Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 9 of 15
ML12361A092
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 10/31/2012
From: Delaney M
Stevenson & Associates
To:
Office of Nuclear Reactor Regulation
Shared Package
ML123620010 List:
References
RS-12-169 12Q0108.40-R-002, Rev 3
Download: ML12361A092 (52)


Text

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 4 Status: --Y--I N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-3903 Equipment Class:

(5) Horizontal Pumps Eauioment DescriDtion:

PUMP, DG COOLING - U2 DIESEL GENERATOR COOLING WATER PUMP Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

TB, 547.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-423

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 4 Status: Eli] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-3903 Equipment Class:

(5) Horizontal Pumps Eauioment DescriDtion:

PUMP. DG COOLING - U2 DIESEL GENERATOR COOLING WATER PUMP Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Pump anchored by six 7/8" (3 per side) cast-in-place anchors.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/8/2012 Evaluated by:

James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-424

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 4 Status: r-1 N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-3903 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

PUMP, DG COOLING - U2 DIESEL GENERATOR COOLING WATER PUMP Photos C-425

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 4 Status: Fv7i N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-390 3 Equipment Class:

EauiDment DescriDtion:

(5) Horizontal Pumps PUMP. DG COOLING - U2 DIESEL GENERATOR COOLING WATER PUMP 20120808-QuadCities-2 363 20120808-QuadCities-2 364 C-426

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 7 Status: LY N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250 VDC BATT 2 Equipment Class:

(15) Batteries on Racks Equipment

Description:

BATTERY, 250V Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

TB, 628.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoracqe

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Although a missing anchor was discussed in the SQUG notes, a thorough examination revealed that there are no missing anchors.

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Minor surface corrosion judged to be acceptable.

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Minor floor shrinkage cracks judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-427

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 7 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250 VDC BATT 2 Equipment Class:

(15) Batteries on Racks Equipment

Description:

BATTERY, 250V Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Each leg anchored by a single 3/8" Wedge type expansion anchor through a 3x3x1/4" clip angle thru-bolted thru the tube leg.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/7/2012 Evaluated by:

James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-428

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 7 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

Equipment Descrip ion:

250 VDC BATT 2 (15) Batteries on Racks BATTERY, 250V m m m

C-429

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 7 Status: FYI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250 VDC BATT 2 Equipment Class:

(15) Batteries on Racks C-430

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 7 Status: FI N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250 VDC BATT 2 Equipment Class:

(15) Batteries on Racks C-431

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 7 Status:

T N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250 VDC BATT 2 Equipment Class:

(15) Batteries on Racks itDescrition BATTERY 250V C-432

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 7 Status:

Y--1 N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250 VDC BATT 2 Equipment Class:

(15) Batteries on Racks C-433

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 7 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250VDC MCC 2 Equipment Class:

(1) Motor Control Centers Eauioment Descriotion:

MCC Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

TB, 615.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Minor shrinkage cracks in floor judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-434

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 7 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250VDC MCC 2 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable. Masonry wall in vicinity restrained at top and judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/7/2012 Evaluated by:

James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-435

Quad Cities Generating Station Unit 2 1200108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 7 Status: FYI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250VDC MCC 2 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC Photos C-436

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 7 Status: [KI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250VDC MCC 2 Equipment Class:

(1) Motor Control Centers 20120807-QuadCities-2 200 C-437

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 7 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

25OVDC MCC 2 Equipment Class:

(1) Motor Control Centers C-438

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 7 Status: [-ý N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250VDC MCC 2 Equipment Class:

(1) Motor Control Centers 20120807-QuadCities-2 208 C-439

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 7 Status:

T N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250VDC MCC 2 Equipment Class:

(1) Motor Control Centers 20120807-QuadCities-2 211 C-440

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 7 Status: T N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250VDC MCC 2A Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 623.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Minor shrinkage cracks in floor judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes Yes C-441

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 7 Status: TI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250VDC MCC 2A Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Door on back of MCC has minor skew at bottom. Door is adequately latched and judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable. Short U-shaped masonry walls (65, 66, and 67 per B-1734, Rev. C) behind MCC are safety-related.

Yes Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Clearance between MCC and fence judged to be acceptable.

