for Appendix Rand ATWS events, and are added to scope for license renewal. Engineering Change Request ECR PB 12-00500 was implemented on Unit 2 changing the plant licensing basis to credit the RWST for the Appendix R and ATWS events.
a. Impact on the UFSAR:
i. Section Q.1.4, "Demineralized Water and Condensate Storage Tank Chemistry Activities," is revised to include RWST chemistry activities.

ii. Section Q.2.5, "Outdoor, Buried and Submerged Component Inspection Activities," is revised to include inspections of the RWST and associated Storage and Transfer System piping and valves.

iii. New Section Q.7.1, "Newly Identified Structures, Systems and Components" is added. This section lists the newly identified items, summarizes the aging management review conclusion, and describes affected aging management programs.

2) The Torus Dewatering Tank dike was not in scope for the first license renewal. As a result of EPU, the torus dewatering tank dike must provide structural support for piping credited with establishing a flowpath from the RWST to the Unit 3 CST. Since the torus dewatering tank dike is now credited for Appendix Rand ATWS events, it is added to scope for license renewal with an intended function of Structural Support to nonsafety-related components.
a. Impact on the UFSAR: This item is described in new UFSAR Section Q.7.1, "Newly Identified Structures, Systems and Components," cited above. There is no additional impact on the UFSAR because the description of the Maintenance Rule Structural Monitoring Program in Section Q.1.16 already includes the relevant materials, aging effects and aging management activities to be performed for the torus dewatering tank dike.

Page 2 of 2

3) The following hoists were not in scope for the first license renewal:

- Radwaste Building Demineralizer Hoist

- Dewatering Building Gaffing Hoist

- Unit 3 One-Ton Crane (over Repair Area)

As a result of review of the current revision of engineering analysis, M-25-102, Overhead Handling Systems Review Final Report, it was identified that these nonsafety-related hoists are above or nearby to safety-related SSCs, and therefore should be included in scope for license renewal with a 10 CFR54.4(a)(2) structural intended function.

a. Impact on the UFSAR: This item is described in new UFSAR Section Q.7.1, "Newly Identified Structures, Systems and Components," cited above. There is no additional impact on the UFSAR because the description of the Crane Inspection Activities in Section Q.1.14 already addresses the relevant components, environments and inspection activities to be performed for the three additional cranes/hoists.
4) In 1998, prior to the PBAPS Units 2 and 3 license renewal, clamps were installed inside the Unit 3 reactor vessel to structurally replace certain jet pump riser piping welds. Since these clamps use bolts to maintain proper clamping force, loss of bolting preload due to irradiation induced stress relaxation was a design consideration. The analysis for these clamps was associated with. the initial 40-year plant operating period, and should have been identified as a Time Limiting Aging Analysis (TLAA). This analysis has now been reevaluated and confirmed to support continued service of the clamps through the period of extended operation.
a. Impact on the UFSAR: This item is described in new UFSAR Section Q.7.2, "Newly Identified Time Limited Aging Analyses." In addition to the TLAA description, the TLAA analysis is summarized and the TLAA disposition provided, consistent with the TLAAs that were identified and evaluated within the original LRA, which are shown in UFSAR Section Q.5.

ATTACHMENT 3 Peach Bottom Atomic Power Station Units 2 and 3 Updated Final Safety Analysis Report, Revision 26 Fire Protection Report, Revision 21 File Directory Structure

Attachment 3 File Directory Structure Page 1of15 Fil~ Slz~ ( Bytes) .

1 r:;~!_;;;;~~~~:-.~-:~:_;_: =~*~*-*:--:~~-~=~**-*l~~~~***l~'.4~ .P .!l.~a n~!t;.:S~a~!Ee;!tyY_A~n~a~l:yr:s:i ;s~F~ ~ i!,* P~.~*.!_*- -~_*--~~-----~*-***--~~~--~-~---*~-~--- ...--_-____,_____ _

ld:\01 PBAPS UFSAR R26 9 ApA Pressure Integrity of Piping.pdf i*---- *****---------!~:..

I --PB_A_PS__UF_SA_~_R2_6_____ OApA Pr=ssure lntegrity_?!P.iE~ig.pdf --------*--*-***---*-*-*--****** .,.,,,,,.,,_,,__,. -*--**-*-******--"-*-**

PB~~~~E~*-*------~--- 03~ ApB Tec~_Specs:pdf. ____~~---*---** .....~-~- .,.......- -..- -.. *--*-*------****'"-~ .....- -..,,. *--...... ___,,,,.,,,_J,..,..,,,;,,.,,,_ _ _ _.,,~...- *...--~*~**'

Attachment 3 File Directory Structure Page 2of15 f"www'--"***~****-*-*~*"-'"' ,,._, *~*-*,,_j:_~.'~!-~~--~!':~gesign ..~!~!ia.p~*******-**~-*******----***~***** .....~~---***~*-***'"

ct Design Criteria Fig.pdf lity Assurance Program.pdf


l~~~~~P~la~nt:!~~Safety Op Analysis.pdf 40 ApG ~~~~~~.ty_Op Analysis ~atr!;<.pd~---**--*****-****..-~*****-*-****--**------www*

--.. www***-*****--*--*-*"****+41 ApG Plant ~UC Safety,,?pf~~-a!!'.sis Fig.p<!!. , --****-...www..--www*-*---..* - - -

~~~~::..'.:~:.'.::::'..~~*****-*---*----.J~.:~:i:~i,.~~gency.,!_~?,_~ecurity P~~~:Pdf ---*-***---**-.,**-******-............,_._........--**-*****............--*-****-.,***--*,*-***** ..... ..

!~~-.~~~~~~-. **-...--...----*~!~~~~~~*o~nmental ~~h,.~Eecs.pd_!,_____, _______ ,__,....- - * - - - - - - * - - - - - * * - - - - * - - - * - -

"......;.,,,,,,_...~......., ...,. . . . ,,,,,, ........,, . . ,,,,,. .,, .,. . . _. . . ,.,.~~~~pg,,~~~~~? Mgmt U~~.~~ ~.~~~-i~;E~,!_,,,..,_ ......- -....._,.,_,_ _ .. '"-~-~-~-*-* .~ ........ *-*--****-~*""*"**" ..*--****-* ........_., "'"'""*""~"'*'*"'"'"

FPP Files

  • n Plan.pdf Pr~tection Plan.~E~:pdf.~......- -..---*~---**......-~....-*~*-*---* ****-~*-........*-*~-******.....,........_ .. ,.... _

Protection Plan ~pC.pdf

Attachment 3 File Directory Structure Page 3of15 Directory Path. * . :FileName **

  • Eiles'i~e (Bytes)

UFSAR Drawing Files

-50, Sheet 0001, Rev 004, RADIATION ZONING BOTH UNITS IN OPERATION EL 91FT - 061N.pdf

~-**;,_,,*--------*----*~----.www}-s~_Sheet 0001, Rev 004,_RADIATION ZONING B~TH ~~PERAT!9N EL 2~~T - OOl_N_.p_d_f_ _ _,___,_,______.__,_,_,_____., __.__

2, Sheet 0001, ~~-v-~20,_~T~LAN WALL-F,~'?,YV-D~~~~9-~~~~~~1.~.T!J_~~.:E~~-- .. -*--**-**

~~!'-~~~:.~~~:~~~~-----l~~~~tO~O~O~l~,R~e~v.!!0~07?!,_!:P~U~M!!P~s*rnu~.T~.~E ARRANGEMENT DRAW!~G BL?CK-_OUT A-15.p~!_ ____________________,____.___

~'~~~~~_l:!U.~FS)!:_A~R'..fR~~2~~6:_!:Ref D~.~--~ *---* E-1!.. She~~9.E_~, Rev 056~.T~~-!3-09~~}4-00,~51 SIN~L!~~,OIA~~~M ST.p~----*---*

IE-10, Sheet 0001, Rev 036, SINGLE LINE METER, RELAY DIAGRAM STARTUP, EMERGENCY POWER SYSTEMS.pdf

.--*~_,,,,,,,----~--... ,,,,~------* _____ ,..,_,,,_.,,.,,,..,,,__~---------,--y---~,.,,,~,......,,.,-,_-

~~'
...:..::.:A::P:::.S~~-~~.~26 !ef ~~[i-~*-*--*-i--E_-_1~~-~eet9001, Rev 01~:.*~!~GLE L'!:l~.~E!E.~~ELAY D~~T~_NDB~_EllESE~~~~~~~.T:E.c:!!,___ , 8 .

1615, Sheet 0001, Rev 082, SINGLE LINE METER AND RELAY DIAGRAM E124 AND E224 EM ERG. L.C .. pdf --*-*"--**----*--*--***-*------~*-i;~~:;3- **-----~---~-<<

  • -------"*-----*---***-- +- __:___,,_,_,;,,__,__ ,,,.____ -*-**-**-* ---,,----**-**-------**-.. ----------****-*****-----'---**-**..**-*--*-*""_,,,,_,,,.,,_, __ )

~-~~*----------------~-~._1_7_,_~_e_~ooo~~~ITT~~~~LINEME~RANDMLAYD~GRAM~3MAND~MEME~_f_~~---------~--~-~~l__________ J 1619, Sheet 0001, Rev 037, SINGLE LINE METER AND RELAY DIAGRAM E124-D-A, E324-D-A AND 434-D-A.pdf

' .. --,,-------*-*--------~******"*-----***----~-----~----------;------~-----*--*--*---i j249,890 l 1621, Sheet 0001, Rev 071, SINGLE LINE METER AND RELAY DIAGRAM E324-T-B AND 424-T-B TURB MCC.pdf


**-*-l----*.,,Y.WW*>"'""m '"'""m~'-"'"->YY*""'~" '=* .. , 'h v.v,* YM'<-"-"'=WN,"<.W' "..,,,..,,. **=~v.;."'"""'""=v*~hWWW=-=

!119,136 l

~

