ML20080G498
| ML20080G498 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/01/1983 |
| From: | Clayton F, Hairston W ALABAMA POWER CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8309200297 | |
| Download: ML20080G498 (5) | |
Text
- -
r .
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1.
NARRATIVE
SUMMARY
OF OPERATIONS AUGUST, 1983 During the month of August, there were no unit shutdowns or significant power reductions.
The following safety-related maintenance was performed in the month of August:
- 1. Performed miscellaneous maintenance on diesel generators.
- 2. Cleaned out 1A charging pump lube oil cooler.
- 3. Replaced numerous waste evaporator: feed filters.
- 4. Replaced mechanical seal on spent fuel pool skimmer pump.
i-
- 5. Adjusted numerous packing glands on main steam system valves.
8309200297 830901 PDR ADOCK 05000348 R PDR
OPERATING DATA REPORT DOCKET NO. 50-348 DATE 9-1-83 COMPLETED BY UA Unfrston III TELEPHONE (205) 899-5155 OPERATING STATUS Joseph M.'Farlev - Unit 1 Notes
- 1. Unit Nam *.
An m" 10R1
- 1) Cumulative dasa since
- 2. Reporting Period: 12/1/77, data of
- 3. Licensed Thermal Power (MWt): 2652 commercial operation.
- 4. Nameplate Rating (Gross MWe): 860
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe): 844.6
- 7. Maximum Dependable Capacity (Net MWe):
803.6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report. Give Reasons:
N/A
- 9. Power Level To Which Res*ricted,If Any (Net MWe): ' M/A
- 10. Reasons For Restrictions,If Any: N/A This Month Yr..to.Date n ulative
' Cur'
- 11. Hours In Reporting Period 744 5,831 50.399
- 12. Number Of Hours Reactor Was Critical 766 r) 4,068.2 32,215.7
- 13. Reactor Reserve Shutdown Hours 0.0 25.1 3,639.6
- 14. Hours Generator On.Line 744.0 1966.3 31,234.5
- 15. Unit Reserve Shutdown Hi urs 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1.971.688 10,029,740 7g qio 7po I 7. Gross Electrical Energy Generated (MWH) 617,154 3,162,260 74;937_gog
- 18. Net Electrical Energy Generated (MWH) 585,990 2,971,936 23.412.156
- 19. Unit Service Factor 100.0 68.0 62.0
- 20. Unit Availability Factor inn n 68.0 62.0
- 21. Unit Capacity Factor (Using MDC Net) 98.0 63.4 57 g
- 22. Unit Capacity Factor (Using DER Net) 95.0 __
61.5 56.0
- 23. Unit Forced Outage Rate 0.0 0.7 16.4
- 24. Shutdowns Scheduled Over Nevt 6 Months (Type. Date, and Duration of Eacht:
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status iPrior to Commercial Operation): Forecast Achieved iNITIA L CRITICa LiTY R/6/77 8/o/77 INITIAL ELECTRICITY 8/20/77 8/l8/77 COMMERCIAL CPERATION 12/1/77 12/1/77 (4/77)
DOCKET No. 50-348 UNIT DATE 9-1-83 C05fPLETED BY W.G. Hairston, III (205) 899-5156 TELEPHONE August. 1983 StONTil DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL talwe Net) (MWe-Net) 793 793 g, 37 2 795 13 792 709 g9 791 3
4 789 J 785 787 783 5 21 785 22 781 6
788 23 7R9 7
783 3 797 24 786 g 72 3 9
782 10 785 26 g3 785 n 788 787 ;3 7ga 12 787 785 l3 3 789 30 788 14 31 7on
- IS 796 16 INSTRUCTIONS On this fonn:t. list the svenge daily unit power levelin MWe Net for e:ch d:y in the reporting month. Compute to
, the neste:t whole me;2 watt.
(9p7) w - ,,-,-c., w4 ,c. . , - - , , , -,,,7,- -,-%,y- .-, ,-.w------r e -Es----v--wy- -w-- - + - 1-- -- -e- <- -w *w-- ww m-n --g- ----tw*----~w, , , - +
UNIT Sil01 DOWNS AND POWER REDUC 110NS DOCKE T NO. _ _50-348 UNII NAME J.M. Farley UnTt l' DAIE _9/1/83 COMPLEI ED ilY W.G. Ilairston, III ftEPORT alONiil Aueust. 1983 TEl.LPIIONE (205) 899-5156 3 -
~.
c_
.2 e re g
5 sa =
9 sX Licensee c .t.
5"
- c. Cause & Coniective No. Date g 3g ;; jg5 Event u? 8-3 Action to H
$E 5 j5y 5
Report * ,
<# G fu Pacvent Recutience THERE WERE NO JNIT Sil rTDOW) S OR SIGNIFICANT PuWER RH: DUCTIONS IN THE MONTil 0F AUGUST.
I I 2 3 4 1:: l'osted Reason: Method: Exhibit G . Instrutiion -
S: Sthednied A liguipment Failure (Explain) 1 -Manual for Prepa:Jtion of Das i i 11 Maintenance o( Test 2 M.mual Scram. Entiy Sheels foi 1.iccei C Itefacting 3 Autenuatic Scram. Esent Ilepint li.Elti! ! (NilRI:G-D.Itegulatory Resisittion 4 Othes (Esplain) 01611 I Operator Training & license Examination F. Adininist raiive 5 G Opciational Lisor (E= plain) INinhis t . S.une Som.
19/77) ll Othes (E xplain)
e E Mailing Address Alabama Power Comp ny 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr. b
= lac;3g7"' AlabamaPbwer the southem elettnc system September 12, 1983 Docket No. 50-348 Di rector, Of fice of Management Inf ormation and Program Control U. S. Nuclea r Regul atory Commi s sion Washington, D.C. 20555 Dea r Si r:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the August, 1983 Monthly Operating Report for Joseph M. F a rl ey Nuclear Plant, U r. i t 1, required by Section 6.9.1.10 of the Appendix A Tech-nical Specifications. As requested by letter f rom Mr. John F.
Stolz to Mr. Alan R. Barton, dated October 21, 1977, a "Narra-tive Summa ry of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very ,uly,
)?/6
,/
F. L. Cl ayton, J r.
ILCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)
Director, IE (10 copies)
Di rector, RIl (1 copy)
Z6- AC
'I '