CNL-14-093, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision

From kanterella
Revision as of 19:33, 20 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision
ML15205A213
Person / Time
Site: Browns Ferry, Watts Bar, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/16/2014
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNL-14-093
Download: ML15205A213 (2)


Text

L44 140716 001 Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402

CNL-14-093

July 16, 2014 10 CFR 50, Appendix E, Section V 10 CFR 50.4 ATTN: Document Control Desk

U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68

NRC Docket Nos. 50-259, 50-260, and 50-296

Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Watts Bar Nuclear Plant, Unit 1

Facility Operating License No. NPF-90 NRC Docket No. 50-390

Subject:

Central Emergency Control Center - Emergency Plan Implementing Procedure Revision In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix E,Section V, this submittal provides the revised Central Emergency Control Center (CECC) Emergency Plan Implementing Procedure (EPIP) listed below.

EPIP Revision Title Effective Date CECC EPIP-19 21 Post Accident Fuel Damage Assessment 06/30/2014