~~~~~~~~!~~~~~--~E::-~17~1~5~,~Sh~e~e~t~OO~O~l~,~Re~v08~SING~LINEMITERANDRE~D~GRAME1~,E234!MER~E134~~*P~ _ _ _ _ _ *~----~---~1-6_6_,7_1_8_ _~

~~~~~.::~~~~~6;:R::e~f~Dw~gs~___,,_ __j~E:,:-::_17~1~7~,~Sh~eet 0001, Rev ~?~'.~!.t:::G_L_E_L_IN_E_M_E_T_E~- AND RELAY DIAGRAM E334 AND E434 EMERG LC AND E334"R,;;...p_df____*____,,,________.~,_;1_s__8,,,_9_3_2_*---*---*-4 26 Ref Dwgs

<<**---~---.1~~~-?20

..+--.:___h_e_e~ 000~~-~~~ 087,_ SINGLE**~~~ DIAG~~]:35 250 y~~~!-~l'fl*P~L___. .*..,,_,,,........._ _ _,,_*.,,,........---~ ...~....... ____~*--- 193,991

  • -""------ --""""f.--.-_:._hee!._0002, ~~~,063!.. SINGLE LINE DIAGRAM 125 ~~ VDC SYSTEM.pd!--------~-~**---..----**--*..- - - - - * - - - - 119,798 d:\01 PBAPS UFSAR R26 Ref Dwgs heet 0003, Rev 007, 12s 2~£Y~-~~:r~~-~~.!~~:e?_!_ .. ___ ,,__ , ..... , --**----*-- .. - - - - - * - - - -

l~:-\01 f"""" __  ;~~~s

_ UFSAR R26 Ref Dwgs SINGLE LINE DIAGRAM 125 250 VDC SYSTEM UNIT id\01 P~J\.PS UFSAR R26 Ref Dwgs

\01 PBAPS UFSAR R26 R~f Dwgs ---*~-- ~:3-~ Sheet ~?03, Rev 007, 12~':f..3SOVEC SWITCHBOARD 30DOO~_PA~~~ LAYOU'.°....~IAGRA'.':'!:Jl_d_f_ _


'"-----"-**+E-28, Shee~ 000~_~:_~_088, SINGLE LINE DIAGRAM INSTRUME~TATION UNINTERRUPTIBLE AC ~~S.pdf -*----**-------- * - - -

  • i * - - ,..~---

E-~~Sheet ~02, Rev 051, SINGLE LINE DIAGRAM INSTRUME~~,TION ~~PTBLE AC SYS.pdf ,_.. --~------------------;'67,561 * - - - - - - - - - - -

-29, Sh~!!.°..9?~'.,8~~g~~~~~~-~-~ ~!~_ DIA~~~~ *.~ME,~T-~T!_~~:_UNINTERRU_~!IB~~~-~~~:_P;JL_,

t 0001, Rev 033, ~INGLE LINE MITER AND RE':'.'Y Dl~_G_RA_M__;,,.p_d_f______

t 0001, _____

Rev 018,:__

SINGLE LINE METER RELAY DIAGRAM 13.8KV AUX POWER SYSTEM.pdf .;,__

~------1

.\01 PBAPS UFSAR R26 Ref Dwgs heet 0001, Rev 008, SINGLE LINE METER, RELAY DIAGRAM COOLING TOWERS D,E OAE-177, OBE-17.pdf

---** -. J

=-__

r~:W;:-;~~;~~~~;-~;~;:;;;:;~- E-6, Sheet 0001, Rev 032, SINGLE LINE ME;;;~ND R~;;-~;;~RA~.~~-;--~---~--..**---*~~ ...................-.~-* -

~----- . **-------* -------*-**--* *---~-------*~---** ___________ _____ ,,,.,. ,,___....*...,,------~------*----- ..**--*--**-*****

d:\01 PBAPS UFSAR R26 Ref Dwgs M-13, Sheet 0001, Rev 013, EQUIPMENT LOCATION REACTOR AND RADWASTE BUILDING UNIT NO 2 PLAN AT EL.pdf ,210,348

-~~~PS UF~26 Ref Dwgs _____  !"1-l~~ee!_E001, Rev 02~'. E~~l~-~~NT ~~~~l~~-~E-~CTO! AND RADWASTE ~~DG UN~T NO 2 P~~AT EL 135.p~f -~ , __ -- , -----w~~S,23~ .

PBAPS UFSAR R26 Ref Dwgs

~-~-N~---~--->0~.,,,..,,N~~- , ,. , ,.,_, , , , . ,. ,

l M-l-CC-11, Sheet 0001,~~~ Rev 008, FUNCTL CONTROL DIAG AREA RADIATION MONITORING SYSTEM.pdf h-<.<------~-n,,,,...,,_,,,._._,,,__.,.,,,,,_~--"""~--;,-~,.,,,_.,,-,,..,,_,,,,,, ~----,;

i197,817

, ,___, _., , , ,.,. , ,.,__~,,,,,,_~.~ --~--,,.,,.,_.,,,..~ __,,_,,,,_~ _,;,I_

File Directory Structure Page 4of15

,,.,_ ,... ,,,_,,,,,, ,,_,,__.,,,,_.,,__,,,_,,.,,,.,,,"'<!Yi_:~C:C::!!!,,?~eet 0002, ~E!.Y,,q9~~~U NE,!~ ~,0 NTROL DIAG AREA RAD IATIO N MON ITO RING I'-""----------,*-----~---- M-1-CC-13, Sheet 0001, Rev 022, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEM*~*P_d_f ---------------*+---',-------

d:\01 PBAPS UFSAR R26 Ref Dwgs ,!::~_C:13, Sheet _9_qo2, Rev~~-FUNCTl~NAL CONTRO~ DIAGRAM,NUCLEAR BOIL~~ MISC SYS.pdf

_ 1-C.C.:!~~-Sheet 0003, ~~~,,9~~~ FUNCTIONAL CONTROL DIAGRAM NUCLEA~,~~~~~~ISC.:.,?.~~~~f'.'.'.1?:J~~~---,-~-*-'"_,.,,,__,,", ,,,.

_,;~ ....,_,_,,___,,t------13-C,._s_h_e_e_t_o_oo __4_:__'~E!,~E,~:.~!.£~~.C:_TION~L C~NT~OL DIAGR~~-~~CL~~~~-~-~~sc SYSTE~;.e;l!,.,_____,,,__,,__,,,,_,,_, _ _ _ _.,,,_.,,,;____._______,_,,4

!~'.:~~~~~UFSA~ R26 Refpwgs ,,_______--f_.1-CC-13, Sheet 0005, Rev 016, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOl~ER MISC. SYSTEMS.pdf 1-CC-13, Sheet 0006, Rev 016, FUNCTIONAL CONTRO~DIA~~~~ ~~C.-~~~!~~R MISC.:.:;_:~!~~~;.e;l,!_,,,_,_,_,,___ ,,,, 84,791_ _ __

  • ~---,-----*-"'-**--*-*-- M-1-CC-13, Sheet 0007, Rev 015, FUNCTIONAL CONTROL DIAGRA~ N~C.~~-MISC SYSTEM.pdf*---*---*---*~=--..~-..~--==1268~~17 -*..- - . - .

1-CC-13,?heet 0008, Rev,92~!-~~~~A1;EONTRO~.~~AM NUCLEA.~..~OILE~ MISC.~~~!.~!:'.!:£.?L _________._,,~.----,--*-~.J.!07,~_93_ _ _ _ ,._,,J

,,~£E:!~'..?heet 0009, Revg14:!UNCTl~~~~ONTRO~Dl~~~Afv!.!JUC:~~~-9..!~~R MISC,,?Y~T~.11::1.:e.~.-*--- __, --- -- *---*~-!!EL~?5 ,,

,,J

,_,,mm~*.,~~_,,,.,,,..,,.,.,,.,,,,~--~,,.......,,..,,,...,,.-, __

!148,686

,_~m,.,,..,,.,,,_..,m,,,,,,,,..,,,,_.,.,_~.-----J

-~13~.Sheet 0011, Rev 016, FUNCTIONA~~~,p1AGRA~~UCLEAR BOI~~~ MISC SYSTEM.pd!,, '

~~,~~~:!~*?~~et OOl~LR.:~9-~2~,~YNCT!~,~~~~~~!~~~~~G,~AM NUCLEAR BOILER MISC ~~~!~~~:£l~f,,,. ,

.,,,,,,,;,..,;,;,::;,:;;,_,_______,;,,,_:!:~C-13,_?heet 0012A, Rev 018, FUNCTIONAL CONTROL DIA5'iRAM ~UCLEAR BO!LER MISC SYS,:pdf _ _,_,, ___ _,_.,________,_,__,_-J,-,,,,,,,,:,,;;;,;;,_;_.__ ____,,_ _ _,,,4 CC-13, Sheet 0013, Rev 020, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf

~-,,,,_,_-1_-,,~~~-~~E;!:!~~~~~ ~e~ 015, FU~-~~~~-~ONTROL DIAGRAM NUCLEAR BOILER MISC Ref Dwgs M-1-CC-13~~.:_:!_g,02:,~Rev 021'..~~~~~~-~SJ_NTRO L D~~-RA~ ~~CLE~,R BO~~~~S, SYSTEMS. pdf _,, **-------*-------,-~~---------i-*-'-,,_,___,___,,,,_,,_,,"__1 d:\01 PBAPS UFSAR R26 Ref Dwgs

~:\01 P~~~~~~?AR ~~~-Refg~~-- ~~~~~~~~-~~~R.~~~~~~ . . ~~NCT!9.~!'~.~-0NTRO,~,A,~,~AM NUCLEAR BOIL~~~.!SC SYSTEMS.p_?_!___ _,_,.__ ***- ______,._ ~www*~w-*

?.:~~_i:BAPS~~SAR R2~~~!:'.'gs -~--,, ~:~~E-:!3, Shee!~8, Re~ 016~£.UN0~9_NAL ~o~_o~~i;_A_R.~OILER Ml~-~YSTEM.~S,.,,;,.p~d~f--*

d:\01 PBAPS u~~~-~_26 Ref -~~e~-*----**-*-*--t_M_-.1-C~:!~-~-~-~9, Rev_~?.!,~~NCT1q~~£9NTROL__D_IA_G_R_A_M_.,,N_U_C_LE_A_R_B_O_l_LE,,_R__ M_ls_c_.s_Y_S_,,.p_d_f______,,____,,___,,_______________ ,_+-__;,;;;,:,.,,..,.,.,,,,,_. ___,____ ,,,_;

M-1-CC-13, Sheet 0020, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 105,177 d:\01 PBAPS UFSAR R26 Ref Dwgs M-1-CC-13, Sheet 0021, Rev 014.. ~~~;~'Z~~~~DIAGRAM ~UC~;AR BOIL~;*MIS~ S;~~~-~~-------------*--,,*---------*--1~~2,~i9 ,,,,,_ _ ~=~l 1,,.,.,, -***----r---.,---- ---------------------*

d:\01 PBAP~~!:i:!..£wgs _ CC-13, Sheet 0022, Rev 017, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC

-13, Sheet 0023, Rev 017, FUNCTIONAL CONTROL DIAGRAM N~-~-~~R,~~.!_~~~-~,,,

-13, ShE!et 0~~4, Rev 019, FUNCTIONAL_~~~~OL DIAG~AM !:!UCLE~-~OILER MISC ?YSTEMS.p;l!, _ _ __

,:._:: c .. 23, S~eet 0001, Rev 009~_!'UNC2:~ CONTROL DIAG NEUTRO~ MONITORl~~~STEM.pdf

~:2:-C.~-23, ShE;!_~~~°"~~L~v~v 008, F~~TL CONTROL DIAG NEUTRON MONITORING www-"'---*-www*~+M_..::_!-C~:~!.~~~!£~92:~~ev _016, ~~NC!~.£~~!~9,!:_~A~~ATER CLEAN-UP.~~?:r_~~:pdf ,... www **---~*-*--,,~

M-1-CC-35, Sheet 0002, Rev 017, FUN~.TIONAL CONTROL DIAGRAM FOR REACTOR WATER CLEANUP.pd~--------*-*------+._:_,,,,,,,;,._________~

M-1.:C.~:~5, She_:!~.9.£~.~E!~ 016, _FUN_~'2~AL cg_~!,R,9~~~6,~~~,~~~,~~~C:!'?_~ WATE~-~~~~~~:£~!. **-- __ ,______,"_"

d:~~~ UFSAR R26 Ref D.'Ngs ----- M-~~.:..?~_E!.:_!0004~~.~~* FUNC!IONAL~~!R.,~!:_l?~GRAM -2'.'2~ REACTOR WAT~~-CLEANUP:pdf

Attachment 3 File Directory Structure Page 5of15 Directory Patli * * *,, L . <.  ;<1z2V ';'iiFile N<1tne

\01 PBAPS UFSAR R26 Ref Dwgs -~I M-l-CC-38, Shee;OOO~ev 011, FUNCTIONAL CON;;;~~-GRAM REACTOR

---*l

,,..,..,,,,.,,,,,,.,,..,.,~.,,,._,..,.,,....,.,..,,,,.,.,,,.~w""'"'"""=~'-"' ~>'WNY, y = *~="~"""'"'*"'" ~**'w""'"""="*'== .. ,W,Y =<<W>-Y,CYY'YW.*'-*"'""""""'""'"'"""'

M-l-CC-38,_Sheet 0002, Rev 006, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE.pdf 1422,773 *-----~*--1 1 PBAPS UFSAR R26 Ref Dwgs l M-l-CC-38, Sheet 0003, Rev 009, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE.pdf !457,492 1 PBAPS UFSAR R26 Ref Dwgs -*---~*lM-~:~C-38, Sheet 0004, Re:--;~l~~~;;~L D;~~~REA~~R CORE ISOLATION COOLING SYS~-EM.pdf*----~-----*****--G68,3~--------*

-~--www***----~_,_.. ,_____ ,, ..,.. ~..---~r~~~;~:--~~:~005:-;:v ~4, FUNCTIONAL CONTROL DIAGRAM ;EA~~~;;;~~~;;*~;~~;~~~~~;~.~~~-- **---- ,~ .... -.**********-*-*----" -*-*-1

"'"T~~:~~:38, Sheet 0~06, Re~ 006, FUN~;IONAL co~~;-~~ DIAGRAM-~IGH ;;~SSURE co~~NT INJECTIN~-;;;TEM.pdf 0

-~, i

~  :;: :~;~;:~: : ; :::~~---=T~~~~~;::s::;:~:::;:: ::;~;.~;~;~-~~-~:~~~~~ ~::::~ ~~~;~:::E~~~~-:7i~;;;;~;:~~~- -** *-------*------*- -

~~~~~~ID~w~,~-*.***~- .. --t M~~~, Shee~q~~~ Rev o~'..,~CTIO~~~~~T~.?IAGRA~~~~~!.,c;>R CORE~£~~!~~:~ml~~~~~~~*P~**,,,____,,_,,,__ ~~-**-*-*

!.u.:. :::~:~~'.-~!:~R~.~-~6 Ref Dwgs ,_,,, J~:.~EE:~~, Sheet~q10, ~ev OW-,F,UNE:!:~g!'J.~L C0~!~9~.P~GRAM.~.~~,ET~.rnRE IS_c:'~~gc:>uN.~.~~~"!:_~!:'.1~-.............- -..*...

