ML20080P887
| ML20080P887 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/16/1984 |
| From: | Hukill H GENERAL PUBLIC UTILITIES CORP. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 5211-84-2030, GL-83-37, NUDOCS 8402230173 | |
| Download: ML20080P887 (3) | |
Text
.
y -
GPU Nuclear Corporation t .
Nuclear o
- eme:reo s Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
February 16, 1984 5211-84-2030 Office of Nuclear Reactor Regulation Attn: D. G. Eisenhut Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 NUREG 0737 Technical Specifications Generic Letter 83-37 This letter responds to Generic Letter 83-37. The attached table shows the status and echedule for submitting Technical Specification Change Requests (TSCR) for the "Long Term" NUREG 0737 items.
Sincerely,
- 1. . Huk:.ll Director, TMI-l HDH:CWS:vj f
! Attachment l-cc: J. Van Vliet R. Conte 8402230173 840216 PDR ADOCK 05000289 P PDR O
GPU Nuclear Corporation is a subsidiary of the Gene al Public Utilities Corporation
\g
, y _n v
TSCR's for Certain' Long Term .NUREG 0737 Items NUREG'0737. Item .TSCR #' Comment-II.B.1 RCSl Vents 1 TSCR - 137 2/9/84 II.B.3 Post Submittal by A change to the administrative controls TS will be forwarded to cover 4 Accident-Sampling 5/31/84 Sampling System f II.E.1.1 EFW Submitted by 11/84 Current T.S. (3.4 & 4.9) cover all_ installed EFW upgrades. For EFW l Evaluation (See Comment) _Long Term Upgrades, the date provided' presumes that TMI-1 remains shutdown through, 9/84 in order to allow completion of the modifica- l tions in accordance with our previous commitment (ourage required).
If this is not the_ case, the Tech Spec Change submittal will be changed accordingly.
II.F.1.1 Noble Gas TSCR 114 1/5/83 z Effluent Monitors II.F.1.2 Iodine 1) TSCR 114 The equipment is covered by TSCR 114 and the program will be included and Particulate 2) Submitted by in a change to the Administrative Controls T.S. similar to II.B.3 Sampling 5/31/84 1
II.F.1.3 Contain- 'TSCR 114 1/5/83 ment Radiation Monitor II.F.1.4 TSCR 114 1/5/83 Containment Pressure Monitor l
II.F.1.5 .TSCR 114 1/5/83 Containment Water Level II.F.1.6 TSCR 114 1/5/83 Containment Hydrogen Nbnitor II.F.2 Inadequate 1) Existing T.S. 3.5.5 Current T.S. covers the saturation margin monitor. TSCR 130 covers
. Core Cooling 2) TSCR 130.2/13/84 incore thermocouples. For RITS, the date presumes that TMI-l remains
- 3) Submitted by 8/84 shutdown through 12/84 in order to allow completion of the modifica-
~
(See Comment) tions in accordance with our previous commitment (outage required).
If this is not the case, the Tech Spec Change submittal will be.
changed accordingly.
III.D.3.4 1) T.S. 3.15.1 and Existing Tech Specs cover the installed equipment. As discussed in Control Room 4.12.1 our phone conversation of February 14, 1984, GPUN is pursuing various Habitability 2) See Comment control room habitability system configurations. When the final system configuration is determined, T.S. changes if needed will be 2 months prior to scheduled operation.