| 05000287/FIN-2018002-01 | 2018Q2 | Oconee | Failure to Perform ISI General Visual Examinations of Containment Moisture Barrier Associated with Containment Liner Leak Chase Test Connection Piping |
| 05000416/FIN-2018002-02 | 2018Q2 | Grand Gulf | Failure to Follow ASME Requirements for Maintaining Inservice Inspection (ISI) Cycles and Perform ASME Required Inservice Inspections within the Scheduled ISI Cycle |
| 05000272/FIN-2017004-01 | 2017Q4 | Salem | Non-conformance with the Containment Thermal Insulation System was not Identified and Corrected |
| 05000275/FIN-2017002-01 | 2017Q2 | Diablo Canyon | Inadequate Expansion Scope of Risk - Informed Welds |
| 05000446/FIN-2017002-02 | 2017Q2 | Comanche Peak | Inadequate Operability Evaluation for Safety - related Pipe Supports |
| 05000250/FIN-2017002-01 | 2017Q2 | Turkey Point | Failure to Perform 100 Percent General Visual Examinations of Containment Moisture Barriers Associated with Containment Liner Leak Chase Test Connections |
| 05000373/FIN-2017001-01 | 2017Q1 | LaSalle | nadequate Controls for ASME Code VT 3 Internal Examination of Pumps and Valves |
| 05000282/FIN-2016004-01 | 2016Q4 | Prairie Island | Baffle Former Bolting Acceptance Criteria |
| 05000456/FIN-2016004-01 | 2016Q4 | Braidwood | Inadequate Control of Welding During FW System Pipe Replacement |
| 05000321/FIN-2016010-01 | 2016Q2 | Hatch | Inaccurate Information Provided Regarding N2E Nozzle Weld Overlay |