ML023030334: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:
{{#Wiki_filter:Westinghouse Technology Advanced Manual Section 4.11 Risk Management
{{#Wiki_filter:Westinghouse Technology Advanced Manual Section 4.11 Risk Management


Westinghouse Technology Advanced Manual                                         Risk Management Westinghouse Technology Advanced Manual                                        Risk Management TABLE OF CONTENTS 4.11   RISK MANAGEMENT ........................................                           4.11-1 4.11.1 Introduction ...........................................                   4.11-1 4.11.2 H istory ........................................                 ...... 4.11-1 4.11.2.1   Deterministic Analysis ............................            4.11-1 4.11.2.2   Probabilistic Risk Assessment .......................           4.11-2 4.11.2.3   Severe Accident Policy ............................             4.11-4 4.11.3 Risk-Based Regulation ....................................                 4.11-6 4.11.4 PRA Policy Statement and Implementation Plan ...................           4.11-8 4.11.4.1    Risk Management ....................                           4.11-9 4.11.4.2    Configuration Management .............                         4.11-10 4.11.4.3    On-Line Maintenance .................                         .4.11-10 4.11.4.4   Maintenance Rule ...................                          4.11-11 4.11.4.5    Inspection of Configuration Management ....                    4.11-14 4.11.5 Summary S............................................                     4.11-15 4.11.6 References .................................                               4.11-16 LIST OF TABLES 4.11-1 Insights from Review of Plant IPEs .................................             4.11-19 USNRC Technical Training Center                           4.11-i                     Rev 0396
Westinghouse Technology Advanced Manual Risk Management TABLE OF CONTENTS 4.11 RISK MANAGEMENT........................................
4.11.1 Introduction...........................................
4.11.2 H istory........................................
4.11.2.1 Deterministic Analysis 4.11.2.2 Probabilistic Risk Assessment.......................
4.11.2.3 Severe Accident Policy............................
4.11.3 Risk-Based Regulation....................................
4.11.4 PRA Policy Statement and Implementation Plan...................
4.11.4.1 4.11.4.2 4.11.4.3 4.11.4.4 4.11.4.5 4.11.5 Summary Risk Management....................
Configuration Management.............
On-Line Maintenance.................
Maintenance Rule Inspection of Configuration Management....
4.11-1 4.11-1 4.11-1 4.11-1 4.11-2 4.11-4 4.11-6 4.11-8 4.11-9 4.11-10
.4.11-10 4.11-11 4.11-14 S............................................
4.11-15 4.11-16 4.11.6 References.................................
LIST OF TABLES 4.11-1 Insights from Review of Plant IPEs.................................
4.11-19 Rev 0396 USNRC Technical Training Center Westinghouse Technology Advanced Manual Risk Management 4.11-i


                                                                                                      -1 Westinghouse Technology Advanced Manual                                          Risk ha3nsb  a -+
WestnghuseTecholoy Avancd Mnua R~d M~~rnmU, LIST OF FIGURES 4.11-1 4.11-2 4.11-3 4.11-4 4.11-5 4.11-6 4.11-7 4.11-8 4.11-9 4.11-10 4.11-11 4.11-12 4.11-13 4.11-14 4.11-15 4.11-16 4.11-17 4.11-18 4.11-19 Deterministic Analysis.......................................
WestnghuseTecholoy Avancd Mnua                                           R~d M~~rnmU,     Ik LIST OF FIGURES 4.11-1   Deterministic Analysis .......................................                   4.11-21 4.11-2    Probabilistic Risk Assessment ..................................                 4.11-23 4.11-3    Elements of PRA ..........................................                       4.11-25 4.11-4    Historical Perspective .......................................                   4.11-27 4.11-5    Major Contributors to Core Damage by Accident Types .................           4.11-29 4.11-6    Relative Importance Factors for BWR Systems ......................               4.11-31 4.11-7    Relative Importance Factors for PWR Systems .......................               4.11-33 4.11-8    Risk-Based Regulation .......................................                   4.11-35 4.11-9    PRA Policy Statement .......................................                     4.11-37 4.11-10  PRA Implementation Plan .....................................                   4.11-39 4.11-11  Risk and Configuration Management - Definitions ....................             4.11-41 4.11-12  Risk M anagement Factors .....................................                   4.11-43 4.11-13  Maintenance Rule - Objectives ..................................                 4.11-45 4.11-14  M aintenance Rule - Scope .....................................                 4.11-47 4.11-15  Configuration Risk Monitoring Methods ...........................               4.11-49 4.11-16  Preventive Maintenance Equipment Out-of-Service Matrix ...............           4.11-51 4.11-17  Risk Monitoring ............................................                     4.11-53 4.11-18  Risk M onitoring Predictive ....................................                 4.11-55 4.11-19  Risk Profile for Allowed Outage Time Determination ...................           4.11-57 ATTACHMENTS NRC Inspection Report Nos. 50-334/94-24 and 50-412/94-25 .........           4.11-59 USNRC Technical Training Center                        4.11-ii                           Rev 0396
Probabilistic Risk Assessment..................................
Elements of PRA..........................................
Historical Perspective.......................................
Major Contributors to Core Damage by Accident Types.................
Relative Importance Factors for BWR Systems......................
Relative Importance Factors for PWR Systems.......................
Risk-Based Regulation.......................................
PRA Policy Statement.......................................
PRA Implementation Plan.....................................
Risk and Configuration Management - Definitions....................
Risk M anagement Factors.....................................
Maintenance Rule - Objectives..................................
M aintenance Rule - Scope.....................................
Configuration Risk Monitoring Methods...........................
Preventive Maintenance Equipment Out-of-Service Matrix...............
Risk Monitoring............................................
Risk M onitoring Predictive....................................
Risk Profile for Allowed Outage Time Determination...................
4.11-21 4.11-23 4.11-25 4.11-27 4.11-29 4.11-31 4.11-33 4.11-35 4.11-37 4.11-39 4.11-41 4.11-43 4.11-45 4.11-47 4.11-49 4.11-51 4.11-53 4.11-55 4.11-57 ATTACHMENTS NRC Inspection Report Nos. 50-334/94-24 and 50-412/94-25.........
4.11-59 Rev 0396 4.11-ii
-1 Westinghouse Technology Advanced Manual Risk ha3nsb a
-+
Ik USNRC Technical Training Center


Westinghouse Technology Advanced Manual                                               Risk Management Westinghouse Technology Advanced Manual                                              Risk Management 4.11 RISK MANAGEMENT                                 reduce risk and to ensure safety. This section discusses the major regulatory and industry Learning Objectives:                                 actions that have been or are being incorporated to address operational and accident risk manage
Westinghouse Technology Advanced Manual Risk Management 4.11 RISK MANAGEMENT Learning Objectives:
: 1. Describe what is meant by the term "defense       ment in nuclear power plants.
: 1. Describe what is meant by the term "defense in depth," and explain how nuclear power plants have been designed to incorporate this concept.
in depth," and explain how nuclear power plants have been designed to incorporate this   4.11.2 History concept.
: 2. Describe how probabilistic risk assessments (PRAs) of nuclear power plants can comple ment deterministic analyses.
4.11.2.1 Deterministic Analysis
: 3. Define the term "configuration management,"
: 2. Describe how probabilistic risk assessments (PRAs) of nuclear power plants can comple             Nuclear power plants in the U. S. have been ment deterministic analyses.                     designed and constructed in accordance with deterministic analyses. Deterministic analyses
and explain why configuration management is necessary in managing risk at nuclear power plants.
: 3. Define the term "configuration management,"        involve standard good engineering practices, and explain why configuration management          calculations, and judgements; and in the case of is necessary in managing risk at nuclear        nuclear power plants, design bases which include power plants.                                    the assumption .of worst-case conditions for accident analyses. Examples of these worst-case
: 4. Describe methods that are used by nuclear utilities to incorporate risk insights into maintenance planning.
: 4. Describe methods that are used by nuclear          conditions include the assumptions of an initial utilities to incorporate risk insights into      reactor power of greater than 100%, restrictive maintenance planning.                            power distributions within the core, conservative engineering factors, the minimum-required
: 5. Describe how PRA results are used by the NRC for risk-based regulation.
: 5. Describe how PRA results are used by the          accident mitigation equipment available, and pipe NRC for risk-based regulation.                  breaks of all possible sizes.
4.11.1 Introduction Nuclear power plants in the U.S. have been designed and constructed in accordance with deterministic analyses. The design bases of each nuclear unit are documented in its Final Safety Analysis Report (FSAR), which is updated yearly as the Updated Safety Analysis Report (USAR). Nuclear power plant operation, includ ing maintenance and surveillance of safety-related equipment, is controlled and restricted by techni cal specification requirements.
4.11.1 Introduction                                        In a large nuclear generating station with a core output rated at over 3000 MW thermal, Nuclear power plants in the U.S. have been      about six pounds of fission products are pro designed and constructed in accordance with          duced each day that the unit is operated at full deterministic analyses. The design bases of each      power. To protect the public from these fission nuclear unit are documented in its Final Safety      products during normal and accident situations, a Analysis Report (FSAR), which is updated              "defense in depth," or multiple levels of assur yearly as the Updated Safety Analysis Report          ance and safety, exists to minimize risk to the (USAR). Nuclear power plant operation, includ        public from nuclear power plant operation.
Throughout the history of commercial nuclear power, the regulatory agencies (the AEC and Slater, the NRC) and the nuclear industry have continued to research and implement new and/or better methods of operating, maintaining, testing, and analyzing nuclear plants and equipment to reduce risk and to ensure safety. This section discusses the major regulatory and industry actions that have been or are being incorporated to address operational and accident risk manage ment in nuclear power plants.
ing maintenance and surveillance of safety-related equipment, is controlled and restricted by techni        -A multiple, barrier concept was used in cal specification requirements.                      designing and building nuclear units. The first barrier against fission product release is the fuel Throughout the history of commercial nuclear    cladding. The fuel cladding is a cylindrical power, the regulatory agencies (the AEC and          sheath that is designed to contain fuel pellets and Slater, the NRC) and the nuclear industry have          fission products during normal and abnormal continued to research and implement new and/or        transients. The second barrier, if isolated, is the better methods of operating, maintaining, testing,    reactor coolant pressure boundary. This barrier and analyzing nuclear plants and equipment to        is designed to withstand high pressures and Rev   1)396 ° USNRC Technical Training Center                 4.11-1                                       Rev 0396
4.11.2 History 4.11.2.1 Deterministic Analysis Nuclear power plants in the U. S. have been designed and constructed in accordance with deterministic analyses. Deterministic analyses involve standard good engineering practices, calculations, and judgements; and in the case of nuclear power plants, design bases which include the assumption.of worst-case conditions for accident analyses. Examples of these worst-case conditions include the assumptions of an initial reactor power of greater than 100%, restrictive power distributions within the core, conservative engineering factors, the minimum-required accident mitigation equipment available, and pipe breaks of all possible sizes.
In a large nuclear generating station with a core output rated at over 3000 MW thermal, about six pounds of fission products are pro duced each day that the unit is operated at full power. To protect the public from these fission products during normal and accident situations, a "defense in depth," or multiple levels of assur ance and safety, exists to minimize risk to the public from nuclear power plant operation.  
-A multiple, barrier concept was used in designing and building nuclear units. The first barrier against fission product release is the fuel cladding. The fuel cladding is a cylindrical sheath that is designed to contain fuel pellets and fission products during normal and abnormal transients. The second barrier, if isolated, is the reactor coolant pressure boundary. This barrier is designed to withstand high pressures and Rev 1)396 USNRC Technical Training Center 4.11-1 Westinghouse Technology Advanced Manual Risk Management Rev 0396
°


I Westinghouse Technolos, v Advanced Manual                                                Risk Management Westn~huse Adance     MaualRisk echolo~                                          Manatement temperatures. The thickness of this barrier varies       acceptance criteria following an accident. Redun 1m the reactor vessel tickness of several inches     dant pumps, valves, instrument sensors, instru
Westn~huse echolo~
  ,he steam generator tube thickness of less than       ment strings, and logic devices are required to one-tenth of an inch. Since the reactor coolant         ensure that no single failure will prevent at least pressure boundary surrounds the first barrier, it       one of these trains from performing its intended should contain any fission products which escape         function.
Adance MaualRisk Manatement temperatures. The thickness of this barrier varies 1m the reactor vessel tickness of several inches  
from the cladding. The containment (reactor building) provides the final barrier. There are             All engineered safety feature systems must be many approved containment designs; each                 physically separated so that a catastrophic failure contains the reactor coolant system and consti           of one systeff will not prevent another engi tutes a barrier to the release of radioactivity to the   neered safety feature system from performing its public. These barriers and the protection against       intended function. Electrical power to the engi the loss of each barriei are requiied by the Code       neered safety features comes from the transmis of Federal Regulations.                                  sion grid via transformers, breakers and busses.
,he steam generator tube thickness of less than one-tenth of an inch. Since the reactor coolant pressure boundary surrounds the first barrier, it should contain any fission products which escape from the cladding. The containment (reactor building) provides the final barrier. There are many approved containment designs; each contains the reactor coolant system and consti tutes a barrier to the release of radioactivity to the public. These barriers and the protection against the loss of each barriei are requiied by the Code of Federal Regulations.
Redundant diesel generators are normally the Engineered safety features (ESFs) are provid         standby power supply.
Engineered safety features (ESFs) are provid ed in nuclear power plants to mitigate the conse quences of reactor plant accidents. Sections of the General Design Criteria in'Appendix A of 10 CFR, Part 50 require that specific systems be provided to serve as ESF systems. Containment systems, a residual heat removal (RHR) system, emergency core cooling systems. (ECCSs),
ed in nuclear power plants to mitigate the conse quences of reactor plant accidents. Sections of             ESF systems are designed to remain func the General Design Criteria in'Appendix A of 10         tional if a safe shutdown earthquake occurs and CFR, Part 50 require that specific systems be           are thus designated as Seismic Category I. The provided to serve as ESF systems. Containment           reactor coolant pressure boundary, reactor core systems, a residual heat removal (RHR) system,           and vessel internals, and systems or portions of emergency core cooling systems. (ECCSs),                 systems that are required for emergency core containment heat removal systems, containment           cooling, post-accident containment heat removal, atmosphere cleanup systems, and certain cooling         and post-accident containment atmosphere water systems are typical of the systems required       cleanup are designed to Seismic Category I to be provided as ESF systems. Each of the ESF           requirements. ESF systems are also designed to systems is designed to withstand a single failure       include diversity. "Diversity" refers to different without the loss of its protective functions during     methods of providing the same safety protection or following an accide nt condition. However,           or function.. Two systems which illustrate this single failure is limited to either an active       diversity are the containment fan cooler system failure during the injection phase following an         and the contaihiment spray system. Each of these accident, or an active or a passive failure during       systems is designed to lower the pressure inside the recirculation phase. Most accident analyzes         the containrient following a steam break or a loss assume the loss of offsite power. This loss of           of coolant accident inside the containment.
containment heat removal systems, containment atmosphere cleanup systems, and certain cooling water systems are typical of the systems required to be provided as ESF systems. Each of the ESF systems is designed to withstand a single failure without the loss of its protective functions during or following an accide nt condition. However, this single failure is limited to either an active failure during the injection phase following an accident, or an active or a passive failure during the recirculation phase. Most accident analyzes assume the loss of offsite power. This loss of offsite power is considered in addition to the "single active failure."
offsite power is considered in addition to the "single active failure."                                 4.11.2.2 Probabilistic Risk Assessment The engineered safety features which contain            A PRA is an engineering tool used to quanti active components are designed with two inde            fy the risk to a facility. Risk is defined as the pendent trains. Examples of systems'e'nploying          likelihood and consequences of rare events at this design feature are- the ECCSs, in which            nuclear power plants. These events are generally either train can satisfy 'all the' requiiements to      referred to as severe accidents. The PRA aug safely shut down the plant -61meet the final            ments traditional deterministic engineering 4.11-2                                       Rev 0396 USNRC Technical                  Center Training Center Technical Training                        4.11-2                                       Rev 0396
The engineered safety features which contain active components are designed with two inde pendent trains. Examples of systems'e'nploying this design feature are-the ECCSs, in which either train can satisfy 'all the' requiiements to safely shut down the plant -61m eet the final acceptance criteria following an accident. Redun dant pumps, valves, instrument sensors, instru ment strings, and logic devices are required to ensure that no single failure will prevent at least one of these trains from performing its intended function.
All engineered safety feature systems must be physically separated so that a catastrophic failure of one systeff will not prevent another engi neered safety feature system from performing its intended function. Electrical power to the engi neered safety features comes from the transmis sion grid via transformers, breakers and busses.
Redundant diesel generators are normally the standby power supply.
ESF systems are designed to remain func tional if a safe shutdown earthquake occurs and are thus designated as Seismic Category I. The reactor coolant pressure boundary, reactor core and vessel internals, and systems or portions of systems that are required for emergency core cooling, post-accident containment heat removal, and post-accident containment atmosphere cleanup are designed to Seismic Category I requirements. ESF systems are also designed to include diversity. "Diversity" refers to different methods of providing the same safety protection or function.. Two systems which illustrate diversity are the containment fan cooler system and the contaihiment spray system. Each of these systems is designed to lower the pressure inside the containrient following a steam break or a loss of coolant accident inside the containment.
4.11.2.2 Probabilistic Risk Assessment A PRA is an engineering tool used to quanti fy the risk to a facility. Risk is defined as the likelihood and consequences of rare events at nuclear power plants. These events are generally referred to as severe accidents. The PRA aug ments traditional deterministic engineering USNRC Technical Training Center 4.11-2 Rev 0396 Rev 0396 I
Westinghouse Technolos, v Advanced Manual Risk Management 4.11-2 USNRC Technical Training Center


Westinghouse Technology Advanced Manual                                                Risk Management WestinEbouse TechnoloEy Advanced Manual                                                 Risk Management analyses by providing quantitative measures of         variety of accident types are important; (4) safety and thus a means of addressing the relative    design-basis accidents are not dominant contribu significance of issues in relation to plant safety. tors to risk; and (5) significant differences in Basically, a nuclear power plant PRA answers          containment designs are important to risk. The three questions:                                      basic PRA approach developed by the RSS is still used today.
WestinEbouse TechnoloEy Advanced Manual Risk Management analyses by providing quantitative measures of safety and thus a means of addressing the relative significance of issues in relation to plant safety.
0    What can go wrong?                                    Because the RSS was the first broad-scale 0    How likely is it?                                application of event- and fault-tree methods to a 0    What are the consequences?                      system as complex as a nuclear power plant, it was one of the more controversial documents in Probabilistic risk assessment is a              the history of reactor safety. The RSS also multidisciplinary approach employing various          analyzed conditions beyond the design basis and methods, including system reliability, contain        attempted to quantify risk. A group called the ment response modeling, and fission release and        Lewis Committee performed a peer review of the public consequence analyses, as depicted graphi        RSS and published a report, NUREG/CR-0400, cally in Figure 4.11-3. A PRA treats the entire        to the NRC three years later to describe the plant and its constituent systems in an integrated    effects of the RSS results on the regulatory fashion, and thus subtle interrelationships can be    process. The report concluded that although the discovered that are important to risk. Another          RSS had some flaws and that PRA had not been important attribute of probabilistic risk assess        formally used in the licensing process, PRA ment is that it involves analyses of both single        methods were the best available and should be and multiple failures. Multiple failures often lead    used to assist in the allocation of the limited to situations beyond the plant design basis and,        resources available for the improvement of in some cases, are more likely than single fail        safety.
Basically, a nuclear power plant PRA answers three questions:
ures. By addressing multiple failures, a PRA can cover a broad spectrum of potential accidents at a          The 1979 accident at Three Mile Island (TMI) plant.                                                substantially changed the character of the NRC's regulatory approach. The accident revealed that The first comprehensive development and          perhaps nuclear reactors might not be safe application of PRA techniques in the commercial      enough and that new policies and approaches nuclear power industry was the NRC-sponsored          were required. Based on comments and recom "Reactor Safety Study" (RSS). The principal          mendations from the Kemeny and Rogovin objective of the RSS was to quantify the risk to      investigations of the TMI accident, a substantial the public from U.S. commercial nuclear power          program to research - severe accident plants. The RSS analyzed both a BWR (Peach            phenomenology was initiated (i.e., those acci Bottom) and a PWR (Surry). The report of the          dents beyond the design basis which could result RSS results, generally referred to as WASH            in core damage). It was also recommended that 1400, was published in October of 1975. The          PRA be used more by the staff to complement its results of the study can be summarized as fol          traditional, non-probabilistic methods of analyz lows: (1) risks from nuclear power plant opera        ing nuclear plant safety. Rogovin also suggested tion are small as compared to non-nuclear haz          in a report to the Commissioners and the public, ards; (2) the frequencies of core melt accidents      NUREG/CR-1250,- that the NRC policy on are higher than previously thought (calculated to      severe accidents consider (1) more severe acci be approximately 5 X 10-5 per reactor year); (3) a    dents in the licensing process and (2)
What can go wrong?
Rev  Ui9b USNRC Technical Training Center                  4.11-3                                       Rev 0396
How likely is it?
What are the consequences?
Probabilistic risk assessment is a
multidisciplinary approach employing various methods, including system reliability, contain ment response modeling, and fission release and public consequence analyses, as depicted graphi cally in Figure 4.11-3. A PRA treats the entire plant and its constituent systems in an integrated fashion, and thus subtle interrelationships can be discovered that are important to risk. Another important attribute of probabilistic risk assess ment is that it involves analyses of both single and multiple failures. Multiple failures often lead to situations beyond the plant design basis and, in some cases, are more likely than single fail ures. By addressing multiple failures, a PRA can cover a broad spectrum of potential accidents at a plant.
The first comprehensive development and application of PRA techniques in the commercial nuclear power industry was the NRC-sponsored "Reactor Safety Study" (RSS). The principal objective of the RSS was to quantify the risk to the public from U.S. commercial nuclear power plants. The RSS analyzed both a BWR (Peach Bottom) and a PWR (Surry). The report of the RSS results, generally referred to as WASH 1400, was published in October of 1975. The results of the study can be summarized as fol lows: (1) risks from nuclear power plant opera tion are small as compared to non-nuclear haz ards; (2) the frequencies of core melt accidents are higher than previously thought (calculated to be approximately 5 X 10-5 per reactor year); (3) a 0
0 0
Rev Ui9b USNRC Technical Training Center variety of accident types are important; (4) design-basis accidents are not dominant contribu tors to risk; and (5) significant differences in containment designs are important to risk. The basic PRA approach developed by the RSS is still used today.
Because the RSS was the first broad-scale application of event-and fault-tree methods to a system as complex as a nuclear power plant, it was one of the more controversial documents in the history of reactor safety. The RSS also analyzed conditions beyond the design basis and attempted to quantify risk. A group called the Lewis Committee performed a peer review of the RSS and published a report, NUREG/CR-0400, to the NRC three years later to describe the effects of the RSS results on the regulatory process. The report concluded that although the RSS had some flaws and that PRA had not been formally used in the licensing process, PRA methods were the best available and should be used to assist in the allocation of the limited resources available for the improvement of safety.
The 1979 accident at Three Mile Island (TMI) substantially changed the character of the NRC's regulatory approach. The accident revealed that perhaps nuclear reactors might not be safe enough and that new policies and approaches were required. Based on comments and recom mendations from the Kemeny and Rogovin investigations of the TMI accident, a substantial program to research - severe accident phenomenology was initiated (i.e., those acci dents beyond the design basis which could result in core damage). It was also recommended that PRA be used more by the staff to complement its traditional, non-probabilistic methods of analyz ing nuclear plant safety. Rogovin also suggested in a report to the Commissioners and the public, NUREG/CR-1250,- that the NRC policy on severe accidents consider (1) more severe acci dents in the licensing process and (2)
Westinghouse Technology Advanced Manual Risk Management 4.11-3 Rev 0396


