Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 5 of 15
ML12361A087
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 10/31/2012
From: Delaney M
Stevenson & Associates
To:
Office of Nuclear Reactor Regulation
Shared Package
ML123620010 List:
References
RS-12-169 12Q0108.40-R-002, Rev 3
Download: ML12361A087 (52)


Text

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 11 Status: [*

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1001-65C Equipment Class:

(5) Horizontal Pumps Equipment

Description:

2C RHR SERVICE WATER PUMP MOTOR Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

TB, 547.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Skid has some surface corrosion; judged to be acceptable.

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Minor shrinkage cracks in floor judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-203

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 11 Status: r N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1001-65C Equipment Class:

(5) Horizontal Pumps Equipment

Description:

2C RHR SERVICE WATER PUMP MOTOR

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?

Yes Comments SEWS Anchorage Notes:

Residual Heat Removal System Water Pump anchored by ten 3/4" (5 per side) cast-in-place anchors.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/8/2012 Evaluated by:

James Griffith Date:

10/16/2012 Michael Wodarcyk 10/16/2012 C-204

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 11 Status: [1 N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1001-65C Equipment Class:

(5) Horizontal Pumps Equipment

Description:

2C RHR SERVICE WATER PUMP MOTOR C-205

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 11 Status: r-1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1001-65C Equipment Class:

(5) Horizontal Pumps WAl C-206

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 11 Status:

Y--lI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1001-65C Equipment Class:

(5) Horizontal Pumps C-207

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 11 Status: FT 1 N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1001-65C Equipment Class:

(5) Horizontal Pumps ipment

Description:

2C RHR SERVICE W C-208

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 11 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1001-65C Equipment Class:

(5) Horizontal Pumps C-209

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 11 Status: F-Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1001-65C Equipment Class:

(5) Horizontal Pumps C-210

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 9 of 11 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1001-65C Equipment Class:

(5) Horizontal Pumps C-211

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 10 of 11 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1001-65C Equipment Class:

(5) Horizontal Pumps

'E WA zu-izuauau*-uao%,nies-z

=,i C-212

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 11 of 11 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1001-65C Equipment Class:

(5) Horizontal Pumps Equipment

Description:

2C RHR SERVICE WATER PUMP MOTOR C-213

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 3 Status: FYIJ N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1002A Equipment Class:

(6) Vertical Pumps EauiDment

Description:

PUMP. 2A Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 554.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora-ge 1,

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3,

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Minor surface corrosion judged to be acceptable.

4, Is the anchorage free of visible cracks in the concrete near the anchors?

Minor shrinkage cracks in grout pad and floor judged to be acceptable.

5, Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes Yes 6,

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects

7.

Are soft tarqets free from impact by nearby equipment or structures?

Yes C-214

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 3 Status: FYjJ N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1002A Equipment Class:

(6) Vertical Pumps EauiDment DescriDtion:

PUMP. 2A

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Pump is anchored with four 1" Cast-in-Place bolts.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/10/2012 Evaluated by:

James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-215

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 3 Status: [Y-N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1002A Equipment Class:

(6) Vertical Pumps Equipment

Description:

PUMP, 2A Photos C-216

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 11 Status: Fj N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1003A Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

HX, 2A RHR Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 554.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraaqe

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Two bolts were observed at each of the 4 trunnion support points on the gallery steel.

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Heat exchanger supported from gallery steel.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-217

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 11 Status: IY-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1003A Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

HX, 2A RHR Some of heat exchanger not visible due to lead shielding blankets.

Lead shielding supported with taut chains and is not expected to move laterally into any soft targets. Judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:.

Large vertical HX hung on four feet at quadrant points near the top of the HX. Each foot is anchored by approx.

1.25" bolts into structural steel platform and the platform is at Elev. 580'.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/10/2012 Evaluated by:

James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-218

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 11 Status: FY N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1003A Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

HX, 2A RHR C-219

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 11 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1003A Equipment Class:

(21) Tanks and Heat Exchangers C-220

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 11 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1003A Equipment Class:

(21) Tanks and Heat Exchangers C-221

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 11 Status:

Y--] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1003A Equipment Class:

(21) Tanks and Heat Exchangers C-222

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 11 Status: r-I N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1003A Equipment Class:

(21) Tanks and Heat Exchangers C-223

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 11 Status: E[* N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1003A Equipment Class:

(21) Tanks and Heat Exchangers C-224

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 9 of 11 Status: [*

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1003A Equipment Class:

(21) Tanks and Heat Exchangers C-225

Quad Cities Generating Station Unit 2 1200108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 10 of 11 Status: F-ý N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1003A Equipment Class:

(21) Tanks and Heat Exchangers C-226

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 11 of 11 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1003A Equipment Class:

(21) Tanks and Heat Exchangers C-227

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 6 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-21-AO Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

PSS DRYWELL PURGE AIR-OP VALVE 1601-21 Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 554.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas. Additional space is provided at the end of this checklist for documentinq other comments.

Anchoraqge

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-228

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 6 Status: [FI N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-21-AO Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

PSS DRYWELL PURGE AIR-OP VALVE 1601-21 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Copper tubing next to flexible conduits judged to be acceptable.

