UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 22, 2007Docket Nos.05000277License Nos.DPR-4405000278DPR-56Mr. Christopher M. CranePresident and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way Kennet Square, PA 19348SUBJECT:PEACH BOTTOM GENERATING STATION - NRC INSPECTION REPORT 05000277/2007403 AND 05000278/2007403
Dear Mr. Crane:
On February 28, 2007, the United States Nuclear Regulatory Commission completed aninspection at your Peach Bottom Generating Station Units 2 and 3. This inspection examined activities conducted under your license as they relate to common defense and security, and to compliance with the Commission's Security Order. The inspection was based upon Temporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC). The inspection results were discussed on February 28, 2007, with Mr. Joseph Grimes and other members of your staff.Based on the results of this inspection, no violations were identified. No reply to this letter isrequired. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component for the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/Samuel Hansell, ChiefDecommissioning Branch Division of Nuclear Materials Safety C. M. Crane2
Enclosure:
Inspection Report 05000277/2007403 and 05000278/2007403w/Attachment: Supplemental Information
REGION IDocket Nos:50-277; 50-278 License Nos:DPR-44; DPR-56 Report No:05000277/2007403 and 05000278/2007403 Licensee:Exelon Generating Company, LLC Facility:Peach Bottom Generating Station, Units 2 & 3 Location:Delta, PA 17314 Date:February 28, 2007 Inspectors:D. Everhart, Security SpecialistJ. Nicholson, Health Physicist K. Modes, Health PhysicistApproved by:Samuel HansellBranch Chief Decommissioning Branch Division of Nuclear Materials Safety EnclosureREPORT DETAILS4OA5Other Activities.1(Closed) NRC Temporary Instruction (TI) 2201/001 - Inspection of Additional SecurityMeasures for Radioactive Material Quantities of Concern (RAMQC) a.Inspection Scope (TI 2201/001)
The inspectors reviewed the RAMQC program to determine the licensee's ability toimplement the additional security measures (ASMs) imposed by U.S. NRC Order EA-05-007, "Imposing Additional Security Measures on the Transportation of RAMQC," issued July 19, 2005. The inspectors also reviewed the program to verify that the Safeguards Information-Modified Handling (SGI-M) protection requirements specified in NRC Order EA-04-0191, "Imposing Requirements for the Protection of Certain Safeguards Information," issued November 5, 2004, have been successfully incorporated into Exelon's information protection strategy. On February 28, 2007, the inspectors covered each ASM and SGI-M requirement. Theinspectors reviewed licensee verifications; background investigations; preplanning and coordination; notifications; communications; drivers and accompanying individuals; procedures; and training and control of information. The inspectors conducted the inspection through interviews with responsible personnel and a review of programmatic and implementing procedures, including associated records and documentation.The inspectors completed one of the required one sample.b.Findings and ObservationsNo findings of significance were identified.c.ConclusionsThe inspectors concluded that Exelon's personnel maintained an effective RAMQCprogram. Exelon personnel effectively implemented the ASMs imposed by U.S. NRC Order EA-05-007, "Imposing Additional Security Measures on the Transportation of RAMQC," issued July 19, 2005. The inspectors also concluded that Exelon personnel successfully incorporated the information protection strategy per the SGI-M protection requirements specified in NRC Order EA-04-0191, "Imposing Requirements for the Protection of Certain Safeguards Information," issued November 5, 2004.40A6Meetings, Including ExitExit Meeting SummaryOn February 28, 2007, the NRC inspectors presented the inspection results toMr. Joseph Grimes and staff members. Although proprietary and safeguards 2Enclosure information was reviewed, the NRC inspectors confirmed that proprietary andsafeguards information was not included in this inspection report.Attachment:Supplemental Information A-1AttachmentSUPPLEMENTAL INFORMATIONLIST OF PERSONS CONTACTED*Joseph Grimes, SVP*Kim Hobbs, Regulatory Assurance
- Robert Lubaszewski, RW/RP
- Mark Ross, RW
- Robert Taylor, RP* Denotes the individual who attended the exit briefing on February 28, 2007.LIST OF ITEMS OPENED AND CLOSEDOPENTemporary Instruction (TI) 2201/001 - Inspection of Additional SecurityMeasures for Radioactive Material Quantities of Concern (RAMQC)CLOSED Temporary Instruction (TI) 2201/001 - Inspection of Additional SecurityMeasures for Radioactive Material Quantities of Concern (RAMQC)LIST OF DOCUMENTS REVIEWEDTemporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures forRadioactive Material Quantities of Concern (RAMQC)Exelon Procedure RP-AA-600-1006, Rev. 4, Notification Requirements forRadioactive/Waste Shipments Greater than the Radioactive Material Quantities of Concern (RAMQC)Plant "P" Shipment Tracking (Shipment #1) February 1, 2007, Rev. 3 Advance Notification of Radioactive (RAMQC) Shipment, January 26, 2007LIST OF ACRONYMS USEDASMAdditional Security MeasuresRAMQCRadioactive Material Quantities of Concern SGI-MSafeguards Information-Modified Handling TITemporary Instruction