                                                                                                              -1 Westinghouse Technology Advanced Manual Westnghuse Adance       MaualRisk echolog b
Westnghuse echolog Adance MaualRisk Manavement probabilistic safety goals to help define what is an acceptable level of plant safety.
Manavement probabilistic safety goals to help define what is               process has aided licensees in determin an acceptable level of plant safety.                             ing which design modifications are desirable from both risk-reduction and In late 1980, the NRC sponsored a current                   cost-benefit standpoints for the improve assessment of severe accident risks for five                     ment of plant safety. PRA results have commercial nuclear power plants' in a report                     more recently been used by licensees in called "Severe Accident Risks: An Assessment                     enforcement discussions and in support for Five U.S. Nuclear Power Plants," NUREG                       of technical specification change requests.
In late 1980, the NRC sponsored a current assessment of severe accident risks for five commercial nuclear power plants' in a report called "Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants," NUREG 1150. This report included an update of the RSS risk assessments of Surry and Peach Bottom and provided the latest NRC version of the state of the art in PRA models, methods, and approach es.
1150. This report included an update of the RSS risk assessments of Surry and Peach Bottom and               4. PRAs have pointed out some general provided the latest NRC version of the state of                 differences with respect to BWRs and the art in PRA models, methods, and approach                     PWRs as classes of plants. For example, es.                                                             NUREG-1 150 states that for BWRs, the principal initiating event contributors to A summary of the insights gained from early                 core damage frequency are station black risk assessments are as follows:                                 outs (SBOs) and anticipated transients without scram (ATWSs); for PWRs, the
A summary of the insights gained from early risk assessments are as follows:
: 1. As illustrated by the NUREG-1150                         principal contributors to core damage results and early! plant PRAs, the PRAs                 frequency' are LOCAs. NUREG-1 150 reflect details of plant sysiems, operations             also states that the core damage frequen and physical layouts. Since nuclear                     cies for PWRs are higher than those for power plants in the U.S. are not stan                   BWRs, because BWRs have more dardized, the PRA results are very plant                 redundant 'methods of supplying water to specific. Reactor design, equipment,                    the reactor coolant system. However, location, and operation (power levels,                   PWRs have lower probabilities of early testing and maintenance, operator actions)               containment failure given a core-damage have large impacts on the results. There                 sequence, since PWR containments are fore, in detail, the results can differ                 larger and can withstand higher pressures significantly from plant to plant.                      than BWR containments.
: 1. As illustrated by the NUREG-1150 results and early! plant PRAs, the PRAs reflect details of plant sysiems, operations and physical layouts.
: 2. Even with the differences in the detailed       4.11.2.3 Severe Accident Policy results between plant studies, PRAs can be used for some generic applications as             In August of 1985, the NRC issued the listed in NUREG-1050. Some examples            "Policy Statement on Severe Accidents Regard are:                                            ing Future Designs and Existing Plants" that introduced the Commission's plan to address
Since nuclear power plants in the U.S. are not stan dardized, the PRA results are very plant specific.
        "*  Regulatory activity prioritization,        severe accident issues for existing commercial
Reactor design, equipment, location, and operation (power levels, testing and maintenance, operator actions) have large impacts on the results. There fore, in detail, the results can differ significantly from plant to plant.
        "*  Safety issue evaluation,                  nuclear power plants. The stated policy was that
: 2. Even with the differences in the detailed results between plant studies, PRAs can be used for some generic applications as listed in NUREG-1050. Some examples are:
        "*  Resource allocation,                      the public should be subject to no undue risk
"* Regulatory activity prioritization,
        "*  Inspection program implementation,        from the operation of commercial nuclear reac and                                        tors. A year later, in August of 1986, the NRC
"* Safety issue evaluation,
        "* NRC policy development.                      established' both qualitative and quantitative safety goals for the nuclear industry. The quali
"* Resource allocation,
: 3. Using PRA in the decision- making                tative safety goals are as follows:
"* Inspection program implementation, and
Center             4.11-4                                       Rev 0396 Technical Training USNRC Technical USNRC                Training Center               4.11-4                                       Rev 0396
"* NRC policy development.
: 3. Using PRA in the decision-making process has aided licensees in determin ing which design modifications are desirable from both risk-reduction and cost-benefit standpoints for the improve ment of plant safety. PRA results have more recently been used by licensees in enforcement discussions and in support of technical specification change requests.
: 4. PRAs have pointed out some general differences with respect to BWRs and PWRs as classes of plants. For example, NUREG-1 150 states that for BWRs, the principal initiating event contributors to core damage frequency are station black outs (SBOs) and anticipated transients without scram (ATWSs); for PWRs, the principal contributors to core damage frequency' are LOCAs. NUREG-1 150 also states that the core damage frequen cies for PWRs are higher than those for BWRs, because BWRs have more redundant 'methods of supplying water to the reactor coolant system. However, PWRs have lower probabilities of early containment failure given a core-damage sequence, since PWR containments are larger and can withstand higher pressures than BWR containments.
4.11.2.3 Severe Accident Policy In August of 1985, the NRC issued the "Policy Statement on Severe Accidents Regard ing Future Designs and Existing Plants" that introduced the Commission's plan to address severe accident issues for existing commercial nuclear power plants. The stated policy was that the public should be subject to no undue risk from the operation of commercial nuclear reac tors. A year later, in August of 1986, the NRC established' both qualitative and quantitative safety goals for the nuclear industry. The quali tative safety goals are as follows:
USNRC Technical Training Center 4.11-4 Rev 0396 Rev 0396 USNRC Technical Training Center
-1 Westinghouse Technology Advanced Manual b
4.11-4


Westinghouse Technology Advanced Manual                                                   Risk Management Westinghouse Technology Advanced Manual                                                    Risk Management
Westinghouse Technology Advanced Manual Risk Management Individual members of the public should be provided a level of protection from the consequences of nuclear power plant opera tion such that individuals bear no significant additional risk to life and health.
  "    Individual members of the public should be               However, because of arbitrary assumptions provided a level of protection from the             in calculations, uncertainties in PRA analyses, consequences of nuclear power plant opera           and gaps in equipment reliability data bases, the tion such that individuals bear no significant     safety goals are not definitive requirements, but additional risk to life and health.                serve as aiming points or numerical benchmarks.
Societal risks to life and health from nuclear power plant operation should be comparable to or less than the risks of generating electric ity by viable competing technologies and should not be significant additions to other societal risks.
  "    Societal risks to life and health from nuclear     In addition, it should be noted that the goals power plant operation should be comparable         apply to the industry as a whole and not to to or less than the risks of generating electric   individual plants. The safety goals are not in and ity by viable competing technologies and           of themselves meant to serve as the sole bases for should not be significant additions to other       licensing decisions. However, when information societal risks.                                     is available that is applicable to a specific licens ing decision, it is to be considered as one factor The corresponding quantitative safety goals         in the licensing.
The corresponding quantitative safety goals are:
are:
The risk to the average individual in the vicinity of a nuclear power plant of prompt fatalities that might result from a reactor accident should not exceed one-tenth of one percent of the sum of prompt fatality risks resulting from other accidents to which members of the U.S. population are generally exposed.
Implementation of the NRC plan to address
The risk to the population near a nuclear power plant of cancer fatalities that might result from nuclear power plant operation should not exceed one-tenth of one percent of the sum of cancer fatality risks resulting from all other causes.
  "    The risk to the average individual in the           severe accident risk included development of vicinity of a nuclear power plant of prompt         plant-specific examinations that would reveal fatalities that might result from a reactor         vulnerabilities to severe accidents and cost accident should not exceed one-tenth of one         effective safety improvements that would reduce percent of the sum of prompt fatality risks         or eliminate the important vulnerabilities. In resulting from other accidents to which             Generic Letter 88-20 dated November 23, 1988, members of the U.S. population are generally         all utilities with licensed nuclear power plants exposed.                                             were requested to perform such examinations.
The average accident fatality rate in the U.S.
The specific objectives for these individual plant
is approximately 5 X 10-4 per individual per year, so the quantitative value for the first goal is 5 X 10-7 per individual per year. The "vicinity of a nuclear power plant" is defined to be the area within one mile of the plant site boundary. The average U.S. cancer fatality rate is approximately 2 X 10-3 per year, so the quantitative value for the second goal is 2 X 10-6 per average individu al per year. The "population near a nuclear power plant" is defined as the population within 10 miles of the plant site.
  "    The risk to the population near a nuclear           examinations (IPEs) are for each utility to:
N However, because of arbitrary assumptions in calculations, uncertainties in PRA analyses, and gaps in equipment reliability data bases, the safety goals are not definitive requirements, but serve as aiming points or numerical benchmarks.
power plant of cancer fatalities that might result from nuclear power plant operation           "* Develop an overall appreciation of severe should not exceed one-tenth of one percent of           accident behavior, the sum of cancer fatality risks resulting from all other causes.                                   "* Understand the most likely severe accident sequences that could occur at its plant, The average accident fatality rate in the U.S.
In addition, it should be noted that the goals apply to the industry as a whole and not to individual plants. The safety goals are not in and of themselves meant to serve as the sole bases for licensing decisions. However, when information is available that is applicable to a specific licens ing decision, it is to be considered as one factor in the licensing.
is approximately 5 X 10-4 per individual per             "    Gain a more quantitative understanding of the year, so the quantitative value for the first goal is         overall probability of core damage and 5 X 10-7 per individual per year. The "vicinity of             radioactive material releases, and a nuclear power plant" is defined to be the area within one mile of the plant site boundary. The           "  If necessary, reduce the overall probability of average U.S. cancer fatality rate is approximately           core damage and radioactive material release 2 X 10-3 per year, so the quantitative value for             by appropriate modifications to procedures the second goal is 2 X 10-6 per average individu             and hardware that would help prevent or al per year. The "population near a nuclear                   mitigate severe accidents.
Implementation of the NRC plan to address severe accident risk included development of plant-specific examinations that would reveal vulnerabilities to severe accidents and cost effective safety improvements that would reduce or eliminate the important vulnerabilities. In Generic Letter 88-20 dated November 23, 1988, all utilities with licensed nuclear power plants were requested to perform such examinations.
N power plant" is defined as the population within 10 miles of the plant site.                                   Many of the IPEs submitted to the NRC have 4.11-5                                         Rev 0396 USNRC USNRC Technical                  Center Training Center Technical Training                        4.11-5                                         Rev 0396
The specific objectives for these individual plant examinations (IPEs) are for each utility to:
"* Develop an overall appreciation of severe accident behavior,
"* Understand the most likely severe accident sequences that could occur at its plant, Gain a more quantitative understanding of the overall probability of core damage and radioactive material releases, and
" If necessary, reduce the overall probability of core damage and radioactive material release by appropriate modifications to procedures and hardware that would help prevent or mitigate severe accidents.
Many of the IPEs submitted to the NRC have USNRC Technical Training Center 4.11-5 Rev 0396 Westinghouse Technology Advanced Manual Risk Management 4.11-5 Rev 0396 USNRC Technical Training Center


Westinghouse Technology Advanced, Manual                                               Risk Management Westinghouse TechnoIoy Advanced, Manual                                                Risk Manaenient identified unique and/or important safety fea         ministic system and engineering analyses to tures. Table 4.11-1 includes a list of insights       focus licensee and regulatory attention on issues obtained through analysis of 72 IPEs (25 BWRs         commensurate with their importance to safety.
Westinghouse TechnoIoy Advanced, Manual Risk Manaenient identified unique and/or important safety fea tures. Table 4.11-1 includes a list of insights obtained through analysis of 72 IPEs (25 BWRs and 47 PWRs) covering 106 commercial nuclear units (35 BWRs and 71 PWRs). The items in the list indicate vulnerabilities identified during the IPE process at various plants and modifica tions that may have been made to plant equipment or procedures to reduce the vulnerabilities and hence, the calculated core damage frequencies.
and 47 PWRs) covering 106 commercial nuclear units (35 BWRs and 71 PWRs). The items in                   Examples of uses of risk insights for risk the list indicate vulnerabilities identified during   based regulation include the prioritization of the IPE process at various plants and modifica         generic safety issues, evaluation of regulatory tions that may have been made to plant equipment       requirements, assessment of design or operation or procedures to reduce the vulnerabilities and       al adequacy, evaluation of improved safety hence, the calculated core damage frequencies.         features, prioritizing inspection activities, evalua tion of events, and evaluation of technical specifi Risk- and reliability-based methods can be       cation revision requests and enforcement issues.
Risk-and reliability-based methods can be used for evaluating allowed outage times, sched uled or preventive maintenance, action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals, and analyses of plant configurations resulting from outages of systems or components. Because of the limitations in thie IPE process such as arbi trary assumptions in calculations, uncertainties in PRA analyses, and gips in equipment ireliability data bases, the insights identified in and of themselves do not require iny action by the individual licensee, btit'provide information on where vulnerabilities exist in its plant.
used for evaluating allowed outage times, sched uled or preventive maintenance, action statements           Using risk- and reliability-based methods to requiring shutdown where shutdown risk may be         improve technical specifications and other regula substantial, surveillance test intervals, and         tory requirements has gained wide interest analyses of plant configurations resulting from       because they can:
4.11.3 Risk-Based Regulation Technical specification requirements for nuclear power plants define the limiting condi tions for operationd (LCOs)' and surveillance requirements (SRs) to assire safety during operation. In general, these requirements are based on deterministic analyses and engineering judgements. Experiences with all modes of plant operation indicate thai some elements of the requirements are unnecessarily restrictive, while a few may not be conducive to safety. Improv ing these requirements involves many consider ations and is facilitated by the availability of plant-specific IPEs and' the development of related methods for analy'sis. Risk-based regula tion is a regulatory approach in which insights fronm PRAs are used in combination with deter-ministic system and engineering analyses to focus licensee and regulatory attention on issues commensurate with their importance to safety.
outages of systems or components. Because of the limitations in thie IPE process such as arbi       "    Quantitatively evaluate risk impacts and trary assumptions in calculations, uncertainties in       justify changes in requirements based on PRA analyses, and gips in equipment ireliability             objective risk arguments, and data bases, the insights identified in and of themselves do not require iny action by the           "* Provide a defensible bases for improved individual licensee, btit'provide information on           requirements for regulatory applications.
Examples of uses of risk insights for risk based regulation include the prioritization of generic safety issues, evaluation of regulatory requirements, assessment of design or operation al adequacy, evaluation of improved safety features, prioritizing inspection activities, evalua tion of events, and evaluation of technical specifi cation revision requests and enforcement issues.
where vulnerabilities exist in its plant.
Using risk-and reliability-based methods to improve technical specifications and other regula tory requirements has gained wide interest because they can:
Caution must be applied when using the 4.11.3     Risk-Based Regulation                     results of risk assessments, however, because of the limitations of PRA methodology. The plant's Technical specification requirements for          initial PRA (and/or IPE) is a snapshot of the plant nuclear power plants define the limiting condi        at the time the plant configuration and data were tions for operationd (LCOs)' and surveillance          collected and analyzed. The analyses must be requirements (SRs) to assire safety during            revised as modifications are made to the plant operation. In general, these requirements are          design, operating methods, procedures, etc., to based on deterministic analyses and engineering        maintain the risk assessment results current. In judgements. Experiences with all modes of plant        addition, a'PRA model is not a complete or operation indicate thai some elements of the          accurate model of the plant during all modes of requirements are unnecessarily restrictive, while      operation. For example, for PWRs, the removal a few may not be conducive to safety. Improv          of both boric acid makeup pumps from service is ing these requirements involves many consider          not very risky during mode I operations; howev ations and is facilitated by the availability of      er, these pumps are very importanit when the plant-specific IPEs and' the development of            achievemeni of the required shutdown margin in related methods for analy'sis. Risk-based regula      mode 5 is considered. Other limitations of PRAs tion is a regulatory approach in which insights        include the uncertainties in the equipment failure fronm PRAs are used in combination with deter-        data bases, the level of understanding of physical 4.11-6                                         Rev 0396 Technical Training USNRC Technical                Center Training Center              4.11-6                                         Rev 0396
Quantitatively evaluate risk impacts and justify changes in requirements based on objective risk arguments, and
"* Provide a defensible bases for improved requirements for regulatory applications.
Caution must be applied when using the results of risk assessments, however, because of the limitations of PRA methodology. The plant's initial PRA (and/or IPE) is a snapshot of the plant at the time the plant configuration and data were collected and analyzed. The analyses must be revised as modifications are made to the plant design, operating methods, procedures, etc., to maintain the risk assessment results current. In addition, a'PRA model is not a complete or accurate model of the plant during all modes of operation. For example, for PWRs, the removal of both boric acid makeup pumps from service is not very risky during mode I operations; howev er, these pumps are very importanit when the achievemeni of the required shutdown margin in mode 5 is considered. Other limitations of PRAs include the uncertainties in the equipment failure data bases, the level of understanding of physical USNRC Technical Training Center 4.11-6 Rev 0396 Westinghouse Technology Advanced, Manual Risk Management 4.11-6 USNRC Technical Training Center Rev 0396


Westinghouse Technology Advanced Manual                                               Risk Management Westinghouse Technology Advanced Manual                                                Risk Manaaement processes, the uncertainties in quantifying human         would be maintained, and to have procedures reliability, the sensitivity of results to analytical      addressing station blackout events. The rule assumptions, and modeling constraints.                    allows utilities several design alternatives to ensure that an operating plant can safely shut Quantitative risk estimates have played an            down in the event that all ac power is lost.
Westinghouse Technology Advanced Manual Risk Manaaement processes, the uncertainties in quantifying human reliability, the sensitivity of results to analytical assumptions, and modeling constraints.
important role in addressing and resolving                One alternative is the installation of a full regulatory issues including:                              capacity alternate ac power source that is capable of powering at least one complete set
Quantitative risk estimates have played an important role in addressing and resolving regulatory issues including:
"  Anticipated transient without scram: Risk              of normal safe shutdown loads.
Anticipated transient without scram: Risk assessments contributed to development of the ATWS rule, 10CFR50.62, which re quires all PWRs to have equipment diverse and independent from the reactor protection system for auxiliary feedwater initiation and turbine trip, requires all CE and B&W PWRs and BWRs to have a diverse scram system, provides functional requirements for the standby liquid control systems of BWRs, and requires that BWRs have equipment for automatically tripping reactor coolant recircu lation pumps.
assessments contributed to development of the ATWS rule, 10CFR50.62, which re                    Backfits: There are many cases where PRAs quires all PWRs to have equipment diverse            have been used to support the backfit deci and independent from the reactor protection          sion process. For example, after the TMI system for auxiliary feedwater initiation and        accident several TMI action plan issues turbine trip, requires all CE and B&W PWRs            evolved. Consumers Power performed a and BWRs to have a diverse scram system,              PRA of the Big Rock Point nuclear plant to provides functional requirements for the              assist in identifying those TMI generated standby liquid control systems of BWRs, and          changes which might actually have an impact requires that BWRs have equipment for                on the risk at the plant. As a result, Consum automatically tripping reactor coolant recircu        ers Power was able to negotiate exemptions lation pumps.                                        on seven issues which did not significantly lower risk at Big Rock Point, saving over
Auxiliary feedwater (AFW) system reliability:
"  Auxiliary feedwater (AFW) system reliability:        $45 million. In addition, Consumers Power The NRC has reviewed information provided            used the PRA to identify changes necessary on auxiliary feedwater systems in safety              to reduce the core damage frequency at Big analysis reports. As part of each review, the        Rock Point to an acceptable level. The cost of NRC assures that an AFW system reliability            a change is generally considered to be the analysis has been performed. The Standard            dollar cost associated with design, licensing, Review Plan states that an acceptable AFW            implementation, operation and maintenance.
The NRC has reviewed information provided on auxiliary feedwater systems in safety analysis reports. As part of each review, the NRC assures that an AFW system reliability analysis has been performed. The Standard Review Plan states that an acceptable AFW system should have an unreliability in the range of 10-4 to 10-5. Compensating factors such as other methods of accomplishing the safety functions of the AFW system or other reliable methods for cooling the reactor core during abnormal conditions may be consid ered to justify a larger unavailability of an AFW system.
system should have an unreliability in the            Sometimes the cost of replacement power is range of 10-4 to 10-5. Compensating factors          included for a backfit requiring a plant such as other methods of accomplishing the            shutdown to implement. The benefit of the safety functions of the AFW system or other          change is the reduction in risk if the change is reliable methods for cooling the reactor core        implemented. The most cost-effective change during abnormal conditions may be consid            provides the most improvement in safety for ered to justify a larger unavailability of an        the least cost. This type of cost-benefit AFW system.                                          analysis was done extensively during the ATWS rule-making process.
Station blackout (loss of all ac power): Risk assessments contributed to development of the blackout rule, 10CFR50.63, which requires licensees to determine a plant specific station blackout duration, during which core cooling and containment intergrity would be maintained, and to have procedures addressing station blackout events. The rule allows utilities several design alternatives to ensure that an operating plant can safely shut down in the event that all ac power is lost.
Station blackout (loss of all ac power): Risk assessments contributed to development of            Risk-based inspections: A PRA provides the blackout rule, 10CFR50.63, which                  information on dominant accident sequences requires licensees to determine a plant              and their minimal cut sets. This information specific station blackout duration, during            has already been used to design the risk which core cooling and containment intergrity        based portions of some plant-specific inspec-4.11-7                                       Rev 0396 USNRC Technical Training Center  Center            4.11-7                                       Rev 0396
One alternative is the installation of a full capacity alternate ac power source that is capable of powering at least one complete set of normal safe shutdown loads.
Backfits: There are many cases where PRAs have been used to support the backfit deci sion process. For example, after the TMI accident several TMI action plan issues evolved.
Consumers Power performed a PRA of the Big Rock Point nuclear plant to assist in identifying those TMI generated changes which might actually have an impact on the risk at the plant. As a result, Consum ers Power was able to negotiate exemptions on seven issues which did not significantly lower risk at Big Rock Point, saving over  
$45 million. In addition, Consumers Power used the PRA to identify changes necessary to reduce the core damage frequency at Big Rock Point to an acceptable level. The cost of a change is generally considered to be the dollar cost associated with design, licensing, implementation, operation and maintenance.
Sometimes the cost of replacement power is included for a backfit requiring a plant shutdown to implement. The benefit of the change is the reduction in risk if the change is implemented. The most cost-effective change provides the most improvement in safety for the least cost. This type of cost-benefit analysis was done extensively during the ATWS rule-making process.
Risk-based inspections: A PRA provides information on dominant accident sequences and their minimal cut sets. This information has already been used to design the risk based portions of some plant-specific inspec-USNRC Technical Training Center 4.11-7 Rev 0396 Westinghouse Technology Advanced Manual Risk Management 4.11-7 Rev 0396 USNRC Technical Training Center


L_
Westnghuse echolog Adance MaualRisk Manavement tion programs. Inspection programs can be prioritized to address the minimization of hardware challenges, the assurance of hard ware availability, and the effectiveness of plant staff actions as they relate to the sys tems and faults included in the dominant accident sequences. A PRA supports the assessment of a plant change by providing a quantitative measure of the relative level of safety associated with the change. This is accomplished by performinr sensitivity studies. A sensitivity study is a study of how different assumptions, configurations, data or other potential changes in the basis of the PRA impact the results.
Westinghouse Technology Advanced Manual Westnghuse Adance     MaualRisk echolog                                          Manavement tion programs. Inspection programs can be         by:
The NRC staff is expected to use PRA results to assist in prioritizing regulatory activities, and plant inspectors are expected to use IPE results to prioritize inspection activities. The inspectors should be alert for situations which constitute near misses. That is, the inspector needs to recognize those events that come close to accident sequences. Recognizing the significance of events at the plant is especially important for those related to sequences initiated by an ATWS or an intersystem LOCA, whichi can have severe consequences.
prioritized to address the minimization of hardware challenges, the assurance of hard         "* Allowing consideration of a broader set of ware availability, and the effectiveness of           potential challenges to safety, plant staff actions as they relate to the sys     "* Providing a: logical means for prioritizing tems and faults included in the dominant               these challenges based on risk significance, accident sequences. A PRA supports the                 and assessment of a plant change by providing a       "* Allowing consideration of a broader set of quantitative measure of the relative level of         resources to defend against these challenges.
Finally, the NRC staff will be involved in more and more discussions in which PRA results are used or misused to justify a particular action'or inaction.' Thierefore,.it is imp6rtant that the staff be familiar with the types of information that a PRA provides and that the staff can use PRA informationi accurately in discussions and decisions.
safety associated with the change. This is accomplished by performinr         sensitivity       In August of 1995, the NRC issued the studies. A sensitivity study is a study of how     "Policy Statement on the Use of Probabilistic different assumptions, configurations, data or     Risk Assessment Methods in Nuclear Regulatory other potential changes in the basis of the       Activities." The overall objectives of the policy PRA impact the results.                           statement are to improve the regulatory process through improved risk-informed safety decision The NRC staff is expected to use PRA results       making, through more efficient use of staff to assist in prioritizing regulatory activities, and   resources, through a reduction in unnecessary plant inspectors are expected to use IPE results to   burdens on licensees, and through the strength prioritize inspection activities. The inspectors       ening of regulatory requirements. The policy should be alert for situations which constitute       statement contains the following elements regard near misses. That is, the inspector needs to           ing the expanded NRC use of PRA:
4.11.4 PRA Policy Statement and Implementation Plan Deterministic approaches to regulation consider a set of challenges'to -safety and deter mine how those challenges 'should be mitigated.
recognize those events that come close to accident sequences. Recognizing the significance of             "  Increased use of PRA in reactor regulatory events at the plant is especially important for           matters should be implemented to the extent those related to sequences initiated by an ATWS           supported by the state of the art in PRA or an intersystem LOCA, whichi can have severe             methods and data' and in a manner that consequences. Finally, the NRC staff will be               complements the NRC's deterministic ap involved in more and more discussions in which             proach and supports the NRC's traditional PRA results are used or misused to justify a               defense-in-depth philosophy.
A probabilistic approach to regulation enhances and extends the traditional deterministic approach by:
particular action'or inaction.' Thierefore, .it is imp6rtant that the staff be familiar with the types   "  PRA should be used to reduce unnecessary of information that a PRA provides and that the           conservatism associated with current regula staff can use PRA informationi accurately in               tory requirements. Where appropriate, PRA discussions and decisions.                                should be used to support additional regulato ry requirements.
"* Allowing consideration of a broader set of potential challenges to safety,
4.11.4       PRA Policy Statement and Implementation Plan                       "  PRA evaluations in support of regulatory decisions should be as realistic as possible, Deterministic approaches to regulation                 and appropriate supporting data should be consider a set of challenges'to -safety and deter         publicly available.
"* Providing a: logical means for prioritizing these challenges based on risk significance, and
mine how those challenges 'should be mitigated.
"* Allowing consideration of a broader set of resources to defend against these challenges.
A probabilistic approach to regulation enhances       "* Uncertainties in PRA evaluations need to be and extends the traditional deterministic approach        considered in applying the Commission's 4.11-8                                     Rev 0396 USNRC Technical USNRC                Training Center Technical Training    Center            4.11-8                                     Rey 0396
In August of 1995, the NRC issued the "Policy Statement on the Use of Probabilistic Risk Assessment Methods in Nuclear Regulatory Activities." The overall objectives of the policy statement are to improve the regulatory process through improved risk-informed safety decision making, through more efficient use of staff resources, through a reduction in unnecessary burdens on licensees, and through the strength ening of regulatory requirements. The policy statement contains the following elements regard ing the expanded NRC use of PRA:
Increased use of PRA in reactor regulatory matters should be implemented to the extent supported by the state of the art in PRA methods and data' and in a manner that complements the NRC's deterministic ap proach and supports the NRC's traditional defense-in-depth philosophy.
" PRA should be used to reduce unnecessary conservatism associated with current regula tory requirements. Where appropriate, PRA should be used to support additional regulato ry requirements.
PRA evaluations in support of regulatory decisions should be as realistic as possible, and appropriate supporting data should be publicly available.
"* Uncertainties in PRA evaluations need to be considered in applying the Commission's USNRC Technical Training Center 4.11-8 Rev 0396 Rey 0396 L_
Westinghouse Technology Advanced Manual 4.11-8 USNRC Technical Training Center


