ML020370056: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:William E. Ide                                 Mail Station 7602 Palo Verde Nuclear       Vice President               TEL (623) 393-6116 P.O. Box 52034 Generating Station       Nuclear Production           FAX (623) 393-6077 Phoenix, AZ 85072-2034 035-00680-WEI/SMM January 11,2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
{{#Wiki_filter:William E. Ide Mail Station 7602 Palo Verde Nuclear Vice President TEL (623) 393-6116 P.O. Box 52034 Generating Station Nuclear Production FAX (623) 393-6077 Phoenix, AZ 85072-2034 035-00680-WEI/SMM January 11,2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555  


==Dear Sirs:==
==Dear Sirs:==
==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)
Palo Verde Nuclear Generating Station (PVNGS)
Line 25: Line 24:
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.
If you have any questions, please contact Sue Meyer at (602) 250-3078.
If you have any questions, please contact Sue Meyer at (602) 250-3078.
Sincerely, WEI/SMM/cj
Sincerely, WEI/SMM/cj  


==Enclosures:==
==Enclosures:==
DECEMBER 2001 Monthly Operating Reports cc:     E. W. Merschoff                           (all w/enclosures)
DECEMBER 2001 Monthly Operating Reports cc:
E. W. Merschoff (all w/enclosures)
J. H. Moorman INPO Records Center Utility Data Institute
J. H. Moorman INPO Records Center Utility Data Institute


NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:             50-528 UNIT NAME:              PVNGS-1 DATE:                    01/11/02 COMPLETED BY:            S. M. Marie-Meyer TELEPHONE:              (602) 250-3078 Repo rting Period:         December 2001
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
: 1. Design Electrical Rating (Net MWe):     1i265
UNIT NAME:
: 2. Maximum Dependable Capacity (Net MWe):         1243 Unit I Generating Statistics                    This Month            Yr. to Date        Cumulative
DATE:
: 3. Hours Reactor was Critical                                            744.0              7,739.0        106,231.1
COMPLETED BY:
: 4. Hours Generator was On-Line                                          744.0              7,712.0        104,887.6
TELEPHONE:
: 5. Unit Reserve Shutdown Hours                                              0.0                  0.0              0.0
Repo 1.
: 6. Net Electrical Energy Generated (MWh)                              917,071          9,559,578      125,963,558 UNIT SHUTDOWNS Outage                   Method of Duration                Shutting Down             Cause and Corrective Action 2                3 No.      Date        Type 1    Hours      Reason          Reactor                    to Prevent Occurrence No reactor shutdowns occurred during the month of December 2001.
50-528 PVNGS-1 01/11/02 S. M. Marie-Meyer (602) 250-3078 rting Period:
1                2                                                3 F-Forced        Reason:                                          Method:
December 2001 Design Electrical Rating (Net MWe):
S-Scheduled        A-Equipment Failure (Explain)                     1-Manual B-Maintenance or Test                             2-Manual Trip / Scram C-Refueling                                       3-Automatic Trip / Scram D-Regulatory Restriction                         4-Continuation E-Operator Training / License Examination         5-Other-(Explain)
1i265
F-Administrative G-Operational Error (Explain)
: 2.
H-Other (Explain)
Maximum Dependable Capacity (Net MWe):
: 3.
: 4.
: 5.
6.
1243 UNIT SHUTDOWNS No.
Date Outage Duration Type 1 Hours Reason 2 Method of Shutting Down Reactor 3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 2001.
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)


==SUMMARY==
==SUMMARY==
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:           50-529 UNIT NAME:            PVNGS-2 DATE:                  01/11/02 COMPLETED BY:          S. M. Marie-Meyer TELEPHONE:              (602) 250-3078 Reporting Period:          December 2001
: Unit I Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 7,739.0 106,231.1 Hours Generator was On-Line 744.0 7,712.0 104,887.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 917,071 9,559,578 125,963,558 1F-Forced S-Scheduled
: 1. Design Electrical Rating (Net MWe):     1265
 
: 2. Maximum Dependable Capacity (Net MWe):         1243 Unit 2 Generating Statistics                    This Month            Yr. To Date        Cumulative
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
: 3. Hours Reactor was Critical                                            744.0              8,027.3        105,901.5
UNIT NAME:
: 4. Hours Generator was On-Line                                          744.0              8,003.4        104,598.0
DATE:
: 5. Unit Reserve Shutdown Hours                                              0.0                  0.0                0.0
COMPLETED BY:
: 6. Net Electrical Energy Generated (MWh)                              950,620          10,083,517        126,924,511 UNIT SHUTDOWNS Outage                     Method of Duration                Shutting Down             Cause and Corrective Action 3
TELEPHONE:
No.        Date        Type 1      Hours      Reason 2      Reactor                      to Prevent Occurrence No reactor shutdowns occurred during the month of December 2001.
Reporting Period:
2                                                3 1FForced            Reason:                                          Method:
50-529 PVNGS-2 01/11/02 S. M. Marie-Meyer (602) 250-3078 December 2001
S-Scheduled        A-Equipment Failure (Explain)                     1-Manual B-Maintenance or Test                             2-Manual Trip / Scram C-Refueling                                       3-Automatic Trip / Scram D-Regulatory Restriction                         4-Continuation E-Operator Training / License Examination         5-Other-(Explain)
: 1.
F-Administrative G-Operational Error (Explain)
Design Electrical Rating (Net MWe):
H-Other (Explain)
1265
: 2.
Maximum Dependable Capacity (Net MWe):
1243
: 3.
: 4.
: 5.
6.
UNIT SHUTDOWNS Outage Duration Type 1 Hours Reason2 Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 2001.
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1 -Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)