Comments SEWS Anchorage Notes:

Welded to embedded angle with total of 33" L 1/4" th fillet distributed fairly even. There is 33" of weld in the front and back. Pad is anchored to floor by 1/2" CEA @ 12" half each side.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/6/2012 Evaluated by:

James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-442

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 7 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

25OVDC MCC 2A Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC C-443

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 7 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250VDC MCC 2A Equipment Class:

(1) Motor Control Centers zu1 zuaUo-uIuaouIuleS-/"1 is C-444

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 7 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250VDC MCC 2A Equipment Class:

(1) Motor Control Centers C-445

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 7 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

25OVDC MCC 2A Equipment Class:

(1) Motor Control Centers C-446

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 7 Status:

Y-j N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

250VDC MCC 2A Equipment Class:

(1) Motor Control Centers C-447

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 7 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5745A Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - HEAT EXCHANGER CONTACT STEAM-LIQUID Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

TB, 547.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Not Applicable Supports for cooler are welded to steel framing in ceiling.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-448

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 7 Status: Y]I N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5745A Equipment Class:

(10) Air Handlers EcuiDment

Description:

COOLER, CUBICLE - HEAT EXCHANGER CONTACT STEAM-LIQUID Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the.safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/8/2012 Evaluated by:

James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-449

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 7 Status:

Y--I N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5745A Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - HEAT EXCHANGER CONTACT STEAM-LIQUID C-450

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 7 Status: [-Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5745A Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - HEAT EXCHANGER CONTACT STEAM-LIQUID C-451

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 7 Status:

Y-I N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5745A Equipment Class:

(10) Air Handlers C-452

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 7 Status:

Y] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5745A Equipment Class:

(10) Air Handlers LE - HEAT U10VOU/

14:0 20120808-QuadCities-2 394 C-453

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 7 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5745A Equipment Class:

(10) Air Handlers C-454

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet I of 13 Status: j-Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5747 Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - HPCI ROOM COOLER Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 554.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

Although SQUG notes described 5 rods supporting the cooler, a total of 6 rods were observed supporting the cooler. Each rod has a plate with four 1/2" anchors to the ceiling. Minor bend in 1 of the 6 rods is judged to be acceptable.

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-455

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 13 Status: LYII N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5747 Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - HPCI ROOM COOLER Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixture with open S-hook. Cooler exhaust ports protect soft targets below. Judged to be acceptable. See IR 1400098.

9.

Do attached lines have adequate flexibility to avoid damage?

Cooler is restrained to wall on each end; thus, there are no concerns regarding the relative flexibility of the cooler and attached piping.

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Cooler hung on five 5/8" rods. Each rod is anchored by four 1/2" concrete expansion anchors.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/9/2012 Evaluated by:

A" James Griffith Date:

10/16/2012 Michael Wodarcyk 10/16/2012 C-456

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 13 Status:

Y] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5747 Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - HPCI ROOM COOLER Photos C-457

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 13 Status:

Y-I N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5747 Equipment Class:

(10) Air Handlers C-458

Quad Cities Generating Station Unit 2 1200108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 13 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5747 Equipment Class:

(10) Air Handlers 20120809-QuadCities-2 229 C-459

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 13 Status:

Y-I N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5747 Equipment Class:

(10) Air Handlers LE - HF C-460

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 13 Status: EKI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5747 Equipment Class:

(10) Air Handlers C-461

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 13 Status:

YI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5747 Equipment Class:

(10) Air Handlers C-462

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 9 of 13 Status: r-Z N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5747 Equipment Class:

(10) Air Handlers C-463

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 10 of 13 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5747 Equipment Class:

(10) Air Handlers

,LE - HF C-464

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 11 of 13 Status: r*

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5747 Equipment Class:

(10) Air Handlers

LE - HPCI RO(

C-465

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 12 of 13 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5747 Equipment Class:

(10) Air Handlers

LE - HPCI RO(

C-466

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 13 of 13 Status: [III N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5747 Equipment Class:

(10) Air Handlers

- HF C-467

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 7 Status: FT I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5748A Equipment Class:

(10) Air Handlers Eauioment Descrirption:

COOLER, CUBICLE - 2A CS PMP RM COOLER Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 554.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Minor shrinkage cracks in wall and ceiling judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes Yes

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-468

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 7 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5748A Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - 2A CS PMP RM COOLER Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Tube in contact with cooler brace. Tube is flexible, brace is rigid; judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

Cooler is restrained to wall; thus, there are no concerns regarding the relative flexibility of the cooler and attached piping.

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Cooler supported by four 5/8" rods. Each rod is anchored by four 1/2" concrete expansion anchors.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/9/2012 Evaluated by:

0 VA James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-469

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 7 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5748A Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - 2A CS PMP RM COOLER Photos C-470

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 7 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5748A Equipment Class:

(10) Air Handlers C-471

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 7 Status: [YII N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5748A Equipment Class:

(10) Air Handlers C-472

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 7 Status: rj-N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5748A Equipment Class:

(10) Air Handlers LE - 2A CS F C-473

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 7 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-5748A Equipment Class:

(10) Air Handlers E - 2A CS PMP RM COOLER C-474