Westinghouse Technology Advanced Manual                                                   Risk Management Westinghouse Technology        Advanced Manual                                            Risk Management safety goals for nuclear power plants.                 1. To support plant operations, mainte nance, inspection, and planning activities; An agency-wide plan has been developed to                 and implement the PRA policy statement. The scope               2. To provide information regarding chang of the PRA implementation plan includes reactor                 es to improve plant safety and reliability.
Westinghouse Technology Advanced Manual Risk Management safety goals for nuclear power plants.
regulation, reactor safety research, analysis and evaluation of operational experience, staff train           A plant's PRA can be used during all modes ing, nuclear material, and low and high level         of plant operation to prioritize operations and waste regulations. The plan provides mecha             maintenance resources to maintain safety at nisms for monitoring programs and management           acceptable levels. This is accomplished, in part, oversight of PRA-related activities. The plan         by periodically updating the PRA results to keep includes both ongoing and new PRA-related             current with plant configuration and component activities. The following are PRA-related regula       failure data. Importance measures can be used to tory activities that are underway within the NRC:      indicate where preventive actions would be most beneficial and what is most important to maintain
An agency-wide plan has been developed to implement the PRA policy statement. The scope of the PRA implementation plan includes reactor regulation, reactor safety research, analysis and evaluation of operational experience, staff train ing, nuclear material, and low and high level waste regulations. The plan provides mecha nisms for monitoring programs and management oversight of PRA-related activities. The plan includes both ongoing and new PRA-related activities. The following are PRA-related regula tory activities that are underway within the NRC:
"*  Graded quality assurance,                          at acceptable safety levels. Based on the updated
"* Graded quality assurance,
"*  The maintenance rule,                            results, adjustments in plant activities and design
"* The maintenance rule,
"*  In-service inspection and testing,                can be made, as appropriate, to maintain the
"* In-service inspection and testing,
"*  The IPE insights program,                          desired level of safety as indicated by the results
"* The IPE insights program,
"*  PRA training for the staff, and                    of the PRA.
"* PRA training for the staff, and
"*  The reliability data rule.
"* The reliability data rule.
The PRA supports plant activities by provid 4.11.4.1 Risk Management                                ing information on the risk-significant areas in plant operation, maintenance, and design.
4.11.4.1 Risk Management Risk management is a means of prioritizing resources and concerns to control the level of safety.
Risk management is a means of prioritizing        Operations, maintenance, inspection, and plan resources and concerns to control the level of        ning personnel can then appropriately address safety. As discussed above, the NRC's and              these areas to control the risk at acceptable levels.
As discussed above, the NRC's and nuclear industry's use of risk analyses have shown that:
nuclear industry's use of risk analyses have shown that:                                                The risk-significant areas are identified by the results of the PRA. These areas are where the
"* The risk from nuclear power plant operation is generally low,
"* The risk from nuclear power plant operation        most attention and effort should be focused.
"* Low cost improvements can sometimes have significant safety and economic benefits, and
is generally low,                                Several useful PRA results are (1) dominant
"* Subtle design and operational differences make it difficult to generalize dominant risk contributors from plant to plant or for a class of plants.
"* Low cost improvements can sometimes have            contributors (these indicate which failures are the significant safety and economic benefits, and      largest contributors to the likelihood of accident
Because each nuclear power plant is essen tially unique, the most powerful use of the PRA is as a plant-specific tool. PRAs can be used in two basic ways:
"* Subtle design and operational differences            sequences), (2) dominant accident sequences make it difficult to generalize dominant risk      (these depict the failure paths that contribute most contributors from plant to plant or for a class    to core damage frequency), and (3) importance of plants.                                        measures (these evaluate what contributes most to core damage, what would reduce the core Because each nuclear power plant is essen          damage frequency the most, and what has the tially unique, the most powerful use of the PRA        greatest potential for increasing core damage is as a plant-specific tool. PRAs can be used in        frequency should it not be as reliable as desired).
: 1. To support plant operations, mainte nance, inspection, and planning activities; and
two basic ways:                                        The major contributors to core damage by acci dent type for the NUREG-1 150 PWR and BWR USNRC Technical Training Center                   4.11-9                                         Rev 0396
: 2. To provide information regarding chang es to improve plant safety and reliability.
A plant's PRA can be used during all modes of plant operation to prioritize operations and maintenance resources to maintain safety at acceptable levels. This is accomplished, in part, by periodically updating the PRA results to keep current with plant configuration and component failure data. Importance measures can be used to indicate where preventive actions would be most beneficial and what is most important to maintain at acceptable safety levels. Based on the updated results, adjustments in plant activities and design can be made, as appropriate, to maintain the desired level of safety as indicated by the results of the PRA.
The PRA supports plant activities by provid ing information on the risk-significant areas in plant operation, maintenance, and design.
Operations, maintenance, inspection, and plan ning personnel can then appropriately address these areas to control the risk at acceptable levels.
The risk-significant areas are identified by the results of the PRA. These areas are where the most attention and effort should be focused.
Several useful PRA results are (1) dominant contributors (these indicate which failures are the largest contributors to the likelihood of accident sequences), (2) dominant accident sequences (these depict the failure paths that contribute most to core damage frequency), and (3) importance measures (these evaluate what contributes most to core damage, what would reduce the core damage frequency the most, and what has the greatest potential for increasing core damage frequency should it not be as reliable as desired).
The major contributors to core damage by acci dent type for the NUREG-1 150 PWR and BWR Rev 0396 USNRC Technical Training Center Westinghouse Technology Advanced Manual Risk Management 4.11-9


Westinghouse Technology Advanced Manual                                                  Risk Managzement Westinghouse Technolo2y     Advanced Manual                                             Risk Management plants are shown in Figure 4.11-5, and the             and systems, and outage frequencies.
Westinghouse Technolo2y Advanced Manual Risk Management plants are shown in Figure 4.11-5, and the relative importance of BWR and PWR systems from NUREG-1050 are shown in Figures 4.11-6 and 4.11-7.
relative importance of BWR and PWR systems from NUREG-1050 are shown in Figures 4.11-6           4.11.4.3 On-Line Maintenance and 4.11-7.
PRA results can be used in many ways during planning and olerational activities at a nuclear plant. The results have an important role in risk management, maintenance planning, and risk-based inspections.
Licensees are increasing the amount and PRA results can be used in many ways             frequency of maintenance performed during during planning and olerational activities at a       power operation. Licensees' expansion of the nuclear plant. The results have an important role     on-line maintenance concept without thorough in risk management, maintenance planning, and         consideration of the safety (risk) aspects raises risk-based inspections.                                 significant concerns. The on-line maintenance concept extends the use of technical specification 4.11.4.2 Configuration Management                       allowed outage times beyond the random single failure in a system and a judgement of a reason Configuration management is one element of         able time to effect repairs upon which the allowed risk management and risk-based regulation.             outage times were based. Compliance with GDC Configuration risk refers to the risk associated       single failure criteria is demonstrated during plant with a specific configuratiori of the plant. A         licensing by assuming a worst-case single configuration usually refers to the status of a       failure, which often results in multiple equipment plant in which multiple components are simulta         failures. This does not imply that it is acceptable neously unavailable. The risk associated with         to voluntarily remove equipment from service to simultaneous outages of multiple components can       perform on-line maintenance on the assumption be much larger than that associated with single       that such actions are bounded by a worst-case component outages. Technicai specifications           single failure.
4.11.4.2 Configuration Management Configuration management is one element of risk management and risk-based regulation.
forbid outages of redundant trains within a safety system, but many other combinations of compo               A simplified qualitative model (shown nent outages can pose significant risk. In con         graphically in Figure 4.11-12) for evaluating risk trolling operational risk, these configurations       can be thought of as including three factors need to be analyzed. The configuration manage         combined in the following way:
Configuration risk refers to the risk associated with a specific configuratiori of the plant. A configuration usually refers to the status of a plant in which multiple components are simulta neously unavailable. The risk associated with simultaneous outages of multiple components can be much larger than that associated with single component outages. Technicai specifications forbid outages of redundant trains within a safety system, but many other combinations of compo nent outages can pose significant risk. In con trolling operational risk, these configurations need to be analyzed. The configuration manage ment process can be predictive in planning maintenance activities and 6utage schedules, and can be retrospective in evaluating the risk signifi cance of plant events.
ment process can be predictive in planning maintenance activities and 6utage schedules, and           Risk = Pi x Pm x Pc can be retrospective in evaluating the risk signifi cance of plant events.
When a component is taken out of service for maintenance or surveillance, it has ani associated downtime and risk. If the component is con trolled by an allowed outage time in the Technical specifications, then this dowvntime is limited by the allowed outage time. Configurition manage ment involves taking measures to avoid risk significant configurations. It involves managing multiple *equipment taken out of service at the same time, the outage times of compn'onents and systems, the availability of backup components and systems, and outage frequencies.
Where:
4.11.4.3 On-Line Maintenance Licensees are increasing the amount and frequency of maintenance performed during power operation. Licensees' expansion of the on-line maintenance concept without thorough consideration of the safety (risk) aspects raises significant concerns. The on-line maintenance concept extends the use of technical specification allowed outage times beyond the random single failure in a system and a judgement of a reason able time to effect repairs upon which the allowed outage times were based. Compliance with GDC single failure criteria is demonstrated during plant licensing by assuming a worst-case single failure, which often results in multiple equipment failures. This does not imply that it is acceptable to voluntarily remove equipment from service to perform on-line maintenance on the assumption that such actions are bounded by a worst-case single failure.
When a component is taken out of service for maintenance or surveillance, it has ani associated         P, =. The probability of an initiating event, downtime and risk. If the component is con                         such as a LOCA, turbine trip, or loss trolled by an allowed outage time in the Technical                 of offsite power.
A simplified qualitative model (shown graphically in Figure 4.11-12) for evaluating risk can be thought of as including three factors combined in the following way:
specifications, then this dowvntime is limited by the allowed outage time. Configurition manage               PM= The probability of not being able to ment involves taking measures to avoid risk                         mitigate the event, with core damage significant configurations. It involves managing                   prevention as the measure of success multiple *equipment taken out of service at the                     ful mitigation.
Risk = Pi x Pm x Pc Where:
same time, the outage times of compn'onents and systems, the availability of backup components 4.11-10                                       Rev 0396 USNRC USNRC Technical     Training Center Technical Training    Center            4.11-10                                         Rev 0396
P, =. The probability of an initiating event, such as a LOCA, turbine trip, or loss of offsite power.
PM= The probability of not being able to mitigate the event, with core damage prevention as the measure of success ful mitigation.
USNRC Technical Training Center 4.11-10 Rev 0396 USNRC Technical Training Center Risk Managzement Westinghouse Technology Advanced Manual 4.11-10 Rev 0396


Westinghouse Technology Advanced Manual                                                   Risk Management Westinghouse Technology Advanced Manual                                                    Risk Management Pc = The probability of not being able to           concept of division or train outages to ensure that mitigate the consequences, with            they do not have a loss of system function. In containment integrity preservation as      the extreme, this could result in all of the equip the measure of success.                    ment in a division being out of service at a time with unexamined risk consequences, while the The intersection of all three occurrences          licensee is in literal compliance with its plant's (initiating event occurs + mitigating equipment          technical specifications. For example, one fails + containment fails) indicates a worst-case        facility that used a division or train approach had scenario, with core melt and subsequent radioac          planned to take out of service the following tive release to the public (a Chernobyl-type event,      equipment: the B AFW pump, the B Battery for example). The intersection of the initiating        charger, the B service water pump, the B RHR pump, and the B charging pump. -Because event and mitigating equipment failure would be redundant train equipment was available, no LCO a TMI-type event, in which there is core melt was exceeded. However, in the event of a without a release. If the consequence of an event is defined as financial loss (a viable definition),      design-basis transient,; such 'as a loss of offsite one would have to say that this intersection            power precipitated by maintenance or instrumen represents a serious scenario itself. Even consid        tation calibration activities associated with non ering the traditional definition of consequence          safety-related equipment in the switchyard, the plant would be in a configuration with significant (potential for core melt), the intersection of an risk implications due to the diminished capability initiating event and mitigating equipment failure to remove decay heat at a high pressure. This is is of concern to the utility and to the NRC.
Westinghouse Technology Advanced Manual Risk Management Pc = The probability of not being able to mitigate the consequences, with containment integrity preservation as the measure of success.
an example of maintenance simultaneously increasing the probability of an initiating event, in An effective risk-assessment process includes this case the loss of offsite power, and diminish consideration of the impact of maintenance ing the plant's capability to mitigate the event.
The intersection of all three occurrences (initiating event occurs + mitigating equipment fails + containment fails) indicates a worst-case scenario, with core melt and subsequent radioac tive release to the public (a Chernobyl-type event, for example). The intersection of the initiating event and mitigating equipment failure would be a TMI-type event, in which there is core melt without a release. If the consequence of an event is defined as financial loss (a viable definition),
activities on all three of these risk factors. It also considers the impact of maintenance activities on There is a clear link between effective mainte both safety-related and non-safety-related equip nance and safety with regard to such issues as the ment. Multiple or single maintenance activities number of plant transients -and challenges to that simultaneously, or within a short time frame, safety systems and the associated need to maxi impact two or more risk factors tend to increase mize the operability, availability, and reliability of risk the greatest. In addition, on-line mainte equipment important to safety. In many cases, nance tends to increase component the only plant changes needed to reduce the unavailabilities. With increased scheduling of probability of core damage are procedure chang maintenance during power operation, the overall es. An example at one plant included staggering impact on train unavailability, when averaged the quarterly tests of the station batteries to over a year, has in many cases increased dramati reduce the probability of common-cause failures cally and in some cases to the point of invalidat of the dc power supplies.
one would have to say that this intersection represents a serious scenario itself. Even consid ering the traditional definition of consequence (potential for core melt), the intersection of an initiating event and mitigating equipment failure is of concern to the utility and to the NRC.
ing the assumptions licensees themselves have made in their plant-specific IPEs.
An effective risk-assessment process includes consideration of the impact of maintenance activities on all three of these risk factors. It also considers the impact of maintenance activities on both safety-related and non-safety-related equip ment. Multiple or single maintenance activities that simultaneously, or within a short time frame, impact two or more risk factors tend to increase risk the greatest. In addition, on-line mainte nance tends to increase component unavailabilities. With increased scheduling of maintenance during power operation, the overall impact on train unavailability, when averaged over a year, has in many cases increased dramati cally and in some cases to the point of invalidat ing the assumptions licensees themselves have made in their plant-specific IPEs.
4.11.4.4 Maintenance Rule Licensees may not have thoroughly consid The maintenance rule, 10CFR50.65, be ered the safety (risk) aspects of doing more on comes effective in July of 1996. One objective line maintenance. Some licensees have used the of the rule is to monitor the effectiveness of USNRC Technical Training Center                     4.11-11                                         Rev 0396
Licensees may not have thoroughly consid ered the safety (risk) aspects of doing more on line maintenance. Some licensees have used the concept of division or train outages to ensure that they do not have a loss of system function. In the extreme, this could result in all of the equip ment in a division being out of service at a time with unexamined risk consequences, while the licensee is in literal compliance with its plant's technical specifications.
For example, one facility that used a division or train approach had planned to take out of service the following equipment: the B AFW pump, the B Battery charger, the B service water pump, the B RHR pump, and the B charging pump. -Because redundant train equipment was available, no LCO was exceeded.
However, in the event of a design-basis transient,; such 'as a loss of offsite power precipitated by maintenance or instrumen tation calibration activities associated with non safety-related equipment in the switchyard, the plant would be in a configuration with significant risk implications due to the diminished capability to remove decay heat at a high pressure. This is an example of maintenance simultaneously increasing the probability of an initiating event, in this case the loss of offsite power, and diminish ing the plant's capability to mitigate the event.
There is a clear link between effective mainte nance and safety with regard to such issues as the number of plant transients -and challenges to safety systems and the associated need to maxi mize the operability, availability, and reliability of equipment important to safety. In many cases, the only plant changes needed to reduce the probability of core damage are procedure chang es. An example at one plant included staggering the quarterly tests of the station batteries to reduce the probability of common-cause failures of the dc power supplies.
4.11.4.4 Maintenance Rule The maintenance rule, 10CFR50.65, be comes effective in July of 1996. One objective of the rule is to monitor the effectiveness of Rev 0396 USNRC Technical Training Center 4.11-11 Westinghouse Technology Advanced Manual Risk Management


Westinghouse Technology Advanced Manual Westnghuse Adance     MaualRisk echolo~                                                        b Minnaopmnt maintenance activities at, the plants for safety           The rule requires that licensees monitor the significant plant equipment in order to minimize       performance or condition of certain structures, the likelihood of failures and events caused by       systems and components (SSCs) against licens the lack of effective maintenance. Another             ee-established goals in a manner sufficient to objective of the rule is to ensure that safety is not provide reasonable assurance that those SSCs degraded when maintenance activities are per           will be capable of performing their intended func formed. The rule requires all nuclear power plant     tions. Such monitoring would take into account licensees to monitor the effectiveness of mainte       industry-wide operating experience. The extent nance activities at their plants. The rule provides   of monitoring may vary from system to system, for continued emphasis on the defense-in-depth         depending on the contribution to risk. Some principle by including selected balance-of-plant       monitoring at the component level may be neces (BOP) structures, systems, and components             sary; most of the monitoring could be done at the (SSCs); integrates risk consideration into the         plant, system, or train level. Monitoring is not maintenance process; establishes an enhanced           required where it has been demonstrated that regulatory basis for inspection and enforcement       an appropriate preventive maintenance program is of BOP maintenance-related issues; and gives a         effectively maintaining the performance of an strengthened regulatory basis for ensuring that       SSC. Each licensee is required to evaluate the the progress achieved is sustained in the future.     overall effectiveness of its maintenance activities The maintenance rule is' a -results-oriented,         at least every refueling cycle, again taking into perfoirmance-based rule. A resiults-oi'iented rule     account industry-wide operating experience, and places a,greater burden on the licensee to develop     to adjust its programs where necessary to ensure the supporting details needed to implement the         that the prevention of failures is appropriately rule, as opposed to that necessary for compliance     balanced with the minimization of unavailability with a traditional prescriptive, process-oriented     of SSCs. Finally, in performing monitoring and regulation.                                           maintenance activities, licensees should assess the total plant equipment that is out of service and The maintenance rule consists of three parts:     determine the overall effect on the performance of (1) goals and monitoring, (2) effective preventive     safety functions.
Westnghuse echolo~
maintenance, and (3) periodic evaluations and safety assessments.' The scope of the rule                 In June of 1995, the NRC published a report includes safety-related' structures, systems, and     (NUREG-1526, "Lessons Learned from Early components that are relied upon to remain func         Implementation of the Maintenance Rule at Nine tional during and following design-basis events       Nuclear Power Plants") which documents to ensure reactor coolant pressure boundary           methods, strengths, and weaknesses found with integrity, reactor shutdown' capability, and the       the implementation of the rule at nine plant sites.
Adance MaualRisk Minnaopmnt maintenance activities at, the plants for safety significant plant equipment in order to minimize the likelihood of failures and events caused by the lack of effective maintenance.
capability to prevent or mitigate the'consequences     These licensees implemented the rule. using the of a~cidents, and those non-safety-related SSCs       guidance in NUMARC 93-01, "Industry Guide (1) that are relied upon to mitigate accidents or     line for Monitoring the Effectiveness of Mainte tr insients or are used in emergency operating         nance at Nuclear Power Plants," which the NRC piocedures; (EOPs), (2) whose failure could           has endorsed in Regulatory Guide 1.160. Most prevent safety-related SSCs from fulfilling their     licensees were thorough in determining which intended functions, or (3) whose failure could         SSCs are within the scope of the rule. Some cause a scram or safety system actuation.              licensees incorrectly failed to classify a few non safety-related systems as being within the scope 4.11-12                                       Rev 0396 USNRC               Training Center Technical Training USNRC Technical                Center             4.11-12                                       Rev 0396
Another objective of the rule is to ensure that safety is not degraded when maintenance activities are per formed. The rule requires all nuclear power plant licensees to monitor the effectiveness of mainte nance activities at their plants. The rule provides for continued emphasis on the defense-in-depth principle by including selected balance-of-plant (BOP) structures, systems, and components (SSCs); integrates risk consideration into the maintenance process; establishes an enhanced regulatory basis for inspection and enforcement of BOP maintenance-related issues; and gives a strengthened regulatory basis for ensuring that the progress achieved is sustained in the future.
The maintenance rule is' a -results-oriented, perfoirmance-based rule. A resiults-oi'iented rule places a, greater burden on the licensee to develop the supporting details needed to implement the rule, as opposed to that necessary for compliance with a traditional prescriptive, process-oriented regulation.
The maintenance rule consists of three parts:
(1) goals and monitoring, (2) effective preventive maintenance, and (3) periodic evaluations and safety assessments.' The scope of the rule includes safety-related' structures, systems, and components that are relied upon to remain func tional during and following design-basis events to ensure reactor coolant pressure boundary integrity, reactor shutdown' capability, and the capability to prevent or mitigate the'consequences of a~cidents, and those non-safety-related SSCs (1) that are relied upon to mitigate accidents or tr insients or are used in emergency operating piocedures; (EOPs), (2) whose failure could prevent safety-related SSCs from fulfilling their intended functions, or (3) whose failure could cause a scram or safety system actuation.
The rule requires that licensees monitor the performance or condition of certain structures, systems and components (SSCs) against licens ee-established goals in a manner sufficient to provide reasonable assurance that those SSCs will be capable of performing their intended func tions. Such monitoring would take into account industry-wide operating experience. The extent of monitoring may vary from system to system, depending on the contribution to risk. Some monitoring at the component level may be neces sary; most of the monitoring could be done at the plant, system, or train level. Monitoring is not required where it has been demonstrated that an appropriate preventive maintenance program is effectively maintaining the performance of an SSC. Each licensee is required to evaluate the overall effectiveness of its maintenance activities at least every refueling cycle, again taking into account industry-wide operating experience, and to adjust its programs where necessary to ensure that the prevention of failures is appropriately balanced with the minimization of unavailability of SSCs. Finally, in performing monitoring and maintenance activities, licensees should assess the total plant equipment that is out of service and determine the overall effect on the performance of safety functions.
In June of 1995, the NRC published a report (NUREG-1526, "Lessons Learned from Early Implementation of the Maintenance Rule at Nine Nuclear Power Plants") which documents methods, strengths, and weaknesses found with the implementation of the rule at nine plant sites.
These licensees implemented the rule. using the guidance in NUMARC 93-01, "Industry Guide line for Monitoring the Effectiveness of Mainte nance at Nuclear Power Plants," which the NRC has endorsed in Regulatory Guide 1.160. Most licensees were thorough in determining which SSCs are within the scope of the rule. Some licensees incorrectly failed to classify a few non safety-related systems as being within the scope USNRC Technical Training Center 4.11-12 Rev 0396 USNRC Technical Training Center Rev 0396 Westinghouse Technology Advanced Manual b
4.11-12


Westinghouse Technology Advanced Manual                                                  Risk Management Westinghouse TechnoIoy      Advanced Manual                                             Risk Mana2ement of the rule. These systems included control room       criteria, taking into account performance history, annunciators, circulating water systems, reactor       preventive maintenance activities, and out-of coolant pump vibration monitoring systems,             service times when developing the performance extraction steam systems, condenser air removal       criteria. SSCs rendered unavailable because of systems, screen wash water systems, generator         preventive maintenance can be trended and gas systems, and turbine lubricating oil systems.     evaluated, and adjustments can be made where necessary to balance the unavailability with The rule requires that reliability goals be       reliability. In addition, the risk contribution established commensurate with safety (risk). In       associated with the unavailability of the system determining which SSCs are risk significant, the       caused by preventive maintenance activities and typical licensee uses an expert panel consisting of   the risk contribution associated with the reliability a multidisciplinary team of PRA, operations, and       of the SSC can be calculated and then used to systems experts in a working group format. The         evaluate adjustments needed to balance the panel uses deterministic and operational experi       contribution from each source to ensure consis ence information to complement PRA or IPE             tency with PRA or IPE evaluations. A fourth insights (importance measures) to establish the       method involves using the PRA to determine relative risk significance of SSCs. The risk           values for unavailability and reliability which, if determination is then used when setting goals and     met, would ensure that certain threshold core monitoring as required by the rule. The rule           damage frequency values would not be exceeded, requires that appropriate corrective action shall be   and then establish performance criteria in accor taken when the performance or condition of an         dance with the resulting unavailability and SSC does not meet established goals. Many             reliability values.
Westinghouse TechnoIoy Advanced Manual Risk Mana2ement of the rule. These systems included control room annunciators, circulating water systems, reactor coolant pump vibration monitoring systems, extraction steam systems, condenser air removal systems, screen wash water systems, generator gas systems, and turbine lubricating oil systems.
licensees have assigned the task of determining the root cause and developing corrective action to           The rule requires that when performing the responsible system engineer at the site; at       monitoring and preventive maintenance activities, some sites the expert panel participates in the         an assessment of the total plant equipment that is process. The relative risk significance of SSCs        out of service should be considered to determine must be reevaluated based on new information,          the overall effect on performance of safety design changes, and plant modifications.              functions. As expected by the results- or perfor mance-oriented nature of the rule, various meth The rule addresses preventive maintenance          ods are being developed and implemented by activities in the following manner: "adjustments      licensees to fulfill this requirement. One method shall be made where necessary to ensure that the      is a matrix approach, which involves listing objective of preventing failures of [SSCs]            preanalyzed configurations to supplement exist through maintenance is appropriately balanced          ing procedural guidance for voluntary on-line against the objective of minimizing the effect of      maintenance. The list of preanalyzed configura monitoring or preventive maintenance on the            tions is developed using importance measures to availability of [SSCs]." In other words, the          rank configurations according to risk. The unavailability of SSCs must be balanced with          equipment out-of-service matrix includes their reliability. Various methods are being          preanalyzed combinations of out-of-service implemented by licensees to perform these              equipment. A multilevel approach is then used to evaluations. For example, unavailability and            either (1) permit the concurrent activities, (2) reliability can be evaluated and balanced as an        require further evaluation, or (3) forbid the integral part of monitoring against performance        performance of the activities in parallel. A simpli-4.11-13                                         Rev 039bo Technical Training Center USNRC Technical                Center            4.11-13                                         Rev 0396
The rule requires that reliability goals be established commensurate with safety (risk). In determining which SSCs are risk significant, the typical licensee uses an expert panel consisting of a multidisciplinary team of PRA, operations, and systems experts in a working group format. The panel uses deterministic and operational experi ence information to complement PRA or IPE insights (importance measures) to establish the relative risk significance of SSCs. The risk determination is then used when setting goals and monitoring as required by the rule. The rule requires that appropriate corrective action shall be taken when the performance or condition of an SSC does not meet established goals. Many licensees have assigned the task of determining the root cause and developing corrective action to the responsible system engineer at the site; at some sites the expert panel participates in the process. The relative risk significance of SSCs must be reevaluated based on new information, design changes, and plant modifications.
The rule addresses preventive maintenance activities in the following manner: "adjustments shall be made where necessary to ensure that the objective of preventing failures of [SSCs]
through maintenance is appropriately balanced against the objective of minimizing the effect of monitoring or preventive maintenance on the availability of [SSCs]." In other words, the unavailability of SSCs must be balanced with their reliability.
Various methods are being implemented by licensees to perform these evaluations. For example, unavailability and reliability can be evaluated and balanced as an integral part of monitoring against performance criteria, taking into account performance history, preventive maintenance activities, and out-of service times when developing the performance criteria. SSCs rendered unavailable because of preventive maintenance can be trended and evaluated, and adjustments can be made where necessary to balance the unavailability with reliability.
In addition, the risk contribution associated with the unavailability of the system caused by preventive maintenance activities and the risk contribution associated with the reliability of the SSC can be calculated and then used to evaluate adjustments needed to balance the contribution from each source to ensure consis tency with PRA or IPE evaluations. A fourth method involves using the PRA to determine values for unavailability and reliability which, if met, would ensure that certain threshold core damage frequency values would not be exceeded, and then establish performance criteria in accor dance with the resulting unavailability and reliability values.
The rule requires that when performing monitoring and preventive maintenance activities, an assessment of the total plant equipment that is out of service should be considered to determine the overall effect on performance of safety functions. As expected by the results-or perfor mance-oriented nature of the rule, various meth ods are being developed and implemented by licensees to fulfill this requirement. One method is a matrix approach, which involves listing preanalyzed configurations to supplement exist ing procedural guidance for voluntary on-line maintenance. The list of preanalyzed configura tions is developed using importance measures to rank configurations according to risk.
The equipment out-of-service matrix includes preanalyzed combinations of out-of-service equipment. A multilevel approach is then used to either (1) permit the concurrent activities, (2) require further evaluation, or (3) forbid the performance of the activities in parallel. A simpli-USNRC Technical Training Center 4.11-13 Rev 039b Rev 0396 o
USNRC Technical Training Center Westinghouse Technology Advanced Manual Risk Management 4.11-13