==SUMMARY==
==SUMMARY==
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:             50-530 UNIT NAME:              PVNGS-3 DATE:                  01/11/02 COMPLETED BY:          S. M. Marie-Meyer TELEPHONE:              (602) 250-3078 Reporting Period:          December 2001
: Unit 2 Generating Statistics This Month Yr. To Date Cumulative Hours Reactor was Critical 744.0 8,027.3 105,901.5 Hours Generator was On-Line 744.0 8,003.4 104,598.0 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 950,620 10,083,517 126,924,511 No.
: 1. Design Electrical Rating (Net MWe):       1269
Date 1FForced S-Scheduled
: 2. Maximum Dependable Capacity (Net MWe):           1247 Unit 3 Generating Statistics                   This Month           Yr. to Date       Cumulative
 
: 3. Hours Reactor was Critical                                           744.0             7,526.6         101,423.7
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
: 4. Hours Generator was On-Line                                           734.2             7,441.2         100,435.9
UNIT NAME:
: 5. Unit Reserve Shutdown Hours                                             0.0                 0.0               0.0
DATE:
: 6. Net Electrical Energy Generated (MWh)                             918,643           9,170,388       122,369,450 UNIT SHUTDOWNS Outage                     Method of Duration                Shutting Down             Cause and Corrective Action 1    Hours      Reason 2      Reactor 3                  to Prevent Occurrence No.        Date        Type S          9.8          B              1          Main Turbine was tripped for LP turbine 01-04      12/1                                                              balance shot.
COMPLETED BY:
3 2Reason:                                          Method:
TELEPHONE:
1F-Forced                                                            1 -Manual S-Scheduled        A-Equipment Failure (Explain)
Reporting Period:
B-Maintenance or Test                             2-Manual Trip / Scram 3-Automatic Trip / Scram C-Refueling 4-Continuation D-Regulatory Restriction 5-Other-(Explain)
50-530 PVNGS-3 01/11/02 S. M. Marie-Meyer (602) 250-3078 December 2001
E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
: 1.
H-Other (Explain)
Design Electrical Rating (Net MWe):
1269
: 2.
Maximum Dependable Capacity (Net MWe):
1247
: 3.
: 4.
: 5.
6.
Unit 3 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 7,526.6 101,423.7 Hours Generator was On-Line 734.2 7,441.2 100,435.9 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 918,643 9,170,388 122,369,450 UNIT SHUTDOWNS Outage Duration Type1 Hours S
9.8 Reason 2 B
Method of Shutting Down Reactor3 1
Cause and Corrective Action to Prevent Occurrence Main Turbine was tripped for LP turbine balance shot.
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1 -Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)


==SUMMARY==
==SUMMARY==
                                                              }}
: No.
01-04 Date 12/1 1 F-Forced S-Scheduled}}

Latest revision as of 01:12, 17 January 2025

December 2001 Monthly Operating Report for Palo Verde Units 1, 2, & 3
ML020370056
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/11/2002
From: Ide W
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
035-00680-WEI/SMM
Download: ML020370056 (4)


Text

William E. Ide Mail Station 7602 Palo Verde Nuclear Vice President TEL (623) 393-6116 P.O. Box 52034 Generating Station Nuclear Production FAX (623) 393-6077 Phoenix, AZ 85072-2034 035-00680-WEI/SMM January 11,2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/5291530 Monthly Operating Reports for DECEMBER 2001 Enclosed are the Monthly Operating Reports for DECEMBER 2001, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.

If you have any questions, please contact Sue Meyer at (602) 250-3078.

Sincerely, WEI/SMM/cj

Enclosures:

DECEMBER 2001 Monthly Operating Reports cc:

E. W. Merschoff (all w/enclosures)

J. H. Moorman INPO Records Center Utility Data Institute

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Repo 1.

50-528 PVNGS-1 01/11/02 S. M. Marie-Meyer (602) 250-3078 rting Period:

December 2001 Design Electrical Rating (Net MWe):

1i265

2.

Maximum Dependable Capacity (Net MWe):

3.
4.
5.

6.

1243 UNIT SHUTDOWNS No.

Date Outage Duration Type 1 Hours Reason 2 Method of Shutting Down Reactor 3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 2001.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

Unit I Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 7,739.0 106,231.1 Hours Generator was On-Line 744.0 7,712.0 104,887.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 917,071 9,559,578 125,963,558 1F-Forced S-Scheduled

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Reporting Period:

50-529 PVNGS-2 01/11/02 S. M. Marie-Meyer (602) 250-3078 December 2001

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

1243

3.
4.
5.

6.

UNIT SHUTDOWNS Outage Duration Type 1 Hours Reason2 Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 2001.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1 -Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

Unit 2 Generating Statistics This Month Yr. To Date Cumulative Hours Reactor was Critical 744.0 8,027.3 105,901.5 Hours Generator was On-Line 744.0 8,003.4 104,598.0 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 950,620 10,083,517 126,924,511 No.

Date 1FForced S-Scheduled

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Reporting Period:

50-530 PVNGS-3 01/11/02 S. M. Marie-Meyer (602) 250-3078 December 2001

1.

Design Electrical Rating (Net MWe):

1269

2.

Maximum Dependable Capacity (Net MWe):

1247

3.
4.
5.

6.

Unit 3 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 7,526.6 101,423.7 Hours Generator was On-Line 734.2 7,441.2 100,435.9 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 918,643 9,170,388 122,369,450 UNIT SHUTDOWNS Outage Duration Type1 Hours S

9.8 Reason 2 B

Method of Shutting Down Reactor3 1

Cause and Corrective Action to Prevent Occurrence Main Turbine was tripped for LP turbine balance shot.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1 -Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

No.

01-04 Date 12/1 1 F-Forced S-Scheduled