ML17263B076
| ML17263B076 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 05/31/1995 |
| From: | Walden J, Widay J ROCHESTER GAS & ELECTRIC CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9506200025 | |
| Download: ML17263B076 (7) | |
Text
P RIQRITY ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
Rochester Gas 6 Electric Corp.
WIDAY,J.A.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION DOCKET N
05000244 P
SUBJECT:
Monthly operating rept for May 1995 for Ginna NP
. /950606 ltr~
DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in-accordance with 10CFR2,2.109(9/19/72).
05000244 p
RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN1 EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME JOHNSON,A KTE
. 01 NRR/DOPS70ECB NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
C U
N NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTACTTIIE DOCUWIENTCONTROL DESK, ROOK/ PI.37 (EXT. 504.2083 ) TO ELIAIINATEYOUR 4'AVE~ FRONI DISTRI!3UTIONLISTS FOR DOCL'MEN'I'S YOU DON"I'L'ED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
~ V 7
l/ized~ y zzz l1I ~ Ow ~ 1 ~
ZZ::."
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TKI.KPHONK ARKA COOK 7IO 546.2700 GINNA STATION June 6,
1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for May, 1995 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No.'0-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1995.
Very truly yours, s
h A. Wid ant Manager JAW:tjn Attachments c:
Mr. Thomas T. Martin NRC (1)
I
'7506200025 9'50531 PDR
'ADOCK 05000244 R
PDR ZpPf I
OPERATING DATAREPORT COMPLETED BY Jun 6 1995 50-244 John V. Walden TELEPHONE (315)5244446 Ext.588
- 1. Unit Name:
R.E. GINNANUCLEAR POWER PLANT
- 2. Reporting Period:
Ma 1995 3.
Licensed Thermal Power (MWt):
1520 4.
Nameplate Rating (Gross MWe):
490 5.
Design Electric Rating (Net MWe):
470 6.
Maximum Dependable Capacity (Gross MWe):
490 7.
Maximum Dependable Capacity (Net MWe):
470 8., ifChanges Occur in Capacity Rating (items Number 3 Through 7) Since Last Report, Give Reason:
9.
Power Level to Which Restricted, IfAny (Net MWe:
- 10. Reason For Restrictions, IfAn:
This Month Yr.-to-Date Cumulative
- 11. Hours in Reported Period
- 12. Number of hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor (%)
- 20. Unit AvailabilityFactor (%)
- 21. Unit Capacity Factor (using MDC Net) (%)
- 22. Unit Capacity Factor (using DER Net) (%)
- 23. Unit Forced Outage Rate (%)
744.0 690.2 0.0 658.3 0.0 934804.0 316061.0 300318.0 88.5 88.5 85.9 85.9 0.0 3623.0 2746.5 0.0 2685.3 0.0 3942688.0 1333378.0 1267669.0 74.1 74.1 74.4 74.4 0.0 223631.0 178562.2 1687.6 175657.6 8.5 249457925.0 82567430.0 78376899.0 78.5 78.6 75.7 75.7 5.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refuelin and Maintenance Started 3/26/95 Finished 5/4/95 Duration 39 da
- 25. IfShutdown At End of Report Period. Estimate Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
- CUMULATIVETOTALCOMMENCINGJANUARY 1. 1975 CUMULATIVETOTALCOMMENCINGNOVEMBER8, 1969
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: June 6
1995 COMPLETED BY:
John Walden TELEPHONE:
315 524-4446 Ext.
588 MONTH Ma 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17.
474 2 ~
18.
474 3.
19.
474 4.
36 20.
475 5.
211 21.
475 6.
404 22.
474 7.
448 23'75 8.
474 24.
475 9.
474 25.
475 10.
475 26.
475 475 27.
475 12; 475 28.
476 13.
475 29.
476 14.
475 30.
475 15.
474 31.
475 16.
474 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. 'ompute to the nearest whole megawatt.
DOCKET NO.
~0-244 UNlTNAhlE R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS COh)PLETl:D BY V
g hn V. Walden TELEPlIONf(3l5 ) 524-4446 Ext.
588 No.
Date 0
I c0 0I 0
0 X.'~
rI4 c0 00 I
0I >>0 c v 0>>
0 0 In C
0O Licensee Event Report II Em 0
0 0
cA (J c0 IA 0c 0
00 O
Cause & Corrective Action to Prevent Recurrence 5-03 3/26/95 S
937.7 Continuation of Annual Refueling Shutdown 1
F: Forced S:
Scheduled REV. 4/SS 4949 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Rcfucling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G.Operational Error (Explain)
El-Other (Explain) hletbod:
1 hhfanual 2-hlanual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG-0161)
Exhibit 1 - Same Source
NARRATXVE SVMIEMY OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: J ne 6
1995 COMPLETED BY:
John Walden TELEPHONE:
315 524-4446 Ext.
588 MONTH Ma 1995 On March 26, the unit was taken off line as scheduled for its annual maintenance and refueling outage.
The unit. was placed on line on May 4.
Total outage duration was 39.1 days.
Average power for the month following power ascension was 974.