{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532 | ||
-4352 January 21, 2011 Mr. Christopher Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324 | |||
-9785 | |||
SUBJECT: DUANE ARNOLD ENERGY CENTER | |||
- NRC SECURITY BASELINE INSPECTION REPORT 05000331/201040 3(DRS) | |||
SUBJECT: DUANE ARNOLD ENERGY CENTER - NRC SECURITY BASELINE INSPECTION REPORT 05000331/ | |||
==Dear Mr. Costanzo:== | ==Dear Mr. Costanzo:== | ||
| Line 32: | Line 32: | ||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The | This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficienc y w as promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector s left the site. | ||
The finding had a cross | |||
-cutting aspect in the area of Human Performance, Resources (H.2(d)), because the licensee failed to ensure that adequate equipment was available to assure nuclear safety. The NRC is treating th is violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program. | |||
If you contest the subject or severity of a NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555 | |||
-0001, with a cop y to the Regional Administrator | |||
, U.S. Nuclear Regulatory Commission | |||
- Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532 | |||
-4352; the Director, Office of Enforcement, U | |||
. S. Nuclear Regulatory Commission, Washington, DC 20555 | |||
- 0001; and the Resident Inspector Office at the Duane Arnold Energy Center | |||
. In addition, if you disagree with the cross-cutting aspect assigned to the finding in this report, you should provide a response within 30 days of the date of this Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at the Duane Arnold Energy Center | |||
. The finding w as NRC-identified. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html (the Public Electronic Reading Room). However, because of the security | |||
-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. | |||
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security | |||
-Related Informatio n-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). | |||
Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | |||
Sincerely,/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 Nonpublic | Sincerely,/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50 | ||
-331 License No. DPR-49 Nonpublic | |||
===Enclosure:=== | ===Enclosure:=== | ||
Inspection Report 05000331/ | Inspection Report 05000331/201040 3(DRS) | ||
===w/Attachment:=== | ===w/Attachment:=== | ||
Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV M. Rasmusson, State Liaison Officer, State of Iowa A. Silakoski, Nuclear Fleet Security cc w/o encl: Distribution via ListServ | Supplemental Information cc w/encl: | ||
S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV M. Rasmusson, State Liaison Officer, State of Iowa A. Silakoski, Nuclear Fleet Security cc w/o encl: | |||
Distribution via ListServ | |||
}} | }} | ||
Revision as of 23:14, 14 August 2018
| ML110240586 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 01/21/2011 |
| From: | Skokowski R A Plant Support Branch II |
| To: | Costanzo C R NextEra Energy Duane Arnold |
| References | |
| IR-10-403 | |
| Download: ML110240586 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
-4352 January 21, 2011 Mr. Christopher Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324
-9785
SUBJECT: DUANE ARNOLD ENERGY CENTER
- NRC SECURITY BASELINE INSPECTION REPORT 05000331/201040 3(DRS)
Dear Mr. Costanzo:
On December 17, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Duane Arnold Energy Center. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on December 17, 2010, with Mr. Dean Curtland and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficienc y w as promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector s left the site.
The finding had a cross
-cutting aspect in the area of Human Performance, Resources (H.2(d)), because the licensee failed to ensure that adequate equipment was available to assure nuclear safety. The NRC is treating th is violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program.
If you contest the subject or severity of a NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555
-0001, with a cop y to the Regional Administrator
, U.S. Nuclear Regulatory Commission
- Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532
-4352; the Director, Office of Enforcement, U
. S. Nuclear Regulatory Commission, Washington, DC 20555
- 0001; and the Resident Inspector Office at the Duane Arnold Energy Center
. In addition, if you disagree with the cross-cutting aspect assigned to the finding in this report, you should provide a response within 30 days of the date of this Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at the Duane Arnold Energy Center
. The finding w as NRC-identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room). However, because of the security
-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security
-Related Informatio n-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50
-331 License No. DPR-49 Nonpublic
Enclosure:
Inspection Report 05000331/201040 3(DRS)
w/Attachment:
Supplemental Information cc w/encl:
S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV M. Rasmusson, State Liaison Officer, State of Iowa A. Silakoski, Nuclear Fleet Security cc w/o encl:
Distribution via ListServ