{{#Wiki_filter:PRIQRITYACCELERATED RIDSPROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)FACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester GAUTH.NAMEAUTHORAFFILIATION WALDEN,J.V.
{{#Wiki_filter:P RIQRITY ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
Rochester Gas6ElectricCorp.WIDAY,J.A.
Rochester Gas 6 Electric Corp.WIDAY,J.A.
Rochester Gas6ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION DOCKETN05000244P
Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET N 05000244 P


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptforMay1995forGinnaNP./950606ltr~DISTRIBUTION CODEIE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecksNOTES:License Expdatein-accordance with10CFR2,2.109(9/19/72).
Monthly operating rept for May 1995 for Ginna NP./950606 ltr~DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in-accordance with 10CFR2,2.109(9/19/72).
05000244pRECIPIENT IDCODE/NAME PD1-1PDINTERNAL:
05000244 p RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN1 EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME JOHNSON,A KTE.01 NRR/DOPS70ECB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D C U N NOTE TO ALL RIDS" RECIPIENTS:
AEOD/SPD/RRAB NRR/DISP/PIPB RGN1EXTERNAL:
PLEASE HELP US TO REDUCE iVASTE!CONTACTTI IE DOCUWIENT CONTROL DESK, ROOK/PI.37 (EXT.504.2083)TO ELIAIINATE YOUR 4'AVE~FRONI DISTRI!3UTION LISTS FOR DOCL'MEN'I'S YOU DON"I'L'ED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10
LITCOBRYCE,JHNRCPDRCOPIESLTTRENCL111111111111RECIPIENT IDCODE/NAME JOHNSON,A KTE.01NRR/DOPS70ECB NOACCOPIESLTTRENCL11111111DCUNNOTETOALLRIDS"RECIPIENTS:
~V 7 l/ized~y zzz l 1I~Ow~1~ZZ::." ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649-0001 TKI.KPHONK ARKA COOK 7IO 546.2700 GINNA STATION June 6, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
PLEASEHELPUSTOREDUCEiVASTE!CONTACTTI IEDOCUWIENT CONTROLDESK,ROOK/PI.37(EXT.504.2083)TOELIAIINATE YOUR4'AVE~FRONIDISTRI!3UTION LISTSFORDOCL'MEN'I'S YOUDON"I'L'ED!TOTALNUMBEROFCOPIESREQUIRED:
LTTR10ENCL10
~V7l/ized~yzzzl1I~Ow~1~ZZ::."ROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.Y.14649-0001 TKI.KPHONK ARKACOOK7IO546.2700GINNASTATIONJune6,1995USNuclearRegulatory Commission DocumentControlDeskWashington, DC20555


==Subject:==
==Subject:==
MonthlyReportforMay,1995Operating StatusInformation R.E.GinnaNuclearPowerPlantDocketNo.'0-244
Monthly Report for May, 1995 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.'0-244  


