ML020370056: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:William E. Ide | {{#Wiki_filter:William E. Ide Mail Station 7602 Palo Verde Nuclear Vice President TEL (623) 393-6116 P.O. Box 52034 Generating Station Nuclear Production FAX (623) 393-6077 Phoenix, AZ 85072-2034 035-00680-WEI/SMM January 11,2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555 | ||
==Dear Sirs:== | ==Dear Sirs:== | ||
==Subject:== | ==Subject:== | ||
Palo Verde Nuclear Generating Station (PVNGS) | Palo Verde Nuclear Generating Station (PVNGS) | ||
| Line 25: | Line 24: | ||
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector. | By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector. | ||
If you have any questions, please contact Sue Meyer at (602) 250-3078. | If you have any questions, please contact Sue Meyer at (602) 250-3078. | ||
Sincerely, WEI/SMM/cj | Sincerely, WEI/SMM/cj | ||
==Enclosures:== | ==Enclosures:== | ||
DECEMBER 2001 Monthly Operating Reports cc: | DECEMBER 2001 Monthly Operating Reports cc: | ||
E. W. Merschoff (all w/enclosures) | |||
J. H. Moorman INPO Records Center Utility Data Institute | J. H. Moorman INPO Records Center Utility Data Institute | ||
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: | NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: | ||
UNIT NAME: | |||
: 2. Maximum Dependable Capacity (Net MWe): | DATE: | ||
: 3. | COMPLETED BY: | ||
: 4. | TELEPHONE: | ||
: 5. | Repo 1. | ||
50-528 PVNGS-1 01/11/02 S. M. Marie-Meyer (602) 250-3078 rting Period: | |||
December 2001 Design Electrical Rating (Net MWe): | |||
1i265 | |||
F-Administrative G-Operational Error (Explain) | : 2. | ||
H-Other (Explain) | Maximum Dependable Capacity (Net MWe): | ||
: 3. | |||
: 4. | |||
: 5. | |||
6. | |||
1243 UNIT SHUTDOWNS No. | |||
Date Outage Duration Type 1 Hours Reason 2 Method of Shutting Down Reactor 3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 2001. | |||
2Reason: | |||
A-Equipment Failure (Explain) | |||
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain) | |||
H-Other (Explain) 3Method: | |||
1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain) | |||
==SUMMARY== | ==SUMMARY== | ||
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: | : Unit I Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 7,739.0 106,231.1 Hours Generator was On-Line 744.0 7,712.0 104,887.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 917,071 9,559,578 125,963,558 1F-Forced S-Scheduled | ||
: 1. Design Electrical Rating (Net MWe): | |||
: 2. Maximum Dependable Capacity (Net MWe): | NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: | ||
: 3. | UNIT NAME: | ||
: 4. | DATE: | ||
: 5. | COMPLETED BY: | ||
TELEPHONE: | |||
Reporting Period: | |||
50-529 PVNGS-2 01/11/02 S. M. Marie-Meyer (602) 250-3078 December 2001 | |||
: 1. | |||
F-Administrative G-Operational Error (Explain) | Design Electrical Rating (Net MWe): | ||
H-Other (Explain) | 1265 | ||
: 2. | |||
Maximum Dependable Capacity (Net MWe): | |||
1243 | |||
: 3. | |||
: 4. | |||
: 5. | |||
6. | |||
UNIT SHUTDOWNS Outage Duration Type 1 Hours Reason2 Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 2001. | |||
2Reason: | |||
A-Equipment Failure (Explain) | |||
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain) | |||
H-Other (Explain) 3Method: | |||
1 -Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain) | |||
==SUMMARY== | ==SUMMARY== | ||
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: | : Unit 2 Generating Statistics This Month Yr. To Date Cumulative Hours Reactor was Critical 744.0 8,027.3 105,901.5 Hours Generator was On-Line 744.0 8,003.4 104,598.0 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 950,620 10,083,517 126,924,511 No. | ||
: 1. Design Electrical Rating (Net MWe): | Date 1FForced S-Scheduled | ||
: 2. Maximum Dependable Capacity (Net MWe): | |||
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: | |||
UNIT NAME: | |||
DATE: | |||
COMPLETED BY: | |||
TELEPHONE: | |||
Reporting Period: | |||
B-Maintenance or Test | 50-530 PVNGS-3 01/11/02 S. M. Marie-Meyer (602) 250-3078 December 2001 | ||
E-Operator Training / License Examination F-Administrative G-Operational Error (Explain) | : 1. | ||