M-1:~:38, Sheet 0011, ~ev 005, FUNCTlc:>_NAL CONTROL DIAGRAM REACTOR CORE ISOLATIO~~OLIN~~!ST~M.pdf l~~~~~~IJ£.SA~~~~~.-e._f_D_w_gs___~- M-1-~~8, Sheet 0012,~_e_v 006, FUNCTI~~~ CONT~£!:_~~~AC~~ CO~~?OLING SYST~.~.p~f------*----

~~-~9,!.~~!~0~~~-~~.~'.. ~~N<:!:,l<;l~AL CONIROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SYS~~M.pdf

- -CC-39, Sheet OOOlA, Rev FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SYSTE.pdf

~!~~.:et 0,006, Rev 00,§_ ~~~~TIONA~ CONTRO~ Dl~~~~-~!~':!_~RESSURE coo~~~~JEC!lc:>~~~TE~:[:~!**--*-*-*"- ,, "'"""""'"'**--***-'*\-***-*~*-3'.:_.,,,,,,.,,,,,,_,, __ ~_

~U~AR~~~~~-s______~~cc~~~OO~R~~CTIONMCONTROLD~GRAMH~HPRSS~COOLAN~ECT~_s_v_~_E_M_.~pill ___.____________* __ ~~---~-

-*-*--*-*****,,*-*----......'::..~.*~****----l~_:!~CC-39, ~h~:_!.°.007A, Rev 0~!.£~-~.010NA.!:_ CONTROL D~!'GR~~ HIG~ PRESSU~~~~!,.INJE<2!~ SYSTEM:P~! ..**


~----=m.***w

. M-l-CC-39, Sheet 0008, Rev 007, _ ,~--,,.-.w FUNCTIONAL CONTROL. DIAGRAM HIGH

_,,,,_,,~---www .,._,,,,,,_.,,.,.,,,.,~,.,,

PRESSURE COOLANT INJECTION SYSTEM.pdf

_ _ _ _ _ _ _,,_w_www_ _ _ ,,_,_ _ _N,,,,,.,,,w=--*--****-*-- ****www-***----

-*-**-*---,l~-l-CC-39, ~~08~~~9~~:.£!:l_NCTION~~l!~!~~~~~.~~.~~~E ~-NT INJE~!ION SYSTE.pdf *--*---*-*..***-*-*----L*~--*-*

, 8,979

!145,862 ,,.,,.w_.,.._,,.w=

~..,,,,,_. y, .,.,,.,,,_.y<o~

01 PBAPS UFSAR R~~Ref Dwgs ___ ,.J M-l-CC-39, Sheet_,~010, ~ev 004'._FUN~~ONAL ~ON!,~_()L DIAGRAM HIGH PRESSURE COOLANT INJECTION SYST~M.pdf****-------,-----*.J136,667 1

--~2:!~~.~~~~1~,~R~ev~0~0~7'.,.~UNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf _,___.___ 147 __,_21_5_____,,____---i

~:l°!:C-~~~.:.!.~~.12'..~~-~~~~!:!c:T~~~()~~9_.~~~~. ~1:i~~_!:l-~~ESSURE.~~.~"!:_.l.~ig~..?~~:i:~.M.p~!..... ,_,,,,,,,,,___,,,,_____ * ,,,,,,,,.,,,, ___ ,, ,961

  • -"**-~_,,,,,,

M-1-CC-4, Sheet 0001, Rev 022, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL

__ ,,____,,_,,__,( ._,,,,,,,,,,.,,_,,_~----*-~---~------~----- .,,,,,-,,-*-~---*---*-***-**--*-,,--,, *--~*_,,

SYSTEM.pdf

_______,,*. ,,,,,,_,~_,,,,_,,,,._._,, _____,,.,,,,.,,,,"__,,,,,,,,,~---+..,,,,,;,*.**_,,._,,, *.**,,, ....,,,,__,,, ___,,.,, **

-.c__________,;;,,,;,,;,
::.:,,,,,_____.+';_M;_-1:;,-,;;;;C,;;;;C-_;4,,:,,,S:..:h:.:.e:.:e:,:,,,;,,t0,003, Rev 015, FUNCTIONAL CONTROL DIA~RAM RECIRC_~LATION FLOW CONT_ROL SYS.pdf ...------*--*-*-----l66,517

~:_~~~~~~~~~~!.£~- www**-****;r,..,,,-vi-1.-1__t**_-*~.... ?heet 0004, Rev 015, "':IRING DIA~~.AM_~~~-C_C_O_~!RO~-~-IA_G_~M RECIRC FLO~ -~~.~-TRWWWO_L~__pd_f_~ !2_9_2,,._2_4_3_, ---******~..**--*-*--i l.~~2.~~P~S-,!;!,~SAR R26 Ref Dwgs ,,,.,,,,,,__ J~-1-~.£~4, ~~:!_ 0006, Re~~~o, FUNCTIONAL ~~R~~~~RAM R_E;CIRCULATION FLOW cg!!_l!gL SY~TEM.~!..__ *-~*-,,*-~--..-~-~--J33,~~----*"*-~-~ ..*

Attachment 3 File Directory Structure Page 6of15

!M--1-C:C-11, Slhee't OIJlO_, Revq~~'. FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL

~~:~------J~~:E!~~'--~~~-E.q~;' Re~~!?!,,,.~UNCT~~_!'JAL ~~NT~!J1-_E!~~~~Cl~~~0],'E~~~OW CON!._~OL S~~!_~~:£~---------**-*---*-****-----l~-*-**-**~--* ---*---*--*!

.~~*~~---~!:2::~~~~;~:_!t~0012, Rev 019, FUNCTIONAL CONTROL DIAGRAM RE<:!RCULATION _FL_o_w_co_N_T_R_O_L_s_vs_T_E_M-'.p_d_f,_______._______________,___~L--------i

~~e~u_'-'.:';~---*-*w*i-~~=-=~~~=~~.:tyo~~-~~ ~~~'.-~UN~!£NAL_C:0~!~9-_~~GRAM_~~~!:J~AL ~~~T REM~VAL SYSTEM.p_d!_ ,, . ---~---*--***-* ,018 ,,,,_,, ,,,,,.~----l Sheet 0007,:~i:~~O?-, FUNCTIONAL CONTROL Dlf\~~ RESIDUAL,,~~f\T R~!':19.~.~ SYS~:p~f--*,,

! M-1-CC-40, Sheet 0008, Rev 009, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf

' '"! M-1-CC-40, Sheet*~~09, Rev 010, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT.pdf ------**

PBAPS UFSAR R26 Ref Dwgs M-1-CC-40, Sheet 0010, Rev 009, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf

-;;~~~-~;~R R;6 ;~; Dwgs ,, , ,,,, --!~~~~~~:~~:*;~ee~-;;~~;:*;*~~~;~-;;~~;TROL~;~-;~SIDU~~ 'HEAT*;;;~~;~~~s;~-~~; -*-*--*-*

,,.,,..,,,_. _ _ _ _ _ _ _ _ _ _ _,,.,,,,,_,,,J._ _ _ _ _ _ _ _.,,.,,,,~ *.- - , , - * - * - - - - * - - - - - - - *..* - - - - - * * * " ' '_________ ,,,,.,,.,,_,__, _ _~--*-**-"*-*-----"""'"'_"_ ..._____,,,"'"" "i'""""-----.-*****"'"*"""-*--1 f-'----**-*---*---*-__.:::.____ M-1-CC-40, Sheet 0012, Rev 005, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf ,,,,___ -*-----;..(1.~44-',*9**-18_______,.___4 CC-40, Sheet 0013, Rev 010, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf !49,363

,, ..,,.,.,~,...,,,,_ _.,,,,,.,~~~-.,,,.,,,,..,..,.,,,,,,..,,M..- . --,,,..,,,,,.,.,.,,,,,,,.,,."""',,,,,,,,.w,,_www,,=m,....,,.,...,..Mh"."""""'"'"""*'"'=h*~NN~,.,.,,,,,,..,,.,.,..,"',,,.,,..,,""""""VNM""""~=h**"'"""'-""'"""'"""'""="'*Nh'NNNM.""*""-*'*"")"'~---*"'"""""""**"

eet 0014, Rev 010, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf \72,370

,~,_,,,,,.;,,._ _,,",.:,,,,,,.:..,_;,__ _'.,,,._,,,..,_~~~**-*""""-~'-* "'" -""'"'""""----~- ..*-.,,.~~www***"**~****-www***,.}:-~-,,,,,,,,.,,~www****""www""""

d:\O~~~f\PS -~~SAR,,~~6 Ref_~:y[s_. ____ ,,

d:\01 PBAPS UFSAR R26 R~~-.....

1, Sheet 0001, Rev 007, FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM.pdf

, ~hee!_OOOl, ;!v 008! FU~!IO~~E~~T~?L DIAi~A~-~ORE ~:;~i!~;~~~;~~=~~=:*~----*---=~~=*** ~.~~***-~~-- *~-lii:~oo

! M-1-CC-41, Sheet 0002, Rev 001, FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM.pdf **--*** *-*-**"*--

213,504 9,409

--=,.= J -***---

1<!:~01 PBAPS ~F5~8,.8-~~ Ref D~gs _ _ _JM-l;~*C-41, ~~;~3, Rev 00~;;;;~~ CONT~;;*L DIA~~RE SPRAY S~STEM.p_~-* *~- *~---www--------;..-';,,,,9_3~9-~---..-

\

0 2: ~~~~-Y.~S,~~-~~.~:! ~~pl.,, - 1 :~~:-~!:. S,he.:!.~99.~~~ 9.9S,~E~.~~Tl~~~~.S:9~T~9~E~~~9.~~.?..~~/\y SYST_~~P,-~L.**,,,.,,.~.* ""'"~'""""'1~29 *~~~------..

  • \01 PBAPS UFSAR R26 R~f Dwgs M-1-CC-41, ?.heet 00~~,!,,~:v OO?L£~NC!._10NAL CONTROL D~~G co~~~~y SYST~~.pdf .. ,,,,, _____________,,,.,_____,,,,___ ,,_,_,,,,;,,~2_5___ ,,___,,,_ _**""
  • \01 PBAPS UFSA~R~R~2~6~R::ef~_!D~w~g~s~--~~~~~~* 5.heet 0006, Re..':'..9~~'. FUNCTIONAL CONT':OL DIAG CORE SPRAY_s_vs_T_E_M__.p_d_f_ _ _,,_,____________,,___,______,__, .--+-------*----....-1 d:~~!~~PS,~~A~,.~~!E.,~gs ..

~:\~.~..:..s~~5-..~~5.~-~~~~ ~~!E!wgs  :~~E~=~~~. Sheet 9.°..~~..~ev o~~'. ~u NCTIONAL CONTROL DIAG CORE_,,,s,,,P,,R..A_Y____ .___ ,,,,.:_,,,_ .... ,, ,..,,_,,,,_ _,,,,,,,,,,,,.,,,,,,,, ..,,.....,,_____ ,.,,,,. ,,,,,.,,,,.,,,,.,,,,,,_,,.,.,,,,,,,,..,,,,,,,,,,,i,...,,,0_3,,935 d:\01 PB":,P5 UFSAR R~~-R_ef_D_w,,,,;g::;,,,s___,,,__,,,+.._-1-CC-42, Sheet 0001'... Rev 011, FUNCTIONAL CONTROL,OIAGRAM ~ONTROL ROD_DRIVE HYDRAULIC SYSTEM.pdf 256,688 Id:\~~!~APS ~~~AR ~2,~Ref~~~ - *1-CC-42, Sheet CJ.002, Rev 003~~~10NA~-~()NTRO~E~AGRAM CON2:R?~~()_EE_RIV~~YDRAULIC SYSTEM.p~_,, _ _.,,,,,,,,..,, **--**-** ,,,,,,,_,,,,,,,,,,-1*-17_5,;,,..,5,,..5_5_,,_ _,,,,,,,.,,,,,_,,,,,.....4 l~\01 P-~~~5.~£..5.~~~~~!_e!,,,,~':;'.~. ~-- _..::1;:~C-4~5...~~.!_9003, R!:~~06, FU~CTIONAL CONTROL DIAGRAM CONTROL ROD DRIV~~Y~!J.~~LIC~!:!!~~-Pd~-"-***. ** .. ,,,,,, ___ , ___,,,,,--,,..~,,..,,1_9.,5,_0_02..,, ........- .. ~-- _

Attachment 3 File Directory Structure Page 7of15 2;,;.,:.________:.:_!!!re~~?rv "._<:~~-~:::c:;;,::.;*:~c;,:,'"~~-"~--,,:.;,:.*-****-'--'*"'-'~-~-.;,;,~--~,:.;,:.~,,.;,-~~~~--;:.=_:_:_.:il:.,;:..o.,.-;_________~~---------~~~--~:.;~----*~~-~~c..i-':~*-~*F_ile~S!~e_(B~yt~esl . -,

M-1-CC-42, Sh:~t££04,R,~,,':'.'~2,:,~.~LN,~12_~~~!R.9~RAME£~!~_9~ROD -~~!\/E.~!!?~~l,l~-~~!~.!YlJ~~!'-. -* . ,,,.,, .. _ _~----*-*--*-""-

186,502 I

,,...,.,.,,,,....,...,...,,,.,"""""~"-,., .. Ji M-1-CC-42, Sheet 0005, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIV~ HYDRAULIC SYSTEM.pdf

\01 PBAPS UFSAR R26 Ref Dwgs M-1-CC-42, Sheet 0006, Rev 004, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf

  • --*------------ -----,~~~:-~~~~~-s~~!,!~07, ~:v ooi~N~;~CONTRO~~~;;;~;;;:;;;;~~------*-------~--~-------*,,,,________ ,,,,,,,,,,_,_,,,+--* :.,,,, _______ ~,,.,,,,,~-----

M-1-CC-42, Sheet 0009, Rev 001, FUNCTIONAL CONTROL DIAGRAM CONT~~-~~9.£.~IV~-~YD~UUC SYSTEM;p?_~-------*--*--****-------****,,*-i-.,,,,;---***-**- ..---*

1---------*--------*-*----! M-1-CC-42, . Sheet 0009A, Rev 005, FUNCTIONAL CONTROL DIAGRAM --*---*- CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf


*--------------*--*"*--*l--'--*--------**----!