==DearSir:==
==Dear Sir:==
PursuanttoourTechnical Specification 6.9.1,attachedherewithisthemonthlyoperating statusreportforGinnaStationforthemonthofMay,1995.Verytrulyyours,shA.WidantManagerJAW:tjnAttachments c:Mr.ThomasT.MartinNRC(1)I'7506200025 9'50531PDR'ADOCK05000244RPDRZpPfI OPERATING DATAREPORTCOMPLETED BYJun6199550-244JohnV.WaldenTELEPHONE (315)5244446 Ext.5881.UnitName:R.E.GINNANUCLEARPOWERPLANT2.Reporting Period:Ma19953.LicensedThermalPower(MWt):15204.Nameplate Rating(GrossMWe):4905.DesignElectricRating(NetMWe):4706.MaximumDependable Capacity(GrossMWe):4907.MaximumDependable Capacity(NetMWe):4708.,ifChangesOccurinCapacityRating(itemsNumber3Through7)SinceLastReport,GiveReason:9.PowerLeveltoWhichRestricted, IfAny(NetMWe:10.ReasonForRestrictions, IfAn:ThisMonthYr.-to-Date Cumulative 11.HoursinReportedPeriod12.NumberofhoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator On-line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (MWH)17.GrossElectrical EnergyGenerated (MWH)18.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor(%)20.UnitAvailability Factor(%)21.UnitCapacityFactor(usingMDCNet)(%)22.UnitCapacityFactor(usingDERNet)(%)23.UnitForcedOutageRate(%)744.0690.20.0658.30.0934804.0316061.0300318.088.588.585.985.90.03623.02746.50.0.2685.30.03942688.0 1333378.0 1267669.0 74.174.174.474.40.0223631.0178562.21687.6175657.68.5249457925.0 82567430.0 78376899.0 78.578.675.775.75.624.Shutdowns Scheduled OverNext6Months(Type,DateandDurationofEach):RefuelinandMaintenance Started3/26/95Finished5/4/95Duration39da25.IfShutdownAtEndofReportPeriod.EstimateDateofStartup:26.UnitsInTestStatus(PriortoCommercial Operation):
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1995.Very truly yours, s h A.Wid ant Manager JAW:tjn Attachments c: Mr.Thomas T.Martin NRC (1)I'7506200025 9'50531 PDR'ADOCK 05000244 R PDR ZpPf I OPERATING DATA REPORT COMPLETED BY Jun 6 1995 50-244 John V.Walden TELEPHONE (315)5244446 Ext.588 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: Ma 1995 3.Licensed Thermal Power (MWt): 1520 4.Nameplate Rating (Gross MWe): 490 5.Design Electric Rating (Net MWe): 470 6.Maximum Dependable Capacity (Gross MWe): 490 7.Maximum Dependable Capacity (Net MWe): 470 8., if Changes Occur in Capacity Rating (items Number 3 Through 7)Since Last Report, Give Reason: 9.Power Level to Which Restricted, If Any (Net MWe: 10.Reason For Restrictions, If An: This Month Yr.-to-Date Cumulative 11.Hours in Reported Period 12.Number of hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor (%)20.Unit Availability Factor (%)21.Unit Capacity Factor (using MDC Net)(%)22.Unit Capacity Factor (using DER Net)(%)23.Unit Forced Outage Rate (%)744.0 690.2 0.0 658.3 0.0 934804.0 316061.0 300318.0 88.5 88.5 85.9 85.9 0.0 3623.0 2746.5 0.0.2685.3 0.0 3942688.0 1333378.0 1267669.0 74.1 74.1 74.4 74.4 0.0 223631.0 178562.2 1687.6 175657.6 8.5 249457925.0 82567430.0 78376899.0 78.5 78.6 75.7 75.7 5.6 24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin and Maintenance Started 3/26/95 Finished 5/4/95 Duration 39 da 25.If Shutdown At End of Report Period.Estimate Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
ForcastAchievedINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION*CUMULATIVE TOTAL COMMENCING JANUARY 1.1975 CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: June 6 1995 COMPLETED BY: John Walden TELEPHONE:
