r JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1.
NARRATIVE
SUMMARY
OF OPERATIONS AUGUST, 1983 During the month of August, there were no unit shutdowns or significant power reductions.
The following safety-related maintenance was performed in the month of August:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Cleaned out 1A charging pump lube oil cooler.
3.
Replaced numerous waste evaporator: feed filters.
4.
Replaced mechanical seal on spent fuel pool skimmer pump.
i-5.
Adjusted numerous packing glands on main steam system valves.
8309200297 830901 PDR ADOCK 05000348 R
OPERATING DATA REPORT DOCKET NO.
50-348 DATE 9-1-83 COMPLETED BY UA Unfrston III TELEPHONE (205) 899-5155 OPERATING STATUS
- 1. Unit Nam *.
Joseph M.'Farlev - Unit 1 Notes
- 1) Cumulative dasa since
- 2. Reporting Period:
An m" 10R1 12/1/77, data of
- 3. Licensed Thermal Power (MWt):
2652 commercial operation.
860
- 4. Nameplate Rating (Gross MWe):
829
- 5. Design Electrical Rating (Net MWe):
844.6
- 6. Maximum Dependable Capacity (Gross MWe):
803.6
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report. Give Reasons:
N/A
- 9. Power Level To Which Res*ricted,If Any (Net MWe):
' M/A N/A
- 10. Reasons For Restrictions,If Any:
This Month Yr..to.Date
' Cur' ulative n
744 5,831 50.399
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 766 r) 4,068.2 32,215.7
- 13. Reactor Reserve Shutdown Hours 0.0 25.1 3,639.6
- 14. Hours Generator On.Line 744.0 1966.3 31,234.5
- 15. Unit Reserve Shutdown Hi urs 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1.971.688 10,029,740 7g qio 7po I 7. Gross Electrical Energy Generated (MWH) 617,154 3,162,260 74;937_gog
- 18. Net Electrical Energy Generated (MWH) 585,990 2,971,936 23.412.156
- 19. Unit Service Factor 100.0 68.0 62.0
- 20. Unit Availability Factor inn n 68.0 62.0
- 21. Unit Capacity Factor (Using MDC Net) 98.0 63.4 57 g
- 22. Unit Capacity Factor (Using DER Net) 95.0 61.5 56.0
- 23. Unit Forced Outage Rate 0.0 0.7 16.4
- 24. Shutdowns Scheduled Over Nevt 6 Months (Type. Date, and Duration of Eacht:
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status iPrior to Commercial Operation):
Forecast Achieved iNITIA L CRITICa LiTY R/6/77 8/o/77 INITIAL ELECTRICITY 8/20/77 8/l8/77 COMMERCIAL CPERATION 12/1/77 12/1/77 (4/77)
DOCKET No.
50-348 UNIT 9-1-83 DATE C05fPLETED BY W.G. Hairston, III (205) 899-5156 TELEPHONE StONTil August. 1983 DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL talwe Net)
(MWe-Net) 793 g,
37 793 2
795 13 792 791 3
709 g9 789 J
785 4
783 5
787 21 6
22 781 785 7
788 23 7R9 783 3
797 24 786 9
g 72 3 782 10 785 26 785 788 g3 n
12 787
- 3 7ga 787 785 l3 3
14 30 788 789 IS 31 7on 796 16 INSTRUCTIONS On this fonn:t. list the svenge daily unit power levelin MWe Net for e:ch d:y in the reporting month. Compute to
, the neste:t whole me;2 watt.
(9p7) w -
,,-,-c.,
w4
,c.
-,,,7,-
-,-%,y-
,-.w------r e
-Es----v--wy-
-w-- - + -
1--
-e-
-w
- w--
ww m-n
--g-
tw*----~w,
,, - +
DOCKE T NO. _ _50-348 UNIT Sil01 DOWNS AND POWER REDUC 110NS UNII NAME J.M. Farley UnTt l' DAIE _9/1/83 COMPLEI ED ilY W.G. Ilairston, III ftEPORT alONiil Aueust. 1983 TEl.LPIIONE (205) 899-5156 3
c_
re 5 sa =
5" sX Licensee c.t.
c.
Cause & Coniective
~.
.2 e g
9 No.
Date g
3g jg5 Event u?
8-3 Action to
$E 5
j5y Report
- fu
<# G Pacvent Recutience H
5 THERE WERE NO JNIT Sil rTDOW) S OR SIGNIFICANT PuWER RH: DUCTIONS IN THE MONTil 0F AUGUST.
I I
2 3
4 1:: l'osted Reason:
Method:
Exhibit G. Instrutiion -
S: Sthednied A liguipment Failure (Explain) 1 -Manual for Prepa:Jtion of Das i i
11 Maintenance o( Test 2 M.mual Scram.
Entiy Sheels foi 1.iccei C Itefacting 3 Autenuatic Scram.
Esent Ilepint li.Elti! ! (NilRI:G-D.Itegulatory Resisittion 4 Othes (Esplain) 01611 I Operator Training & license Examination F. Adininist raiive 5
G Opciational Lisor (E= plain)
INinhis t. S.une Som.
19/77) ll Othes (E xplain)
E Mailing Address e
Alabama Power Comp ny 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.
b
= lac;3g7"'
AlabamaPbwer the southem elettnc system September 12, 1983 Docket No. 50-348 Di rector, Of fice of Management Inf ormation and Program Control U. S. Nuclea r Regul atory Commi s sion Washington, D.C.
20555 Dea r Si r:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the
- August, 1983 Monthly Operating Report for Joseph M.
F a rl ey Nuclear Plant, U r. i t 1,
required by Section 6.9.1.10 of the Appendix A Tech-nical Specifications.
As requested by letter f rom Mr. John F.
Stolz to Mr. Alan R.
Barton, dated October 21, 1977, a "Narra-tive Summa ry of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very
,uly,
)?/
,/
6 F.
L. Cl ayton, J r.