UFSAR R26 Ref Dwgs M-1-CC::.,42, She:.!~010,_R,~': 01~,_FU~-~19~AL ~ON!:_R~~~§.~AM CON~9~ R~£_1?~,Y-~-~YDR':~~~?~TEM.p~!_,, ____ ---******---*---**

~~?AR_~~-D_w_gs_ _ _---+_:_!-CC:~-~~~heet 0011, Rev 003~ FUNCTIONAL -~ONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYS!,EM.pdf___________~----

_ _ _u_F_S..A__ R ~~~:! Dwgs .. CC-42, Sheet 0012, Rev 006, FU~£T~~NA~_EONTROL DIAGRAM CONT~_o_L~Ro_~£R_1v_E.!:12:~_.RA~U_L_1c.~~:!:~~-Pd!.-. ..,, _ _ _,,.......,,.....- ...---r-~~~------*--*--~

---2~~~PS UF~AR R~6 Ref Dwgs .,,--*--+"--~~=~~.
!~~! OOBL~::: OO?!~.~CTl~AL EONTROL DIA~RAM_~_()!:lT~..oL RO_EJ_g_~!~~--:,i,;~RAULIC:..~V,?~~...:~:!~.--------" ,,,,.,,_,,,~-***j234'.83~-- ,,,,_,,,,,,.,,,_ _ ]

ld:\01 P~A_P_S_IJ.'.SAR R26 Ref_~wgs 1-CC-~L~hee! 0014, Rev 003~.'.UNCTIONAL CONTR~L DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTE~_pdf ________ www 5..!339 -**------1 id:\01 PBAPS UFSAR R26 Ref Dwgs --+--1**WWWC_C-_4_2~~~:.:!.£':l.~5, Rev 004, ~~NCTIONAL C~NTROL DIAGRAM CO~!~~DRIVE HYe~AULIC SYSTE~:pdf ---*------**-** ........-----*-0---1.:.,2www2_3______ ----~www---1 2,6 Ref Dwgs' .* -:~:~~:42,~h~t ____ ;,,,,,,,,,..,,,,,,,, _,,_F_u_.NCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HY~RAULIC SYSTE1':'1J:_d! "" '3_90,3,~2 *

!M-1-CC-42, Sheet 0018, Rev 001, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf !99,405 ____www_

  • I 1~~2~~~~~~R~~~-6R_e_fD_w_gs__-..--~CC:42,_;;heet 0018A, R:v 003, FUNCTIONAL CONTROL DIAGRA~ .~ONTROL ROD_~~l~~~C SYST~--~-~-pd_**~----www----*---**----t~9,381,,_...,,______j

~=\~~APS UFSAR R2~!.:f Dwgs """" ----  !~:_!-CC:.:~'. ~~::t 0~01, .~:.~-~-~~--~-~N~TL c~~O~_EIAG STAND-~;~~9~1-~ ~~~~ ~,,v,;;:~!.~~~L ... " --*--- " ' *-------~-~-~~:.?,?,.,,,,,,,,.

,d:\01 PBAPS UFSAR R26 Ref Dwgs

~ ,.,,,,,,,,,_.,.,~w,,,,,, **~*¥N<=n~Nw*, ¥µ*=~,, .....,,..-..**~***,.-.,,¥w,,..,....,_..,,,...,,,,..,.,,,,,..,,,,...,~~

DD-3,2~~et 0~01, Rev 006!.~~0C~~.£~~.§.~~-~2!ANDBY L.!3_~!£..~~!..R.9LSYSTEM.pd_!........,,________.__ .,,,... !119,518

,,,~,,,~°""""",,,._....,,.,.,.,,_,,,,_,,,,,.,,,,,,,,,,.,.,,,,_w,,,,¥~~~,,._,,.~,-"'

0 '"'"'~"" .,

t_c!jOl PBA!_?. UFSAR R26 Ref Dwgs DD-5, Sheet 0001, Rev 008~ PROCESS DIAG REACTOR WATER CLEAN-UP SYSTEM HIGH PRESS CO.E~-------*---*---**------*--+---c--*--**----"""-*---'

l~~~*~!~~U~Fs;~A~R'.._!R~2~6'.~R~:e~f!?.D_w~gs~** ,,,,,,,_____ ,J~-*1~.::-.~D-~D.:-~6:, She:.!_9001, R,,:,,~ 006, -~RO~~??E.~~~~~- PRESS c90LANT IN_~~TION SY*~-~-~TROL RO.pd!,,, .... ,,,,,,, __ -***,,,,,,,,,_ _,,,,,,,,_,,,,,,,,,,,,,, ,,,,,,,_,,,,,,,.,,,,,,._,,,,___ __J l~:l01 ~APS UF?~R,-~~~-~=~E.'."'...g;;, ,s____.,,,,,, +'M_-_~:!?.?-8~~~:et oo~~Re~ 013,~~~~STE~~~~~~g_IAGRAM.~-- ......-~--------............--~ ___ _,,,,,,,.,,,,,,___,,.,_,,___ ,,_._~:?.~~..,,,,,,_.~--***---'

1~~~~~2. !:JFSAR R26 ..R.=f D_w_,,,gs__ ,,_,,.,.,_,,,,,,;...--~=~!?.=~~-She:!,_9_901, R,!:,~,,009~~RO~.~~~..?IAG ~ESl~UAL HEAT REMOV~~JRHR) C£~2~~~~0D DRl.p~! _____,,,,_.,,,,, ------*-**---*-*--j~5,~g~---*--------

,d:\01 PBAPS UFSAR R26 Ref,www Dwgs__,,,_____ ,,, __ r____ ,________

1-T-20, Sheet 0001, Rev 014, INSTRUMENT

~*-*--*--,, .... ,,_____ ...__MOUNTING ENGINEERING DIAGRAM NEUTRON ............... SYSTEM.pdf____, ., , , ,.. , , ..........- -..................,,,,,,,..,,,,_,_,....+---.:...938 ....._,,_,, __, ....- ....,,,

ld:\01 PBAPS UFSAR R26 Ref Dwgs f,,,,_ _, _ _ _._ _,_,,_ _,wwwwww,,www>>www>-wwwwj.,,,,,..,,_ _ _ _ _. , _ _ _ _

\ M-1-T-20, Sheet 0002, Rev 012, NEUTRON MONITORING ,.

SYSTEM.pdf d:\01 PBAPS UFSA~~~- Ref _?~g_s_~ 'WWW l.!:'!:1-T-20~eet 0003, Rev 014, N~-~TRON ~Nl!9RING ?YSTEM INSTRUM~!'!! ENGINE~~~~M.p_c!!,__, ________ .. ___, ____,,___________ _

d:\01 PBAPS UFSAR R26 Ref Dwgs l M-1-T-20, Sheet 0004, Rev 013, INSTRUMENT ENGINEERING DIAGRAM NEUTRON MONITORING SYSTEM.pdf 386,295 l?,~~-~~-~~-~~?~~,,~:."!~-"~"*"~"'~*~**~"'~--*-*** _,,.. , *-~~~;;:;~;e~~~~~-~~~;~~~~;;~~~;~;~~;~~:E~~~~ RECl~~~ON*;~;*;~~*~*;;~-~~-~;~*~-~1~~~;;~~ ..--=--=-.J._;_7,_3_~0_*=_---_,____,,,,..-*---~

G~.:~~ ..i:~~:~.'.~~~~~~~~~~~-. --*--l!~::~~c:s~~h~:e::et~0~0~0~2,_ Rev o~~-~rnU~ENT ~~~EERING DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM - HISTORY.pdf INSTRUMENT ENGINEERING DIAGRAM RECIRCULATION FLOW CON_!~OL SYSTE~ PID:£~!... *.. ---** ...,,_,,_,,_,,_,,,.,,_

~::~~-~~-~!~~}~.~~~~-~:!.£~>...... . . ,,_,,,,,,. . ..J~.::~:T~~~---~~i;:.tooo4!.~e,~0_18, INS~~~~.~~-~,§INEERIN~_E>1AG~~--~~S.IR~LATION ~~OWESJ~TROL~~'!!~:P~!. ,,........,,,,_....,,

~~~-'.'.~~~*~~~~~!_~~~------~~~T-29, ~~eet 0001, Rev 012, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MIS~: SYSTEMS.pdf ---*-*--**---www-""'"'5*-4,_8_5_4_______,,,,_.__...,

1 PBAPS UFSAR R26 Ref Dwgs M-1~!:~~ ~he:!~o,02, R.:.v 012, FUN~!!~.t:JTROL Dli:~AM ~~~~EAR BOl_L~~ MIS~:~YSTEl~_S.:pdf___,,. _ _,,,,,,,,,,.' ,,,,,,,,_,,______,,,,_ ,51,0~-

[~*;~} PB!,1-P~~:~~~,,.R.,2~-~~f "~~!!~~=*** M-1-T~~9, ~~eet 000~:::~12, REAC~~~CTION SYS!,~~~~..:!1~.f*~-..-~----"" -*--*---~~-~--..- 244,844______

Attachment 3 File Directory Structure Page 8of15

>\.{'.~ :. '

r~j'. : . . . :~ir.i:cto~~ P~t~ .....** *. **.*;., *:...........~~:..........===~~:..L..::.i:==;;;,...........:...;;,;,;.,,;.;..;;,__====;...,-**-*,,,;'--".&£J.L;.;..:..:..;:.~.,,,;;;==~-'--*===-***-~"c:..............~:-...-.w.:J.....~:._;...,-:.,,...._..;...,..,,....,.

c '

  • -*L. ~ile ~i~e (Bvt~Ll d:\01 PBAPS U,~S.AR ~.?.~~~f Dw~. -* ~:.~:!::..4,~5,~~~~,.9g9?L~i;,v 09?.'.~~~5:f0R ~-~~!~£'}El~S.~T,~l\'.1.~ED PID.pd*~---***-----*u*~ . 154,514 M-l-T-49, Sheet 0003, R~v 015, INSTRUMENT ENGINEERING DIAGRAM REACTOR PROTECTION SYSTEM:p_d_f_ _ _ _ _ _ _ _ _ _ _ _ _ _4;,,;;,:....~=--*-----*1 4, Rev 006, INSTRUMENT ENGINEERING DIAGRAM REACTOR PROTECTION SYS P AND ID.pdf INSTRUMENT ENGINEERING DIAGRAM ~~AC:g~~RE!ECT~9_t:l.~,'.!'.?!~~J~~-f_,,,,,,_,...... ~-**"*~--*

~~.!-~~~~~::'~.~~-~J~~,~---*--~-~:T-49, Sheet..9.'2.q6, Rev 014~ INST_RUMENT_~r:!_GINEERl~~--~~AGRA~-~~~TOR P~~~c;!!ON SYS .':,,~l~_D ID.pd~----*---*-*----*-***-*

GENERAL ARRANGEMENT PLAN AT EL 116-0

\01 PBAPS UFSAR R26 Ref Dwgs

\ *""'~"'"""""""""~~~NNNNM~W.-'W.'"~=w.w.>.WMW.MV,,_..~ '°'~"'-+'-oo***-""'-*---*----*

ld:\01 PBAPS UFSAR R2~-R~ef_Dwg_s------2~~~~i::~~~R~e~v~O~ll,, DRAIN AND SUMP SYSTEM.pdf ._,______,____. . . . . ~

1283,771

--,---~-------1 1 !S~~. R2? Ref Dwgs 021, GENERALARRANGEMENT PLAN AT EL 135FT-o .......:.-~---*-****-~-----**""'"'-**~--..*-----*******~---~**, ~~~}~~~---*-**--- *---

t 0001, Rev 048, DIAGRAM ~~§.~!?~---*--****--* ******----..-- ,,,_,,,,,,__..........

~~~~~~~~~'._,,, _ _j~~~~~!t~0~0~0~2~,R~e~v~0~4~6, P AND I DIAGRAM LEGEND__._Pd_f_ _ _._ _ __

0001, Rev 075, MAIN STEAM B~~.~_!\ND CROSSf>:~"***-"-*--***"-"*~---....- - - - - * - - - * * ..- - -...............- .. **-*-

~~:!;,_~~P:::S:._~U~~F::_SAR R26 Ref Dwgs PS UFSAR R26 Ref Dwgs

~--..* - - * *.. - - - - - * - -..-....;;;.,.,.~.........- .... M-307, Sheet ~004,~~~ g?4, C~NDENSAT!~~~TEM..:£~...- .......----*-----**----*--....-,_. ,..........____, ...,,,, ____,____ ,,,,,,,.____ -1,...--"------.... ---*-*-"'1 R R26 Ref Dwgs ~~.~~.eet o~~-~ev 07~, co~~NSATE SY~'.~~:E~L..... _,___ ............_ _,,,,,_ _ _ _,,,.......,,,,,,_ _ _...._,,,,,...,_.. , ..._ _,,_ _,,,,.-...

