UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713
November 27, 2017 Mr. Bryan Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: NINE MILE POINT NUCLEAR STATION - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT
05000220/2017502 AND 05000410/2017502
Dear Mr. Hanson:
On October 26, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the October 24, 2017, evaluated emergency preparedness exercise at the Nine Mile Point Nuclear Station. On October 26, 2017, the NRC inspectors discussed the results of this inspection with Mr. Peter Orphanos, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely,
/RA/ Raymond McKinley, Chief
Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-220 and 50-410 License Nos. DPR-63 and NPF-69
Enclosure:
NRC Inspection Report No. 05000220/2017502; 05000410/2017502
REGION I Docket Nos.: 50-220 and 50-410
License Nos. DPR-63 and NPF-69
Report Nos. 05000220/2017502 and 05000410/2017502
Licensee: Exelon Generation Company, LLC
Facility: Nine Mile Point Nuclear Station, LLC Units 1 and 2
Location: Oswego, NY
Dates: October 23 - 26, 2017
Inspectors: J. Ambrosini, Sr. Emergency Preparedness Inspector, Division of Reactor Safety (DRS) J. DeBoer, Emergency Preparedness Inspector, DRS B. Fuller, Senior Operations Engineer, DRS J. Schoppy, Senior Reactor Inspector, DRS
Approved By: Raymond McKinley, Chief Plant Support Branch 1 Division of Reactor Safety
2
SUMMARY
Inspection Report 05000220/2017502 and 05000410/2017502; 10/23-26, 2017; Nine Mile Point
Nuclear Station; Exercise Evaluation, Exercise Evaluation - Scenario Review, Performance Indicator Verification.
This was an announced inspection conducted by four Region I-based inspectors. No findings were identified during the inspection. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 6.
No findings were identified.
Cornerstone: Emergency Preparedness
No findings were identified.
3
REPORT DETAILS
REACTOR SAFETY
Cornerstone: Emergency Preparedness
1EP1 Exercise Evaluation
a. Inspection Scope
On October 24, 2017, Exelon conducted a biennial emergency preparedness (EP)exercise at the Nine Mile Point Nuclear Station. The NRC inspectors evaluated the adequacy of Exelon's conduct of the exercise and its capability to assess staff performance via a formal critique process, as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle.
To evaluate the exercise, the inspectors reviewed:
The adequacy of Exelon's performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b)(4), (5), (9), and (10), which include: emergency classification, offsite notification, radiological assessment, and onsite and public protective action recommendations, respectively.
The overall adequacy of Exelon's emergency response facilities with regard to Nine Mile Point emergency plan commitments. The inspectors assessed the following facilities: the simulator control room, the technical support center, the operations support center, and the emergency operations facility.
Exelon's performance in other areas, such as: the emergency response organization's (ERO) recognition of abnormal plant conditions, command and control, communications both within and between facilities, prioritization of mitigation activities, utilization of repair and field monitoring teams, interface with offsite agencies, staffing and procedure adequacy, and the overall implementation of the Nine Mile Point emergency plan and its implementing procedures.
A review of past performance issues from the last biennial exercise inspection report and Exelon's EP drill reports, to determine the effectiveness of corrective actions as demonstrated during the October 24, 2017, exercise and to ensure compliance with 10 CFR 50.47(b)(14), which requires licensees to conduct periodic drills and exercises and to correct any deficiencies identified.
The post-exercise critiques, to evaluate Exelon's self-assessment of its ERO performance during the October 24, 2017, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g.
Documents reviewed for each section of this inspection report are listed in the
.
b. Findings
No findings were identified.
1EP8 Exercise Evaluation - Scenario Review
a. Inspection Scope
Prior to the October 24, 2017, EP exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Exelon had submitted to the NRC, to determine if the exercise would test major elements of the Nine Mile Point emergency plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle.
b. Findings
No findings were identified.
OTHER ACTIVITIES (OA)
4OA1 Performance Indicator Verification (71151 - 3 Samples)
a. Inspection Scope
The inspectors reviewed data for the Nine Mile Point EP Performance Indicators (PI), which are:
- (1) Drill and Exercise Performance (DEP) (EP01);
- (2) ERO Drill Participation (EP02); and
- (3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP inspection at Nine Mile Point was conducted in the July 2016, so the inspectors reviewed supporting documentation from EP drills and tests from the second calendar quarter of 2016 through the second calendar quarter of 2017, to verify the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, "Regulatory Assessment Performance Indicator Guidelines," Revision 7.
This inspection activity represented the completion of three samples.
b. Findings
No findings were identified.
4OA6 Meetings, including Exit
On October 26, 2017, the inspectors presented the results of this inspection to Mr. Peter Orphanos, Site Vice President and other members of Exelon's staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- P. Orphanos, Nine Mile Point Site Vice President
- V. Cwietniewicz, Exelon Mid-Atlantic Emergency Planning Manager
- K. Yurkon, Nine Mile Point Emergency Planning Manager
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None