CNL-14-093, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision
| ML15205A213 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry, Watts Bar, Sequoyah |
| Issue date: | 07/16/2014 |
| From: | James Shea Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CNL-14-093 | |
| Download: ML15205A213 (2) | |
Text
L44 140716 001 Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402
CNL-14-093
July 16, 2014 10 CFR 50, Appendix E, Section V 10 CFR 50.4 ATTN: Document Control Desk
U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68
NRC Docket Nos. 50-259, 50-260, and 50-296
Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
Watts Bar Nuclear Plant, Unit 1
Facility Operating License No. NPF-90 NRC Docket No. 50-390
Subject:
Central Emergency Control Center - Emergency Plan Implementing Procedure Revision In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix E,Section V, this submittal provides the revised Central Emergency Control Center (CECC) Emergency Plan Implementing Procedure (EPIP) listed below.
EPIP Revision Title Effective Date CECC EPIP-19 21 Post Accident Fuel Damage Assessment 06/30/2014