ML20138P247
| ML20138P247 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak, 05000000 |
| Issue date: | 07/06/1983 |
| From: | Lancaster B, Tolson R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | |
| Shared Package | |
| ML20138M609 | List:
|
| References | |
| FOIA-85-59 CP-QP-15.6, NUDOCS 8511070017 | |
| Download: ML20138P247 (5) | |
Text
_ _ _ _ . -
- PRCCECURC. REVISICN IO5Il#I NUMER CA c - PAGE .
TEXAS UTILITIES GENERATING CO !
lCP.QP.15.6 1
- 1 of 5
, i i ;R 2 6 ISt:$ +
PREPARED SY: . h r&t.aio 7 88 l '
CATE'
. i SDAR STATUS TRACKING
/
j APPROVED SY: f6fi#a '"/e h ( ) t/ CAIE 1.0 REFERENCE I 1.A CP.QO.16.1, "Significant Construction Deficiencies"
- 2. ENERR C0h"ROLD COPY 2.1 PURPOSE AND SCOPE CONTROL No. 4ldi The purpose of this procedure is to describe the method for the tracking of Signi ficant Deficiency Analysis Report (SDAR) initiated in accordance with Reference 1.A.
2.2 RESPONSIBILITY The Site QA Supervisor has overall responsibility for timely responses to SDAR's. The Non.ASE QA Supervisor shall be responsible for implementing the tracking system described i in this procedure. '
j 3.0 INSTRUCTION 3.1 SDAR NUMBER LOG An SDAR number log shall be maintained by the QA Secretary.
3.2 SDAR STATUS The QA Secretary shall maintain an SDAR Tracking Matrix (Figure 1). The matrix shall reflect status and additional informa tion, as required. Each SDAR shall be assigned a sequential ntaber from the SDAR ntaber log. The matrix l shall identify the following information: j I
i i
i w%2 TEOOO OA 8511070017 851016 PDR FOIA GARDE 85--59 PDR
PROCEDURE REVISION ISSUE NUMBER DATE PAGE TEXAS UTILITIES GENERATING CO.
CPSES CP.QP.15.6 1 JUL 2 6 foot 2 of 5 a) SDAR No.
b) Issue date of SDAR c) Due date for response to NRC d) Response assigned to e) Due date to Non.ASME QA Supervisor f) Brief description of finding g) Status of response 3.4 ASSIGNED RESPONSES Af ter entering the item in the SDAR Matrix, the request for response shall be transmitted to the individual assigned that responsibility. The transmittal shall show a required response date. Nomally the required response shall be 15 days from the date of the transmittal. Extensions to response dates may be made upon written justification to the Non.A91E QA Supervi sor. When the da te requested exceeds the response due date to the NRC, the Site QA Supervisor shall formally request an extension from the TUGC0 Quality Assurance Manager or his designee, who in turn will request such extensions from the NRC.
- 3.5 OPEN ITEMS REPORT A report shall be generated providing a brief status of each open SDAR. Thi s report (Figure 2) shall be published weekly. Individuals assigned a response due date that falls during the week when the report is issued shall be verbally reminded that the response is due. If a response is not received before the due da te , a femal request for the response shall be delivered to the responsible individual, requesting immediate action. Any response overdue more than 2 days, without an approved extension, shall be brought to the attention of the Non.ASME QA Supervisor for resolution. Items shall remain on the report until closed by the NRC.
TUGCC OA I
%g3
PROCEDURE REVISION ISSUE NUMBER DATE PAGE TEXAS UTILITIES GENERATING CO.
CPSES CP.QP.15.6 1 JUL 2 6 igg 3 of 5 3.6 RESPONSE REVIEW After receipt of the response, the Non.ASME QA Supervisor shall review the draft response for adequacy and upon apprcval shall forward the response to the Si te QA Supervi sor for review and forwarding to the Manager, Quality Assurance.
t i
i l
pe3 TUGCO CA J
_ . - _ _ -. . - - - . . .-- - - = .
i PROCEDURE REVISION NUMBER E PAGE
' TEXAS UTILITIES GENERATING CO.
CPSES CP-09-15.6 1 E26 % 4 of a.
FIGURE 1 l
u k
a=8 e 3 e 5
ly*E .
a ,
c .
= M C
5 g
s 1*
5
- G 2
E
=
5 s ,
2 5 '
5*E
- l.
f
' 3 y g l : i !
]5g8 W
- G 2 l t .
i l
. l f
'" " 3 TbGCO CA f
I i
j
- - - - , _ . . . . = ,,
I I ,
PROCEDURE l REVISION lSSUE NUMBER , , DATE PAGE TEXAS UTILITIES GENERATING CO. '
CPSES .
1 lm 2 61983 5 cf a-lCP-QP-15.6 l FIGURE 2 l
4 i
OPErl 50AA'$
- -03 CII-20
- Installation of Hilti Boltt" (Hilti $ pacing) Completion 7/1/81 'to report required unless con ietion date missed 77-03 "afor Conduit Supports Being Installed Awaiting NPC closure - 11/25/R0 Taylor contacted 77--13
'-4) Concrete for Unit 2 $ team Generator
- orca rtments .o corDietion date - awaiting last repair 20-05 Ecedmer.t lengths of Hilti Bolt A .o s 8/5/81 - Taylor =til close in Floor Slabs U-2? 01esel Generator Dt;e Succorts 10/3/R1- ruet.m m.g 3 g ij-lj M1ti Bolts for Conduit Suoports (UT)
CONietion 12/;/31 I{.;f,j Instrumentation Supports Overstressed con ietion 1/a/82 i
i l
7 i
,, g 3 TUGCC CA '