-307, Sheet 0006, Rev 043, CONDENSATE SYSTEM,0006.pdf

.~~~::~~..~.ooo.~:..~!:~.~~~'.-~EE~~~:!!.~.~ND£,EED PUMPS.pd!._ "'"""'"'"" .*. ---* ....~***~--*-""~""'"*"'-*""
  • ---:--*.308, S~~!0003, Rev 059, FEE£WA.:!:~.~ AND FEED PUMPS.pdf

~~~!!~:~.~~~~~~~~.~i..~~. .~~5, ........- ...~~~~~'..5,~~~!g~~~~-~~~~~~~~~~WA'.~R A~~-~EE.£.~~~PS:IJ~!...*..---*-***-..*-..- ........ ""**-***-..~*-* . 55,506 M-308, Sheet 00~~,~ev gg~~~~~~~~~£~~~~.. ~-l!.~~;Jl~_f_ _...............____.,_ _ _.._ ..........__.._ ~ *---~-..-~....~-~ .. - - ...J;~,~;--~. . -.~** *~*

Sheet 0001, Rev 068, AIR EJECTION AND OFF File Directory Structure Page 9of15

~.:..,, ..,.,,.,_,~_,......--..----.,,,,,;;;,..,, ....*...**,,__.*.+.~E.-~~eet oo~~!~:v osi,1 .~.~-~~g~~~ . ~.~~.~E.~.f ,

-310, Sheet 0005, Rev 004, AIR EJECTION AND OFF GAS.pdf i~:;~~-..-~~P::s:;;U~F:::SA~R~R~:2:;6~R~e;f~.:'.Dw:'.':'.!lg;s~-*-*--*~~~ Sheet 0001, Rev 050, CONDE~~TE FILTER DEMINERALl~~~~:sTEM.pdf *----~---*-**"**--*-"**--------**-------i123,901 _ _,_ _,_,_,i

-311, Sheet 0003, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf

,_,,~-"'"'"'""'_H_.,~,N-,,e,,,,,_,,_,,,,,,,,_,.,.,.,,,,,,,..,,,,,,,,_,,,,,,_<,_,,,.,.,,.,,N,,,,,,_~--0 =-<""~~~=.,,,,.><MkW..-d>w_,,.,,,,,,,..,,m,,,,,,,m,,."-~'==""""'"""' _ _ _ _ ,,,,,,=~'" "~'".

!479,271 V<>;;.,,,,,,,,,,,,,,..,,,,.=*-=>""1 j

--**"'-------***--~*~1, She~~ 0004, Re~ 039, .~~?~~TE FILTE.R ~~MINERALIZE,R,.2Y2~~"'.'.'.l:P:!! ..,,,,,_ _ _ _,. _ _ _ _,_,,,.,...,,_~--,,..*.---**--***-----

i-;,,,_*---*----*--,,,,,;;;,._,,____,+_-3,_1_1:..,S_h_e_et_o_~os, Rev 039, CONDENSATE FILTE~ DEMINERALIZER SYSTEM.pdf***-----

l~~-~PS U_F,'.i~~~~.~ef Dwgs,,,_. _ _,,

.:\01 P~~.~FSAR ~~?_R_e_f_D_w.,;;g:..s~---+---3_1,1...:',_S_he_e_t,~El.! Rev 055, CO~DENSATE FILTER DEMINE~LIZER SYSTEM.pdf ----"**--*--------****---~-*--*--*--*---:*-~------*------*~!

  • ~**-*-"'-*.-*~--**+--~~~~- 2~~~~~~, Rev,9~,~.£,~~DENSA~"~' FILTER DEIVl_~ERALIZER s~~~~:P~,_,,. ____ ,___ ~,,,,,,_ _ ,,,,,~.,-_,,,-_,,,,,,_,.,,,,,,,,_,~ ,,,_,_,_~,~~--***-*-**-**,,_WWW_._,,,,,_.;

f,,,,,,;,,, __P,,B,,A_P_s,,,u,.,,F_S_A_R_R,,,,2_6_R_ef_D_w_g~s_,,,,,,_,",,_,,,,+- 311'... ~~.eet 00~~; Rev 040,'._ ~~~.EJENS~!~~':!.ER DEMI NE~.~IZER SYST~~:~.*-** ,,,,, ,_.,,,,,,,,,,,,,,, ,,_, ,,.,,, ***--***--,,,, .,, ,,,,,_,,, __ ,_ ,,,_,,,

311, Sheet 0010, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf

~~~~~~~~~.~~~!. .P.~~----~~12, She~! 0001, Rev as~, CIRCULATING WATER sysTEM.pdf i661,900 i

--,,i--.------1

'.~~~.~~~~!;~~-=~~~*-*-,,,,-,,,j!~~1~2::,.:_sh~e~e~ 0002, Rev 058, CIRCULA'!,'ING WATER SY~TEM.pdf ,.,,,,,,,,,,,,_,_,,,,,,_,,,_,__________ ,,,,.___,,____________ ,,,,_,,_(-.18._6,,,9_,,,~~-,,,,,,_ __

,,,_,,,.,.,,,,...,,.._ ..,....:~---**--*l*-*,,*-1,,4, Sheet 0002, Re:f.£6,~, SE~~~..~~ER.~!2]!~;pdf _ _ _ _.,,,,.*.. ,,,.,,..,.,_.,,._.,,...,,,, . ._ _ _ _,,,,________ ,~**----*-,,,,.,.,,,,,,,,,.,_,,,,.,,

  • ~------~;,,,,,,,,,_ __,,__1_4~,_sh_e_e_t_0003,Rev066,SER~~EWATERSYS,!EM.pdf _ _ __

_ ,,,,,,,,_____. ___,,,,_;::,,,,,,,,, ___,,,_+--*~4, Shee! 000~: Rev 9.~~~~~.~!~~:'."~!ER SYSTEM.p~---*---- _,,,_,,,_,,, __ ,,,,.,,,,,,,,,,, __ .......,,_ _ _,,,,,,,,,,,,,,,,, *-*-*---,.,,._,,,,,,_,,,,,

l~:~~~~PS:_Ul!~F;s~A~~R~R~2~6~R~e!:,f~Dw~gss..,,, ...........,,.,,.,,,,_,,_ -314,..~heet oo~~~,,Rev 069, ~~:'..~~yvATrn~y~~,:f.!._~---,,*-~---,,,,,,,,"',,,,,,_.~---* . -~..- - -..-- ....-,,,---~.,,,.,,.. ,.

---~P...S:.,;;,,U;F_S;:,,A,;~R;,,,;R..~2;:.;;6...:R;,;;,e;;.,f;;;,,D,;.w;,,:o:gs:,_,,,,_ _ ,,,__.;,;,;,,;,,-3;:;'.!:.~:..2~!.~~~~, Rev ~~~:.~E..~".'.ICE WA:!:~R SYSTEM.pd!,,,,,,, _ _ _ _,,_,,,,,_ _ _ _,,,,,,_,,,........,,,,,.....,,,,._ _._,,,,,_,,_ ...,,,__.......,,,,,.,,,,,,,.,,,,,,,,,,,,,,,,_.,,,,,_

,,,,,,~~PS .~~SAR R2~~:!',,E~IE,,,,,,_,,,,_,,,,,,, -314, ~..~et 0006,,,~ev 06~SERVIC~-~!!=~SYSTEM:e~_,, _ _,,,,,_ _ _ _ _ _,,,_,,,,,,,,,,, ,,,,,,,,,,,,,,_,,,,,,,,,,,,,, ___- , _..,,,,,,,,,_,,,,,,,,,,,,_ _,,,,,,,,,,

~~APS u_~AR R2.~ Ref ~wg~---* 314, Sheet 0007, Rev 059, SERVICE WATER SYSTEM.pdf i~\01~!-~~~ R26 Ref Dwgs _314, S~eet 0008, ~:..~RVIC~~AT~_R SYSTEM.pdf,,,,,,,.,,,,,, ...,,..~------*-,,~--*----.. --~-~-------------~~---+----*~---,,... , ,. ,,.,,,-;

~.:)~~.J:BAPS UFSAR R26 R,,e,,,f..."Dw_.:o:gs,,,,_,,,,,, .._,,,,~,.,,,,,3_1_4;,,,,,,S_h,,,,e,e.t.. 0,,,0,,,0~9;,,'._R~.~ £~~. SER~IC~2':'.'ft::!:~~..~~~!,,~.r:-1*Pdf ,,.,,,,, ,,,,,,, ,,,,,,,,._.,,__,

d:\01 PBAPS UFSAR R26 Ref Dwgs ev 086, EMERGENCY SERVIC~_WATER AND HIGH .~RESSURE SERVIC~_WATE~.SYSTEM.pdf

~~~~~~~!~~'.,,,..,,,,, ___ ~~~~~~~~~~~~~~E~N~CYY-2!SE~R~V~IC~E~W'!.5,AT~E~R~A~N~D~GHPRES_su_R_E_S_E_R_v_1c_E_W_A_T_E_R_S_Y_ST_E_M_S_._Pd_f_ _ _ _ _ _ _ _,__,_____

~5, She:..~9_°.03, R~~.E~?!~.ME~~.~.1~~ ~AT~~ Hl§.~~~~~~~~Y~E w~~.~-~:~e.~L ..., *~-.--~- . . .- ..,,*---.. . .~ ,,,,,,,~ . .-..;,. .,,,,,,,,,,;,,,~..-.. , ,,,,,,,.,,-~.,,. ***-- ,,,.;

,,, ___;;::,_,,,,_~*- *<_,. ,,_3~~'. Shee~~94, ~ev ~.~.~!~~~~~.~.~.2.~VIC~~~:!:ER ~.~~l!,IGH ~.~ES~~RE:_Pdwwwf_ _ _ _ ,.. _ _ _,,,,,,,,,,.,,,. ___,,,._.. ~*-,,~,,,,--~..,,...,,_.,_,,,,,,,,,,,._ __

BAPS UFS~R R26 Ref Dwgs 315, Sheet 000~~ Rev 059, EMERG SERV WTR, HIGH PRESS SERV WTR SYSTEM.pd_!_._ _ _ _ _.

BAPS UFSA.R R26 Ref Dwgs 315, Sheet 0006, Rev 003, PID EMERGENCY SERVICE WATER AND HIGH PRESS SERVICE WATER

__,,,,,___,,,;,,~~~:!.£>007, ~~ 003, ~~~~~-~~~_c:~~.RVIC~ WATER AND .~IGH p~~ss SERVICE WATE.~~Y.pdf ~- ,,,.,,,,,,,,,,_,,,.,,,,,,,,,,,,,,,,,,,

Attachment 3 File Directory Structure Page 10of15

<c ',

'*,:; . ~;,:,_-~ ~~~t~ry P~th,__ <.,~.- *. ; FilBi?:e(Bytes)*** i;

~--*---1 d :\01 PBAPS u FSAR_~~.~~ [)~!I!..... , **--*+--*-*'--** *-**-***-"---.. ,,.,.,,,:,,,,,,,. ,,,__. .,.,,,_,_,,.. ,,www,,,,,.,,,www... _ _ _ _ .,,,,,,.,,~,,,,.,,,,,,, ,,,,,,,,,,,,,_ _ _ _ ,,,,,, *--*--*---*~<<"**-********-*--wwwwww****-*-*--* ,,,,,,.,, ""-W~v.y;,l I

d:\01 PBAPS UFSAR R26 Ref Dwgs 316, Sheet 0002, Rev 064, COOLING WATER-TURBl,.".!E BUILDING.pdf d:\01 PBAPS UFSAR R26 Ref Dwgs !M-316, Sheet 0003, Rev 052, COOLING WATER REACTOR BUILDING.pdf 8.~~.~. Y.~5-.~~2_6 Ref~wg;==-JM-31~!~~::t oop4, R:~~~:'.E~.9~~NG W~'.~~:!,URB~~E B~~~::P~*---*** ~ ,_,,,,,,,,,,,_,,,,,www.,,~---*www*m"*' ,-~

M-317, Sheet 0091, R!.':.9~~_!1W_ WA'.~~ SYSTEr':'1.pdf__ ._www_ _ _ _ _*_ _ _...,,___,_ _ _ _,,.* _ , _ . _ _ _ _,_._ _ _ _,. _ _ ,_ _.,,,

  • --"'--*--*-f---!7, She:_t 0002, Rev 954, RAW WATER SYSTEM.pdf__ *****-----www*

19, Sheet 0001, -~!!.~ ~~-*M-~~~:LJ~0,~.IV11~~R_A_L_IZWWWEWWWRWwww~'..~~.:P_?L ***- * * * * * - - - ... ,,_ _,, ,,,_,___,,, .... ,. ,,,,,,.,,,_,.. ,,,.,,......... * - -........,_.,,.,,,,__ ,,,_,;,.,,..-:...-,,,-

IM-319, Sheet 0002, Rev 053, M.AKE:UP DEMINERALIZE~ W~TER._.p_d_f_ __

?19, ~~~-~.!.~ev 011, MA~~~..£.E,.~~ALIZER WA,~~~:~..,,...,~-~*---,,,.,______,,,_,,,,,,_,,,.,,,,,,,"_..,,,,.,,_,,.,,.,,,_._... ,,,-.~ ....,___ .,

-:,319, ~heet 00~~'... Rev ~20, M~KE U~E~MINE~ALl~~R WAT~R.pd! ...._ _ _www_,.,,,, .,,,,_,_,,,._ ..

\ - - ' - - - - - - - - - - - - - = - - - - - + - - ' -320, ---- Sheet

- ' - 0001,

  • - - -Rev

' ' -039,

- - -COMPRESSED

-<><< AIR- NOTES AND INDEX .TITLE _ _SHEET.pdf

_ _,;_,,,_ _ _ _ _ _ _ _ _ _ _ WWW >>**-----------4-_,,;,,,www________-i R R26 Ref Dwgs 4, AIR COMPRESSOR 2AK001 AND

. ~~~~~'.She.~!...ooo~'. ..Rev 044, ~~..~~~. ~-E~~.!3!~~°"~~ND.,,1?RYERS.:P~...- -.. ,,,,,,,,,,,,,,,.,,,,, ,,,,,,,,,,,.,,,.,,,,,,, ,,,,,,,,,,,,,.,,,,,,_,...,,,,,,,__.,~,.,.... ,.,.,,,,,,,.,...,.,,,,,.,

M-320, Sheet 0004, Rev 041, AIR COMPRESSORS 2CK001 AND 2DK001.pdf M-320, Sheet 0005, Rev 040, RW AIR COMPRESSORS OOK308 AND OOK309 AND RESPIRATORY AIR CO.pdf * - - - -

  • p~~~SA,_~,.!3,~~! Dwgs _,,,,,,,,,,,.J ~~::.~.~~'.~~:e..t.~~~!.~~§.~~.~~.~si:!E BACKWASH SYS AIR COMPRESSOR 2AK315 AND LOW PRESS.,,A.,,,,1,_R~-~....- -........ , ,,,.,,

s UFSAR R26 Ref Dwgs i: AIR TURBINE BUILD!!'l~:££~ ....- _______,,,,,,,,_..,, ...,,.,.._ ...,,_,,._ _ _ _ ,,,.,.,.,.,,._,,,,,.,_,.,,.,,.,4.,,,,,.;,,,,,,,,,~-**"""""'",'W