I Westinghouse Technology Advanced Manual                                                Risk  Man*oprnpnt Westnghuse Adance     MaualRisk echolog                                            Manaivement fied example of an equipment out-of-service           then the configuration is not allowed.
Westnghuse echolog Adance MaualRisk Manaivement fied example of an equipment out-of-service matrix is shown in Figure 4.11-16. Although the matrix approach is simple to use, it defines a limited number of combinations and may not address all operational situations and may unnec essarily limit operational flexibility.
matrix is shown in Figure 4.11-16. Although the matrix approach is simple to use, it defines a               Some licensees have implemented or are limited number of combinations and may not             considering computer-based safety (risk) moni address all operational situations and may unnec       tors that will-calculate and display the risk chang essarily limit operational flexibility.                es associated with changes in plant configuration.
Another method of monitoring the safety (risk) impact of plant configuration involves using the plant IPE to evaluate the changes in the core damage frequency resulting from equipment outages. In Figure 4.11-17, the core damage freoiuency was calculated, for each day, based on tl plant configuration, that existed at the time, and plotted against time. This plant actually operated during the charted time period more conservatively than in its IPE, since the time averaged core damage frequency, based on the actual plant configurations, was lower than the core damage frequency cal6ulated in accordance with the IPE methodology. The "spikes" in core damage frequency correspond to periods of more risk-intensive configurations. Using this method in the predictive mode, the analysis of changes in the core damage frequency would be done during the maintenance planning and scheduling pro cess. The maintenance schedule would be adjust ed to minimize significant spikes in the core damage frequency.
Maintenance planners using the system in the Another method of monitoring the safety           predictive mode, or operators using the system (risk) impact of plant configuration involves           on-line in real time, would be required by plant using the plant IPE to evaluate the changes in the     procedures to take predetermined actions and/or core damage frequency resulting from equipment         initiate further evaluations based on the magni outages. In Figure 4.11-17, the core damage             tude of any indicated increase in risk (decrease in freoiuency was calculated, for each day, based on       safety margin) due to a change in plant configura tl plant configuration, that existed at the time,       tion or operating condition. In order for this type and plotted against time. This plant actually           of system to be used for other than full power operated during the charted time period more           operating conditions, development and imple conservatively than in its IPE, since the time         mentation of PRA models for shutdown plant averaged core damage frequency, based on the           conditions would be necessary.
Figure 4.11-18 is a similar example from a different plant. This type of configuration control analysis is also being used at some foreign plants as the basis for risk-based technical specifications. In Figure 4.11-19, the magnitude of the' projected increase in core damage frequency determines the amount of time the plant is allowed to be in the analyzed configu ration. For example, if the calculated increase in core damage frequency is a factor of 10 or less aboVe the baseline, the allowed duration in that configuration is 30 days; if the calkulated increase is between a factor of 10 and a factor of 30 above the baseline, the allowed duration is 3 days. If the calculated increase in core damage frequency is greater than a factor of 30 above the baseline, then the configuration is not allowed.
actual plant configurations, was lower than the core damage frequency cal6ulated in accordance         4.11.4.5 Inspection of Configuration with the IPE methodology. The "spikes" in core                       Management damage frequency correspond to periods of more risk-intensive configurations. Using this method           The processes used by the licensees to in the predictive mode, the analysis of changes in     schedule and:plah on-line maintenance should the core damage frequency would be done during         ensure that maintenance and testing schedules are the maintenance planning and scheduling pro           appropriately modified to account for degraded or cess. The maintenance schedule would be adjust         inoperable equipment. The following are exam ed to minimize significant spikes in the core         ples of questions that should help to determine damage frequency. Figure 4.11-18 is a similar         the operations/maintenance level of familiarity example from a different plant. This type of           with the process employed by a licensee in configuration control analysis is also being used     managing its scheduled maintenance activities.
Some licensees have implemented or are considering computer-based safety (risk) moni tors that will-calculate and display the risk chang es associated with changes in plant configuration.
at some foreign plants as the basis for risk-based     When planning on-line maintenance:
Maintenance planners using the system in the predictive mode, or operators using the system on-line in real time, would be required by plant procedures to take predetermined actions and/or initiate further evaluations based on the magni tude of any indicated increase in risk (decrease in safety margin) due to a change in plant configura tion or operating condition. In order for this type of system to be used for other than full power operating conditions, development and imple mentation of PRA models for shutdown plant conditions would be necessary.
technical specifications. In Figure 4.11-19, the magnitude of the' projected increase in core           "* Does the licensee take probabilistic risk damage frequency determines the amount of time             insights into account?
4.11.4.5 Inspection of Configuration Management The processes used by the licensees to schedule and:plah on-line maintenance should ensure that maintenance and testing schedules are appropriately modified to account for degraded or inoperable equipment. The following are exam ples of questions that should help to determine the operations/maintenance level of familiarity with the process employed by a licensee in managing its scheduled maintenance activities.
the plant is allowed to be in the analyzed configu     "* Does the licensee allow multiple train outag ration. For example, if the calculated increase in         es?
When planning on-line maintenance:
core damage frequency is a factor of 10 or less       "* How does the licensee take into account aboVe the baseline, the allowed duration in that           component and system dependencies?
"* Does the licensee take probabilistic risk insights into account?
configuration is 30 days; if the calkulated increase   "* How does the licensee assure that important is between a factor of 10 and a factor of 30 above         combinations of equipment needed for the baseline, the allowed duration is 3 days. If           accident mitigation are not unavailable at the the calculated increase in core damage frequency           same time?
"* Does the licensee allow multiple train outag es?
is greater than a factor of 30 above the baseline,     "* By what process does the licensee determine Center             4.11- 14                                     Rev 0396 USNRC Technical      Training Center Technical Training                      4.11-14                                       Rey 0396
"* How does the licensee take into account component and system dependencies?
"* How does the licensee assure that important combinations of equipment needed for accident mitigation are not unavailable at the same time?
"* By what process does the licensee determine USNRC Technical Training Center 4.11-14 Rev 0396 Rey 0396 4.11-14 I
Westinghouse Technology Advanced Manual Risk Man*oprnpnt USNRC Technical Training Center


Westinghouse Technology Advanced Manual                                                   Risk Management Westinghouse Technology Advanced Manual                                                  Risk Management the procedures and testing to emphasize in               that the technical specifications allow certain minimizing component unavailability and                 configurations of plant equipment involving reducing the potential for accident or transient         auxiliary feedwater pumps and high head initiation, including the impact of mainte               safety injection pumps that could potentially nance activities involving non-safety-related           place the plant in an unanalyzed condition.
Westinghouse Technology Advanced Manual Risk Management the procedures and testing to emphasize in minimizing component unavailability and reducing the potential for accident or transient initiation, including the impact of mainte nance activities involving non-safety-related equipment?
equipment?
How does the licensee determine the maxi mum amount of time to allow for the mainte nance and how does it determine the risk associated with the decision?
How does the licensee determine the maxi                 This report illustrates how rigorous imple mum amount of time to allow for the mainte         mentation of risk-based inspection techniques nance and how does it determine the risk           and insights with regard to the plant's configura associated with the decision?                       tion management and on-line maintenance prac
At any given time, how much planned maintenance is in progress and how is it coordinated to minimize risk?
At any given time, how much planned                 tices can identify and resolve safety-significant maintenance is in progress and how is it           issues, thereby reducing risk and improving coordinated to minimize risk?                       safety.
Are there occurrences of scheduled mainte nance activities that simultaneously, or within a short period of time, impact two or more of the risk factors discussed in section 4.11.4.3?
Are there occurrences of scheduled mainte nance activities that simultaneously, or within     4.11.5        Summary a short period of time, impact two or more of the risk factors discussed in section                   Deterministic approaches to regulation 4.11.4.3?                                           consider a set of challenges to safety and deter mine how those challenges should be mitigated.
Specific guidance and inspection require ments for maintenance activities can be found in the NRC Inspection Manual, chapter 62700.
Specific guidance and inspection require           A probabilistic approach to regulation enhances ments for maintenance activities can be found in       and extends the traditional deterministic approach the NRC Inspection Manual, chapter 62700.               by (1) allowing consideration of a broader set of Attachment I contains an example of an inspec           potential challenges to safety, (2) providing a tion report that includes various items related to     logical means for prioritizing these challenges the inspection of risk and configuration manage         based on risk significance, and (3) allowing ment:                                                   consideration of a broader set of resources to defend against these challenges.
Attachment I contains an example of an inspec tion report that includes various items related to the inspection of risk and configuration manage ment:
"    IPE results were used to focus the inspectors' attention on the emergency switchgear                   Licensees are increasing the amount and ventilation, the loss of which was identified       frequency of maintenance performed during by the IPE as the initiator of the top-ranked       power operation. Licensees' expansion of the sequence contributing to core damage fre           on-line maintenance concept without thoroughly quency (cover letter, Notice of Violation, and     considering the safety (risk) aspects raises section 3.1.2 of the inspection report).           significant concerns. The maintenance rule is being implemented to ensure that safety is not
IPE results were used to focus the inspectors' attention on the emergency switchgear ventilation, the loss of which was identified by the IPE as the initiator of the top-ranked sequence contributing to core damage fre quency (cover letter, Notice of Violation, and section 3.1.2 of the inspection report).  
"   The associated violation regarding the white       degraded during the performance of maintenance control power light for the emergency             activities. The rule requires all nuclear power switchgear ventilation fans was cited against     plant licensees to monitor the effectiveness of 10CFR50, Appendix B, Criterion XVI,               maintenance activities.
" The associated violation regarding the white control power light for the emergency switchgear ventilation fans was cited against 10CFR50, Appendix B, Criterion XVI, "Corrective Actions." After July, 1996, this type of violation could be cited against the maintenance rule, 10CFR50.65.
      "Corrective Actions." After July, 1996, this type of violation could be cited against the           The attached inspection report's content maintenance rule, 10CFR50.65.                      reinforces some of the concepts discussed in this section, such as risk-informed inspections (using
Section 4.4 of the report discusses the fact that the technical specifications allow certain configurations of plant equipment involving auxiliary feedwater pumps and high head safety injection pumps that could potentially place the plant in an unanalyzed condition.
"    Section 4.4 of the report discusses the fact      IPE results to prioritize inspection activities - see
This report illustrates how rigorous imple mentation of risk-based inspection techniques and insights with regard to the plant's configura tion management and on-line maintenance prac tices can identify and resolve safety-significant issues, thereby reducing risk and improving safety.
: 4. 11-1                                         Rev U3Yb USNRC Technical Training       Center Training Center            4.11-15                                         Rev 0396
4.11.5 Summary Deterministic approaches to regulation consider a set of challenges to safety and deter mine how those challenges should be mitigated.
A probabilistic approach to regulation enhances and extends the traditional deterministic approach by (1) allowing consideration of a broader set of potential challenges to safety, (2) providing a logical means for prioritizing these challenges based on risk significance, and (3) allowing consideration of a broader set of resources to defend against these challenges.
Licensees are increasing the amount and frequency of maintenance performed during power operation. Licensees' expansion of the on-line maintenance concept without thoroughly considering the safety (risk) aspects raises significant concerns. The maintenance rule is being implemented to ensure that safety is not degraded during the performance of maintenance activities. The rule requires all nuclear power plant licensees to monitor the effectiveness of maintenance activities.
The attached inspection report's content reinforces some of the concepts discussed in this section, such as risk-informed inspections (using IPE results to prioritize inspection activities - see USNRC Technical Training Center
: 4. 11-1
Rev U3Yb USNRC Technical Training Center Westinghouse Technology Advanced Manual Risk Management 4.11-15 Rev 0396


Westirighouse Technology Advanced Manual Westri~huseTecholoy Adancd MaualRisk                                             ¶!uiauýmpn t,
Westri~huseTecholoy Adancd MaualRisk  
section 3.1.2 of the inspection report) and           1150, U.S. Nuclear Regulatory Commis maintenance rule applications (same section,         sion, June 1989.
¶!uiauýmpn section 3.1.2 of the inspection report) and maintenance rule applications (same section, which discusses maintenance trending, etc), and plant configurations which are allowed by the technical specifications but put the plant in an undesirable (unsafe/unanalyzed) condition (see section 4.4 of the inspection report).
which discusses maintenance trending, etc), and plant configurations which are allowed by the     9. "Individual Plant Examination for Severe technical specifications but put the plant in an     Accident Vulnerabilities," Generic Letter No.
4.11.6 References
undesirable (unsafe/unanalyzed) condition (see       88-20, U.S. Nuclear Regulatory Commis section 4.4 of the inspection report).                sion, Washington, DC, November 1988.
: 1. "Reactor Safety Study - An Assessment of Accident Risks in U.S. Commercial Nuclear Power Plants" (WASH-1400), NUREG 75/014, U.S. Nuclear Regulatory Commis sion, Washington, DC, October 1975.
4.11.6     References                           10. "Fundamentals of PRA," Idaho National Engineering Laboratory, Idaho Falls, ID,
: 2. "Risk Assessment Review Group Report to the U.S. Nuclear Regulatory Commission,"
: 1. "Reactor Safety Study - An Assessment of           January 1990.
NUREG/CR-0400, September 1978.
Accident Risks in U.S. Commercial Nuclear Power Plants" (WASH-1400), NUREG             11."Analysis of Core Damage Frequency:
: 3. "Report of the President's Commission on the Accident at Three Mile Island," J.G.
75/014, U.S. Nuclear Regulatory Commis           Internal Events Methodology," NUREG/CR sion, Washington, DC, October 1975.               4550, Vol. 1, Rev. 1, SAND86-2048, Sandia National Laboratories, Albuquerque,
Kemeny et al., October 1979.
: 2. "Risk Assessment Review Group Report to           NM, January 1990.
: 4. "Three Mile Island - A Report to the Com missioners and to the Public," NUREG/CR 1250, Vol. 1, January 1980.
the U.S. Nuclear Regulatory Commission,"
: 5. "Interim Reliability Evaluation Program Procedures Guide," NUREG/CR-2728, U.S. Nuclear Regulatory Commission, Washington, DC, January 1983.
NUREG/CR-0400, September 1978.               12."Fault Tree Handbook," NUREG-0492, U.S. Nuclear Regulatory Commission,
: 6. "PRA Procedures Guide," NUREG/CR 2300, U.S. Nuclear Regulatory Commis sion, Washington, DC, January 1983.
: 3. "Report of the President's Commission on           Washington, DC, January 1981.
: 7. "Probabilistic Risk Assessment Reference Document," NUREG-1050, U.S. Nuclear Regulatory Commission, Washington, DC, September 1984.
the Accident at Three Mile Island," J.G.
: 8. "Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants," NUREG-1150, U.S. Nuclear Regulatory Commis sion, June 1989.
Kemeny et al., October 1979.                 13. "Evaluation of Station Blackout Accidents at Nuclear Power Plants - Technical Findings
: 9. "Individual Plant Examination for Severe Accident Vulnerabilities," Generic Letter No.
: 4. "Three Mile Island - A Report to the Com           Related to Unresolved Safety Issue A-44,"
88-20, U.S. Nuclear Regulatory Commis sion, Washington, DC, November 1988.
missioners and to the Public," NUREG/CR           NUREG-1032, U.S. Nuclear Regulatory 1250, Vol. 1, January 1980.                      Commission, Washington, DC, June 1988.
: 10. "Fundamentals of PRA," Idaho National Engineering Laboratory, Idaho Falls, ID, January 1990.
: 5. "Interim Reliability Evaluation Program       14. "Anticipated Transients Without Scram for Procedures Guide," NUREG/CR-2728,                 Light Water Reactors," NUREG- 0480, Vol.
11."Analysis of Core Damage Frequency:
U.S. Nuclear Regulatory Commission,               1, U.S. Nuclear Regulatory Commission, Washington, DC, January 1983.                     Washington, DC, April 1978.
Internal Events Methodology," NUREG/CR 4550, Vol. 1, Rev. 1, SAND86-2048, Sandia National Laboratories, Albuquerque, NM, January 1990.
: 6. "PRA Procedures Guide," NUREG/CR              15. "Study of the Value and Impact of Alternative 2300, U.S. Nuclear Regulatory Commis             Decay Heat Removal Concepts for Light sion, Washington, DC, January 1983.               Water Reactors," NUREG/CR-2883, Vol.
12."Fault Tree Handbook," NUREG-0492, U.S. Nuclear Regulatory Commission, Washington, DC, January 1981.
1,2,3, U.S. Nuclear Regulatory Commis
: 13. "Evaluation of Station Blackout Accidents at Nuclear Power Plants - Technical Findings Related to Unresolved Safety Issue A-44,"
: 7. "Probabilistic Risk Assessment Reference          sion, Washington, DC, June 1985.
NUREG-1032, U.S. Nuclear Regulatory Commission, Washington, DC, June 1988.
Document," NUREG-1050, U.S. Nuclear Regulatory Commission, Washington, DC,       16. "PRA Applications Program for Inspection at September 1984.                                  ANO-1," NUREG/CR-5058, U.S. Nuclear Regulatory' Commission, Washington, DC,
: 14. "Anticipated Transients Without Scram for Light Water Reactors," NUREG- 0480, Vol.
: 8. "Severe Accident Risks: An Assessment for          March 1988.
1, U.S. Nuclear Regulatory Commission, Washington, DC, April 1978.
Five U.S. Nuclear Power Plants," NUREG-4.11-16                                   Rev 0396 USNRC USNRC Technical     Training Center Technical Training    Center        4.11-16                                   Rev 0396
: 15. "Study of the Value and Impact of Alternative Decay Heat Removal Concepts for Light Water Reactors," NUREG/CR-2883, Vol.
1,2,3, U.S. Nuclear Regulatory Commis sion, Washington, DC, June 1985.
: 16. "PRA Applications Program for Inspection at ANO-1," NUREG/CR-5058, U.S. Nuclear Regulatory' Commission, Washington, DC, March 1988.
USNRC Technical Training Center 4.11-16 Rev 0396 USNRC Technical Training Center Rev 0396 Westirighouse Technology Advanced Manual t,
4.11-16


Westinghouse Technology Advanced Manual                 Risk Management Westinghouse Technology    Advanced Manual              Risk Management
Westinghouse Technology Advanced Manual Risk Management
: 17. "Insights on Plant Specific Unique and/or Important to Safety Features Identified from 72 IPEs for 106 BWR and PWR Units,"
: 17. "Insights on Plant Specific Unique and/or Important to Safety Features Identified from 72 IPEs for 106 BWR and PWR Units,"
U.S. Nuclear Regulatory Commission, Washington, DC, July 1995.
U.S. Nuclear Regulatory Commission, Washington, DC, July 1995.
Line 193: Line 307:
: 21. "Perspectives on Reactor Safety," NUREG CR-6042, SAND93-0971, Sandia National Laboratories, Albuquerque, NM, March 1994.
: 21. "Perspectives on Reactor Safety," NUREG CR-6042, SAND93-0971, Sandia National Laboratories, Albuquerque, NM, March 1994.
: 22. NRC Inspection Report Nos. 50-334/94-24 and 50-412/94-25, November 1994.
: 22. NRC Inspection Report Nos. 50-334/94-24 and 50-412/94-25, November 1994.
4.11-17       Rev 0396 Center USNRC Technical Training Center                 4.11-17       Rev 0396
USNRC Technical Training Center 4.11-17 Rev 0396 Westinghouse Technology Advanced Manual Risk Management USNRC Technical Training Center 4.11-17 Rev 0396


Westinghouse Technology Advanced Manual                                             Risk Management Westinghouse Technology Advanced Manual                                            Risk Management TABLE 4.11 -1 INSIGHTS FROM REVIEW OF PLAN'~T IPEs Insight         Description                                            Applicability Additional Nitrogen     A backup nitrogen supply can usually reduce           BWR and PWR Supply                  calculated core damage frequency (CDF) caused by loss of pneumatic power supply to important plant components such as safety/relief valves and main steam isolation valves inside containment.
Westinghouse Technology Advanced Manual Risk Management TABLE 4.11 -1 INSIGHTS FROM REVIEW OF PLAN'~T IPEs Insight Additional Nitrogen Supply Gas Turbine Genera tors Containment Venting Capability Additional Diesel Generators Bleed and Feed Description A backup nitrogen supply can usually reduce calculated core damage frequency (CDF) caused by loss of pneumatic power supply to important plant components such as safety/relief valves and main steam isolation valves inside containment.
Gas Turbine Genera      Gas turbines can be an alternate ac power source tors                    to keep the plant functioning during a station       BWR and PWR blackout (SBO) or loss of offsite power (LOSP) during which even the emergency diesel genera tors (DGs) fail to start.
Gas turbines can be an alternate ac power source to keep the plant functioning during a station blackout (SBO) or loss of offsite power (LOSP) during which even the emergency diesel genera tors (DGs) fail to start.
Containment Venting    Containment venting can prevent core damage           BWR Capability              and provide containment overpressure protection under certain severe accident scenarios. Loss of containment heat removal has been identified in many BWR PRAs as a significant contributor to CDF. A hardened vent provides a means of removing heat from the containment, indepen dent of the RHR and plant service water sys tems.
Containment venting can prevent core damage and provide containment overpressure protection under certain severe accident scenarios. Loss of containment heat removal has been identified in many BWR PRAs as a significant contributor to CDF. A hardened vent provides a means of removing heat from the containment, indepen dent of the RHR and plant service water sys tems.
Additional Diesel      Increased redundancy and diversity in electrical       BWR and PWR Generators              power supply systems substantially reduces the likelihood of certain accident events. Several IPEs identified the need to perform maintenance and testing of the DGs on a separate schedule using different personnel, and the need for operators to be thoroughly trained in its use.
Increased redundancy and diversity in electrical power supply systems substantially reduces the likelihood of certain accident events. Several IPEs identified the need to perform maintenance and testing of the DGs on a separate schedule using different personnel, and the need for operators to be thoroughly trained in its use.
Bleed and Feed        Most PWRs have bleed and feed (once-through           PWR core cooling) capability. Bleed and feed requires high pressure injection pump(s) and PORVs.
Most PWRs have bleed and feed (once-through core cooling) capability. Bleed and feed requires high pressure injection pump(s) and PORVs.
____________________________                        1 ____________
Applicability BWR and PWR BWR and PWR BWR BWR and PWR PWR 1 ____________
4.11-lY                               Key tJ.IYO USNRC Technical Training Center Center                    4.11-19                               Rev 0396
USNRC Technical Training Center 4.11-lY Key tJ.IYO Westinghouse Technology Advanced Manual Risk Management 4.11-19 Rev 0396 USNRC Technical Training Center


Deterministic Analysis
Deterministic Analysis
* Standard good engineering practices, calculations, and judgements Defense-In-Depth
* Standard good engineering practices, calculations, and judgements Defense-In-Depth  
"* Multiple fission product barriers
"* Multiple fission product barriers  
"* Redundancy
"* Redundancy  
"* Diversity
"* Diversity  
"* Single Failure Criteria
"* Single Failure Criteria  
"* Worst Case Assumptions Figure 4.11-1 Deterministic Analysis 4.11-21
"* Worst Case Assumptions Figure 4.11-1 Deterministic Analysis 4.11-21