Small valve 2-4799-1281 has adequate horizontal separation to conduit support and small vertical separation. Station vertical seismic acceleration is small; therefore, vertical separation is judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes

9.

Do attached lines haveadequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Light fixture near valve with broken cover. Broken pieces were removed during walkdown. No seismic interaction concem. See IR 1400092.

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/10/2012 Evaluated by:

1 James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-229

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 6 Status:

T N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-21-AO Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

PSS DRYWELL PURGE AIR-OP VALVE 1601-21 Photos C-230

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 6 Status:

Y-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-21-AO Equipment Class:

(7) Fluid-Operated Valves I::niinmgnt I'lka*&rtir n-DI,)n r'llVIA=l I DI I Cf: AIInD VAI %19: IrAn.'l-C-231

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 6 Status: ELI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-21-AO Equipment Class:

(7) Fluid-Operated Valves 0

C-232

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 6 Status: E[II N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-21-AO Equipment Class:

(7) Fluid-Operated Valves C-233

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 3 Status: LY] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-23-AO Equipment Class:

(7) Fluid-Operated Valves VLV, BUTTERFLY ISO, 18 - PSS DRYWELL VENT TO STANDBY GAS Equipment

Description:

TREATMENT AND RB EXH SYS AO VLV 1 Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 647.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-234

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 3 Status: LTI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-23-AO Equipment Class:

(7) Fluid-Operated Valves VLV, BUTTERFLY ISO, 18 - PSS DRYWELL VENT TO STANDBY GAS Equipment

Description:

TREATMENT AND RB EXH SYS AO VLV 1 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Tubes for valve in close proximity are flexible and judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixture judged to be acceptable.

Yes Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/8/2012 Evaluated by:

James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-235

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 3 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-23-AO Equipment Class:

(7) Fluid-Operated Valves VLV, BUTTERFLY ISO, 18 - PSS DRYWELL VENT TO STANDBY GAS Equipment

Description:

TREATMENT AND RB EXH SYS AO VLV 1 C-236

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet I of 12 Status: T N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-24-AO Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

VLV, BUTTERFLY ISO, 18 - U-2 CNMT RX BLDG EXH VENT VLV Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 647.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-237

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 12 Status: r-I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-24-AO Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

VLV, BUTTERFLY ISO, 18 - U-2 CNMT RX BLDG EXH VENT VLV Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/8/2012 Evaluated by:

James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-238

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 12 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

EauiDment

Description:

2-1601-24-AO (7) Fluid-Operated Valves VLV. BUTTERFLY ISO. 18 - U-2 CNMT RX BLDG EXH VENT VLV Photos C-239

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 12 Status: [Y] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-24-AO Equipment Class:

(7) Fluid-Operated Valves C-240

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 12 Status:

Y-I N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-24-AO Equipment Class:

(7) Fluid-Operated Valves C-241

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 12 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-24-AO Equipment Class:

(7) Fluid-Operated Valves C-242

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 12 Status: E] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-24-AO Equipment Class:

(7) Fluid-Operated Valves C-243

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 12 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-24-AO Equipment Class:

(7) Fluid-Operated Valves C-244

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 9 of 12 Status:

T N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-1601 AO (7) Fluid-Operated Valves C-245

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 10 of 12 Status: [I N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-24-AO Equipment Class:

(7) Fluid-Operated Valves C-246

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 11 of 12 Status: Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-1601-24-AO (7) Fluid-Operated Valves C-247

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 12 of 12 Status: ELI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-24-AO Equipment Class:

(7) Fluid-Operated Valves eYSO 18 C-248

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 6 Status:

T I N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-57-MO Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves VLV, ISO, 1", N2 MAKEUP TO CONTAIMENT - U-2 N2 MU TO CNMT Equipment

Description:

DOWNSTREAM SV HANDWHEEL Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findingis. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-249

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 6 Status: ET] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-57-MO Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves VLV, ISO, 1", N2 MAKEUP TO CONTAIMENT - U-2 N2 MU TO CNMT Eauioment DescriDtion:

DOWNSTREAM SV HANDWHEEL Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes Small pipe near rugged MO V motor judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/6/2012 See south HCU bank area walk-by for further notes.

Evaluated by:

a'"

James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-250

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 6 Status: r*

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

Equipment

Description:

2-1601-57-MO (8) Motor-Operated and Solenoid-Operated Valves VLV, ISO, 1", N2 MAKEUP TO CONTAIMENT - U-2 N2 MU TO CNMT DOWNSTREAM SV HANDWHEEL Photos Photos C-251

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 6 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-57-MO Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves VLV, ISO, 1", N2 MAKEUP TO CONTAIMENT - U-2 N2 MU TO CNMT DOWNSTREAM SV HANDWVHEEL C-252

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 6 Status: Yj N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-1601-57-MO Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves VLV, ISO, 1", N2 MAKEUP TO CONTAIMENT - U-2 N2 MU TO CNMT C-253

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 6 Status:

I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-1601-57-MO (8) Motor-Operated and Solenoid-Operated Valves VLV, ISO, 1", N2 MAKEUP TO CONTAIMENT - U-2 N2 MU TO CNMT C-254