~~~~~-~~~~~:~~*~..~~~~*---*-..Jl~-3~2~0~,S~he.et 00~8, Rev 034, INSTRUMENT AIR TURBINE BUILDING EL. 102.pdf

-320, Shee~OOO~. Rev 04.3.!.~~~PRESS~~ Al.~ SY~TE*~-~2!RUME~_T A!~I..LJ.~~~NE ~UILDIN.9.. ~.~.:!16.p';!!___,,_,______,www,,,,,,_,,,,,,,,,,.,,,,,

r.-,:,,,,__P_B_A_Ps_u_F_S_A,.R......R.. 2....6.__R_e_f_Dw-=-gs_~_,,,,.,.._20, Sheet..~10, Rev _02~~~~STRUM~!'!!.~!R TUR~INE. BUILDING EL. l~~:E~..,,,,, . *---*~-~----

PBAPS UFSAR R26 Ref Dwgs 20, Sheet 0011, Rev ~~}~~1:~YMENT..AIRrnRBINE BU_ILD~~-~L. 135.~_df_______,**_______.............,,_,,_,,,.....,,.,,,__,,,,_,,,,._,_,,,,_

PBAPS UFSAR R26 Re!_Dwg~~www,***www*fw--20...:'. She:_!.0012, Rev 046, COMP~ESS~.~_!~ SYS,TEM ~NSTRUM~~.1:~~!:,UR~!NEJJ;!f).pdf INSTRUMENT AIR REACTOR BUILDING EL.

,d:\01 PBAPS UFSAR R26 Ref Dwgs ,_J~~1::=.=~~. ,.:!h~e.:t.oo.1..5.:.~~~-~~~.1~~!~~~~'.~.!~~~~~TO~~U.~.EJ~~~:1?~,'.,e~!,...~~ ,,,,, "*-~~*-**>>www<'>*

~~-1_;~-*~~~;~;~~2_"~_-;_e_,~*~~-g_;_~:~~-........~==~~h:i.:e.et 0016, Rev 042, INS!RUMENT..AIR REACTOR BUILDING EL. 165.pdf - - - - - - - - * - * - - * -..----------www*---**-

he:!, 0017, Rev 039, COMPRESSEp AIR SYSTEM INST.~l!..~ENT AIR REACTOR BL~~,,~-L._1_9_5.,:,.p_df__,,,,.,,,.,_www_._,,_,,_,,_,___, _ _ _ _ _ _ _ _.J...-,:*.,,,;,,,_,,;__,,___ www_ _ _ _ ,,j

~.......~., ....,~~~~~~~,:!_!:>wg?**-.. heet 001.~~ Rev ~.~!~~'.~~~!,~~!~_!ICTO~~!~~l~~~~www~-*.. ,,,,,,.,,_.,,_..,,,_,,

ld:\01 PBAPS UFSAR R26 Ref Dwgs 19,~,q~7, COMPRES,,5,!',!?.~ SYSTEM SERVICE f.\~ TURBINE BUILDIN~,~L.102-,]:1.6, 135AND165.pdf J~~01P~APSUFSARR~26~Re~f~D~w~g~s~--...-._j!~~~~~~~~~R~e~v.~~~S'.~E~RV~l~C~E~A~IR~R~E~A~CT~O~R~B~U~IL~D~IN~G~E~L~.~91~-~6~A~N~D'.2:2~~--***-----*-*,~-www-*----*-*--..----*---*~~2:.?~~~

PBAPS UFSAR R.~6 Re~~wg~.*_,,,.,, ..-320~.shee..t 0021.:.Rev 03~~.~~~~.E AIR~~~~OR BUILDIN~..~~* 135.pdf -~'"",. ,_.,_,,,,,,,,,.,,,,

~~~~PS U!SAR R26 R._ef Dwgs .. .,.,,,,,,,, r
ii-32~!. Sheet 002~~, 037, SERVICE AIR~CTO~: ..~?.:;. 195 A_~234.pdL.._.,,,,_____,, _ _ ,,_--*-~*=-=~~ ,. . . ~=-=r124~~~. ,~,,, __,_WWW"

Attachment 3 File Directory Structure Page 11of15

