December 2001 Monthly Operating Report for Palo Verde Units 1, 2, & 3
ML020370056
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/11/2002
From: Ide W
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
035-00680-WEI/SMM
Download: ML020370056 (4)


Text

William E. Ide Mail Station 7602 Palo Verde Nuclear Vice President TEL (623) 393-6116 P.O. Box 52034 Generating Station Nuclear Production FAX (623) 393-6077 Phoenix, AZ 85072-2034 035-00680-WEI/SMM January 11,2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/5291530 Monthly Operating Reports for DECEMBER 2001 Enclosed are the Monthly Operating Reports for DECEMBER 2001, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.

If you have any questions, please contact Sue Meyer at (602) 250-3078.

Sincerely, WEI/SMM/cj

Enclosures:

DECEMBER 2001 Monthly Operating Reports cc:

E. W. Merschoff (all w/enclosures)

J. H. Moorman INPO Records Center Utility Data Institute

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Repo 1.

50-528 PVNGS-1 01/11/02 S. M. Marie-Meyer (602) 250-3078 rting Period:

December 2001 Design Electrical Rating (Net MWe):

1i265

2.

Maximum Dependable Capacity (Net MWe):

3.
4.
5.

6.

1243 UNIT SHUTDOWNS No.

Date Outage Duration Type 1 Hours Reason 2 Method of Shutting Down Reactor 3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 2001.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

Unit I Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 7,739.0 106,231.1 Hours Generator was On-Line 744.0 7,712.0 104,887.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 917,071 9,559,578 125,963,558 1F-Forced S-Scheduled

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Reporting Period:

50-529 PVNGS-2 01/11/02 S. M. Marie-Meyer (602) 250-3078 December 2001

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

1243

3.
4.
5.

6.

UNIT SHUTDOWNS Outage Duration Type 1 Hours Reason2 Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 2001.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1 -Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

Unit 2 Generating Statistics This Month Yr. To Date Cumulative Hours Reactor was Critical 744.0 8,027.3 105,901.5 Hours Generator was On-Line 744.0 8,003.4 104,598.0 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 950,620 10,083,517 126,924,511 No.

Date 1FForced S-Scheduled

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Reporting Period:

50-530 PVNGS-3 01/11/02 S. M. Marie-Meyer (602) 250-3078 December 2001

1.

Design Electrical Rating (Net MWe):

1269

2.

Maximum Dependable Capacity (Net MWe):

1247

3.
4.
5.

6.

Unit 3 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 7,526.6 101,423.7 Hours Generator was On-Line 734.2 7,441.2 100,435.9 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 918,643 9,170,388 122,369,450 UNIT SHUTDOWNS Outage Duration Type1 Hours S

9.8 Reason 2 B

Method of Shutting Down Reactor3 1

Cause and Corrective Action to Prevent Occurrence Main Turbine was tripped for LP turbine balance shot.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1 -Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

No.

01-04 Date 12/1 1 F-Forced S-Scheduled