Probabilistic Risk Assessment
Probabilistic Risk Assessment  
"* What can go wrong?
"* What can go wrong?  
"* Likelihood?
"* Likelihood?  
"* Consequences?
"* Consequences?
Results
Results  
"* Dominant Contributors
"* Dominant Contributors  
"* Dominant Accident Sequences
"* Dominant Accident Sequences  
"* Importance Measures Figure 4.11-2 Probabilistic Risk Assessment 4.11-23
"* Importance Measures Figure 4.11-2 Probabilistic Risk Assessment 4.11-23


Level 1                                                            Level 2                     Level 3 F--
Level 2 Level 1 F--
Event Tree r
Valve 1vav]
                                                    ,, aa Ar al ai
Vale
[
"~,Valve Plant and Sstem Design Data I LOCA s  
Tree i
'r anJenht1  
* a            a
-1$ý oCf Power
                                                    *      ,      a        ,                       -F i      a Releae Categories    10E-1 Valve I LOCA s FC    FA      FAC  FD 1OE-2
.TurbineTrtp
                                'r anJenht1 1 vav]    Vale  "~,Valve  -1$ý oCfPower              ....          T      L .......- lSI          I         1OE-3
*Steam Bmak I Extemal Eventt
                              .TurbineTrtp        *    .            I -        I
-r.arhquake
                              *Steam Bmak a                     a                         lOE-4 a                    a I Extemal Eventt
.ncicb~dng Accident Initiators Event Tree r
                              -r.arhquake                      i    !  l            .                            10E-5
Ar
                              .ncicb~dng S        ault Tree                                      IOE-6 1OE-7 101E   10E3   10E5 U'  Plant and Sstem            Accident                                                      Release Description Design Data            Initiators                                                                                    Co nsequences Figure 4.11-3 Elements of PRA 0o
[
-F L.......-
T al Tree
,, a a i a i
a a
a i
a I -
I a
a a
a i
l S
ault Tree Releae Categories FC FA FAC FD lSI I
10E-1 1OE-2 1OE-3 lOE-4 10E-5 IOE-6 1OE-7 Release Description 101E 10E3 10E5 Co nsequences Figure 4.11-3 Elements of PRA 0o Level 3 U'


History 1975 Reactor Safety Study (WASH-1400) 1980 Severe Accident Risks: An Assessment An Assessment for Five U.S. Nuclear Power Plants (NUREG-1150) 1985 Severe Accident Policy 1988 Individual Plant EHamination (IPE) Program (Generic Letter 88-20) 1993 Evaluation of Potential Severe Accidents During Low Power and Shutdown Operations (NUREG-6143)
History 1975 Reactor Safety Study (WASH-1400) 1980 Severe Accident Risks: An Assessment An Assessment for Five U.S. Nuclear Power Plants (NUREG-1150) 1985 Severe Accident Policy 1988 Individual Plant EHamination (IPE) Program (Generic Letter 88-20) 1993 Evaluation of Potential Severe Accidents During Low Power and Shutdown Operations (NUREG-6143)
Figure 4.11-4 Historical Perspective 4.11-27
Figure 4.11-4 Historical Perspective 4.11-27


1094 CO'.' -SEAL SGTR INT SYS STATION BLACKOUT LOCA ATWS INT SYS LOCA TRANSIENT STATION                                 "SW-SEAL BLACKOUT                                  LOCA SEQUOYAH                                           ZION INS S LO TRANSIEN" STATION BLACKOUT SURRY LOCA TRANSII ATWS(
1094 INT SYS LOCA TRANSIENT CO'.' -SEAL SGTR STATION BLACKOUT ATWS INT SYS LOCA STATION BLACKOUT "SW-SEAL LOCA SEQUOYAH INS S LO TRANSIEN" STATION BLACKOUT SURRY GRAND GULF Figure 4.11-5 PEACH BOTTOM Major Contributors To Core Damage By Accident Types 4.11-29 ZION LOCA TRANSII ATWS(
GRAND GULF                                   PEACH BOTTOM Figure 4.11-5   Major Contributors To Core Damage By Accident Types 4.11-29


PWR                   I   I I II11111                               I I 111111            I I I 11111 SYSTEMS Maximum Minwnum Relative                         Relative                     a          0 AFWS      Importance                       Importance 0p HPRS                        Averag Relative I
PWR SYSTEMS AFWS HPRS PCs DC HPIS CSIS sws EMERGENCY AC RHRS RPS PORV LPRS LPSI ESAD SUMP P,
PCs                      Importance DC il HPIS                                                                )                I I-I CSIS sws po                I P,
-L I
EMERGENCY AC
I I II11111 Minwnum Maximum Relative Relative Importance Importance Averag Relative Importance I I 1 11111 I
-L RHRS po                    I RPS t0 PORV LPRS                                  4            0 I
I I 11111 a
I LPSI ESAD                  4            0 SUMP "1
0 0p I
I   I I I I, , , ,                       I I I II   III I            SI rII I        I II0 10.3                                     10- 2                           10-1                               I Source Nufleg-1050 Relative Importance of PWR Systems considering dominant accident sequences from 15 PRAs (0O Figure 4.11-7 Relative Importance Factors
I I I I I,,,,
I I I II III I 10.3 10-2 10-1 Relative Importance of PWR Systems considering dominant accident sequences from 15 PRAs Figure 4.11-7 Relative Importance Factors S rI I I I I II0 Source Nufleg-1050
il I-I po I
po I
t0 4
0 4
0 I
(0O
)
I I
"1 I


I   I I   I   I   I   'liii I   I II I111111 11111 BWR                                                                                                                I   I I I I I II I SYSTEMS I    I I III HII                                I    I I 111111I 0
BWR SYSTEMS SWS PCS RPS HPCI LPCI SIR-VALVE EMERGENCY AC ADS FEEDWATER SYS RHRS RCIC DC POWER LPCS
p SWS                                                      Maximum Minimum Relative Relative Importance Importance PCS Average RPS                                Relative Importance                                                               p0 HPCI
.A I
                                                                                                  -I                     0 LPCI                                                                            Me                 0 SIR-VALVE 0
I I III HII I
EMERGENCY AC 0
I I
.A              ADS pd FEEDWATER SYS RHRS
I  
                                          -                -0                                                   I RCIC S       0                                     I DC POWER LPCS
'liii I
                                    -0 I I I 11111                                       l I I 11111 I   I   K  l  I I   I   I I   I I I I I II I    .....
I I
10-2                                             10-1                                   1 10-3 Relative Importance of BWR Systems considering dominant accident sequences from 15 PRAs                                 Source Nufleg-1050 0
I 11111 I
Figure 4.11-6 Relative Importance Factors                                                           (D
I I 111111 p 0 Maximum Relative Importance p0  
-I 0
Me 0
0 0
pd
-0 S
0  
-0 I I I 11111 I I I 11111 I
I I I I I I I 10-2 10-1 Relative Importance of BWR Systems considering dominant accident sequences from 15 PRAs 1
Source Nufleg-1050 Figure 4.11-6 Relative Importance Factors I
I I 111111I Minimum Relative Importance Average Relative Importance 10-3 0
(D I
I I I I I I I I I
I l
I I
K l
I I
I I
I


Risk-Based Regulation A regulatory approach in which insights derived from PRA are used in combination with deterministic and engineering analyses to focus licensee and regulatory attention on issues commensurate with their importance to safety.
Risk-Based Regulation A regulatory approach in which insights derived from PRA are used in combination with deterministic and engineering analyses to focus licensee and regulatory attention on issues commensurate with their importance to safety.
0   RTWS Rule ( OCFR58.62)
0 RTWS Rule ( OCFR58.62)
* Auxiliary Feedwater System Reliability
Auxiliary Feedwater System Reliability Blackout Rule ( OCFR58.63)
* Blackout Rule ( OCFR58.63)
Backfit ( 8CFR58.1 09)
* Backfit ( 8CFR58.1 09)
Risk-Based Inspection Figure 4.11-8 Risk Based Regulation 4.11-35
* Risk-Based Inspection Figure 4.11-8 Risk Based Regulation 4.11-35


PRA Policy Statement (August 16, 1 995)
PRA Policy Statement (August 16, 1 995)
* Increased use of PRA in reactor regulatory matters should be implemented to the extent supported by state of the art in PRA methods and data and in a manner that complements the NRC's deterministic approach and supports the NRC's traditional defense-in-depth philosophy.
Increased use of PRA in reactor regulatory matters should be implemented to the extent supported by state of the art in PRA methods and data and in a manner that complements the NRC's deterministic approach and supports the NRC's traditional defense-in-depth philosophy.
"* PRA should be used to reduce unnecessary conservatism associated with current regulatory requirements. Where appropriate, PRA should be used to support additional regulatory requirements.
PRA should be used to reduce unnecessary conservatism associated with current regulatory requirements. Where appropriate, PRA should be used to support additional regulatory requirements.
"* PRA evaluations in support of regulatory decisions should be as realistic as possible and appropriate supporting data should be publicly available.
PRA evaluations in support of regulatory decisions should be as realistic as possible and appropriate supporting data should be publicly available.
"*  Uncertainties in PRA evaluations need to be considered in applying the Commission's safety goals for nuclear power plants.
Uncertainties in PRA evaluations need to be considered in applying the Commission's safety goals for nuclear power plants.
Figure 4.11-9 PRA Policy Statement 4.11-37
Figure 4.11-9 PRA Policy Statement 4.11-37


PRA Implementation Plan
PRA Implementation Plan  
"* Agency-Wide Plan to Implement the PRA Policy Statement
"* Agency-Wide Plan to Implement the PRA Policy Statement  
"* Includes both on-going and new PRA related activities
"* Includes both on-going and new PRA related activities  
"* Encourages risk-based initiatives from licensees PRA Applications
"* Encourages risk-based initiatives from licensees PRA Applications  
"* Graded Quality Assurance
"* Graded Quality Assurance  
"* Inservice Testing
"* Inservice Testing  
"* Inservice Inspection
"* Inservice Inspection  
"* Technical Specifications
"* Technical Specifications Maintenance Rule IPE Insights Reliability Data Rule (proposed)
* Maintenance Rule
* IPE Insights
* Reliability Data Rule (proposed)
Figure 4.11-10 PRA Implementation Plan 4.11-39
Figure 4.11-10 PRA Implementation Plan 4.11-39


Risk Management R means of prioritizing resources and concerns to control the leuel of safety (risk).
Risk Management R means of prioritizing resources and concerns to control the leuel of safety (risk).
Configuration Management Managing the configuration of plant systems to control the leuel of safety (risk).
Configuration Management Managing the configuration of leuel of safety (risk).
Figure 4.11-11 Risk and Configuration Management - Definitions 4.11-41
plant systems to control the Figure 4.11-11 Risk and Configuration Management - Definitions 4.11-41


0196-X RISK MANAGEMENT FACTORS Risk = Pi X Pm X Pc Figure 4.11-12 Risk Management Factors 4.11-43
0196-X RISK MANAGEMENT FACTORS Risk = Pi X Pm X Pc Figure 4.11-12 Risk Management Factors 4.11-43


Maintenance Rule (I OCFR58.65)
Maintenance Rule (I OCFR58.65)
Effective July 1996 Overall objective of rule is to monitor the effectiveness of maintenance actiuities...for safety significant plant equipment...in order to minimize the likelihood...of failures and events...caused by the lack of effective maintenance.
Effective July 1996 Overall objective of rule is to monitor the effectiveness of maintenance actiuities...for safety significant plant equipment...in order to minimize the likelihood...of failures and events...caused by the lack of effective maintenance.  
"* Goals and Monitoring
"* Goals and Monitoring  
"* Effective Preventive Maintenance
"* Effective Preventive Maintenance  
"* Periodic Evaluations and Safety Assessments.
"* Periodic Evaluations and Safety Assessments.
Figure 4.11-13 Maintenance Rule - Objectives 4.11-45
Figure 4.11-13 Maintenance Rule - Objectives 4.11-45


Scope
Scope Safety-related structures, systems, and components that are relied upon to remain functional during and following design basis events to ensure RCS pressure boundary integrity, reactor shutdown capability, safe shutdown capability, and the capability to prevent or mitigate the consequences of accidents non-safety-related SSCs (1) that are relied upon to mitigate accidents or transients or are used in emergency operating procedures (EOPs),
* Safety-related structures, systems, and components that are relied upon to remain functional during and following design basis events to ensure RCS pressure boundary integrity, reactor shutdown capability, safe shutdown capability, and the capability to prevent or mitigate the consequences of accidents
* non-safety-related SSCs (1) that are relied upon to mitigate accidents or transients or are used in emergency operating procedures (EOPs),
(2) whose failure could prevent safety-related SSCs from fulfilling their intended functions, or (3) whose failure could cause a scram or safety system actuation.
(2) whose failure could prevent safety-related SSCs from fulfilling their intended functions, or (3) whose failure could cause a scram or safety system actuation.
Figure 4.11-14 Maintenance Rule - Scope 4.11-47
Figure 4.11-14 Maintenance Rule - Scope 4.11-47


Configuration Risk Monitoring Methods 0   Matrix approach (pre-analyzed configurations)
Configuration Risk Monitoring Methods 0
* COF impact analysis
Matrix approach (pre-analyzed configurations)
* Safety (risk) monitor Figure 4.11-15 Configuration Risk Monitoring Methods 4.11-49
COF impact analysis Safety (risk) monitor Figure 4.11-15 Configuration Risk Monitoring Methods 4.11-49
 
IHPCI IRCIC lLPCI A LPCIB ICS A ICS B ALT INJ BALT INJ COND PCOND FWS R
I B BSTR I MPMPS MS ICHOR HPCI RCIC CS A CS B Or Very High Risk TSLCO<7 Or Medium Ops Mgr days Risk OK ReqdI I
I ALT INJ I AI ALT INJ B
4 4
: 4.
I 1
4 4
: 4.
I I
S J.
I I
4
: 4.
I 4
4 I
4 11 I
4 COND BSTR COND PMPS FW PMPS STA BAT CHGR TS ICO >7 And Risk Ops Supv days Low OK Reqd J
Figure 4.11-16 Preventive Maintenance Equipment Out-Of-Service Matrix 4.11-51 LPCI A LPCI B PM Not Allowed:
Risk Eval Reqd &
"TS LCO
<12 hrs Ops Mgr OK Reqd DG BAT CHGR I


IHPCI  IRCIC      lLPCI A LPCIB      ICS A ICS B      ALT INJ    I BINJ  COND BALT BSTR  I MPMPS  FWS PCOND MS      ICHOR R HPCI RCIC LPCI A LPCI B 4      4        4.         I CS A 1          4      4        4.         I CS B IALT INJ II        I         S      J.       I         I AI I
1.001E-03 --
4      4.      I         4 PM Not      "TSLCO  Or Very                    ALT INJ Allowed:    <12 hrs High Risk                  B 4        I        4 Risk Eval  Ops Mgr                                        COND Reqd &      OK Reqd                                        BSTR 11      I         4 COND PMPS TSLCO<7 Or Medium Ops Mgr                                                    FW days        Risk    OK ReqdI                                                PMPS STA BAT CHGR TS ICO >7 And Risk Ops Supv                                                                      DG BAT days        Low    OK Reqd                                                                      CHGR
LL a 0 1.00E 4.40E 2.60E-05 1.60E-05 -->*
          ---------------------------      J Figure 4.11-16 Preventive Maintenance Equipment Out-Of-Service Matrix 4.11-51
d TI L\\I1 Il 11 III V II
&#xfd;IAII A
##f!A;RR:
RNTR IW P
I New CDF W 9 I
7
-4
.i
-L oA (0
0
--L
-A*
Baseline IPE 0
New Average CDF c~o~O N
~
CO~
CD ICJ O
CU) 0 (a
Co) 0 N&#xfd; 00 m
N m
D If CJ0 0
II
&#xfd;Jq 16..
2d 1A
!I...*I*I!..La....
I I
II II I I
J m
n n i i.
l i
i
=
= =-*...........  


                                                                                                                                      -        -    New CDF 1.001E-03 --                                                                                                                            Baseline
==
                                                                                                                                              --      IPE 0      New Average CDF I             I             I LL a0
HH"Huu H !ill nMHH" HiMM I
-L (0 1.00E-04  -
I I
oA
l IIII 1
    --L
I I1I I!
    -A*
I W
4.40E                                                    l                                     I                    I          W    IZT W 9 I  7- -------
IZT
0 2.60E-05 d TIL\I1 II 1 II IIII II
                                                                                              ......                        .i                                              -4 1.60E-05 -->*
I Il11 II    I III VI! &#xfd;IAII A I I1 I J m
* n  n i  i .  ...  ..
I
                                                                ##f!A;RR:
l i i  " " = * =
I &#xfd;Jq !I
                                                                                            =-* ...........
RNTR
                                                                                                              ==                  16..
IW P
2d 1A ..La.. .
                                                                                                                                        ...*I*I!                            ......
                            .........                                                    HH"Huu        H !ill      HiMM                                  nMHH" c~o~O    N    ~    CO~            CD  ICJ  O      CU)          0    (a    Co) 0    N&#xfd;    00                D    Ifm    CJ0 N  m 0


0196-X UNIT 2 INSTANTANEOUS RISK GRAPH 2.OOE-04 1.50E-04 M
0196-X UNIT 2 INSTANTANEOUS RISK GRAPH (A)
G 1.OOE-04 cI                                                            FJ 0*
(B)
to E           A 0
(C)
DF                              H 5.OOE-05 BC
(D)
                                    'if' O.OOE+0O (A) Emergency Chilled Water Pump P162 Control Transformer Replacement (B) Train B Cold Leg Injection Valves 2HV9329/HV9323 Transformer Replacement (C) Train B Cold Leg Injection Valves 2HV9326/HV9332 Transformer Replacement (D) Diesel Generator 2G003 Annual Maintenance and HPSI 2P019 Preventive Maint.
(E)
(E) Diesel Generator 2G003 Annual Maintenance and SWC 2P1 14 Preventive Maint.
(F)
(F) AFW Pump P141 Preventive Maintenance (G) AFW Pump P141 Preventive Maintenance and PPS Testing (H) Diesel Generator 2G002 Annual Maintenance and SWC 2P1 12 Preventive Maint.
(G)
(H)
Emergency Chilled Water Pump P162 Control Transformer Replacement Train B Cold Leg Injection Valves 2HV9329/HV9323 Transformer Replacement Train B Cold Leg Injection Valves 2HV9326/HV9332 Transformer Replacement Diesel Generator 2G003 Annual Maintenance and HPSI 2P019 Preventive Maint.
Diesel Generator 2G003 Annual Maintenance and SWC 2P1 14 Preventive Maint.
AFW Pump P141 Preventive Maintenance AFW Pump P141 Preventive Maintenance and PPS Testing Diesel Generator 2G002 Annual Maintenance and SWC 2P1 12 Preventive Maint.
Core damage frequency (CDF) calculated for Mode 1 operations only.
Core damage frequency (CDF) calculated for Mode 1 operations only.
Average CDF for 3 month period = 2.4E-05/yr.
Average CDF for 3 month period = 2.4E-05/yr.
Figure 4.11-18 Risk Monitoring Predictive 4.11-55
Figure 4.11-18 Risk Monitoring Predictive 4.11-55 2.OOE-04 1.50E-04 M
0*
cI to E
0 1.OOE-04 5.OOE-05 G
FJ A
DF H
BC
'if' O.OOE+0O
 
FOREIGN REACTOR RISK PROFILE 35 I,-
100 200 300 Cumulative Target Lifetime Cumulative Average 12 Month Cumulative Average
-Point Actual 400 DAYS a
UI 0
(0 CD CD CD 0
:3 s.1 30 25 20 15 10 5
-Factor of 10 kUn 0
0
- NRC Inspection Report Nos. 50-334/94-24 AND 50-412/94-25


FOREIGN REACTOR RISK PROFILE 35 30 25                                                      Cumulative Target Lifetime Cumulative Average (0
November 29, 1994 Mr. James E. Cross Senior Vice President Nuclear Power Division Duquesne Light Company Post Office Box 4 Shippingport, Pennsylvania 15077  
UI 12 Month Cumulative Average CD 20 CD  0                                          I,-          -Point      Actual s.1 CD        15
                      -Factor of 10 0
10
:3 kUn 5
0 100        200        300            400 0
DAYS a
  - NRC Inspection Report Nos. 50-334/94-24 AND 50-412/94-25 November 29, 1994 Mr. James E. Cross Senior Vice President Nuclear Power Division Duquesne Light Company Post Office Box 4 Shippingport, Pennsylvania 15077


==SUBJECT:==
==SUBJECT:==
NOTICE OF VIOLATION (NRC INSPECTION REPORT NOS. 50-334/94-24 AND 50-412/94-25)
NOTICE OF VIOLATION (NRC INSPECTION REPORT NOS. 50-334/94-24 AND 50-412/94-25)  


==Dear Mr. Cross:==
==Dear Mr. Cross:==
 
This refers to the inspection conducted by Messrs. L. Rossbach, P. Sena, and S. Greenlee of this office from October 11 to November 14, 1994.
This refers to the inspection conducted by Messrs. L. Rossbach, P. Sena, and S. Greenlee of this office from October 11 to November 14, 1994. The inspection included a review of activities at the Beaver Valley facility. At the conclusion of the inspection, the findings were discussed with Messrs.
The inspection included a review of activities at the Beaver Valley facility.
At the conclusion of the inspection, the findings were discussed with Messrs.
G. Thomas, T. Noonan, and other members of your staff.
G. Thomas, T. Noonan, and other members of your staff.
Areas examined during the inspection are identified in the report. The inspection consisted of interviews, observations, document reviews, and independent evaluations of activities important to public health and safety.
Areas examined during the inspection are identified in the report.
The inspection consisted of interviews, observations, document reviews, and independent evaluations of activities important to public health and safety.
The purpose of the inspection was to determine whether activities authorized by the license were conducted safely and in accordance with NRC requirements.
The purpose of the inspection was to determine whether activities authorized by the license were conducted safely and in accordance with NRC requirements.
Our inspection found that, overall, the activities observed were effective in assuring the safe operation of the Beaver Valley power plants. However, based on the results of this inspection, certain of your activities appeared to be in violation of NRC requirements as specified in the enclosed Notice of Violation (Notice). Specifically, a deficiency in the control circuitry for the Unit 2 emergency switchgear ventilation fans was not identified and corrected prior to NRC involvement, despite a history of related work requests. This is of concern for three reasons: First, your Unit 2 Individual Plant Examination (IPE) identified loss of emergency switchgear ventilation as the top ranked initiating sequence contributing to core damage frequency. Although this implies that deficiencies in this system could be of high safety significance, your staff most directly responsible for assuring the reliability of this system were not aware of the IPE rankings. Second, several work requests related to this circuit deficiency were worked in the past, but your staff did not identify the deficiency. Third, programs such as maintenance trending, problem reporting, and system engineering did not identify the recurring nature of this problem and the need for further follow up. We note that your staff has now corrected this circuit deficiency and been that staff in operations, maintenance, and system engineering have now cause to the  root      of informed of the IPE conclusions. However, your attention these concerns is requested.
Our inspection found that, overall, the activities observed were effective in assuring the safe operation of the Beaver Valley power plants.
You are required to respond to this letter and should follow the instructions your specified in the enclosed Notice when preparing your response. In response, you should document   the specific actions taken and any additional to this actions you plan to prevent recurrence. After reviewing your response future Notice, including your proposed corrective actions and the results   of
However, based on the results of this inspection, certain of your activities appeared to be in violation of NRC requirements as specified in the enclosed Notice of Violation (Notice).
Specifically, a deficiency in the control circuitry for the Unit 2 emergency switchgear ventilation fans was not identified and corrected prior to NRC involvement, despite a history of related work requests.
This is of concern for three reasons:
First, your Unit 2 Individual Plant Examination (IPE) identified loss of emergency switchgear ventilation as the top ranked initiating sequence contributing to core damage frequency.
Although this implies that deficiencies in this system could be of high safety significance, your staff most directly responsible for assuring the reliability of this system were not aware of the IPE rankings.
: Second, several work requests related to this circuit deficiency were worked in the past, but your staff did not identify the deficiency.
Third, programs such as maintenance trending, problem reporting, and system engineering did not identify the recurring nature of this problem and the need for further follow up.
We note that your staff has now corrected this circuit deficiency and that staff in operations, maintenance, and system engineering have now been informed of the IPE conclusions.
However, your attention to the root cause of these concerns is requested.
You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response.
In your response, you should document the specific actions taken and any additional actions you plan to prevent recurrence.
After reviewing your response to this Notice, including your proposed corrective actions and the results of future


I inspections, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirements.
inspections, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its enclosures, and your response will be placed in the NRC Public Document Room. Accordingly, your response should not, to the extent possible, include any personal privacy, proprietary, or safeguards information so that it can be released to the public and placed in the NRC Public Document Room.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its enclosures, and your response will be placed in the NRC Public Document Room.
Accordingly, your response should not, to the extent possible, include any personal privacy, proprietary, or safeguards information so that it can be released to the public and placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
The responses directed by this letter and the enclosed Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
Your cooperation with us is appreciated.
Your cooperation with us is appreciated.
Sincerely, Original Signed By:
Sincerely, Original Signed By:
James C. Linville, Chief Projects Branch No. 3 Division of Reactor Projects Docket Nos. 50-334; 50-412
James C. Linville, Chief Projects Branch No. 3 Division of Reactor Projects Docket Nos. 50-334; 50-412  