~~~~~l;'!~~~~,Dwgs . -320, Sheet 0024, Rev 039, AIR COMPRESSOR 3BK001 AND DRYE_!lS.pdf

~~~~~~.~l~S~~~~-~!,,ID.w_;;;:,gs_____ ,__~,-~~~!. Sh:,:,t 00~, Rev 041, AIR_~~~~ESSOR~~K092:_ AND 3DK09Ydf --------*--**-*,-*,-----~-*--*---*-*-*---*----,**-*"---*--------*--**-*w1 01 PBAPS UFSAR R26 Ref Dwgs

\~_1, ~~~!:~~~?~R R26_!:f.E>wgs

~~!~~~~s u~:6._R_R26 ~!_!)~gs **- ,-* ---1"'*--,*--'

\01 PBAPS UF~~~~?- Ref_,D_w__;;;ogs____4 ___: ______,;_,,,_

.~:\01 P~APS UFSA~_R26_R__e_f_D_w_g_s__.____._ COMPRESSED AIR SYSTEM INSTRUMENT AIR REACTOR BUILDING EL ld:~~!-~BAPS UFSAR R26 Ref Dwgs ':!;t 00~~~~:~.9~~LCOMPRESSED AIR SYSTEM INSTRUMENT AIR REACTOR BUILDING d:\01 PBAPS UFSAR R26 Ref Dwgs Sheet 0036, Rev 039, COMPRESSED AIR SYSTEM INSTRUMENT AIR REACTOR BLDG EL. 165,0.pdf 1 PBAPS UFSAR R26 Ref Dwgs Sheet 0038,, ~e,~036, INST.~.~-~.~!.~~~~i:~~-~.~~_I~~!~.~ E~:..~.~~:P~-*---* ,,,,_~_,,,,,,,,,,,,,,,,,,,,,,_,,,,,,,

  • --~~~.~e~e!tgo~o:~'.--~~~E~6,!, COMPRE?~~~!-!_R SYSTEM ~~~~~~-~~~!~~~~~~~2:~~'.~2--~,,,~~?-~N D l~_:P~ ,,,, __ _

040, Rev 037, SERVICE AIR REACTOR BUILDING EL. 91-6 AN~_116.pdf - - - - - - - -..---*-*----- ..---*-,,***----*-*-*--t!_6_3_,8_2__ 3___________,1

\01 P~~PS UFSA_R R26 R:f~wg=-*-*-*---~~.~~..~::;.~~'.::.~~':~~36, SER~l£E AIR,~~!,-CTO~~~.~~~~-EL..~:~:.~-~~,,,,,**---*---*

\'":'~~!'~~~~~5,i'.'.~.~R~26~--~Re~~f~D~~w~!g~=s~-~*---~~~:.::~~ee~t;_~0!:0~4'f;;2,~R~~e~v ~~!!. SERVICE ~1,,~.~~~~:>R BUIL?ING EL. !~~!.~~-~~-1:~*-**~-,,*-*---~-***-***-*-*-"'"'"""~*-,,

I'-~1j~~~~~~~-i:_~2~~6~_!R~~e~~f.~D.w~g:s~..*-.---~~~~~~!.!.~00~4~!:3!'.'.~Re~~v'.50~~4~3,01~NS~T~~R:~U~M~~E~Nl.!,T,~A:l~R~~R~A~.~D~W':!,,A~S'.!_T~E..~BL~D~G~E:';L:.~1~3?5.!:;A~N..~D.21~65::-~pd~f..,,..,,_....,,,,_ _...,,,,,_,,,,__,, *~*-**-*-*""' *--*------*)

,~_:\01 PB~~. R2~ef Ewgs 20, Sheet 0044, Rev 035, INST~U~~!.Al~~ADWASTE BU!LDIN..':1,~~:P~~*-~-* ,, _______,,,,,,,,,,,,_,,_,,_,,,,,,,_,,,,_,,,,.,,,,,,,,,,,,, _ _ ,,,, ___,,38~!~~?._, ___,,, ____ ,,l ld:\01 PBAPS UFSAR R26 Ref Dwgs -320, Sheet 0045, Rev 037, INSTRUMENT AIR RADWASTE BUILDING EL. 91-6.pdf ho5,208 ---*I 1;\01 PBAPS ~;~R R26 Ref*~:~~--r~-***~------;;~~~ AIR ~AD;;;,;~:~~~-;,-13~-AND 165.;~; * - - - - - * - - - - - * - - - - - -..**-*~5,924  ;

i*---***..--,,--,,*--~ *~*-**- ----*-..*-~---*-**-----*-~-~------**~---**-;-----~-~--*-**"';

!d:\01 PBAPS UFSAR R26 Ref Dwgs i"'""W<<~<*<'<~'"-'<*=,_..,* """""'"""""" W<o=<-'<'""'W"<<<<*=-<~=<<<'<*'<'<'""""

320, Sheet

<W"'-""v"<<WO Rev COMPRESSED AIR SYSTEM SERVICE AIR COMMON AREAS AND OFF GAS TUNNEL.pdf 157,819

~<<OW0,'<<0-"<'-"<<<<<~0,_.<<<'~-<<<'0=c<<<*** **='",,.,.....""*'<'< ,,,,,.,, , °'"""""'""' r:"N,"<<<<=~*'OW"<<*

l

  • "<;;._.O~<~"--'*~'<W#<<<**'

jd:\01 PBAPS UFSAR R26 Ref Dwgs IM-320, Sheet 0048, Rev 040, SERVICE AIR ADMIN.pdf ,,305,071

\01  ;;~~ UFSAR ;~~
;- *---lM-3;~: Sheet 0049, Rev O~::;;;MPR;~*E~; SYSTEM INSTRUMENT ~~;~~~ILIARY B~ILER BUILDIN~.~:;;---------

F'~~!Y;; ~'.?A_;~;~~R-~~*-*" ___ j;-~~~;;;~050: ~e~~.:.E~~'.RES~~2~~~~~~~.MENT Ai~~~~!l~~~~!l~~G.pdf ,,, ~~~-*-.. ~~*-:~:--**

1-:;~::*;;;:.:=.~:~:;;:: ::; ~=;~- . t~~!;~-~::;~;:~~;~~~~~;~~~;~~;~~~:*~-;~;~~;7. . -*-*~*-*~-*,,*--***, ,,_~,,**-'"*' 1 F\~~.~BAP?.~F~~R R26 ~:!,,Dwgs 01, Rev 034, ~~9-~NG TOWERS.pdf ,, _ _ _ , * - - - - - * - * - - . ,,,,, _ _,_,,,,,, ,,,,,,,,,____ .,,,,_ _,,,,,,,,,,,, !524,120 Ld:\01 ~S UF~~~ R26 RefDwg~ 322, Sheet ~~2, Rev ~~~-CO~ING-2:0WE~':.q!:'.'1,,r:-'.19N !~~.:!:RUM ENT. LIST.pd!,.__ ~**~--*.,, .......-,,,,~*_,,.-~.~.., , -..,,,,_,,,,_,,__~~~~~...--.,,,-~.

File Directory Structure Page 12of15

._ ____  :;_~Dtrect~.,c_v_P_at_.h_.*_.~------'-"-*-~: *' --~~---  : *----~,r*. **, :_ * '~--~£ilet.fa~e. '"-*-**_.__ --~~~-~~~----* ___ **** . 19*i; :.:____ :j_ ;~.~~ J;; 1~ File~jii:.ts\tte~L- i!

M-324, Sheet 0001, Rev 063, AUXILIARY STEAM SYSTEM.pdf

'* -*-*--***--*~-~---*- **~---***--*-******<-*-----"*-*----*-*** .....,,,,,,,,.,.,,,.,,,,,,,,,,_,,_ ,,,,,,_,,,,,' _____ , _, _____.- ,,,.,,,,' "'~***---- ------- *----*-**** ,. ._. ,,,.,,_,,_. __ .,,,,,,.,,,.,,,,_____-*;\

!133,182 Rev 059, AUXILIARY STEAM SYST~_M.....;.p_d_f_ _ __ j98,035  !

  • ----~------1

)130,154 1

  • -0--1 --------*~-1 CHILLED WATER SYSTEM DRYWELL COOLING:e~.--,,--..-~-*-- . -~~--..*-**-~** ***-**---------~*--*- .~~~13,,.*.*~ ...~-*..*-** ____.. !

~~!!~~et 00~, Rev 046, C!2!~~ED WAT~~~YST5.~E~YW~LL c9~~!NG;pd!._______________________,, _______~---------~665,707__ .,,,____,,_________j 327, Sheet 0004, Rev 049, CHILLED WTR. SYS. DRYWELL COOLING.pdf i205,914 'i

--****n*\-*, * --- w *w-w**----~----~----.,-------;--www-wwwwww-*-*--www'

\O_l_~~~~~!SAR R26. Ref ~~gs -WWW" M-~3,~~::~~oo~~ev o~~~~~GE~~-C,~__L~~.§.~~~~~:P~f______www*--.. . . . . . . . _. . . . ,,,,,_,_______ !124,153 '**--*-**-.. --"*"""'I i

--..~-:.....,,,_5__,,_____.. -~-.--www-!

M-331, Sheet 0002, Rev 054, P AND ID OFF-GAS RECOMBINER0 SYSTEM.pdf

~~;~-~heet 0003, Rev 07~~~;F-GAS~;~~~~~;;;;STEM. pdf*---<<~------*--* .,.,....., .... ,.._~_,,__,,,,.........,,.,,,,____,__...~-wwwwww-'"""T;;;,~56 ,, ____ ,,__ ""

1110,693 lI

,,..,_,,_,~,.. ,.,_,,_,,.,..,...,,,N,,NNNNN ,_,,,,,=,_,..,,,,,,....,..~....,..,,.,,.~,.,-,,.~*;.,,....,--~,,,,,,,,,,,..,,....,..,....,,..,.....w,,;....,;;,,,,,,,..,,.~=<<-m=w;.""--"' "'"" ,... ¥ '"""'"""",.,.,..,,..,,.,,,,.,..,,=~-"-'""'""""'"""~--.wm.>NNNNNNW*WN "".~*m"""-m __ ,,,.,v~*~;=u~*MW,,.,.,.,,;..-,

M-331, Sheet 0004, Rev 058, P A~D ID OFF-GA~ RECOMBINER SYSTEM.pd!____________ .,,_,,,,,____ 1315,218 *----*-------~

.~..:..~hee! 0005, Rev 061, OFF-GAS REC~MBINER SYSTEM.pdf w.=~,_..,,,_,,__~~A~-l 1~.2~:~!.9~~!~_ev 061, OF~~tl~ ~~C_C?~BI N~~-5,~_S,TE ~:.P~!--~---** , *=*;

~

1, Sheet 0007, Rev 063, OFF-GAS RECOMBINER SYSTEM..o..p_d_f ----*------------*------WWW*-------*----------

  • ------*--* ..---- ...._. ____,,._-_3_51,~::~ 0002:. ~ev_~~-N UC.~!,~~l~_<;!!~~R..:P..ci.!_ __________ , ...................---~--www .. www ..- - *. .- - - - * - , , * - - - -....... , . _ _ _ _ _ _ ,,,,,......... wwwwww**'

*------------+*--3_5_1_,_sh_e__e_t_9~~~-~:~5J75, NUE~~~~~q~~ER.pdf... * * - - - - - - - - **----*--**--*******-*****-----**-*..--*----*..- - - - - - - - *...

1 PBAP~. ~_FSAR R26 R=!_ DW£!_,,,_,,____,,,"-~~!._?h,eet 00~~-~:':.~?~NU~!,AR B~~LER.P,.cj..!._,. ....._.........,,.,..- ..........................~.......,..~.----'""""" - - - - - - - * * -..*--***---*--------**--*

-352, Sheet 0001, Rev 062, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf NUCLEAR BOIL~~~SE~ INST~-~~~!'~-~~---"-----*~- -*---

~UCL~~~-!'!.~~~~ES~~~~~..T~~-~~T~:!:!~-~:P~ . ,.,,, ,,,,,,,,,. ,,_, ...,. ***--*""' ....,,. , , .... -~**-***.-~~~----

062, NUCLEAR BOILER VESSEL INSTRUMENTATION..:e~------*-----* *-------------*-"*"'+---'--*--*-****----***--!

UCLEAR BOILER VESSEL INSTRUMENTATION.pdf File Directory Structure Page 13of15 M-353, Sheet 0003, Rev~~2, REAO,-SJ~~~~~!~E~~9~!~M~V,~~~~.:P.d.f.*****-***********

d:\01PBAPSUFSARR26Re~f~D~w~g~s:_..__~J!~~~~~~~~0~59~,~R~E~A~CT~O~R~-R~E~C~IR~C~U~LA~Tl~O~N~P~U~M~P~SY~S~T~EM~.p~d~f~~-~-----;__--~--~--~-----J~~~~--~~~--l

[~j~-~~~~~UFSAR~2~6~R~e~fD~w~g~s~------*~:~~~~:~~~~~~.~~~~..':'::'!:,~~~~~:~;~~=~:~-~----~--~---*~-~---***~---""------~-~--~l~~~~www--**---*-~-J jd:\01 PBAPS UFSAR R26 Ref Dwgs M-355, Sheet 0003, Rev 035, CLEAN-UP FILTER AND DEMINERALIZER SYS!EM.pdf ld:\01 ;BAPS UFSAR R26 Ref Dwgs , M-355, Sheet 0004, Rev 033, CLEAN-UP FILTER AND DEMINERALIZER SYSTEM.pdf f ~--* .... *-**-..*--~ef Dwgs -** *--]~~;;~~~;:;*~~~!:;~£?~:*~~~~~~;~D DRIVE HYDRAULI~ S~~~;~~;;.;~~--- .** -**- *-**-*-www---***--**-*--*~=---*---+1~2-3_,4_6~3-~--***---***

d
\01 PBAPS UFSAR R26 Re__f~D_w_,g'"'s---~.....,~:~7, S~~~!.0001, Ri:.'.'..£?2:._S:_~)N~pL RO~E~~-~- HYDRAULIC S~~!-~.~-=-~~~T B:£l:!!____ ***---------~******--*---*--~ ..- - -.........- .*.*www_04_9*.6_,,_50_3_............~---~-i l~~~~*;;;::;~-~~~~*R-;;~*;_*~_f,.D.*w.___g,_s,............-*.*I ~-357, s~:_:_9oo~:~i:.Y..£3,6, co_r:i_~pL ROD D~!_VE HY_~RAULIC SY~!~~-:!~~T B.pdf ~ ..... ---* * * - - - ......~*.- ...,,,_____,,.,,,,......- .... ,.,,,,,,,,+-1__0,,8_,,,2__

38____ ,,,_.,,,,_,,_,,,,""'

FSAR R26 Ref Dwgs M-358, Sheet 0001, Rev 039, STANDBY LIQUID CONTROL SYSTEM.pdf

_,,,,,.;;.._ , ___ ,~358, Sh~! 0002, R:y 039, STAND~Y LIQUID CONTROLSYSTEM.pdf 1

M-359, Sheet 0001, Rev 050, REACTOR CORE ISOLATION COOLING SYSTEM.pdf

"'*"'"'='Vl/=-~,~-=,;w**'<<<mo,,,>;,,..._..,,,...,.,,_.,,,.,,,,.,,,,""='*OW _ _ _,__, "*~*~¥.,,.,.,,,........,,....,,..............,._,=,,...

.~:!~~'..,_ ___e~~~~~~~~~0~4~8,~R~E'!:A~CT~O~R~CO~RE~l~SOLATION COOLING SYSTEM:.""P_df_ _ _ _ _ _,,,_________,_____________

01PBAPSUF_S_A_R_R_26_~~~f~D~w~g~s____,,~~~~~!~~~:'.'.E.~6~,~R~.c~.l~.c~.~P~U~M~P~T~U~R~B~IN~E~D~E~T~A~ILS~.EP~df~--~ ..- - - - - - - - - - - - - - - - - - * - - - - - - - - - - *..- - . -

d:\01_ PBf'-PS UFSA~~~Ref Dwgs , ____,,,__-_3~~~~-:!_ 0003, ~~.:~:~UMP~~~~~~,!AILS LUB~_C?,!~-~-~£EC?,NTROL ~~~YEM U~!:£df ..-~~-"-**--* ..*--*----..----*---*-*-***..-*--***-r---*;,,,__,__"',,,,,,,,,,,,, __,,,_.__,,,_,

d:\01 PBAPS UFSAR R26 Ref Dwgs -360, Sheet 0004, Rev 039, R.C.l.C. PUMP-TURBN DETAILS LUBE_ OIL ~~£,CONTROL ~~-~-NIT 3,pdf d:\01 PBA_P_s_u_F.SAR R.~..~.~-e_f_D__

w_-:,gs_,,,,,,,,_,,_;,,,_-361, sh:_:t 000!:~.."..~6, RESIDU~!:._~~AT R~MOVAL SYSTEM.p_~!. - ,.,,,,,,,___ ,,,,_ ,_,,,, --"-*----****---***-*-,,,,~----*- ,,_+;:,,;,,,;.:.::,;:,,:;,,,,,,,,,,____,,_

361, Sheet 0002, Rev 071, RESIDUAL HEAT REMOVAL SYSTEM.pdf 1

- . - .. *----~----- . *-*----..* .... --.~***-----~----r ..-

361, Sheet 2003, R:v 0~3, RESIDL0~.!:!5._~T REMOVAL SV,~!.5._M.pdL __ ,,,,,,,, ..................... ,,,_________.. ,,,,...,,._,,______,. ...____,,,,_,,_...___ ~~~~~-------*

_:361, She_e~,£~04, R~~?4, RESIDUAL HEAT.~EMOVAL SY~TEM.p~--------*--- ..--------- *--------**-------- ~~~~9-..,,, _ _.,,,--**

M-36~ Sheet 00~-~, Rev ~64, CORE SPRAY COO~~NG SYSTEM.p*~-***------


*------------:::-**-**----**--:;~~62, ~~~~002, Rev 062, P AND ID ~ORE S~LING SYS~~_:Pdf _~-------**-------------***--------~-~-~

M-363, Sh~.:!_~99.~'..~.9~3,:..~!!.~2;~0,9L COC?~l!:l_§. AND CLEAN-UP._p~!

-~---,,,,,,,.;"'--*,---i-*_;;_~.c:.':.;S:.._h_eet 00~~ Rev 044, FUEL P001:_ COOLING AND CLEAN-UP.p~!. _- - - - - -

,Sheet 0001, Rev 028, FUEL POOL FILTER DEMINERALIZER

~~~~~~:~~-,~~!~. .'::~~~-........ ,,. --~ ~~~~~~.E!:!..~~9~ Rev ~~?: . ~~~!:!29~2-~P~~~*P~! ....... ----~

