Text
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 11 Status: [*
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1001-65C Equipment Class:
(5) Horizontal Pumps Equipment
Description:
2C RHR SERVICE WATER PUMP MOTOR Project:
Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):
TB, 547.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Skid has some surface corrosion; judged to be acceptable.
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Minor shrinkage cracks in floor judged to be acceptable.
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes Yes Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes C-203
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 11 Status: r N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1001-65C Equipment Class:
(5) Horizontal Pumps Equipment
Description:
2C RHR SERVICE WATER PUMP MOTOR
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixtures judged to be acceptable.
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments SEWS Anchorage Notes:
Residual Heat Removal System Water Pump anchored by ten 3/4" (5 per side) cast-in-place anchors.
Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/8/2012 Evaluated by:
James Griffith Date:
10/16/2012 Michael Wodarcyk 10/16/2012 C-204
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 11 Status: [1 N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1001-65C Equipment Class:
(5) Horizontal Pumps Equipment
Description:
2C RHR SERVICE WATER PUMP MOTOR C-205
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 11 Status: r-1 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1001-65C Equipment Class:
(5) Horizontal Pumps WAl C-206
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 11 Status:
Y--lI N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1001-65C Equipment Class:
(5) Horizontal Pumps C-207
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 11 Status: FT 1 N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1001-65C Equipment Class:
(5) Horizontal Pumps ipment
Description:
2C RHR SERVICE W C-208
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 11 Status:
Y N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1001-65C Equipment Class:
(5) Horizontal Pumps C-209
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 11 Status: F-Y N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1001-65C Equipment Class:
(5) Horizontal Pumps C-210
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 9 of 11 Status:
Y N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1001-65C Equipment Class:
(5) Horizontal Pumps C-211
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 10 of 11 Status:
Y N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1001-65C Equipment Class:
(5) Horizontal Pumps
'E WA zu-izuauau*-uao%,nies-z
=,i C-212
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 11 of 11 Status:
T N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1001-65C Equipment Class:
(5) Horizontal Pumps Equipment
Description:
2C RHR SERVICE WATER PUMP MOTOR C-213
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 3 Status: FYIJ N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1002A Equipment Class:
(6) Vertical Pumps EauiDment
Description:
PUMP. 2A Project:
Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):
RB, 554.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchora-ge 1,
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
Yes
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes 3,
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes Minor surface corrosion judged to be acceptable.
4, Is the anchorage free of visible cracks in the concrete near the anchors?
Minor shrinkage cracks in grout pad and floor judged to be acceptable.
5, Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes Yes 6,
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects
- 7.
Are soft tarqets free from impact by nearby equipment or structures?
Yes C-214
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 3 Status: FYjJ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1002A Equipment Class:
(6) Vertical Pumps EauiDment DescriDtion:
PUMP. 2A
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixtures judged to be acceptable.
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEWS Anchorage Notes:
Pump is anchored with four 1" Cast-in-Place bolts.
Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/10/2012 Evaluated by:
James Griffith Date:
10/4/2012 Michael Wodarcyk 10/4/2012 C-215
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 3 Status: [Y-N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1002A Equipment Class:
(6) Vertical Pumps Equipment
Description:
PUMP, 2A Photos C-216
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 11 Status: Fj N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1003A Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):
RB, 554.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraaqe
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
Two bolts were observed at each of the 4 trunnion support points on the gallery steel.
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes Yes Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Heat exchanger supported from gallery steel.
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes Yes Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes C-217
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 11 Status: IY-] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1003A Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
HX, 2A RHR Some of heat exchanger not visible due to lead shielding blankets.
Lead shielding supported with taut chains and is not expected to move laterally into any soft targets. Judged to be acceptable.
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixtures judged to be acceptable.
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEWS Anchorage Notes:.
Large vertical HX hung on four feet at quadrant points near the top of the HX. Each foot is anchored by approx.
1.25" bolts into structural steel platform and the platform is at Elev. 580'.
Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/10/2012 Evaluated by:
James Griffith Date:
10/4/2012 Michael Wodarcyk 10/4/2012 C-218
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 11 Status: FY N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1003A Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 11 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1003A Equipment Class:
(21) Tanks and Heat Exchangers C-220
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 11 Status:
Y N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1003A Equipment Class:
(21) Tanks and Heat Exchangers C-221
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 11 Status:
Y--] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1003A Equipment Class:
(21) Tanks and Heat Exchangers C-222
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 11 Status: r-I N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1003A Equipment Class:
(21) Tanks and Heat Exchangers C-223
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 11 Status: E[* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1003A Equipment Class:
(21) Tanks and Heat Exchangers C-224
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 9 of 11 Status: [*
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1003A Equipment Class:
(21) Tanks and Heat Exchangers C-225
Quad Cities Generating Station Unit 2 1200108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 10 of 11 Status: F-ý N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1003A Equipment Class:
(21) Tanks and Heat Exchangers C-226
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 11 of 11 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1003A Equipment Class:
(21) Tanks and Heat Exchangers C-227
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 6 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-21-AO Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
PSS DRYWELL PURGE AIR-OP VALVE 1601-21 Project:
Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):
RB, 554.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas. Additional space is provided at the end of this checklist for documentinq other comments.
Anchoraqge
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-228
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 6 Status: [FI N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-21-AO Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
PSS DRYWELL PURGE AIR-OP VALVE 1601-21 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Copper tubing next to flexible conduits judged to be acceptable.
Small valve 2-4799-1281 has adequate horizontal separation to conduit support and small vertical separation. Station vertical seismic acceleration is small; therefore, vertical separation is judged to be acceptable.
