CNL-20-028, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 24

From kanterella
Revision as of 13:53, 22 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 24
ML20157A180
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 05/29/2020
From: Hulvey K
Tennessee Valley Authority
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
CNL-20-028
Download: ML20157A180 (3)


Text

SAFEGUARDS INFORMATION nm Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-20-028 May 29, 2020 10 CFR 50.4(b)(4) 10 CFR 50.54(p)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRG Docket Nos. 50-390, 50-391, and 72-1048

Subject:

Watts Bar Nuclear.Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 24 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.54(p), this letter provides Revision 24 of the Watts Bar Nuclear Plant (WBN) Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program.

The Revision Log of the WBN Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program provided in the enclosure describes each change. The revised plan became effective as of April 6, 2020.

Tennessee Valley Authority has evaluated the changes contained in this revision and does not consider the revision to decrease the safeguards effectiveness of the subject plan. The documented evaluation is available on site for inspection.

  • The enclosure to this letter contains Safeguards Information and should be protected in accordance with 10 CFR 73.21 and 10 CFR 73.22. The enclosed plan revision is being sent by certified mail and the signed receipt will signify that the Nuclear Regulatory Commission has received this information.

SoDJ SAFEGUARDS INFORMATION ;Jtf~Sl/p SAFEGUARDS INFORMATION CLASSIFICATION DOES NOT APPLY TO THIS PAGE WHEN SEPARATED FR'OM THE ENCLOSURE. ;v/41-tJfv/S S

II SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission CNL-20-028 .

Page2 May 29, 2020 There are no new regulatory commitments associated with this submittal. If you have any questions regarding this information, please contact.Gordon Williams, Senior Manager, Fleet Licensing (Acting) at (423) 751-2687.

  • Respectfully, Kimberly D. Hulvey Director, Nuclear Regulatory Affairs (Acting)

Enclosure:

Watts Bar Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 24 cc (Enclosure):

NRC Regional Administrator- Region II SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION CLASSIFICATION DOES NOT APPLY TO THIS PAGE WHEN SEPARATED FROM THE ENCLOSURE.

SAFEGUARDS INFORMATION Enclosure Watts Bar Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 24 SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION CLASSIFICATION DOES NOT APPLY TO THIS PAGE WHEN SEPARATED FROM THE ENCLOSURE.

CNL-20-028