==Enclosures:==
==Enclosures:==
: 1. Notice of Violation
: 1.
: 2. NRC Inspection Report Nos. 50-334/94-24 and 50-412/94-25 cc w/encls:
Notice of Violation
: 2.
NRC Inspection Report Nos. 50-334/94-24 and 50-412/94-25 cc w/encls:
G. S. Thomas, Vice President, Nuclear Services T. P. Noonan, President, Nuclear Operations L. R. Freeland, General Manager, Nuclear Operations Unit K. D. Grada, Manager, Quality Services Unit N. R. Tonet, Manager, Nuclear Safety Department H. R. Caldwell, General Superintendent, Nuclear Operations K. Abraham, PAO (2 copies)
G. S. Thomas, Vice President, Nuclear Services T. P. Noonan, President, Nuclear Operations L. R. Freeland, General Manager, Nuclear Operations Unit K. D. Grada, Manager, Quality Services Unit N. R. Tonet, Manager, Nuclear Safety Department H. R. Caldwell, General Superintendent, Nuclear Operations K. Abraham, PAO (2 copies)
Public Document Room (PDR)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Pennsylvania State of Ohio
NRC Resident Inspector Commonwealth of Pennsylvania State of Ohio I


ENCLOSURE 1 NOTICE OF VIOLATION Duquesne Light Company                             Docket Nos. 50-412 Beaver Valley Power Station, Unit 2               License Nos. NPF-73 During an NRC inspection conducted between October   11 and November 14, 1994, one violation of NRC requirements was identified. In accordance with the "General Statement of Policy and Procedure for NRC   Enforcement Actions,"
ENCLOSURE 1 NOTICE OF VIOLATION Duquesne Light Company Docket Nos. 50-412 Beaver Valley Power Station, Unit 2 License Nos. NPF-73 During an NRC inspection conducted between October 11 and November 14,
10 CFR Part 2, Appendix C, the violation is listed   below:
: 1994, one violation of NRC requirements was identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"
10 CFR Part 2, Appendix C, the violation is listed below:
10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Actions," states, in part, that measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and non-conformances are promptly identified and corrected.
10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Actions," states, in part, that measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and non-conformances are promptly identified and corrected.
Contrary to the above, as of October 21, 1994, established measures did not assure that conditions adverse to quality were promptly identified and corrected. Specifically, the investigations of an unusually dim white control power light for emergency switchgear ventilation fans 2HVZ-FN261A on October 30, 1993, and 2HVZ-FN261B on September 24, 1994, failed to identify that the standby fan would not start if called upon following the loss of the running fan except when started by the emergency diesel sequencer. Equipment maintenance history was not used to identify that a trend of similar problem descriptions of a dim white control power light has existed since 1989.
Contrary to the above, as of October 21, 1994, established measures did not assure that conditions adverse to quality were promptly identified and corrected.
Specifically, the investigations of an unusually dim white control power light for emergency switchgear ventilation fans 2HVZ-FN261A on October 30, 1993, and 2HVZ-FN261B on September 24, 1994, failed to identify that the standby fan would not start if called upon following the loss of the running fan except when started by the emergency diesel sequencer.
Equipment maintenance history was not used to identify that a trend of similar problem descriptions of a dim white control power light has existed since 1989.
This is a Severity Level IV violation (Supplement I).
This is a Severity Level IV violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region I, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation 94-25-01. This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued to show cause why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.
Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN:
Dates at King of Prussia. Pennsylvania this 221h day of November, 1994
Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region I, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation 94-25-01.
This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation:
(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued to show cause why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.
Where good cause is shown, consideration will be given to extending the response time.
Dates at King of Prussia. Pennsylvania this 221h day of November, 1994


U. S. NUCLEAR REGULATORY COMMISSION REGION I Report Nos.             94-24 94-25 Docket Nos.              50-334 50-412 License Nos.            DPR-66 NPF-73 Licensee:                Duquesne Light Company One Oxford Center 301 Grant Street Pittsburgh, PA 15279 Facility:               Beaver Valley Power Station, Units 1 and 2 Location:                Shippingport, Pennsylvania Inspection Period:      October 11 - November 14, 1994 Inspectors:              Lawrence W. Rossbach, Senior Resident Inspector Peter P. Sena, Resident Inspector Scot A. Greenlee, Resident Inspector Approved by:                                                              Date W. J. Lazarus, Chief Reactor Projects Section 3B Inspection Summary This inspection report documents the safety inspections conducted during day and backshift hours of station activities in the areas of: plant operations; maintenance and surveillance; engineering; and plant support.
U. S. NUCLEAR REGULATORY COMMISSION REGION I Report Nos.
Docket Nos.
License Nos.
Licensee:
94-24 94-25 50-334 50-412 DPR-66 NPF-73 Duquesne Light Company One Oxford Center 301 Grant Street Pittsburgh, PA 15279 Facility:
Location:
Inspection Period:
Inspectors:
Approved by:
Beaver Valley Power Station, Units 1 and 2 Shippingport, Pennsylvania October 11 - November 14, 1994 Lawrence W. Rossbach, Senior Resident Inspector Peter P. Sena, Resident Inspector Scot A. Greenlee, Resident Inspector W. J. Lazarus, Chief Reactor Projects Section 3B Inspection Summary This inspection report documents the safety inspections conducted during day and backshift hours of station activities in the areas of:
plant operations; maintenance and surveillance; engineering; and plant support.
Date


EXECUTIVE  
EXECUTIVE  


==SUMMARY==
==SUMMARY==
 
Beaver Valley Power Station Report Nos. 50-334/94-24 & 50-412/94-25 Plant Operations Good operator performance was demonstrated during response to a loss of pressure in the control room temperature control air system, and to a blown fuse in the Unit 1 solid state protection system.
Beaver Valley Power Station Report Nos. 50-334/94-24 & 50-412/94-25 Plant Operations Good operator performance was demonstrated during response to a loss of pressure in the control room temperature control air system, and to a blown fuse in the Unit 1 solid state protection system. Troubleshooting of a decrease in vacuum on the 2-1 emergency diesel generator was well planned and documented. Operators at Unit 1 demonstrated a-strong questioning attitude when they identified a potential relationship between an out-of-service quench spray pump and net positive suction head to the recirculation spray pumps.
Troubleshooting of a decrease in vacuum on the 2-1 emergency diesel generator was well planned and documented.
Operators at Unit 1 demonstrated a-strong questioning attitude when they identified a potential relationship between an out-of-service quench spray pump and net positive suction head to the recirculation spray pumps.
However, the recirculation spray pumps were unnecessarily removed from service before it was determined that one quench spray pump will ensure adequate net positive suction head.
However, the recirculation spray pumps were unnecessarily removed from service before it was determined that one quench spray pump will ensure adequate net positive suction head.
Maintenance An unusually dim control power light for emergency switchgear ventilation fans led to identification of a deficiency with the control circuitry.
Maintenance An unusually dim control power light for emergency switchgear ventilation fans led to identification of a deficiency with the control circuitry.
Specifically, if the running fan was to fail for any reason, the standby fan could not auto-start or be manually started without first placing the failed fan control switch in "pull to lock" unless sequenced on by the emergency diesel sequencer. Previous troubleshooting efforts did not identify or correct this problem, and maintenance history trending was not used to identify the need for additional investigations of this control circuitry despite a history of work requests with a similar problem description.
Specifically, if the running fan was to fail for any reason, the standby fan could not auto-start or be manually started without first placing the failed fan control switch in "pull to lock" unless sequenced on by the emergency diesel sequencer.
Additionally, operations and maintenance personnel, and the system engineer, were unaware that the licensee's Individual Plant' Examination identified the loss of emergency switchgear ventilation as the top ranked initiating sequence contributing to core damage frequency. The failure to promptly identify the emergency switchgear ventilation control circuitry deficiency is a violation of 10 CFR 50, Appendix B, Criterion XVI, "Corrective Actions."
Previous troubleshooting efforts did not identify or correct this problem, and maintenance history trending was not used to identify the need for additional investigations of this control circuitry despite a history of work requests with a similar problem description.
Operations personnel re-identified a previous deficiency associated with the SLCRS system that had not been repaired for almost three years. Good management attention has been subsequently focused on the timely repair of this deficiency. Test data showed that the system still would have performed its function. Corrective actions to address problems with the diesel speed sensing circuit and the rod control system were also appropriate.
Additionally, operations and maintenance personnel, and the system engineer, were unaware that the licensee's Individual Plant' Examination identified the loss of emergency switchgear ventilation as the top ranked initiating sequence contributing to core damage frequency.
Engineerin The licensee continued to demonstrate leadership in the nuclear industry through the identification of significant generic issues. Specifically, the licensee identified an AMSAC design deficiency which would have made the system inoperable if feedwater flow on one channel was outside its normal band, and issued a 10 CFR Part 21 notification concerning an anomaly with the test circuits on the Unit I solid state protection system. The AMSAC issue is still under evaluation for Part 21 applicability.
The failure to promptly identify the emergency switchgear ventilation control circuitry deficiency is a violation of 10 CFR 50, Appendix B, Criterion XVI, "Corrective Actions."
Operations personnel re-identified a previous deficiency associated with the SLCRS system that had not been repaired for almost three years.
Good management attention has been subsequently focused on the timely repair of this deficiency.
Test data showed that the system still would have performed its function.
Corrective actions to address problems with the diesel speed sensing circuit and the rod control system were also appropriate.
Engineerin The licensee continued to demonstrate leadership in the nuclear industry through the identification of significant generic issues.
Specifically, the licensee identified an AMSAC design deficiency which would have made the system inoperable if feedwater flow on one channel was outside its normal band, and issued a 10 CFR Part 21 notification concerning an anomaly with the test circuits on the Unit I solid state protection system.
The AMSAC issue is still under evaluation for Part 21 applicability.
ii
ii


(EXECUTIVE    
(EXECUTIVE  


==SUMMARY==
==SUMMARY==
CONTINUED) in an Appropriate controls were not in place to prevent placing the plants unanalyzed condition if the steam driven   auxiliary feedwater (AFW)   pump is out were promptly put in place pending   a of service. Appropriate controls                                              found revision to the Technical Specifications. Additionally, the inspectors           AFW the  minimum that the emergency operating procedures (EOPs) did not reflect               The flow required during small break loss of coolant accident   conditions.
CONTINUED)
issue of AFW flow requirements for the EOPs is an unresolved item (50-334/94-24-02 and 50-412/94-25-02) pending further review by the NRC.
Appropriate controls were not in place to prevent placing the plants in an unanalyzed condition if the steam driven auxiliary feedwater (AFW) pump is out of service.
Appropriate controls were promptly put in place pending a revision to the Technical Specifications.
Additionally, the inspectors found that the emergency operating procedures (EOPs) did not reflect the minimum AFW flow required during small break loss of coolant accident conditions.
The issue of AFW flow requirements for the EOPs is an unresolved item (50-334/94-24-02 and 50-412/94-25-02) pending further review by the NRC.
Plant Support Health physics and security programs continue to be effectively implemented.
Plant Support Health physics and security programs continue to be effectively implemented.
this subject Improvements in plant housekeeping and management attention on have been noted.
Improvements in plant housekeeping and management attention on this subject have been noted.
iii
iii


Line 416: Line 663:


==SUMMARY==
==SUMMARY==
......................................................... ii TABLE OF CONTENTS ......................................................... iv 1.0   MAJOR FACILITY ACTIVITIES ...........................................     1 2.0   PLANT OPERATIONS (71707) ............................................. 1 2.1    Operational Safety Verification ...............................
ii TABLE OF CONTENTS.........................................................
2.2    Loss of Control Room Temperature Control Air Pressure ......... 2 2.3    Unit I Quench Spray Pump Maintenance ........................... 2 2.4    Operator Response to Unit 1 Solid State Protection System.         3 2.5    Unit 2 Emergency Diesel Generator Troubleshooting ............. 3 4
iv 1.0 MAJOR FACILITY ACTIVITIES...........................................
3.0   MAINTENANCE (62703, 61726, 71707) ...................................     4 3.1   Maintenance Observations ....................................... 5 3.1.1 Unit 2 Rod Control ....................................... 5 3.1.2 Unit 2 Emergency Switchgear Ventilation .................     7 3.2. Surveillance Observations .....................................
1 2.0 PLANT 2.1 2.2 2.3 2.4 2.5 OPERATIONS (71707).............................................
3.2.1 Supplemental Leak Collection System (SLCRS) Duct               8 Damage at Unit 1 .........................................
Operational Safety Verification...............................
3.2.2 Unit I Emergency Diesel Generator Speed Sensing               9 Circuit Failures .........................................
Loss of Control Room Temperature Control Air Pressure.........
10 4.0   ENGINEERING (71707, 37551, 92903) ................................... 10 4.1   AMSAC Design Omission .........................................
Unit I Quench Spray Pump Maintenance...........................
4.2   Calibration of CREBAPS Pressure Switches (Unresolved Item         11 50-334/94-17-01) (closed) ..................................... 12 4.3   Solid State Protection System 10 CFR Part 21 (closed) ......... 12 4.4   Auxiliary Feedwater Flow Margin ...............................
Operator Response to Unit 1 Solid State Protection System.
13 5.0   PLANT SUPPORT (71750, 71707) ......................................... 13 5.1    Radiological Controls ......................................... 13 5.2    Security ....................................................... 14 5.3    Housekeeping ...................................................
Unit 2 Emergency Diesel Generator Troubleshooting.............
14 6.0   ADMINISTRATIVE ....................................................... 14 6.1   Preliminary Inspection Findings Exit ...........................
3.0 MAINTENANCE (62703, 61726, 71707)...................................
6.2   Attendance at Exit Meetings Conducted by Region-Based             14 Inspectors ..................................................... 14 6.3   NRC Staff Activities ...........................................
3.1 Maintenance Observations.......................................
iv
3.1.1 Unit 2 Rod Control.......................................
3.1.2 Unit 2 Emergency Switchgear Ventilation.................
3.2.
Surveillance Observations.....................................
3.2.1 Supplemental Leak Collection System (SLCRS)
Duct Damage at Unit 1.........................................
3.2.2 Unit I Emergency Diesel Generator Speed Sensing Circuit Failures.........................................
4.0 ENGINEERING (71707, 37551, 92903)...................................
4.1 AMSAC Design Omission.........................................
4.2 Calibration of CREBAPS Pressure Switches (Unresolved Item 50-334/94-17-01) (closed).....................................
4.3 Solid State Protection System 10 CFR Part 21 (closed).........
4.4 Auxiliary Feedwater Flow Margin...............................
5.0 PLANT 5.1 5.2 5.3 SUPPORT (71750, 71707).........................................
Radiological Controls.........................................
Security.......................................................
Housekeeping...................................................
6.0 ADMINISTRATIVE.......................................................
6.1 Preliminary Inspection Findings Exit...........................
6.2 Attendance at Exit Meetings Conducted by Region-Based Inspectors.....................................................
6.3 NRC Staff Activities...........................................
1 2
2 3
3 4
4 5
5 7
8 9
10 10 11 12 12 13 13 13 14 14 14 14 14 iv


DETAILS 1.0   MAJOR FACILITY ACTIVITIES Both units operated at full power for the duration of the period.
DETAILS 1.0 MAJOR FACILITY ACTIVITIES Both units operated at full power for the duration of the period.
2.0   PLANT OPERATIONS (71707) 2.1   Operational Safety Verification Using applicable drawings and check-off lists, the inspectors independently verified safety system operability by performing control panel and field walkdowns of the following systems: supplemental leak collection and release, control room ventilation, temperature control air pressurization, and emergency switchgear ventilation. The emergency switchgear ventilation walkdown was a semi-annual engineered safety system inspection and resulted in safety significant findings as described in Section 3.1.2. These systems were properly aligned. The inspectors observed plant operation and verified that the plant was operated safely and in accordance with licensee procedures and regulatory requirements. Regular tours were conducted of the following plant areas:
2.0 PLANT OPERATIONS (71707) 2.1 Operational Safety Verification Using applicable drawings and check-off lists, the inspectors independently verified safety system operability by performing control panel and field walkdowns of the following systems:
a     Control Room                             Safeguards Areas
supplemental leak collection and release, control room ventilation, temperature control air pressurization, and emergency switchgear ventilation.
* Auxiliary Buildings                 a   Service Buildings 0     Switchgear Areas
The emergency switchgear ventilation walkdown was a semi-annual engineered safety system inspection and resulted in safety significant findings as described in Section 3.1.2.
* Turbine Buildings 0     Access Control Points
These systems were properly aligned.
* Intake Structure
The inspectors observed plant operation and verified that the plant was operated safely and in accordance with licensee procedures and regulatory requirements.
* Protected Areas
Regular tours were conducted of the following plant areas:
* Yard Areas
a Control Room Safeguards Areas Auxiliary Buildings a
* Spent Fuel Buildings
Service Buildings 0
* Containment Penetration Areas
Switchgear Areas Turbine Buildings 0
* Diesel Generator Buildings During the course of the inspection, discussions were conducted with operators concerning knowledge of recent changes to procedures, facility configuration, and plant conditions. The inspectors verified adherence to approved procedures for ongoing activities observed. Shift turnovers were witnessed and staffing requirements confirmed. The inspectors found that control room access was properly controlled and a professional atmosphere was maintained.
Access Control Points Intake Structure Protected Areas Yard Areas Spent Fuel Buildings Containment Penetration Areas Diesel Generator Buildings During the course of the inspection, discussions were conducted with operators concerning knowledge of recent changes to procedures, facility configuration, and plant conditions.
The inspectors verified adherence to approved procedures for ongoing activities observed.
Shift turnovers were witnessed and staffing requirements confirmed.
The inspectors found that control room access was properly controlled and a professional atmosphere was maintained.
Inspectors' comments or questions resulting from these reviews were resolved by licensee personnel.
Inspectors' comments or questions resulting from these reviews were resolved by licensee personnel.
Control room instruments and plant computer indications were observed for correlation between channels and for conformance with technical specification (TS) requirements. Operability of engineered safety features, other safety related systems, and onsite and offsite power sources were verified. The inspectors observed various alarm conditions and confirmed that'operator with response was in accordance with plant operating procedures. Compliance of TS and implementation of appropriate action statements for equipment out entries service was inspected. Logs and records were reviewed to determine if records were accurate and identified equipment status or deficiencies. These included operating logs, turnover sheets, system safety tags, and the   jumper the condition  of  various and lifted lead book. The inspectors also examined fire protection, meteorological, and seismic monitoring systems.
Control room instruments and plant computer indications were observed for correlation between channels and for conformance with technical specification (TS) requirements.
Operability of engineered safety features, other safety related systems, and onsite and offsite power sources were verified.
The inspectors observed various alarm conditions and confirmed that'operator response was in accordance with plant operating procedures.
Compliance with TS and implementation of appropriate action statements for equipment out of service was inspected.
Logs and records were reviewed to determine if entries were accurate and identified equipment status or deficiencies.
These records included operating logs, turnover sheets, system safety tags, and the jumper and lifted lead book.
The inspectors also examined the condition of various fire protection, meteorological, and seismic monitoring systems.


2 2.2     Loss of Control Room Temperature Control Air Pressure On November 14, 1994, at 3:25 p.m., the plant operators at Unit 1 received a control room temperature control air pressure low alarm. The air system pressure was found at 15 psig. Normal system pressure is between 50 and 70 psig. The alarm response procedure refers the operators to the control room emergency habitability system technical specification (3.7.7.1) and Updated Final Safety Analysis Report (UFSAR) Section 9.13.4 "Main Control Area."
2 2.2 Loss of Control Room Temperature Control Air Pressure On November 14, 1994, at 3:25 p.m., the plant operators at Unit 1 received a control room temperature control air pressure low alarm.
After reviewing these references, the Shift Supervisor concluded that he could not be assured of operability of the Unit I control room supply and exhaust dampers. These dampers, VS-D-40-1A through D, have a flexible boot seal which provides for air-tight isolation of the control room during accident conditions. The control room temperature control air system supplies air to these seals. Consequently, at 4:10-p.m., it was identified that both Units I and 2 were required to enter Technical Specification 3.0.3, which requires action within 1 hour to initiate plant shutdown. Both units were in Mode 1 and both units began preparations for plant shutdown. The operators determined that the loss of air pressure was due to-a stuck open automatic moisture blowdown valve. The valve was isolated and the low pressure alarm cleared at 4:27 p.m. The units exited Technical Specification 3.0.3 at 4:34 p.m. Neither unit progressed to the point of reducing power.
The air system pressure was found at 15 psig.
The inspectors reviewed this event and concluded that-the operators took appropriate response actions. The inspectors did note that the event indicated a potential single failure vulnerability in the safety-related control room temperature control air system. The vulnerability is "potential" because the damper seals have backup accumulators and isolation check valves which may allow the seals to work even with a loss of pressure in the rest of the system. However, the accumulators and the check valves are apparently not tested to ensure this capability. The licensee was still evaluating this failure vulnerability when the report period ended.
Normal system pressure is between 50 and 70 psig.
2.3     Unit 1 Quench Spray Pump Maintenance During a routine control room walkdown, the inspectors noted that the licensee had removed the Unit 1 'A' train recirculation spray and quench spray pumps from service. The pumps were taken out of service by a clearance for maintenance on the quench spray pump (oil leak repair). The inspectors asked why the recirculation spray pumps were included on the clearance. The inspectors found that'the night-shift crew had a concern about net positive suction head to the recirculation spray pumps when-removing a quench spray pump from service. Some of the flow from the quench spray pumps is diverted directly to the containment sump. This provides added cooling for the sump water to ensure adequate net positive suction head for the recirculation spray and low head safety injection pumps under all design basis conditions. The from night-shift operators were concerned that removing one quench spray pump might service, while leaving all the recirculation spray pumps in service, leave the opposite train recirculation spray pumps without sufficient net positive suction head.
The alarm response procedure refers the operators to the control room emergency habitability system technical specification (3.7.7.1) and Updated Final Safety Analysis Report (UFSAR)
Section 9.13.4 "Main Control Area."
After reviewing these references, the Shift Supervisor concluded that he could not be assured of operability of the Unit I control room supply and exhaust dampers.
These dampers, VS-D-40-1A through D, have a flexible boot seal which provides for air-tight isolation of the control room during accident conditions.
The control room temperature control air system supplies air to these seals.
Consequently, at 4:10-p.m., it was identified that both Units I and 2 were required to enter Technical Specification 3.0.3, which requires action within 1 hour to initiate plant shutdown.
Both units were in Mode 1 and both units began preparations for plant shutdown.
The operators determined that the loss of air pressure was due to-a stuck open automatic moisture blowdown valve.
The valve was isolated and the low pressure alarm cleared at 4:27 p.m.
The units exited Technical Specification 3.0.3 at 4:34 p.m.
Neither unit progressed to the point of reducing power.
The inspectors reviewed this event and concluded that-the operators took appropriate response actions.
The inspectors did note that the event indicated a potential single failure vulnerability in the safety-related control room temperature control air system.
The vulnerability is "potential" because the damper seals have backup accumulators and isolation check valves which may allow the seals to work even with a loss of pressure in the rest of the system.
However, the accumulators and the check valves are apparently not tested to ensure this capability.
The licensee was still evaluating this failure vulnerability when the report period ended.
2.3 Unit 1 Quench Spray Pump Maintenance During a routine control room walkdown, the inspectors noted that the licensee had removed the Unit 1 'A' train recirculation spray and quench spray pumps from service.
The pumps were taken out of service by a clearance for maintenance on the quench spray pump (oil leak repair).
The inspectors asked why the recirculation spray pumps were included on the clearance.
The inspectors found that'the night-shift crew had a concern about net positive suction head to the recirculation spray pumps when-removing a quench spray pump from service.
Some of the flow from the quench spray pumps is diverted directly to the containment sump.
This provides added cooling for the sump water to ensure adequate net positive suction head for the recirculation spray and low head safety injection pumps under all design basis conditions.
The night-shift operators were concerned that removing one quench spray pump from service, while leaving all the recirculation spray pumps in service, might leave the opposite train recirculation spray pumps without sufficient net positive suction head.