H-Other (Explain) | Design Electrical Rating (Net MWe): | ||
1269 | |||
: 2. | |||
Maximum Dependable Capacity (Net MWe): | |||
1247 | |||
: 3. | |||
: 4. | |||
: 5. | |||
6. | |||
Unit 3 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 7,526.6 101,423.7 Hours Generator was On-Line 734.2 7,441.2 100,435.9 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 918,643 9,170,388 122,369,450 UNIT SHUTDOWNS Outage Duration Type1 Hours S | |||
9.8 Reason 2 B | |||
Method of Shutting Down Reactor3 1 | |||
Cause and Corrective Action to Prevent Occurrence Main Turbine was tripped for LP turbine balance shot. | |||
2Reason: | |||
A-Equipment Failure (Explain) | |||
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain) | |||
H-Other (Explain) 3Method: | |||
1 -Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain) | |||
==SUMMARY== | ==SUMMARY== | ||
: No. | |||
01-04 Date 12/1 1 F-Forced S-Scheduled}} | |||
Latest revision as of 01:12, 17 January 2025
| ML020370056 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/11/2002 |
| From: | Ide W Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 035-00680-WEI/SMM | |
| Download: ML020370056 (4) | |
Text
William E. Ide Mail Station 7602 Palo Verde Nuclear Vice President TEL (623) 393-6116 P.O. Box 52034 Generating Station Nuclear Production FAX (623) 393-6077 Phoenix, AZ 85072-2034 035-00680-WEI/SMM January 11,2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/5291530 Monthly Operating Reports for DECEMBER 2001 Enclosed are the Monthly Operating Reports for DECEMBER 2001, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.
If you have any questions, please contact Sue Meyer at (602) 250-3078.
Sincerely, WEI/SMM/cj
Enclosures:
DECEMBER 2001 Monthly Operating Reports cc:
E. W. Merschoff (all w/enclosures)
J. H. Moorman INPO Records Center Utility Data Institute
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
Repo 1.
50-528 PVNGS-1 01/11/02 S. M. Marie-Meyer (602) 250-3078 rting Period:
December 2001 Design Electrical Rating (Net MWe):
1i265
- 2.
Maximum Dependable Capacity (Net MWe):
- 3.
- 4.
- 5.
6.
1243 UNIT SHUTDOWNS No.
Date Outage Duration Type 1 Hours Reason 2 Method of Shutting Down Reactor 3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 2001.
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
SUMMARY
- Unit I Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 7,739.0 106,231.1 Hours Generator was On-Line 744.0 7,712.0 104,887.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 917,071 9,559,578 125,963,558 1F-Forced S-Scheduled
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
Reporting Period:
50-529 PVNGS-2 01/11/02 S. M. Marie-Meyer (602) 250-3078 December 2001
- 1.
Design Electrical Rating (Net MWe):
1265
- 2.
Maximum Dependable Capacity (Net MWe):
1243
- 3.
- 4.
- 5.
6.
UNIT SHUTDOWNS Outage Duration Type 1 Hours Reason2 Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 2001.
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1 -Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
SUMMARY
- Unit 2 Generating Statistics This Month Yr. To Date Cumulative Hours Reactor was Critical 744.0 8,027.3 105,901.5 Hours Generator was On-Line 744.0 8,003.4 104,598.0 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 950,620 10,083,517 126,924,511 No.
Date 1FForced S-Scheduled
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
Reporting Period:
50-530 PVNGS-3 01/11/02 S. M. Marie-Meyer (602) 250-3078 December 2001
- 1.
Design Electrical Rating (Net MWe):
1269
- 2.
Maximum Dependable Capacity (Net MWe):
1247
- 3.
- 4.
- 5.
6.
Unit 3 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 7,526.6 101,423.7 Hours Generator was On-Line 734.2 7,441.2 100,435.9 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 918,643 9,170,388 122,369,450 UNIT SHUTDOWNS Outage Duration Type1 Hours S
9.8 Reason 2 B
Method of Shutting Down Reactor3 1
Cause and Corrective Action to Prevent Occurrence Main Turbine was tripped for LP turbine balance shot.
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1 -Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
SUMMARY
- No.
01-04 Date 12/1 1 F-Forced S-Scheduled