y GPU Nuclear Corporation t
. Nuclear
- eme:reo o
s Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
February 16, 1984 5211-84-2030 Office of Nuclear Reactor Regulation Attn:
D. G. Eisenhut Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 NUREG 0737 Technical Specifications Generic Letter 83-37 This letter responds to Generic Letter 83-37.
The attached table shows the status and echedule for submitting Technical Specification Change Requests (TSCR) for the "Long Term" NUREG 0737 items.
Sincerely, 1.
. Huk:.ll Director, TMI-l HDH:CWS:vj f Attachment l-cc:
J. Van Vliet R. Conte 8402230173 840216 PDR ADOCK 05000289 P
PDR O
GPU Nuclear Corporation is a subsidiary of the Gene al Public Utilities Corporation
\\g
y
_n v
TSCR's for Certain' Long Term.NUREG 0737 Items NUREG'0737. Item
.TSCR #'
Comment-II.B.1 RCSl Vents 1 TSCR - 137 2/9/84 II.B.3 Post Submittal by A change to the administrative controls TS will be forwarded to cover 4
Accident-Sampling 5/31/84 Sampling System f
II.E.1.1 EFW Submitted by 11/84 Current T.S. (3.4 & 4.9) cover all_ installed EFW upgrades. For EFW l
Evaluation (See Comment)
_Long Term Upgrades, the date provided' presumes that TMI-1 remains shutdown through, 9/84 in order to allow completion of the modifica-l tions in accordance with our previous commitment (ourage required).
If this is not the_ case, the Tech Spec Change submittal will be changed accordingly.
II.F.1.1 Noble Gas TSCR 114 1/5/83 z
Effluent Monitors II.F.1.2 Iodine
- 1) TSCR 114 The equipment is covered by TSCR 114 and the program will be included and Particulate
- 2) Submitted by in a change to the Administrative Controls T.S. similar to II.B.3 Sampling 5/31/84 1
II.F.1.3 Contain-
'TSCR 114 1/5/83 ment Radiation Monitor II.F.1.4 TSCR 114 1/5/83 Containment Pressure Monitor l
II.F.1.5
.TSCR 114 1/5/83 Containment Water Level II.F.1.6 TSCR 114 1/5/83 Containment Hydrogen Nbnitor II.F.2 Inadequate 1) Existing T.S. 3.5.5 Current T.S. covers the saturation margin monitor. TSCR 130 covers
. Core Cooling
- 2) TSCR 130.2/13/84 incore thermocouples.
For RITS, the date presumes that TMI-l remains
- 3) Submitted by 8/84 shutdown through 12/84 in order to allow completion of the modifica-(See Comment) tions in accordance with our previous commitment (outage required).
~
If this is not the case, the Tech Spec Change submittal will be.
changed accordingly.
III.D.3.4
- 1) T.S. 3.15.1 and Existing Tech Specs cover the installed equipment.
As discussed in Control Room 4.12.1 our phone conversation of February 14, 1984, GPUN is pursuing various Habitability
- 2) See Comment control room habitability system configurations. When the final system configuration is determined, T.S. changes if needed will be 2 months prior to scheduled operation.
,