3 The inspectors researched the operators' concern and found that -the analysis for containment sump net positive suction head adequately accounted for the loss of one quench spray pump. Additionally, the analysis document stated that the cooling water from the quench spray pumps was only needed under certain conditions, primarily large break loss of coolant accidents.
3 The inspectors researched the operators' concern and found that -the analysis for containment sump net positive suction head adequately accounted for the loss of one quench spray pump.
Consequently, taking the recirculation spray pumps out of service was not necessary. The licensee's Nuclear Safety Department confirmed this assertion shortly after the inspectors questioned the licensee's actions, and told the operators that the pumps should be placed back in service. The inspectors complemented the operators questioning attitude, but noted that their actions unnecessarily increased the risk of system failure during an accident.
Additionally, the analysis document stated that the cooling water from the quench spray pumps was only needed under certain conditions, primarily large break loss of coolant accidents.
Furthermore, the implications of taking multiple pieces of safety'equipment out of service at the same time must be carefully evaluated. The analysis for containment sump net positive suction head did not specifically address the condition of one quench spray pump and two recirculation spray-pumps out of service at the same time (without a low head pump out of service). The licensee has since determined that the analysis does bound the condition. The inspector's observations were discussed with the Unit 1 Operation Manager, who had already reached similar conclusions, and had discussed the issue'with the personnel involved.
Consequently, taking the recirculation spray pumps out of service was not necessary.
2.4   Operator Response to Unit 1 Solid State Protection System The inspectors observed the operator response to a partial failure the Unit 1 solid state protection system (SSPS). The control room received simultaneous annunciators for reactor coolant pump IA undervoltage, underfrequency, breaker trip, turbine stop valve closure, and turbine auto-stop low oil pressure.
The licensee's Nuclear Safety Department confirmed this assertion shortly after the inspectors questioned the licensee's actions, and told the operators that the pumps should be placed back in service.
Operators immediately evaluated these annunciators and noted that normal operating parameters existed for the reactor coolant pump and main turbine and that the plant was in a safe condition. It was concluded that an off-normal condition existed with the SSPS and immediate assistance was provided by instrumentation and controls engineers. Subsequent troubleshooting activities are discussed in Section 3.1.
The inspectors complemented the operators questioning attitude, but noted that their actions unnecessarily increased the risk of system failure during an accident.
2.5   Unit 2 Emergency Diesel Generator Troubleshooting The 2-1 diesel generator has experienced a reduction of crankcase vacuum over the past several months from 1.1 to 0.8 inches water. Under normal conditions, the crankcase operates with a slight vacuum to prevent the buildup of flammable vapors. A positive pressure can result from the failure of the crankcase ventilation system or excessive combustion gases passing-the piston rings. Operations and maintenance personnel developed a troubleshooting plan to investigate this degrading trend. Through these efforts, it was identified that a flow restriction exists in the discharge line of the crankcase blower.
Furthermore, the implications of taking multiple pieces of safety'equipment out of service at the same time must be carefully evaluated.
The licensee will continue to monitor crankcase pressure and plans on correcting this restriction during the upcoming refueling outage. The inspector found this to be acceptable, since there is no actual degradation of the diesel engine, a vacuum still exists, and there exists a safety-risk the associated with removing an operable diesel from service. Additionally, inspectors considered the troubleshooting efforts to be well planned and documented.
The analysis for containment sump net positive suction head did not specifically address the condition of one quench spray pump and two recirculation spray-pumps out of service at the same time (without a low head pump out of service).
The licensee has since determined that the analysis does bound the condition.
The inspector's observations were discussed with the Unit 1 Operation Manager, who had already reached similar conclusions, and had discussed the issue'with the personnel involved.
2.4 Operator Response to Unit 1 Solid State Protection System The inspectors observed the operator response to a partial failure the Unit 1 solid state protection system (SSPS).
The control room received simultaneous annunciators for reactor coolant pump IA undervoltage, underfrequency, breaker trip, turbine stop valve closure, and turbine auto-stop low oil pressure.
Operators immediately evaluated these annunciators and noted that normal operating parameters existed for the reactor coolant pump and main turbine and that the plant was in a safe condition.
It was concluded that an off-normal condition existed with the SSPS and immediate assistance was provided by instrumentation and controls engineers.
Subsequent troubleshooting activities are discussed in Section 3.1.
2.5 Unit 2 Emergency Diesel Generator Troubleshooting The 2-1 diesel generator has experienced a reduction of crankcase vacuum over the past several months from 1.1 to 0.8 inches water.
Under normal conditions, the crankcase operates with a slight vacuum to prevent the buildup of flammable vapors.
A positive pressure can result from the failure of the crankcase ventilation system or excessive combustion gases passing-the piston rings.
Operations and maintenance personnel developed a troubleshooting plan to investigate this degrading trend.
Through these efforts, it was identified that a flow restriction exists in the discharge line of the crankcase blower.
The licensee will continue to monitor crankcase pressure and plans on correcting this restriction during the upcoming refueling outage.
The inspector found this to be acceptable, since there is no actual degradation of the diesel engine, a vacuum still exists, and there exists a safety-risk associated with removing an operable diesel from service.
Additionally, the inspectors considered the troubleshooting efforts to be well planned and documented.


4 3.0     MAINTENANCE   (62703, 61726, 71707) 3.1     Maintenance Observations The inspectors reviewed selected maintenance activities to assure that: the activity did not violate-Technical Specification Limiting Conditions for Operation and that redundant components were operable; required approvals and releases had been obtained prior to commencing work; procedures used for the task were adequate and. work,was within the skills of the trade; activities were accomplished by qualified personnel; radiological and fire prevention controls were adequate and implemented; QC hold points were established where required and observed;- and equipment was properly tested and returned to service.
4 3.0 MAINTENANCE (62703, 61726, 71707) 3.1 Maintenance Observations The inspectors reviewed selected maintenance activities to assure that:
the activity did not violate-Technical Specification Limiting Conditions for Operation and that redundant components were operable; required approvals and releases had been obtained prior to commencing work; procedures used for the task were adequate and. work,was within the skills of the trade; activities were accomplished by qualified personnel; radiological and fire prevention controls were adequate and implemented; QC hold points were established where required and observed;- and equipment was properly tested and returned to service.
The maintenance work requests (MWRs) listed below were observed and reviewed.
The maintenance work requests (MWRs) listed below were observed and reviewed.
Unless otherwise indicated, the activities observed and reviewed were properly conducted.
Unless otherwise indicated, the activities observed and reviewed were properly conducted.
MWR 035464   No. 2 EDG Jacket Water Pressure Alarm Troubleshoot and Repair See Section 3.2.2 of this report.
MWR 035464 No. 2 EDG Jacket Water Pressure Alarm Troubleshoot and Repair See Section 3.2.2 of this report.
MWR 036230   Troubleshoot and Rep. SSPS Alarms On November 4, 1994, plant operators at Unit I received several intermittent alarms and indications associated with the solid-state protection system (SSPS). The intermittent nature of the alarms told;the. operators that the problem was associated with only one channel of the, SSPS (because of the multiplexing arrangement; a problem with only one-channel of the SSPS will cause the indications to-flash in and out). The problem was quickly isolated to a blown fuse in channel 1-of train 'B' in the SSPS. The inspectors observed the licensee's efforts to verify and replace the fuse. The inspectors observed excellent coordination between the operations and maintenance personnel.     Part of the maintenance included removing power from the affected channel of the SSPS. This evolution was very thoroughly researched and briefed. The Unit I Operations Manager reminded everyone of the importance of'self-checking, and the pitfalls of haste. This was particularly appropriate since the plant entered a 6 hour Technical Specification action statement.
MWR 036230 Troubleshoot and Rep.
MWR 036371     Troubleshoot and Repair SSPS Intermittent Alarms MWR 035759     Investigate Emergency Switchgear Ventilation Relay 162-HVZBB MWR 036084   Emergency Switchgear Ventilation Fan 2HVZ-FN261A Troubleshooting MWR 036084   Emergency Switchgear Ventilation Fan 2HVZ-FN261B Troubleshooting MWR 036447   Blocking Diode Installation Per DCP 2124 MWRs 035759, 036084, 036084, and 036477 are discussed in Section 3.1.2.
SSPS Alarms On November 4, 1994, plant operators at Unit I received several intermittent alarms and indications associated with the solid-state protection system (SSPS).
The intermittent nature of the alarms told;the. operators that the problem was associated with only one channel of the, SSPS (because of the multiplexing arrangement; a problem with only one-channel of the SSPS will cause the indications to-flash in and out).
The problem was quickly isolated to a blown fuse in channel 1-of train 'B' in the SSPS.
The inspectors observed the licensee's efforts to verify and replace the fuse.
The inspectors observed excellent coordination between the operations and maintenance personnel.
Part of the maintenance included removing power from the affected channel of the SSPS.
This evolution was very thoroughly researched and briefed.
The Unit I Operations Manager reminded everyone of the importance of'self-checking, and the pitfalls of haste.
This was particularly appropriate since the plant entered a 6 hour Technical Specification action statement.
MWR 036371 Troubleshoot and Repair SSPS Intermittent Alarms MWR 035759 Investigate Emergency Switchgear Ventilation Relay 162-HVZBB MWR 036084 Emergency Switchgear Ventilation Fan 2HVZ-FN261A Troubleshooting MWR 036084 Emergency Switchgear Ventilation Fan 2HVZ-FN261B Troubleshooting MWR 036447 Blocking Diode Installation Per DCP 2124 MWRs 035759, 036084, 036084, and 036477 are discussed in Section 3.1.2.


5 3.1.1 Unit 2 Rod Control Unit 2 has experienced three rod control system "urgent" failure alarms over toa recent one-week period. Any failure that affects the ability of the system move rods is considered urgent. An urgent alarm will automatically de and the energize the lift coil and energizes both the stationary gripper coils movable gripper coils at reduced current.
5 3.1.1 Unit 2 Rod Control Unit 2 has experienced three rod control system "urgent" failure alarms over a recent one-week period.
On each occasion, the urgent failures were generated by rod control power cabinet 2BD. This power cabinet is associated with Group 2 rods for- control banks 'B' and 'D' and shutdown bank 'B'.           Each alarm was received when no rod movement was demanded,   and operators     were able to reset the alarm. Proper rod movement was verified following alarm reset in order to verify operability.
Any failure that affects the ability of the system to move rods is considered urgent.
The lift regulation circuit board and the failure detector circuit board were replaced in an attempt to correct the spurious alarms. Subsequent investigation of the boards by Westinghouse determined that no deficiencies                   and existed with these boards. Brainstorming sessions between Westinghouse licensee engineers lead to a suspicion         involving   the   -24VDC   power   supplies.
An urgent alarm will automatically de energize the lift coil and energizes both the stationary gripper coils and the movable gripper coils at reduced current.
: 3) had Monitoring of the power supplies found the primary power supply (Number drifted to -30VDC. This was determined       to be the   cause   of the   spurious has alarms. As corrective action, the voltage on the primary power supply             The  former been lowered so that it has now become the backup power supply. supply. The backup power supply (Number 4) has now become the primary power                             the power supplies are auctioneered. The licensee is currently evaluatingswapping replacement of the Number 3 power supply-for the             next   outage. Since occurred.
On each occasion, the urgent failures were generated by rod control power cabinet 2BD.
the two power supplies, no additional rod control urgent alarms have               to  be timely The inspectors considered the licensee's         resolution     of this   issue and thorough.
This power cabinet is associated with Group 2 rods for-control banks 'B' and 'D' and shutdown bank 'B'.
3.1.2 Unit 2 Emergency Switchgear Ventilation switchgear The inspectors performed a walkdown of the safety related emergencythat could ventilation system in order to identify if any conditions               existed Plant degrade system performance. The Beaver Valley Unit 2 Individual                           to core Examination (IPE) determined that     the   top ranked   sequence     contributing by a   complete   loss   of both   trains   of emergency damage frequency is initiated switchgear ventilation. The consequential events if operators fail.to of establish alternate room cooling within a prescribed time include:-loss                 coolant emergency AC power; loss of vital bus instrumentation; and a reactor pump seal loss of coolant accident without high head safety                 injection.
Each alarm was received when no rod movement was demanded, and operators were able to reset the alarm.
During the inspector's walkdown of the control panel on October                 21, the light   for   emergency     switch   gear supply inspectors noted that the control power                                    system  alignment, fan 2HVZ-FN261B did not appear     to   be energized.       Per normal
Proper rod movement was verified following alarm reset in order to verify operability.
                                'B' fan   was in standby.     A normal   white   light the 'A' fan was running and                                                    removal    of the indicates that the fan   is ready   to   auto-start     if   needed. Upon unusually      dim.
The lift regulation circuit board and the failure detector circuit board were replaced in an attempt to correct the spurious alarms.
lens cover by an'operator, -the light bulb was noted as being                     there    was a The inspectors questioned why this condition existed.and whether       review    of  the'control deficiency with the fan control circuitry. Upon further                       knowledge by circuitry, the reactor operator demonstrated excellent system         maintaining      relay determining that a sneak circuit path existed           which   was
Subsequent investigation of the boards by Westinghouse determined that no deficiencies existed with these boards.
Brainstorming sessions between Westinghouse and licensee engineers lead to a suspicion involving the -24VDC power supplies.
Monitoring of the power supplies found the primary power supply (Number 3) had drifted to -30VDC.
This was determined to be the cause of the spurious alarms.
As corrective action, the voltage on the primary power supply has been lowered so that it has now become the backup power supply.
The former backup power supply (Number 4) has now become the primary power supply.
The power supplies are auctioneered.
The licensee is currently evaluating the replacement of the Number 3 power supply-for the next outage.
Since swapping the two power supplies, no additional rod control urgent alarms have occurred.
The inspectors considered the licensee's resolution of this issue to be timely and thorough.
3.1.2 Unit 2 Emergency Switchgear Ventilation The inspectors performed a walkdown of the safety related emergency switchgear ventilation system in order to identify if any conditions existed that could degrade system performance.
The Beaver Valley Unit 2 Individual Plant Examination (IPE) determined that the top ranked sequence contributing to core damage frequency is initiated by a complete loss of both trains of emergency switchgear ventilation.
The consequential events if operators fail.to establish alternate room cooling within a prescribed time include:-loss of emergency AC power; loss of vital bus instrumentation; and a reactor coolant pump seal loss of coolant accident without high head safety injection.
During the inspector's walkdown of the control panel on October 21, the inspectors noted that the control power light for emergency switch gear supply fan 2HVZ-FN261B did not appear to be energized.
Per normal system alignment, the 'A' fan was running and 'B' fan was in standby.
A normal white light indicates that the fan is ready to auto-start if needed.
Upon removal of the lens cover by an'operator, -the light bulb was noted as being unusually dim.
The inspectors questioned why this condition existed.and whether there was a deficiency with the fan control circuitry.
Upon further review of the'control circuitry, the reactor operator demonstrated excellent system knowledge by determining that a sneak circuit path existed which was maintaining relay


6 162-HVZBB energized with the fan in a standby condition. The inspectors and licensee personnel physically verified that this relay was indeed energized.
6 162-HVZBB energized with the fan in a standby condition.
This relay should be de-energized when the fan is in standby. The consequence of this relay being energized is that fan 2HVZ-FN261B will not auto-start as designed upon loss of the 'A' train fan. Operators would also be unable to manually start the "B' fan since relay 162-HVZBB is maintaining the "anti pump" and trip coils of the fan breaker energized. The inspectors observed various fan manipulations which verified that the 'B' fan would not auto start if a very dim white-light condition existed. It was possible to clear this locked-up relay and obtain a normal white control power light by first placing the control switch in "pull to lock," then back to auto. Some operators knew of this condition and considered it to be a "workaround." Current operating and alarm response -procedures (fan auto-stop and high switchgear area temperature) did not specify the need for this control switch manipulation upon failure of the running fan. Further review, of-the fan start circuitry with relay personnel determined that both trains of, fans would properly auto start with the emergency diesel sequencer if called upon during a loss of power to the respective emergency bus.
The inspectors and licensee personnel physically verified that this relay was indeed energized.
The inspectors reviewed the maintenance history (since 1993) for both'trains of emergency switch gear supply ventilation fans and noted that three recent MWRs were generated to investigate the dim white light condition. Each MWR is summarized below:
This relay should be de-energized when the fan is in standby.
MWR 015912 was opened on January 14, 1993, and worked on October 10, 1993, to investigate the dim white control power light for fin 2HVZ-FN261A. Since the control switch was in pull to lock during this maintenance, no problems were found and post maintenance testing verified proper fan operation.
The consequence of this relay being energized is that fan 2HVZ-FN261B will not auto-start as designed upon loss of the 'A' train fan.
MWR 032143, was opened on June 11, 1994, to investigate the dim white control power light for fan 2HVZ-FN261A. This MWR was scheduled to be worked during the upcoming refueling outage.
Operators would also be unable to manually start the "B' fan since relay 162-HVZBB is maintaining the "anti pump" and trip coils of the fan breaker energized.
MWR 35001 was opened September 24, 1994, to investigate relay 162-HVZBB following observation of a dim white control power light. This MWR was voided the same day by the Nuclear Shift Supervisor who was subsequently able to auto start both trains of fans byflrstplacing the control switch in "pull to lock." The shift supervisor attributed this condition to "system design, not equipment deficiency." However, no additional follow-up action was pursued.
The inspectors observed various fan manipulations which verified that the 'B' fan would not auto start if a very dim white-light condition existed.
It was possible to clear this locked-up relay and obtain a normal white control power light by first placing the control switch in "pull to lock," then back to auto.
Some operators knew of this condition and considered it to be a "workaround."
Current operating and alarm response -procedures (fan auto-stop and high switchgear area temperature) did not specify the need for this control switch manipulation upon failure of the running fan.
Further review, of-the fan start circuitry with relay personnel determined that both trains of, fans would properly auto start with the emergency diesel sequencer if called upon during a loss of power to the respective emergency bus.
The inspectors reviewed the maintenance history (since 1993) for both'trains of emergency switch gear supply ventilation fans and noted that three recent MWRs were generated to investigate the dim white light condition.
Each MWR is summarized below:
MWR 015912 was opened on January 14, 1993, and worked on October 10, 1993, to investigate the dim white control power light for fin 2HVZ-FN261A.
Since the control switch was in pull to lock during this maintenance, no problems were found and post maintenance testing verified proper fan operation.
MWR 032143, was opened on June 11, 1994, to investigate the dim white control power light for fan 2HVZ-FN261A.
This MWR was scheduled to be worked during the upcoming refueling outage.
MWR 35001 was opened September 24, 1994, to investigate relay 162-HVZBB following observation of a dim white control power light.
This MWR was voided the same day by the Nuclear Shift Supervisor who was subsequently able to auto start both trains of fans byflrstplacing the control switch in "pull to lock."
The shift supervisor attributed this condition to "system design, not equipment deficiency."
However, no additional follow-up action was pursued.
To eliminate the sneak circuit path, Design Change 2124 has been implemented to install a blocking diode which will allow relays 162-HVZAB/BB to drop out as required with the fans in standby.- The licensee's troubleshooting, as found testing, design change implementation, and post-modification testing during this inspection period were considered by the inspectors to be thorough and adequate to preclude future auto-start circuitry problems.
To eliminate the sneak circuit path, Design Change 2124 has been implemented to install a blocking diode which will allow relays 162-HVZAB/BB to drop out as required with the fans in standby.- The licensee's troubleshooting, as found testing, design change implementation, and post-modification testing during this inspection period were considered by the inspectors to be thorough and adequate to preclude future auto-start circuitry problems.


7 The inspectors interviewed shift supervisors, the responsible system engineer, and maintenance personnel regarding the emergency switchgear ventilation system. These individuals had either limited or no knowledge of the plant's IPE and could not identify the dominant core damage sequence or the most important safety system reported in the IPE. Upon the request of operating personnel, the inspectors provided the Unit 2 crew with a copy of the executive summary of the licensee's IPE. The training department is-scheduled to provide formal training to the operators on PRA in early 1995. At the end of this inspection period, an additional summary document was provided to operators and maintenance personnel by the licensee's engineering department.
7 The inspectors interviewed shift supervisors, the responsible system engineer, and maintenance personnel regarding the emergency switchgear ventilation system.
These individuals had either limited or no knowledge of the plant's IPE and could not identify the dominant core damage sequence or the most important safety system reported in the IPE.
Upon the request of operating personnel, the inspectors provided the Unit 2 crew with a copy of the executive summary of the licensee's IPE.
The training department is-scheduled to provide formal training to the operators on PRA in early 1995.
At the end of this inspection period, an additional summary document was provided to operators and maintenance personnel by the licensee's engineering department.
The inspectors also reviewed the status of the licensee's enhancements to resolve the loss of emergency switchgear ventilation as identified by the IPE.
The inspectors also reviewed the status of the licensee's enhancements to resolve the loss of emergency switchgear ventilation as identified by the IPE.
Section 6.3.1.1 of the IPE states that alarm response procedures are being reviewed to determine if they can provide more explicit guidance on how to establish sufficient alternate cooling in the event of a failure of both trains of emergency switchgear fans. Per the licensee's IPE, "simply opening doors will not produce a chimney effect." The inspectors previously noted (see NRC inspection report 50-412/94-14) that little progress was evident to resolve this vulnerability. Engineering memorandum (EM) 108125 was''
Section 6.3.1.1 of the IPE states that alarm response procedures are being reviewed to determine if they can provide more explicit guidance on how to establish sufficient alternate cooling in the event of a failure of both trains of emergency switchgear fans.
subsequently issued on June 24, 1994, for engineering to provide information on the number of temporary fans needed to maintain adequate room cooling, their locations, and source of supply air. This EM was completed October 21, 1994. No interim guidance had yet been provided to operators, but the alarm response procedure is currently on schedule for completion by December 31.
Per the licensee's IPE, "simply opening doors will not produce a chimney effect."
The inspectors previously noted (see NRC inspection report 50-412/94-14) that little progress was evident to resolve this vulnerability.
Engineering memorandum (EM) 108125 was''
subsequently issued on June 24, 1994, for engineering to provide information on the number of temporary fans needed to maintain adequate room cooling, their locations, and source of supply air.
This EM was completed October 21, 1994.
No interim guidance had yet been provided to operators, but the alarm response procedure is currently on schedule for completion by December 31.
The inspector also noted that Quality Assurance (QA) audit (BV-C-94-09),
The inspector also noted that Quality Assurance (QA) audit (BV-C-94-09),
issued October 10, 1994, stated that IPE Vulnerability 6.3.1.1, "Loss of Emergency Switchgear Ventilation," has not been scheduled for corrective actions or engineering analysis. This QA observation was.written against the Nuclear Safety Department. The inspectors, however, noted that the QA observation could have been more accurate, since the procedure group and engineering were taking proper action following the previous observations by the NRC.
issued October 10, 1994, stated that IPE Vulnerability 6.3.1.1, "Loss of Emergency Switchgear Ventilation," has not been scheduled for corrective actions or engineering analysis.
Overall, the inspectors concluded that licensee personnel had prior of opportunities to identify the potential problem with the start capability was the emergency switchgear ventilation fans. Equipment   maintenance history not used to identify the multiple MWRs (including pre 1993 work requests) that had been generated due to the dim white light condition, or that additional investigation was warranted. The inspectors concluded that the lack of awareness of the importance of this system (in terms of probabilistic risk assessment) also contributed to the failure to thoroughly-follow-up on the suspected control circuit deficiency by operations. Although licensee personnel identified the sneak circuit-path, it required the prompting of the inspectors regarding the adequacy of the fan control circuitry. The failure to promptly identify the emergency switchgear ventilation system control deficiency and thus take corrective action to preclude repetition is a violation (50-412/94-25-01) of 10 CFR 50, Appendix B, Criterion XVI, "Corrective Actions."
This QA observation was.written against the Nuclear Safety Department.
The inspectors, however, noted that the QA observation could have been more accurate, since the procedure group and engineering were taking proper action following the previous observations by the NRC.
Overall, the inspectors concluded that licensee personnel had prior opportunities to identify the potential problem with the start capability of the emergency switchgear ventilation fans.
Equipment maintenance history was not used to identify the multiple MWRs (including pre 1993 work requests) that had been generated due to the dim white light condition, or that additional investigation was warranted.
The inspectors concluded that the lack of awareness of the importance of this system (in terms of probabilistic risk assessment) also contributed to the failure to thoroughly-follow-up on the suspected control circuit deficiency by operations.
Although licensee personnel identified the sneak circuit-path, it required the prompting of the inspectors regarding the adequacy of the fan control circuitry.
The failure to promptly identify the emergency switchgear ventilation system control deficiency and thus take corrective action to preclude repetition is a violation (50-412/94-25-01) of 10 CFR 50, Appendix B, Criterion XVI, "Corrective Actions."


