IR 05000280/2006001
| ML060610422 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 03/02/2006 |
| From: | Division Reactor Projects II |
| To: | |
| Shared Package | |
| ML060610416 | List: |
| References | |
| IR-06-001 | |
| Download: ML060610422 (2) | |
Text
Surry Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2006 10:39:55 Report 22
EB3-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 05/01/2006 05/05/2006
7111108P IP Inservice Inspection Activities - PWR
EB3SGISI
- U1 STEAM GENERATOR ISI Baseline Inspections 05/08/2006 05/12/2006
7111108P IP Inservice Inspection Activities - PWR
EB3-HS
- HEAT SINK Baseline Inspections 05/22/2006 05/26/2006 1, 2 7111107B IP Heat Sink Performance
EB2-TFP
- TRIENNIAL FP PRE-INSPECTION VISIT Baseline Inspections 05/16/2006 05/18/2006 1, 2 7111105T IP Fire Protection [Triennial]
ISFSI-PT
- 60854 - PREOP TESTING OF AN ISFSI Other Routine 06/05/2006 06/09/2006 1, 2 60854 IP Preoperational Testing Of An ISFSI
EB2-TFP
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/12/2006 06/16/2006 1, 2 7111105T IP Fire Protection [Triennial]
EB2-TFP
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/26/2006 06/30/2006 1, 2 7111105T IP Fire Protection [Triennial]
PSB1-RP
- RP PUBLIC PREINSPECTION VISIT/ ISFSI Baseline Inspections 07/10/2006 07/12/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas
PSB1-RP
- RP PUBLIC BASELINE Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/31/2006 08/04/2006 1, 2 71151 IP Performance Indicator Verification
EB3-MR
- MR EFFECTIVENESS Baseline Inspections 08/28/2006 09/01/2006 1, 2 7111112B IP Maintenance Effectiveness
PS2-EP
- EP INSP Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/23/2006 10/27/2006 1, 2 71151 IP Performance Indicator Verification
EB3-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 10/30/2006 11/03/2006
7111108P IP Inservice Inspection Activities - PWR
EB3SGISI
- U2 STEAM GENERATOR ISI Baseline Inspections 11/06/2006 11/10/2006
7111108P IP Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.
Enclosure
Surry Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2006 10:39:55 Report 22
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Baseline Inspections 11/12/2006 11/17/2006
71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity
- REQUAL INSPECTION Baseline Inspections 03/05/2007 03/09/2007 1, 2 7111111B IP Licensed Operator Requalification Program
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 06/11/2007 06/15/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 06/11/2007 06/15/2007 1, 2 7111117B IP Permanent Plant Modifications
PS2-EP
- EP EXERCISE Baseline Inspections 07/09/2007 07/13/2007 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 07/09/2007 07/13/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/09/2007 07/13/2007 1, 2 71151 IP Performance Indicator Verification
- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 09/24/2007 09/28/2007 1, 2 71152B IP Identification and Resolution of Problems
PSB1-RP
- RP OCCUPATIONAL PRE-INSP VISIT/ISFSI Baseline Inspections 09/24/2007 09/26/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.