UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713 August 28, 2019 Mr. Rod Penfield Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 SUBJECT: BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 UPDATED INSPECTION PLAN INSPECTION REPORT 05000334/2 019 00 5 AND 05000412/2019 00 5
Dear Mr. Penfield:
The enclosed inspection plan lists the inspections scheduled through June 30 , 20 21 , for Beaver Valley Power Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
Additionally, NRC Region I plans to conduct an inspection per Temporary Instruction 2515/194
, "Inspection of the Licensees'
Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems ," at your facility during the period. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, "Recommendations for Modifying the Reactor Oversight Process Engineering Inspections"), and other changes to the baseline inspection program described in SECY-19-0067, "Recommendations for Enhancing the Reactor Oversight Process." Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room
). Please contact me at 610-337-5205 with any questions you have regarding this letter.
Sincerely,
/RA/ Matthew R. Young, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.
50-334 and 50-412 License Nos.
Beaver Valley Inspection Plan cc: Distribution via ListServ SUBJECT: BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 UPDATED INSPECTION PLAN INSPECTION REPORT 05000334/2019 00 5 AND 05000412/2019 00 5 DATED AUGUST 28, 2019 DISTRIBUTION w/encl (via e-mail) DLew, RA (R1ORAMAIL)
RLorson, DRA (R1ORAMAIL)
DCollins, DRP (R1DRPMAIL)
Deputy Director, DRP (R1DRPMAIL)
JYerokun, DRS (R1DRSMAIL)
PKrohn, DRS (R1DRSMAIL)
MFerdas, DRP MYoung, DRP RVadella, DRP JKrafty, DRP SHorvitz, DRP AGould, AA DDodson, RI, OEDO RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1 Resource ROPreports Resource DRS Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpabResource ROPassessment Resource DOCUMENT NAME:
S:\ROP Assessment Meetings
\ROP-20 Second Quarter Process
\Branch 6\2019 Beaver Valley MC Letter.docx ADAMS ACCESSION NUMBER:
ML19232A338 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME RVadella MYoung DATE 8/15/19 8/16/19 OFFICIAL RECORD CO PY Beaver Valley
07/01/2019 - 06/30/2021
Unit Start End Activity CAC Title Staff Count
RAD SAFETY REMP
1, 2 07/08/2019
07/12/2019
000731 Radiological Environmental Monitoring Program
1, 2 07/08/2019
07/12/2019
IP 71151 000746 Performance Indicator Verification
Triennial Heat Sink
1, 2 07/14/2019
07/20/2019
000700 Heat Sink Performance
BV-ACCESS CONTROL, EQUIP PERF, TRAINING
1, 2 07/22/2019
07/26/2019
000734 Access Control
1, 2 07/22/2019
07/26/2019
000736 Equipment Performance, Testing, and Maintenance
1, 2 07/22/2019
07/26/2019
000739 Security Training
1, 2 07/22/2019
07/26/2019
IP 71151 001338 Performance Indicator Verification
RAD SAFETY 01,02,03,04
1, 2 07/29/2019
08/02/2019
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 07/29/2019
08/02/2019
000726 Occupational ALARA Planning and Controls
1, 2 07/29/2019
08/02/2019
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 07/29/2019
08/02/2019
000728 Occupational Dose Assessment
50.59 Process
1, 2 08/04/2019
08/17/2019
000709 Evaluations of Changes, Tests, and Experiments
BEAVER VALLEY 2 INITIAL OL EXAM
2 09/01/2019
09/07/2019
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
10/06/2019
10/19/2019
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
INSERVICE INSPECTION - UNIT 1
1 10/20/2019
11/02/2019
000702 Inservice Inspection Activities (PWR)
RAD SAFETY OUT
1, 2 10/21/2019
10/25/2019
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 10/21/2019
10/25/2019
000726 Occupational ALARA Planning and Controls
1, 2 10/21/2019
10/25/2019
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 10/21/2019
10/25/2019
000728 Occupational Dose Assessment
1, 2 10/21/2019
10/25/2019
IP 71151 000746 Performance Indicator Verification
8/20/2019 8:19:13 AM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Beaver Valley
07/01/2019 - 06/30/2021
Unit Start End Activity CAC Title Staff Count
TI-194 Open Phase Condition Inspection - BV
1, 2 01/27/2020
01/31/2020
000512 Inspection of the Licensee
s Implementation of Industry Initiative Associated With the
Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin
2012-01)
Rad Safety Inspection
1, 2 01/27/2020
01/31/2020
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 01/27/2020
01/31/2020
000726 Occupational ALARA Planning and Controls
1, 2 01/27/2020
01/31/2020
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 01/27/2020
01/31/2020
000728 Occupational Dose Assessment
BV1 Requal Inspection with P/F Results
1 04/12/2020
04/18/2020
000703 Licensed Operator Requalification Program and Licensed Operator Performance
04/12/2020
04/18/2020
000704 Licensed Operator Requalification Program and Licensed Operator Performance
Rad Safety Refuel
1, 2 04/13/2020
04/17/2020
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 04/13/2020
04/17/2020
000726 Occupational ALARA Planning and Controls
1, 2 04/13/2020
04/17/2020
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 04/13/2020
04/17/2020
000728 Occupational Dose Assessment
ISI - UNIT 2
2 04/20/2020
05/01/2020
000702 Inservice Inspection Activities (PWR)
BEAVER VALLEY EP EXERCISE INSPECTION
1, 2 06/08/2020
06/12/2020
000716 Exercise Evaluation
1, 2 06/08/2020
06/12/2020
000719 Emergency Action Level and Emergency Plan Changes
1, 2 06/08/2020
06/12/2020
IP 71151 001397 Performance Indicator Verification
Rad Safety RETS
1, 2 06/22/2020
06/26/2020
000730 Radioactive Gaseous and Liquid Effluent Treatment
1, 2 06/22/2020
06/26/2020
IP 71151 000746 Performance Indicator Verification
Rad Safety Instruments
1, 2 08/17/2020
08/21/2020
000729 Radiation Monitoring Instrumentation
8/20/2019 8:19:13 AM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Beaver Valley
07/01/2019 - 06/30/2021
Unit Start End Activity CAC Title Staff Count
Access Control, Equip Perf, Training
1, 2 09/07/2020
09/11/2020
000734 Access Control
1, 2 09/07/2020
09/11/2020
000736 Equipment Performance, Testing, and Maintenance
1, 2 09/07/2020
09/11/2020
000739 Security Training
1, 2 09/07/2020
09/11/2020
IP 71151 001338 Performance Indicator Verification
DESIGN BASIS ASSURANCE INSPECTION
1, 2 09/14/2020
09/18/2020
000713 Design Bases Assurance Inspection (Teams)
1, 2 09/28/2020
10/02/2020
000713 Design Bases Assurance Inspection (Teams)
Rad safety Inspection
1, 2 11/16/2020
11/20/2020
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 11/16/2020
11/20/2020
000726 Occupational ALARA Planning and Controls
1, 2 11/16/2020
11/20/2020
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 11/16/2020
11/20/2020
000728 Occupational Dose Assessment
1, 2 11/16/2020
11/20/2020
IP 71151 000746 Performance Indicator Verification
Radwaste
1, 2 11/16/2020
11/20/2020
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
Transportation
Rad Safety Inspection
1, 2 01/11/2021
01/15/2021
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 01/11/2021
01/15/2021
000726 Occupational ALARA Planning and Controls
1, 2 01/11/2021
01/15/2021
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 01/11/2021
01/15/2021
000728 Occupational Dose Assessment
FY21 Beaver Valley 1 Initial Examination
1 01/31/2021
02/06/2021
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
02/28/2021
03/13/2021
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
PI&R BIENNIAL
1, 2 02/08/2021
02/12/2021
IP 71152B 000747 Problem Identification and Resolution
1, 2 02/22/2021
02/26/2021
IP 71152B 000747 Problem Identification and Resolution
8/20/2019 8:19:13 AM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Beaver Valley
07/01/2019 - 06/30/2021
Unit Start End Activity CAC Title Staff Count
Beaver Valley EP Program Inspection
1, 2 04/05/2021
04/09/2021
000717 Alert and Notification System Testing
1, 2 04/05/2021
04/09/2021
000718 Emergency Response Organization Staffing and Augmentation System
1, 2 04/05/2021
04/09/2021
000719 Emergency Action Level and Emergency Plan Changes
1, 2 04/05/2021
04/09/2021
000720 Maintenance of Emergency Preparedness
1, 2 04/05/2021
04/09/2021
IP 71151 001397 Performance Indicator Verification
Rad Safety Inspection
1, 2 04/19/2021
04/23/2021
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 04/19/2021
04/23/2021
000726 Occupational ALARA Planning and Controls
1, 2 04/19/2021
04/23/2021
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 04/19/2021
04/23/2021
000728 Occupational Dose Assessment
8/20/2019 8:19:13 AM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report