. --~-~-- AR R~-~ Ref Dwgs *----~ M~~~?~ Sheet 00~~'.-~_E!,V 06~~!~H p~~~~~RE ~oo~~!.~~0~0N~!STEM:P.'!!.... ---- --*-~----~-~----~-- **-****-*"' .___.,,,

d:\01 PBAPS U~SAR R26 Ref Dwgs _____ 1M-365, Sheet 0002, Rev 066, HIGH PRESSURE COOLANT INJECTION SYST~_M.pdf*-~*

Attachment 3 File Directory Structure Page 14of15 1

~

  • * *.. ~. .;birectof~*Path.:. _*~~c..::c:-ic:~-,;.=~-*-~:~~~...*--'-'~~~;.;c.:.;...._~~...,,.o;~-~c,c,~;.;;;....;.,;:c:::..;.,~.~-**:-~.....c~"'---*--c_c,c,.c~ **-. c__:.:.:.~~-~.c.. ...;.;c;_~

.' , "-~~ -~-----*;

L .f~~:~i,ze {_!!_0e,s}* _

l~.:~01, PBAPS UFSAR R26_,Ref ~~gs -------+----~;.;.c_S_h_e_e_t_o_o"o~;_Rev o~~-.!:!:~.~~-~MP-TU~_EETAILS ~-~~-~El.!:.~~'? c~~~2'!'.?!EMS.p~!. *-----******------------*-*--*****-*-**--*-~--~*500,532 d:\01 PBAPS UFSAR R26 Ref Dwgs 6, Sheet 0004, Rev 053, HPIC PUMP TURBINE DETAILS.pdf * - - - - ~-*;_~4..;.,_~;-~=----_-_*-_*-_*-_*--_.. _---;

d:\01 ~~PS UFSAR R26 Ref Dwgs 7, Sheet 0001, Rev 086, CONTAINMENT ATMOSPHERIC CONTROLSYSTEM.pdf \181,557

~ . -~----------*---1 d:\01 PBAPS UFSAR R26 Ref Dwgs  ! M-367, Sheet 0002, Rev 076, CONTAINMENT ATMOSPHERIC CONTROL SYSTEM.pdf 1425, 701

-*-*---~-----*-,**~--*-*-,,,,--i** ---~-,,,,,,,,_~,,,,~~--~--*-**-*-------*--,,-*--*-***-**-,---

d:\01 PBAPS UFSAR R26 Ref Dwgs i M-367, Sheet 0003, Rev 078, CONTAINMENT ATMOSPHERIC CONTROL SYSTEM.pdf

~~APS UF~AR R;~;;~wgs-~=1~~~~-s~::;~~;!,~~~93, p ; D :*~IA~-CNTN,-~~T ;~;~~;~~~~~ON;RO~~YS;~;~! - -=-=**=~===*==-~:.,,.*.-_.,,,,--i,:;,,::,:;;;;,;;,,;,,__~,.._.__, ._, , , __i PBAPS UFSAR R26 Ref Dwgs

-he:~~~~*' Rev 036, P AND ID RADWASTE LIQUID COLLECTION SYSTEM.pdf

, ,,,,,,,,,,,,,,,,,,,.,,,,,,_~**-**"""-"-*-*"""'"-'--****~---*--*--"' ,,,,,,,,,,_,,,_,._~-----,,,,,,,,,,,,._ , -----~ .. ,,,,,,,,,,,,,,_

~!~901, Rev o~~!-~~~~!.!:!~~M02!'.~~~.Y2~<?~~~!~!,'A*Pd~f--*~,,,,.. ,__ ,,

d:\01 PBAPS UFSAR R26 Ref£~- 72, Sheet 0002, Rev 05~, CONTAINMENT ATMOSPHERE DILLJ_TION SYST~M.pd_f_ _,,,_,,._,,__,_ _ ,,,, _ _ ,,_ _ _ _ _ _ _ _ _ _ ---~.. ,

d:\01 PBAPS UFSAR R26 Ref Dwgs


72, Sheet 0003, Rev 004, P AND I DIAG CNTNMNT ATMOSPHERE DILUTION SYS.pdf www---*-

d:\01 PBAPS UFSAR R26 Ref ~~~s-~~.... 72, Sheet 0~4, Rev 004, CONTAINMENT ATMOSPHERE DILUT!ON SYSTEM.pdf , f 176,355_ _ _.,,_~~..

~:\01 PBA~~-~FS~~~~.EJ".'f~.... ,,,,.,,.J~:'?_!~~~!~.1~9El, Rev 01~.!:_q_?T ACS:!E~NTSAMP~~~~~-~NS!~~!::'.1_~~!,-~~D EQUIP,~~NT LIS.!J!! ,,,,,,,,_.. ,,,_WWW,,_,,,,,,,_......, , , _ _ _ )199,636

..~:\01 PBAPS UFS_AR R26,, Ref ~wgs ___,,,,,M __-3_7_4,;,,,_sh_e,,,e,,_t_o_o_o_2,.;.,_R_e,,_v_o_2_0.;,,,,_Po_s_,,,,T_A_C_C_ID_E_N_T_S_A_M

__P__L_IN_G_S_Y_S_T_EM__,,,.p__d_f_____,,_____,____,________ ,, ______,_,,,,,_____ www_ _ www_,,,_,,,,,,,:,,,,_, _ _ _ _ _ _ _ _ _ <

?.:\01 PBAPS UF~AR R2~ Re!. Dwgs ,., , _ _,, "_M__-_37_7__,,', Sheet.. ~~1, Re..':'..£>44, DIESEL GEN!UX,?!~!~MS STARTING.*~IR SYST~!::'.1_.:P:!!__, ____-, _ _,,,,,,,,,,,,,___.,,,,_,,_,,,__,__,,,,,,,,__,,_,,,,,_,,,,,,,__,,_,,,,_;____,,,_,,,,__ ,,,,,,,__ ,<

77, Sheet 0005, Rev 009, DIESEL GENERATOR AUX SYSTEMS COMB AIR INTAKE EXHAUST SYSTEM.pdf ,,______ ____ ,,,,,

~~~~~~g~~~0~6, P A~D ID_~~!RO!:_ ROC?,M HVAC.£9.!____,,_________ ,,...______..__ ,,______

06, P AND ID - CONTROL ROOM nv.A.L.um 85,_Sheet ODO_~!. RevE~.!~E~,!?~ESEL BLD,BOILER BLD, SHOP~ WAREHOUSE BLDG TEMP CONTROL DIAG::_edf *---www-*-*------*-

87, Sheet 0001, ~~~~~~'.!~~~!~~DG. YE:!!_!0Tl0!:_~~9,,~~IAGR~pdf_www,,,,,,,,,,,_,, _ _ _ _ ,,,,,,,,,,,,~-----... ,,~_,,,_____,,,,,,,,,,,,,,,,_

Rev 037, REACTOR BUILDING VENTILATION FLOW DIAGRAM.pdf ld:\01 PBAPS ~FSAR R2~-~ef ~~--

PBAPS UFSAR R26 Ref Dwgs .

390, Sheet ~~..~:....~7 v~~7, DRY':-'~El~ING FLOW,_ DIAGRAM.~~!______,,_,,_www_ _ _ ,,,,,, _ _ ,,,, _ _ _ ,,,, _ _ _ __

d:\01 PBAPS UFSAR R26 Ref Dwgs _J~~:~:o;e~:e,t~o~o~o~..!:e_:',,~~~~~~~D SE~_,S:NTNMNT ISOLATIO~~~ROL DIAG.pdf ~- ~-~~..~,,,_,, ___,,,_,,___~,,,,.

f;\01 PBAPS UF~AR,,R26_~~f Dv:i..~5--*==.. ~~_?91, She;!_~02, ~~..~.£~!,,,PRIMARY A~__l),,,,.S,,~_O,,!:!P~RY,,~~MNT ISOLATION CON!R,2.':..~:ed_f_ _,,_,,,,,,,_,.,,,,,,,,,__, _ ***-*~~---~~***

~*~~~~~~~R~R~2~6~R~e~f~Dw~gs~~---!.M~-3~9~7!,,,S~h~e:!;e:_t0~0~0!21:!..'~Re~v~0~6~1~,S~T~A~NDBY GAS TREATMENT CONTROL DIAGRAM.pdf 178,841 M-397, Sheet 0002, Rev 046, STANDBY GAS TREATMENT CONTROL DIAGRAM.pdf File Directory Structure Page 15of15

  • -~--~_,_j>ire2fdiv~i>a!_ti_~,*~'-'-~-i--~--~*--'--'-~~-'-'--~*-~"'=--~-'-'-'-~-'-----'-~'-'-~----"'~~"""""-*--- es

-~~~~-~~-~R R2~-~~EJyigs ____,,-+*'*;

,__;,___B_~PS UFSAR R26 Ref Dwgs BAPS UFSAR R26 Ref Dwg!____

399, Sheet 000_~!.~~-005,!_~~~GEN_c;y_~~~~~~TTE~M, LA~~A__T__ o__R_Y~S_U_PP~L~Y___A____N__D__E_X_H_.:P__d__f______ ~------www--*----------**-****~---'------* ----~-----l

. 92:. ~BAP~ UfS_f\_~~26 RefD_w""""g_s_*~*-***-* ~!~!~1~~-~!~8,i:_~~~?~~_!=~~~L A~-~~~-~~~-~!.~LA~--~~~-~~?-~E ~~-~~.:~~~~~! 3CEp7 -~~~-- _ *-------- *--~*-**-*---..*----*-*----~------~*-+*--*-'-*-www-** --------*--

. ~- PBAPS_L,!F,~i:~-~~~ Ref __D_w.=-g.s__---**--- GENERAL ARRANGEMENT PLAN AT EL 195FT-OOIN AT EL135-0 AND

. ~~- PB~-~~--~~-~~-~-~~~-~i:! D~~~-www***** R_:~ 012, ~~~-~~-~~~!~ENT ~~NAT EL ~-3~~?,~UMPS_:~~ NO 2A~_9~-~B!'~1-:fl~."- --WWW*. --............. .

0-~~BAP?_~_SAR ~~-~!:.f Dwg~www-- Rev 013, GENERAL ARRANGEMENT SECTIONS A-A, B-B APPL TURB DRIVES FOR REACTOR FE.pdf

. 92:.~BAPS ~?~~~~~~i:! D~.;;;g_s -*--www***--- IPING AND MECHANICAL REACTOR BLDG UNIT NO 2 PLAN AT EL 165-0 AREA

-96, Sheet 00~~~ Rev 019, PIPING AND MECHANICAL REACTOR BLDG UNIT NO-~ PLAN AT EL 16~T-OOIN ARE.p~__ f _ _www*----*----*----......+---:.._.,_www*-*-----------*l 54, Sheet 0001, Rev 030, CONTAl~~ENT VES~~LS - REQUIREMENTS SUPPRES~~ON CHAMBER-YNITS 2, 3 .p~----------*--*-----**---'-'-*---*;,,,,__,_,....._.,.www---*--l FPP Drawing Files

-318, Sheet 0001, ~~v o~~!.~~--~.!:'...~9~E.1:~9~~YSTE~*P,d,! ________ ,,- ****--*---*-**"-*"-**--*--****"'*-*--..***--************** ****-**~-*--*****--

~~~t:_eet 0002, Rev 097, Fl~ROTECTION~YSTEM.pdf ~--*---***---****-*-----**--------***-*---***-..www*---+...,,.,;_-*-----*--*--**. "1 l513)'.~~~~ F.PP R21 Ref ~"._Vgs _ _ _ _ , --~~-~,Sheet 0003, Rev o~o, FIR~~~9TECTIO~~YSTE~:E.~!.....

d:\O~-~~APS _F.PP R21 Ref.~wg~----~--*-

.~\~~.~.~~!:~~~~3,~~~~.!gwg~..-

d:\02 PBAPS FPP R21 Ref Dwgs

__ _;..,_ _,.,0...0.1_,,,,.F,,l_RE_ PRC?~~!,19..~~!,~~*P5!!_...=~==-=::::-~ . -~.==*--

  • -----~~-=~~!~~~.'.~:'.-~~.!:~IR~E_!'.P~RO~T!!E~C:!Tl~O~Nl~S~Y~STEM.pdf

-* . . . . . * -* * *-~-- *--===- ~. .:=-==1i~1,~:~i.~*

llll,413

.......*~=*

d:\02 PBAPS FPP R21 Ref Dwgs TECTION SYSTEM.pdf eet 0011, Rev 000, FIRE PROTECTION SYSTEM.pdf

-www*--*--*----------*--**-------

ENCLOSURE 1 Peach Bottom Atomic Power Station Units 2 and 3 Updated Final Safety Analysis Report, Revision 26 Fire Protection Report, Revision 21 Compact Disk (CD)

'~ :,lp_

ENCLOSURE 2 Peach Bottom Atomic Power Station Units 2 and 3 Updated Final Safety Analysis Report, Revision 26 Fire Protection Report, Revision 21 UFSAR I FPP Reference Drawings Compact Disk (CD)

- I