*CUMULATIVE TOTALCOMMENCING JANUARY1.1975CUMULATIVE TOTALCOMMENCING NOVEMBER8,1969 AVERAGEDAILYUNITPOWERLEVELDOCKETNO:50-244UNIT:R.E.GinnaNuclearPowerPlantDATE:June61995COMPLETED BY:JohnWaldenTELEPHONE:
315 524-4446 Ext.588 MONTH Ma 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17.474 2~18.474 3.19.474 4.36 20.475 5.211 21.475 6.404 22.474 7.448 23'75 8.474 24.475 9.474 25.475 10.475 26.475 475 27.475 12;475 28.476 13.475 29.476 14.475 30.475 15.474 31.475 16.474 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.'ompute to the nearest whole megawatt.
315524-4446Ext.588MONTHMa1995DAYAVERAGEDAILYPOWERLEVEL(MWe-Net)
DOCKET NO.~0-244 UNlTNAhlE R.E.GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS COh)PLETl:D BY V g hn V.Walden TELEPlIONf(3l5)524-4446 Ext.588 No.Date 0 I c 0 0 I 0 0 X.'~rI4 c 0 0 0 I 0I>>0 c v 0>>0 0 In C 0 O Licensee Event Report II Em 0 0 0 cA (J c 0 IA 0 c 0 0 0 O Cause&Corrective Action to Prevent Recurrence 5-03 3/26/95 S 937.7 Continuation of Annual Refueling Shutdown 1 F: Forced S: Scheduled REV.4/SS 4949 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Rcfucling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G.Operational Error (Explain)El-Other (Explain)hletbod: 1 hhfanual 2-hlanual Scram.3-Automatic Scram.4-Other (Explain)Fxhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER)File (NUREG-0161)Exhibit 1-Same Source NARRATXVE SVMIEMY OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: J ne 6 1995 COMPLETED BY: John Walden TELEPHONE:
DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 17.4742~18.4743.19.4744.3620.4755.21121.4756.40422.4747.44823'758.47424.4759.47425.47510.47526.47547527.47512;47528.47613.47529.47614.47530.47515.47431.47516.474INSTRUCTIONS Onthisformat,listtheaveragedailyunitpowerlevelinMWe-Netforeachdayinreporting month.'omputetothenearestwholemegawatt.
315 524-4446 Ext.588 MONTH Ma 1995 On March 26, the unit was taken off line as scheduled for its annual maintenance and refueling outage.The unit.was placed on line on May 4.Total outage duration was 39.1 days.Average power for the month following power ascension was 974.  
DOCKETNO.~0-244UNlTNAhlE R.E.GINNANUCLEARPOWERPLANTUNITSHUTDOWNANDPOWERREDUCTIONS COh)PLETl:D BYVghnV.WaldenTELEPlIONf(
"E J'2 0~1 e~~4}}
3l5)524-4446Ext.588No.Date0Ic00I00X.'~rI4c000I0I>>0cv0>>00InC0OLicenseeEventReportIIEm000cA(Jc0IA0c000OCause&Corrective ActiontoPreventRecurrence 5-033/26/95S937.7Continuation ofAnnualRefueling Shutdown1F:ForcedS:Scheduled REV.4/SS4949Reason:A-Equipment Failure(Explain)
B-Maintenance orTestC-Rcfucling D-Regulatory Restriction E-Operator Training&LicenseExamination F-Administrative G.Operational Error(Explain)
El-Other(Explain) hletbod:1hhfanual2-hlanual Scram.3-Automatic Scram.4-Other(Explain)
FxhibitG-Instructions forPreparation ofDataEntrySheetsforLicenseeEventRcport(LER)File(NUREG-0161)Exhibit1-SameSource NARRATXVE SVMIEMYOPOPERATING EXPERIENCE DOCKETNO:50-244UNIT:R.E.GinnaNuclearPowerPlantDATE:Jne61995COMPLETED BY:JohnWaldenTELEPHONE:
315524-4446Ext.588MONTHMa1995OnMarch26,theunitwastakenofflineasscheduled foritsannualmaintenance andrefueling outage.Theunit.wasplacedonlineonMay4.Totaloutagedurationwas39.1days.Averagepowerforthemonthfollowing powerascension was974.  
"EJ'20~1e~~4}}