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes Yes
- 9.
Do attached lines haveadequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Light fixture near valve with broken cover. Broken pieces were removed during walkdown. No seismic interaction concem. See IR 1400092.
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/10/2012 Evaluated by:
1 James Griffith Date:
10/4/2012 Michael Wodarcyk 10/4/2012 C-229
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 6 Status:
T N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-21-AO Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
PSS DRYWELL PURGE AIR-OP VALVE 1601-21 Photos C-230
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 6 Status:
Y-] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-21-AO Equipment Class:
(7) Fluid-Operated Valves I::niinmgnt I'lka*&rtir n-DI,)n r'llVIA=l I DI I Cf: AIInD VAI %19: IrAn.'l-C-231
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 6 Status: ELI N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-21-AO Equipment Class:
(7) Fluid-Operated Valves 0
C-232
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 6 Status: E[II N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-21-AO Equipment Class:
(7) Fluid-Operated Valves C-233
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 3 Status: LY] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-23-AO Equipment Class:
(7) Fluid-Operated Valves VLV, BUTTERFLY ISO, 18 - PSS DRYWELL VENT TO STANDBY GAS Equipment
Description:
TREATMENT AND RB EXH SYS AO VLV 1 Project:
Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):
RB, 647.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-234
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 3 Status: LTI N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-23-AO Equipment Class:
(7) Fluid-Operated Valves VLV, BUTTERFLY ISO, 18 - PSS DRYWELL VENT TO STANDBY GAS Equipment
Description:
TREATMENT AND RB EXH SYS AO VLV 1 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Tubes for valve in close proximity are flexible and judged to be acceptable.
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixture judged to be acceptable.
Yes Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/8/2012 Evaluated by:
James Griffith Date:
10/4/2012 Michael Wodarcyk 10/4/2012 C-235
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 3 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-23-AO Equipment Class:
(7) Fluid-Operated Valves VLV, BUTTERFLY ISO, 18 - PSS DRYWELL VENT TO STANDBY GAS Equipment
Description:
TREATMENT AND RB EXH SYS AO VLV 1 C-236
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet I of 12 Status: T N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-24-AO Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
VLV, BUTTERFLY ISO, 18 - U-2 CNMT RX BLDG EXH VENT VLV Project:
Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):
RB, 647.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-237
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 12 Status: r-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-24-AO Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
VLV, BUTTERFLY ISO, 18 - U-2 CNMT RX BLDG EXH VENT VLV Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixtures judged to be acceptable.
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/8/2012 Evaluated by:
James Griffith Date:
10/4/2012 Michael Wodarcyk 10/4/2012 C-238
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 12 Status:
T N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
EauiDment
Description:
2-1601-24-AO (7) Fluid-Operated Valves VLV. BUTTERFLY ISO. 18 - U-2 CNMT RX BLDG EXH VENT VLV Photos C-239
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 12 Status: [Y] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-24-AO Equipment Class:
(7) Fluid-Operated Valves C-240
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 12 Status:
Y-I N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-24-AO Equipment Class:
(7) Fluid-Operated Valves C-241
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 12 Status:
Y N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-24-AO Equipment Class:
(7) Fluid-Operated Valves C-242
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 12 Status: E] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-24-AO Equipment Class:
(7) Fluid-Operated Valves C-243
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 12 Status:
Y N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-24-AO Equipment Class:
(7) Fluid-Operated Valves C-244
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 9 of 12 Status:
T N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
2-1601 AO (7) Fluid-Operated Valves C-245
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 10 of 12 Status: [I N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-24-AO Equipment Class:
(7) Fluid-Operated Valves C-246
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 11 of 12 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
2-1601-24-AO (7) Fluid-Operated Valves C-247
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 12 of 12 Status: ELI N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-24-AO Equipment Class:
(7) Fluid-Operated Valves eYSO 18 C-248
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 6 Status:
T I N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-57-MO Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves VLV, ISO, 1", N2 MAKEUP TO CONTAIMENT - U-2 N2 MU TO CNMT Equipment
Description:
DOWNSTREAM SV HANDWHEEL Project:
Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):
RB, 595.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findingis. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-249
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 6 Status: ET] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-57-MO Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves VLV, ISO, 1", N2 MAKEUP TO CONTAIMENT - U-2 N2 MU TO CNMT Eauioment DescriDtion:
DOWNSTREAM SV HANDWHEEL Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes Small pipe near rugged MO V motor judged to be acceptable.
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/6/2012 See south HCU bank area walk-by for further notes.
Evaluated by:
a'"
James Griffith Date:
10/4/2012 Michael Wodarcyk 10/4/2012 C-250
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 6 Status: r*
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
2-1601-57-MO (8) Motor-Operated and Solenoid-Operated Valves VLV, ISO, 1", N2 MAKEUP TO CONTAIMENT - U-2 N2 MU TO CNMT DOWNSTREAM SV HANDWHEEL Photos Photos C-251
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 6 Status:
Y N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-57-MO Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves VLV, ISO, 1", N2 MAKEUP TO CONTAIMENT - U-2 N2 MU TO CNMT DOWNSTREAM SV HANDWVHEEL C-252
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 6 Status: Yj N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-1601-57-MO Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves VLV, ISO, 1", N2 MAKEUP TO CONTAIMENT - U-2 N2 MU TO CNMT C-253
Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 6 Status:
I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
2-1601-57-MO (8) Motor-Operated and Solenoid-Operated Valves VLV, ISO, 1", N2 MAKEUP TO CONTAIMENT - U-2 N2 MU TO CNMT C-254