August 31, 2018 Mr. John Dinelli, Site Vice President Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751 SUBJECT: UPDATED INSPECTION PLAN FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (REPORT 05000382/2018005)
Dear Mr. Dinelli:
The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 , for Waterford Steam Electric Station, Unit 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes
. Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/194, "Inspection of the Licensee's Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01)." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1 574 with any questions you have regarding this letter.
Sincerely,
/RA/ Cornelius F. O'Keefe
, Chief Project Branch D Division of Reactor Projects Docket Nos.
50-3 82 License Nos.
NPF-38 Enclosure:
Inspection Plan Waterford 08/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count TRIENNIAL FIRE PROTECTION INSPECTION 6 3 07/22/2018 08/18/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)
3 07/22/2018 08/04/2018 IP 92702 000238 Followup On Corrective Actions For Violations And Deviations 3 08/13/2018 08/17/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)
EP PROGRAM INSPECTION 1 3 07/30/2018 08/10/2018 IP 71114.02 000717 Alert and Notification System Testing 3 07/30/2018 08/10/2018 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 3 07/30/2018 08/10/2018 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3 07/30/2018 08/10/2018 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 3 07/30/2018 08/10/2018 IP 71151 001397 Performance Indicator Verification RAD SAFETY 2,4 2 3 09/10/2018 09/14/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 3 09/10/2018 09/14/2018 IP 71124.04 000728 Occupational Dose Assessment BIENNIAL PI&R 4 3 09/17/2018 09/21/2018 IP 71152B 000747 Problem Identification and Resolution 3 10/01/2018 10/05/2018 IP 71152B 000747 Problem Identification and Resolution FORCE-ON-FORCE PLANNING & EXERCISE WEEK 7 3 09/24/2018 09/28/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 3 10/15/2018 10/19/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing INITIAL EXAM 4 3 09/30/2018 10/06/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
3 11/04/2018 11/10/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
CYBER SECURITY INSPECTION 5 3 11/05/2018 11/09/2018 IP 71130.10P 000741 Cyber Security 3 11/26/2018 11/30/2018 IP 71130.10P 000741 Cyber Security Security Access Control .02 1 3 12/03/2018 12/07/2018 IP 71130.02 000734 Access Control 3 12/03/2018 12/07/2018 IP 71151 001338 Performance Indicator Verification 8/22/2018 10:13:16 AMPage 1 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report Waterford 08/01/2018 - 06/30/2020
Unit Start End Activity CAC Title Staff Count
WATERFORD INSERVICE INSPECTION
3 01/14/2019
01/25/2019
000702 Inservice Inspection Activities - PWR
3 01/14/2019
01/18/2019
000725 Radiological Hazard Assessment and Exposure Controls
01/14/2019
01/18/2019
000726 Occupational ALARA Planning and Controls
WATERFORD EQ PROGRAMS INSPECTION
3 04/01/2019
04/19/2019
000714 Design Bases Assurance Inspection (Programs)
TARGET SET INSPECTION
3 04/29/2019
05/31/2019
000743 Review of Power Reactor Target Sets
Security Access Control .02
3 05/13/2019
05/17/2019
000734 Access Control
05/13/2019
05/17/2019
IP 71151 001338 Performance Indicator Verification
BRQ
3 07/29/2019
08/03/2019
000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
RP TEAM INSPECTION
3 09/16/2019
09/20/2019
000729 Radiation Monitoring Instrumentation
09/16/2019
09/20/2019
000730 Radioactive Gaseous and Liquid Effluent Treatment
09/16/2019
09/20/2019
000731 Radiological Environmental Monitoring Program
09/16/2019
09/20/2019
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
Transportation
Security Protective Strategy .05
3 10/07/2019
10/11/2019
000737 Protective Strategy Evaluation
3 11/18/2019
11/22/2019
000716 Exercise Evaluation
11/18/2019
11/22/2019
000719 Emergency Action Level and Emergency Plan Changes
11/18/2019
11/22/2019
IP 71151 001397 Performance Indicator Verification
8/22/2018 10:13:16 AM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Waterford 08/01/2018 - 06/30/2020
Unit Start End Activity CAC Title Staff Count
3 12/09/2019
12/13/2019
000512 Inspection of the Licensee
s Implementation of Industry Initiative Associated With the
Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin
2012-01)
RS24 Radiation Safety
3 02/10/2020
02/14/2020
000726 Occupational ALARA Planning and Controls
02/10/2020
02/14/2020
000729 Occupational Dose Assessment
Waterford 3 - Design Bases Assurance Inspection (Teams)
3 05/04/2020
05/08/2020
000713 Design Bases Assurance Inspection (Teams)
05/18/2020
05/22/2020
000713 Design Bases Assurance Inspection (Teams)
8/22/2018 10:13:16 AM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
ML18234A105 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: CFO/RDR Yes No Publicly Available Sensitive NRC-002 OFFICE C:DRP/D NAME NO'Keefe SIGNATURE /RA/ DATE 8/22/18