Revision as of 12:58, 7 July 2018

Monthly Operating Rept for May 1995 for Ginna NPP.W/950606 Ltr
ML17263B076
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/31/1995
From: WALDEN J V, WIDAY J A
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9506200025
Download: ML17263B076 (7)


Text

P RIQRITY ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.

Rochester Gas 6 Electric Corp.WIDAY,J.A.

Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET N 05000244 P

SUBJECT:

Monthly operating rept for May 1995 for Ginna NP./950606 ltr~DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in-accordance with 10CFR2,2.109(9/19/72).

05000244 p RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN1 EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME JOHNSON,A KTE.01 NRR/DOPS70ECB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D C U N NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACTTI IE DOCUWIENT CONTROL DESK, ROOK/PI.37 (EXT.504.2083)TO ELIAIINATE YOUR 4'AVE~FRONI DISTRI!3UTION LISTS FOR DOCL'MEN'I'S YOU DON"I'L'ED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

~V 7 l/ized~y zzz l 1I~Ow~1~ZZ::." ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649-0001 TKI.KPHONK ARKA COOK 7IO 546.2700 GINNA STATION June 6, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for May, 1995 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.'0-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1995.Very truly yours, s h A.Wid ant Manager JAW:tjn Attachments c: Mr.Thomas T.Martin NRC (1)I'7506200025 9'50531 PDR'ADOCK 05000244 R PDR ZpPf I OPERATING DATA REPORT COMPLETED BY Jun 6 1995 50-244 John V.Walden TELEPHONE (315)5244446 Ext.588 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: Ma 1995 3.Licensed Thermal Power (MWt): 1520 4.Nameplate Rating (Gross MWe): 490 5.Design Electric Rating (Net MWe): 470 6.Maximum Dependable Capacity (Gross MWe): 490 7.Maximum Dependable Capacity (Net MWe): 470 8., if Changes Occur in Capacity Rating (items Number 3 Through 7)Since Last Report, Give Reason: 9.Power Level to Which Restricted, If Any (Net MWe: 10.Reason For Restrictions, If An: This Month Yr.-to-Date Cumulative 11.Hours in Reported Period 12.Number of hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor (%)20.Unit Availability Factor (%)21.Unit Capacity Factor (using MDC Net)(%)22.Unit Capacity Factor (using DER Net)(%)23.Unit Forced Outage Rate (%)744.0 690.2 0.0 658.3 0.0 934804.0 316061.0 300318.0 88.5 88.5 85.9 85.9 0.0 3623.0 2746.5 0.0.2685.3 0.0 3942688.0 1333378.0 1267669.0 74.1 74.1 74.4 74.4 0.0 223631.0 178562.2 1687.6 175657.6 8.5 249457925.0 82567430.0 78376899.0 78.5 78.6 75.7 75.7 5.6 24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin and Maintenance Started 3/26/95 Finished 5/4/95 Duration 39 da 25.If Shutdown At End of Report Period.Estimate Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION*CUMULATIVE TOTAL COMMENCING JANUARY 1.1975 CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: June 6 1995 COMPLETED BY: John Walden TELEPHONE:

315 524-4446 Ext.588 MONTH Ma 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17.474 2~18.474 3.19.474 4.36 20.475 5.211 21.475 6.404 22.474 7.448 23'75 8.474 24.475 9.474 25.475 10.475 26.475 475 27.475 12;475 28.476 13.475 29.476 14.475 30.475 15.474 31.475 16.474 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.'ompute to the nearest whole megawatt.

DOCKET NO.~0-244 UNlTNAhlE R.E.GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS COh)PLETl:D BY V g hn V.Walden TELEPlIONf(3l5)524-4446 Ext.588 No.Date 0 I c 0 0 I 0 0 X.'~rI4 c 0 0 0 I 0I>>0 c v 0>>0 0 In C 0 O Licensee Event Report II Em 0 0 0 cA (J c 0 IA 0 c 0 0 0 O Cause&Corrective Action to Prevent Recurrence 5-03 3/26/95 S 937.7 Continuation of Annual Refueling Shutdown 1 F: Forced S: Scheduled REV.4/SS 4949 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Rcfucling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G.Operational Error (Explain)El-Other (Explain)hletbod: 1 hhfanual 2-hlanual Scram.3-Automatic Scram.4-Other (Explain)Fxhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER)File (NUREG-0161)Exhibit 1-Same Source NARRATXVE SVMIEMY OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: J ne 6 1995 COMPLETED BY: John Walden TELEPHONE:

315 524-4446 Ext.588 MONTH Ma 1995 On March 26, the unit was taken off line as scheduled for its annual maintenance and refueling outage.The unit.was placed on line on May 4.Total outage duration was 39.1 days.Average power for the month following power ascension was 974.

"E J'2 0~1 e~~4