8 3.2. Surveillance Observations The inspectors witnessed/reviewed selected surveillance tests to determine whether properly approved procedures were in use, details were adequate, test instrumentation was-properly calibrated and used, technical specifications were satisfied, testing was~performed by qualified personnel, and test results satisfied acceptance criteria or were properly dispositioned. The operational surveillance-tests.(OSTs), loop calibration procedures (LCPs), and relay calibration procedures (RCPs) listed below were observed and reviewed. Unless otherwise indicated, the activities observed and reviewed were properly conducted without any notable deficiencies.
8 3.2.
OST 1.43.6               Containment High Range Monitors Functional Test OST 1.43.7               Noble Gas Monitor Functional Test OST 2.47.1               Containment Airlock Test LCP-2-44F-P21B           Emergency Switchgear Area Supply Pressure Loop Calibration 1/2RCP-30A-PC           Calibration of ATC and Agastat Timing Relays 3.2.1 Supplemental Leak Collection System (SLCRS) Duct Damage at Unit 1 On October 16, 1994,: the licensee's Operations Department identified some large holes (several square feet in area) in the SLCRS duct leading to the Unit 1 waste gas storagevault. The licensee also recognized that the deficiency had an outstanding maintenance work request (MWR) that was written in October of 1991., The function of this part of the SLCRS is to maintain~a negative pressure on the waste gas storage vault, in order to reduce the magnitude of a radioactive release from a leak in one of the waste gas storage tanks. Any release from the waste gas storage tanks would also be changed to an elevated (vice a ground) release because of the SLCRS. The inspectors reviewed this issue'to determine why the licensee had not repaired the damaged duct after almost 3 years, and to evaluate the impact of the damaged duct on the performance of the SLCRS.
Surveillance Observations The inspectors witnessed/reviewed selected surveillance tests to determine whether properly approved procedures were in use, details were adequate, test instrumentation was-properly calibrated and used, technical specifications were satisfied, testing was~performed by qualified personnel, and test results satisfied acceptance criteria or were properly dispositioned.
The operational surveillance-tests.(OSTs), loop calibration procedures (LCPs),
and relay calibration procedures (RCPs) listed below were observed and reviewed.
Unless otherwise indicated, the activities observed and reviewed were properly conducted without any notable deficiencies.
OST 1.43.6 Containment High Range Monitors Functional Test OST 1.43.7 Noble Gas Monitor Functional Test OST 2.47.1 Containment Airlock Test LCP-2-44F-P21B Emergency Switchgear Area Supply Pressure Loop Calibration 1/2RCP-30A-PC Calibration of ATC and Agastat Timing Relays 3.2.1 Supplemental Leak Collection System (SLCRS) Duct Damage at Unit 1 On October 16, 1994,: the licensee's Operations Department identified some large holes (several square feet in area) in the SLCRS duct leading to the Unit 1 waste gas storagevault.
The licensee also recognized that the deficiency had an outstanding maintenance work request (MWR) that was written in October of 1991., The function of this part of the SLCRS is to maintain~a negative pressure on the waste gas storage vault, in order to reduce the magnitude of a radioactive release from a leak in one of the waste gas storage tanks.
Any release from the waste gas storage tanks would also be changed to an elevated (vice a ground) release because of the SLCRS.
The inspectors reviewed this issue'to determine why the licensee had not repaired the damaged duct after almost 3 years, and to evaluate the impact of the damaged duct on the performance of the SLCRS.
The original MWR was categorized as a Priority 2 (urgent/highly desirable),
The original MWR was categorized as a Priority 2 (urgent/highly desirable),
but was downgradedithe day after it was written to a Priority 3 (expedite/desirable). The deficiency was not repaired immediately because proper work instructions were not readily available.for the repair.
but was downgradedithe day after it was written to a Priority 3 (expedite/desirable).
Construction'maintenance personnel informally told the Engineering Department that they needed a Plant Installation Process, Standard (PIPS) to repair the duct. The need for the PIPS was never formally communicated to engineering management personnel, and, thus, a high priority was never given to completing this document- -The SLCRS System Engineer was aware of the deficiency, and had adequate test data to demonstrate that SLCRS would perform its design basis functions even with the hole. The test data also showed that the condition was not degrading. Because of the test data, the maintenance engineering and planning personnel did not place a high priority on the repair, and did not
The deficiency was not repaired immediately because proper work instructions were not readily available.for the repair.
Construction'maintenance personnel informally told the Engineering Department that they needed a Plant Installation Process, Standard (PIPS) to repair the duct.
The need for the PIPS was never formally communicated to engineering management personnel, and, thus, a high priority was never given to completing this document- -The SLCRS System Engineer was aware of the deficiency, and had adequate test data to demonstrate that SLCRS would perform its design basis functions even with the hole.
The test data also showed that the condition was not degrading.
Because of the test data, the maintenance engineering and planning personnel did not place a high priority on the repair, and did not


9 pursue the delay in generating a PIPS. Based on this test data, the inspectors concluded that SLCRS would have performed its design basis function in this degraded condition.
9 pursue the delay in generating a PIPS.
Based on this test data, the inspectors concluded that SLCRS would have performed its design basis function in this degraded condition.
This portion of the SLCRS is not routinely accessed because it is in the lower level of the east valve trench, which is a contaminated, high radiation area.
This portion of the SLCRS is not routinely accessed because it is in the lower level of the east valve trench, which is a contaminated, high radiation area.
Consequently, plant operators were not routinely reminded of the existence of the deficiency. Although this deficiency did not receive appropriate attention in the past, the inspectors observed very good management attention since the Operations Department re-identified the SLCRS deficiency in October, 1994. The PIPS has been completed and approved for use. Repair of the deficiency is scheduled to begin November 16. Although the deficiency did not receive appropriate attention, management attention to deficiencies in safety related systems has been very timely in the recent past. The inspectors have noted that plant management is better focused on safety-related plant deficiencies since recent management changes, and plan of the day meeting changes were implemented. The licensee is going to discuss the SLCRS issue with all system engineers and will emphasize the need to raise any similar issues to an appropriate level of management.
Consequently, plant operators were not routinely reminded of the existence of the deficiency.
3.2.2 Unit 1 Emergency Diesel Generator Speed Sensing Circuit Failures On October 6, 1994, during the monthly surveillance on the No. 1-2 Emergency Diesel Generator (EDG), the low jacket water pressure alarm was received with the diesel at idle speed (approximately 490 rpm). The alarm cleared before the unit reached normal operating speed (approximately 900 rpm). This~was the only deficiency noted during the surveillance. According to'the alarm response procedure (ARP), the alarm is set to occur at <20 psig if the diesel is operating at >870 rpm. Since the alarm cleared prior to the EDG reaching 870 rpm, and none of the problems outlined in the ARP were apparent, the operating crew assumed that the associated pressure switch was somehow malfunctioning. The surveillance test was determined to be satisfactory, and a maintenance work request was written to determine the cause of the low jacket water pressure alarm. On October 10, the EDG System Engineer recognized that the problem with the low pressure alarm might be associated with the diesel speed sensing circuits. One of the functions of the circuits is to block the low pressure alarm when the diesel is below 870 rpm. Since a malfunction in a speed sensing circuit could affect EDG operability, the No. 2 EDG was declared inoperable and troubleshooting was initiated.
Although this deficiency did not receive appropriate attention in the past, the inspectors observed very good management attention since the Operations Department re-identified the SLCRS deficiency in October, 1994.
The licensee found the cause of the problem was associated with one of the speed sensing relays. The relay had drifted from its setpoint of 870 rpm to less than 490 rpm. Each EDG has two identical speed sensing circuits with three relays per circuit. The relays are set at 40 rpm, 140 rpm, and 870 rpm.
The PIPS has been completed and approved for use.
The licensee checked all of the relays for proper operation, and found that all of the 140 rpm and 870 rpm relays were outside of their required +/- 20 rpm setpoint tolerance band. Two of the relays (including the one-which drifted below 490 rpm) were replaced because of repeatability problems. The 140 and 870 rpm relays were adjusted, and all of the relays were verified to operate properly during a post-maintenance test.
Repair of the deficiency is scheduled to begin November 16.
Although the deficiency did not receive appropriate attention, management attention to deficiencies in safety related systems has been very timely in the recent past.
The inspectors have noted that plant management is better focused on safety-related plant deficiencies since recent management changes, and plan of the day meeting changes were implemented.
The licensee is going to discuss the SLCRS issue with all system engineers and will emphasize the need to raise any similar issues to an appropriate level of management.
3.2.2 Unit 1 Emergency Diesel Generator Speed Sensing Circuit Failures On October 6, 1994, during the monthly surveillance on the No. 1-2 Emergency Diesel Generator (EDG),
the low jacket water pressure alarm was received with the diesel at idle speed (approximately 490 rpm).
The alarm cleared before the unit reached normal operating speed (approximately 900 rpm).
This~was the only deficiency noted during the surveillance.
According to'the alarm response procedure (ARP), the alarm is set to occur at <20 psig if the diesel is operating at >870 rpm.
Since the alarm cleared prior to the EDG reaching 870 rpm, and none of the problems outlined in the ARP were apparent, the operating crew assumed that the associated pressure switch was somehow malfunctioning.
The surveillance test was determined to be satisfactory, and a maintenance work request was written to determine the cause of the low jacket water pressure alarm.
On October 10, the EDG System Engineer recognized that the problem with the low pressure alarm might be associated with the diesel speed sensing circuits.
One of the functions of the circuits is to block the low pressure alarm when the diesel is below 870 rpm.
Since a malfunction in a speed sensing circuit could affect EDG operability, the No. 2 EDG was declared inoperable and troubleshooting was initiated.
The licensee found the cause of the problem was associated with one of the speed sensing relays.
The relay had drifted from its setpoint of 870 rpm to less than 490 rpm.
Each EDG has two identical speed sensing circuits with three relays per circuit.
The relays are set at 40 rpm, 140 rpm, and 870 rpm.
The licensee checked all of the relays for proper operation, and found that all of the 140 rpm and 870 rpm relays were outside of their required +/- 20 rpm setpoint tolerance band.
Two of the relays (including the one-which drifted below 490 rpm) were replaced because of repeatability problems.
The 140 and 870 rpm relays were adjusted, and all of the relays were verified to operate properly during a post-maintenance test.


10 The inspectors observed selected parts of the relay calibrations and the post maintenance test. The maintenance and testing was adequately controlled.
10 The inspectors observed selected parts of the relay calibrations and the post maintenance test.
However, the licensee was not using calibrated instrumentation to verify the relay set points during the post-maintenance test. The post-maintenance test procedure specified using the diesel skid-mounted tachometer which is not in the licensee's calibration program. This was pointed out by the inspectors, and the licensee obtained a calibrated stroboscope to ensure the set-points were accurate.
The maintenance and testing was adequately controlled.
Because of the problems-with the No. 1-2 EDG, the licensee checked the operation of the No. 1-1 EDG speed sensing relays during its next regularly scheduled surveillance test. All of the 140 and 870 rpm relays were found slightly out of tolerance, and were adjusted prior to returning the unit to service. The licensee has determined that the repeatability problems with the relays on the No. 1-2 EDG were due to contact corrosion. Other licensee's with the same type of EDGs were contacted, and reported similar problems with the diesel speed sensing circuits. The speed circuit vendor (MKS Power Systems) does not sell a safety-related version of the circuit any more because of the-lack of long-term-relay reliability.. The licensee is going to monitor the performance of the relays during every EDG surveillance test until the next refueling outage. During the refueling outage, the licensee plans to replace the speed sensing circuits with newer, more reliable circuits (similar to the circuits installed at Unit 2).
However, the licensee was not using calibrated instrumentation to verify the relay set points during the post-maintenance test.
The inspectors concluded that the licensee's corrective actions to address the problems with the-speed sensing circuits were appropriate. The as-found relay set-points would-not-have affected the operation of the EDGs under design basis conditions. In general, deviations which would have affected EDG operability would have been noted during surveillance testing. The 870 rpm relay which drifted below 49o rpm was also determined not to affect operability.- This relay has a close-permissive function for the EDG output breaker; however, the licensee's test data shows that the diesel will reach rated speed before the generator reaches rated output voltage. Therefore, the voltage permissive would have prevented the EDG output breaker from closing early.
The post-maintenance test procedure specified using the diesel skid-mounted tachometer which is not in the licensee's calibration program.
The initial actions to address the jacket water, low pressure alarm could have been more aggressive. The deficiency was allowed to exist for 4 days before anyone recognized that it might impair operabilityoof the EDG. The licensee's ARP for low jacket water pressure was a contributing factor to the lack of attention to the alarm. The ARP did not consider problems with the speed sensing circuits as a possible cause, and all theverifications required by the procedure led the operators to conclude that the pressure detector- had malfunctioned. This observation was discussed with the Unit 1 Operations Manager. The Operations Manager had already arrived at a similar conclusion and was discussing~the event at licensed operator retraining.
This was pointed out by the inspectors, and the licensee obtained a calibrated stroboscope to ensure the set-points were accurate.
4.0   ENGINEERING (71707, 37551, 92903) 4.1   AMSAC Design Omission At Beaver Valley Units 1 and 2, the Anticipated Transient Without Scram (ATWS)
Because of the problems-with the No.
1-2 EDG, the licensee checked the operation of the No.
1-1 EDG speed sensing relays during its next regularly scheduled surveillance test.
All of the 140 and 870 rpm relays were found slightly out of tolerance, and were adjusted prior to returning the unit to service.
The licensee has determined that the repeatability problems with the relays on the No. 1-2 EDG were due to contact corrosion.
Other licensee's with the same type of EDGs were contacted, and reported similar problems with the diesel speed sensing circuits.
The speed circuit vendor (MKS Power Systems) does not sell a safety-related version of the circuit any more because of the-lack of long-term-relay reliability.. The licensee is going to monitor the performance of the relays during every EDG surveillance test until the next refueling outage.
During the refueling outage, the licensee plans to replace the speed sensing circuits with newer, more reliable circuits (similar to the circuits installed at Unit 2).
The inspectors concluded that the licensee's corrective actions to address the problems with the-speed sensing circuits were appropriate.
The as-found relay set-points would-not-have affected the operation of the EDGs under design basis conditions.
In general, deviations which would have affected EDG operability would have been noted during surveillance testing.
The 870 rpm relay which drifted below 49o rpm was also determined not to affect operability.- This relay has a close-permissive function for the EDG output breaker; however, the licensee's test data shows that the diesel will reach rated speed before the generator reaches rated output voltage.
Therefore, the voltage permissive would have prevented the EDG output breaker from closing early.
The initial actions to address the jacket water, low pressure alarm could have been more aggressive.
The deficiency was allowed to exist for 4 days before anyone recognized that it might impair operabilityoof the EDG.
The licensee's ARP for low jacket water pressure was a contributing factor to the lack of attention to the alarm.
The ARP did not consider problems with the speed sensing circuits as a possible cause, and all theverifications required by the procedure led the operators to conclude that the pressure detector-had malfunctioned.
This observation was discussed with the Unit 1 Operations Manager.
The Operations Manager had already arrived at a similar conclusion and was discussing~the event at licensed operator retraining.
4.0 ENGINEERING (71707, 37551, 92903) 4.1 AMSAC Design Omission At Beaver Valley Units 1 and 2, the Anticipated Transient Without Scram (ATWS)


11 Mitigation Actuation Circuitry (AMSAC) system was found to contain a design omission which could render the system inoperable under certain conditions.
11 Mitigation Actuation Circuitry (AMSAC) system was found to contain a design omission which could render the system inoperable under certain conditions.
The system is required by 10 CFR 50.62 and is designed to limit reactor coolant system pressure, diverse from the reactor protection system, by automatically initiating the auxiliary feedwater system and a turbine trip under conditions indicative of an ATWS.
The system is required by 10 CFR 50.62 and is designed to limit reactor coolant system pressure, diverse from the reactor protection system, by automatically initiating the auxiliary feedwater system and a turbine trip under conditions indicative of an ATWS.
Both Beaver Valley Units have an AMSAC system based on the Westinghouse Owners Group WCAP-10858P-A, Revision 1, "AMSAC Generic Design Package." The system is designed to initiate auxiliary feedwater flow and trip'the main turbine whenever the unit is above 40 percent power and 2 of 3 normal feedwater loops are below 25 percent of full flow. The AMSAC system at Beaver Valley is a Foxboro Spec 200 Micro Control System. As discussed in-WCAP-10858, the frequency of inadvertent AMSAC actuations shall be minimized. In order to satisfy this aspect of the design, AMSAC logic monitors the feedwater.flow signals entering the AMSAC cabinets for levels indicative of an instrument loop failure. If any of the feedwater input channels deviate outside-the normal range (i.e., indicating a failed low channel), then the AMSAC actuation output is automatically blocked. Design requirements include trip switches for the three feedwater flow channels on the AMSAC control panel. -Placing a feedwater flow channel in a tripped condition is supposed to remove the automatic block feature in the logic created when AMSAC sensed the'bad feedwater flow input and create a logic condition where AMSAC would actuate on a 1 of 2 low feedwater flow condition. During a review of the AMSAC logic, the licensee has found that these trip switches do not remove the automatic blocking feature. Thus, AMSAC is-rendered inoperable at any time one of the three feedwater flow inputs is outside their normal range. This omission was not identified during the system acceptance tests performed at the vendor facility or during the initial installation testing since this unblock feature was not specifically examined during these tests.
Both Beaver Valley Units have an AMSAC system based on the Westinghouse Owners Group WCAP-10858P-A, Revision 1, "AMSAC Generic Design Package."
Based on the vendor's recommendations, a minor design change is currently being developed so that placing the bad feedwater flow channel in a tripped condition will remove the AMSAC block as originally designed. For thea pre interim, if a feedwater channel fails 'low, the licensee has developed approved temporary modification which will insert a flow signal of less than 25 percent for the appropriate channel. This will remove the actuation block signal and produce a remaining coincidence logic of 1/2. The inspectors reviewed the adequacy of the licensee's translation of~the design basis offound AMSAC into the design requirements for the AMSAC vendor. The inspectors Purchase Specification 8700-DES-0162, Revision 3, contained the sufficientfrom information for the vendor on removing a low main feedwater flow input this AMSAC. The licensee has determined that the failure   to incorporate aspect of the system design was due to an oversight by Foxboro. The inspectors were satisfied with the licensee's corrective actions and personnel considered the identification of this design omission by engineering         CFR to be noteworthy. The licensee is currently evaluating this issue for 10 21 reportability since AMSAC is considered to be a "basic component."
The system is designed to initiate auxiliary feedwater flow and trip'the main turbine whenever the unit is above 40 percent power and 2 of 3 normal feedwater loops are below 25 percent of full flow.
The AMSAC system at Beaver Valley is a Foxboro Spec 200 Micro Control System.
As discussed in-WCAP-10858, the frequency of inadvertent AMSAC actuations shall be minimized.
In order to satisfy this aspect of the design, AMSAC logic monitors the feedwater.flow signals entering the AMSAC cabinets for levels indicative of an instrument loop failure.
If any of the feedwater input channels deviate outside-the normal range (i.e., indicating a failed low channel), then the AMSAC actuation output is automatically blocked.
Design requirements include trip switches for the three feedwater flow channels on the AMSAC control panel. -Placing a feedwater flow channel in a tripped condition is supposed to remove the automatic block feature in the logic created when AMSAC sensed the'bad feedwater flow input and create a logic condition where AMSAC would actuate on a 1 of 2 low feedwater flow condition.
During a review of the AMSAC logic, the licensee has found that these trip switches do not remove the automatic blocking feature.
: Thus, AMSAC is-rendered inoperable at any time one of the three feedwater flow inputs is outside their normal range.
This omission was not identified during the system acceptance tests performed at the vendor facility or during the initial installation testing since this unblock feature was not specifically examined during these tests.
Based on the vendor's recommendations, a minor design change is currently being developed so that placing the bad feedwater flow channel in a tripped condition will remove the AMSAC block as originally designed.
For the interim, if a feedwater channel fails 'low, the licensee has developed a pre approved temporary modification which will insert a flow signal of less than 25 percent for the appropriate channel.
This will remove the actuation block signal and produce a remaining coincidence logic of 1/2.
The inspectors reviewed the adequacy of the licensee's translation of~the design basis of AMSAC into the design requirements for the AMSAC vendor.
The inspectors found Purchase Specification 8700-DES-0162, Revision 3, contained the sufficient information for the vendor on removing a low main feedwater flow input from AMSAC.
The licensee has determined that the failure to incorporate this aspect of the system design was due to an oversight by Foxboro.
The inspectors were satisfied with the licensee's corrective actions and considered the identification of this design omission by engineering personnel to be noteworthy.
The licensee is currently evaluating this issue for 10 CFR 21 reportability since AMSAC is considered to be a "basic component."


                                                                                - I___________
I___________
12 4.2     Calibration of CREBAPS Pressure Switches (Unresolved Item 50-334/94-17-01) (closed)
12 4.2 Calibration of CREBAPS Pressure Switches (Unresolved Item 50-334/94-17-01) (closed)
During a routine walkdown of the control room emergency bottled air pressurization system (CREBAPS), the inspectors noted that several pressure switches, which protect the system from an over-pressure condition, had not been calibrated since 1987. The switches sense a high pressure condition in the piping downstream of the pressure regulators. The licensee initiated calibration checks and an analysis of the failure modes of these switches.
During a routine walkdown of the control room emergency bottled air pressurization system (CREBAPS),
the inspectors noted that several pressure switches, which protect the system from an over-pressure condition, had not been calibrated since 1987.
The switches sense a high pressure condition in the piping downstream of the pressure regulators.
The licensee initiated calibration checks and an analysis of the failure modes of these switches.
The issue was identified as an unresolved item (50-334/94-17-01) pending review of the licensee's failure analysis and the calibration data.
The issue was identified as an unresolved item (50-334/94-17-01) pending review of the licensee's failure analysis and the calibration data.
The calibration checks showed that all of the switches would have operated as intended. The licensee's failure modes analysis showed that failure to isolate one of the air lines on a high pressure condition would not challenge the CREBAPS or the control room pressure boundary. However, the licensee found, through-recent operating experience, that if a switch fails low, CREBAPS system operationcan be degraded (the associated discharge line is disabled). Consequently, the switches will be entered into the licensee's safety-related component calibration program. This issue is closed.
The calibration checks showed that all of the switches would have operated as intended.
4.3   Solid State Protection System 10 CFR Part 21 (closed)
The licensee's failure modes analysis showed that failure to isolate one of the air lines on a high pressure condition would not challenge the CREBAPS or the control room pressure boundary.
On September 1, 1994, the Duquesne Light Company submitted a 10 CFR Part 21 report to the NRC concerning the Beaver Valley Unit 1 Solid State Protection System (SSPS). The report concerned an anomaly with the train "B' SSPS semi automatic tester. The semi-automatic tester is used to test various logic card circuits. The licensee found that the tester card was producing extra test pulses. The extra pulses could prevent testing some logic combinations, which could mask a logic card failure. This problem was discovered by the licensee during troubleshooting of an unrelated logic card failure indication.
However, the licensee found, through-recent operating experience, that if a switch fails low, CREBAPS system operationcan be degraded (the associated discharge line is disabled).
Consequently, the switches will be entered into the licensee's safety-related component calibration program.
This issue is closed.
4.3 Solid State Protection System 10 CFR Part 21 (closed)
On September 1, 1994, the Duquesne Light Company submitted a 10 CFR Part 21 report to the NRC concerning the Beaver Valley Unit 1 Solid State Protection System (SSPS).
The report concerned an anomaly with the train "B' SSPS semi automatic tester.
The semi-automatic tester is used to test various logic card circuits.
The licensee found that the tester card was producing extra test pulses.
The extra pulses could prevent testing some logic combinations, which could mask a logic card failure.
This problem was discovered by the licensee during troubleshooting of an unrelated logic card failure indication.
An observant engineer noticed that the test pulse train on the input of the logic card (with the unrelated failure indication) was not correct.
An observant engineer noticed that the test pulse train on the input of the logic card (with the unrelated failure indication) was not correct.
The licensee found that the system clock counter for the semi-automatic tester was causing the additional pulses. This card was replaced and train 'B' of the SSPS was successfully tested. The Unit 1 train 'A' and the Unit 2 SSPS logic testers were also checked for proper operation,. and no further problems were noted. The licensee has initiated periodic surveillance checks to verify proper operation of all SSPS logic test circuits. Westinghouse has issued a Nuclear Safety Advisory Letter as a resultoof the Duquesne Light Company findings. The letter recommends that all utilities with Westinghouse solid state protection systems check the semi-automatic test circuits, as a minimum, during each refueling outage.
The licensee found that the system clock counter for the semi-automatic tester was causing the additional pulses.
This card was replaced and train 'B' of the SSPS was successfully tested.
The Unit 1 train 'A' and the Unit 2 SSPS logic testers were also checked for proper operation,. and no further problems were noted.
The licensee has initiated periodic surveillance checks to verify proper operation of all SSPS logic test circuits.
Westinghouse has issued a Nuclear Safety Advisory Letter as a resultoof the Duquesne Light Company findings.
The letter recommends that all utilities with Westinghouse solid state protection systems check the semi-automatic test circuits, as a minimum, during each refueling outage.
The inspectors concluded that the licensee demonstrated a strong questioning attitude in the, identification of the SSPS semi-automatic tester anomaly, and took appropriate, conservative actions to report and correct the deficiency.
The inspectors concluded that the licensee demonstrated a strong questioning attitude in the, identification of the SSPS semi-automatic tester anomaly, and took appropriate, conservative actions to report and correct the deficiency.
This 10 CFR Part 21 issue is considered closed for Beaver Valley.
This 10 CFR Part 21 issue is considered closed for Beaver Valley.


13 4.4     Auxiliary Feedwater Flow Margin During a review of the Offsite Review Committee meeting minutes, the inspectors discovered that the licensee's analysis for a small break loss of coolant accident (SBLOCA) did not bound all of the conditions which are allowed by the Unit 1 and Unit 2 Technical Specifications. Specifically, any time the steam driven Auxiliary Feedwater (AFW) pump is out of service, both high head safety injection (HHSI) pumps and both motor driven AFW pumps must be in service. The Technical Specifications at both units allow the steam driven AFW pump and a motor driven AFW pump to be out of service for up to 6 hours, and place no restrictions on taking a HHSI pump out of service at the same time as the steam driven AFW pump.
13 4.4 Auxiliary Feedwater Flow Margin During a review of the Offsite Review Committee meeting minutes, the inspectors discovered that the licensee's analysis for a small break loss of coolant accident (SBLOCA) did not bound all of the conditions which are allowed by the Unit 1 and Unit 2 Technical Specifications.
The inspectors asked several shift supervisors if they were-aware that taking a HHSI pump or a motor driven AFW pump out of service at the same time as the steam driven AFW pump was an unanalyzed condition. The inspectors found-that none of the shift supervisors were aware that this condition was unanalyzed, and no controls were in place to prevent placing the plant in-such a condition. The inspectors reviewed the Quality Services Unit Technical Specification data base for both units. No instances were found where aservice  steam driven AFW pump and a HHSI pump or a motor   driven   AFW pump were out of at the same time with a Plant in Mode 1.
Specifically, any time the steam driven Auxiliary Feedwater (AFW) pump is out of service, both high head safety injection (HHSI) pumps and both motor driven AFW pumps must be in service.
not The inspectors were not able to determine exactly why plant operators were     were aware of the required controls on AFW and HHSI pumps. The requirements known to the Nuclear Safety Department in early 1993, and were communicated to the Operations Department in the form of letters and a "basis for continued operation" determination. Additionally, the Operations Department was told to that the Emergency Operating Procedures (EOPs) must be revised immediately reflect the required AFW flow rates. Apparently, there was some internal or disagreement/questions concerning the necessity to implement more controls change the EOPs. The disagreement/questions were not fully resolved and no changes were made. After the inspectors identified that controls were lacking to prevent placing the plant in this unanalyzed condition, the licensee implemented appropriate controls at both units. The licensee was already working on Technical Specification changes to reflect the required controls.flows.
The Technical Specifications at both units allow the steam driven AFW pump and a motor driven AFW pump to be out of service for up to 6 hours, and place no restrictions on taking a HHSI pump out of service at the same time as the steam driven AFW pump.
The EOPs, however, have not been changed to reflect the required AFW issue        of The licensee is still evaluating the   necessity   for the change. The reflecting design basis AFW flows in the EOPs is an unresolved   Item (50-334/94-24-02 and 50-412/94-25-02) pending NRC review of the licensee's determination.
The inspectors asked several shift supervisors if they were-aware that taking a HHSI pump or a motor driven AFW pump out of service at the same time as the steam driven AFW pump was an unanalyzed condition.
5.0   PLANT SUPPORT (71750, 71707) 5.1   Radiological Controls Posting and control of radiation and high radiation areas were inspected.
The inspectors found-that none of the shift supervisors were aware that this condition was unanalyzed, and no controls were in place to prevent placing the plant in-such a condition.
devices were Radiation work permit compliance and use of personnel monitoring checked. Conditions of step-off pads, disposal     of protective clothing, radiation control job coverage, area monitor operability and calibration a sampling (portable and permanent), and personnel frisking were observed on
The inspectors reviewed the Quality Services Unit Technical Specification data base for both units.
No instances were found where a steam driven AFW pump and a HHSI pump or a motor driven AFW pump were out of service at the same time with a Plant in Mode 1.
The inspectors were not able to determine exactly why plant operators were not aware of the required controls on AFW and HHSI pumps.
The requirements were known to the Nuclear Safety Department in early 1993, and were communicated to the Operations Department in the form of letters and a "basis for continued operation" determination.
Additionally, the Operations Department was told that the Emergency Operating Procedures (EOPs) must be revised immediately to reflect the required AFW flow rates.
Apparently, there was some internal disagreement/questions concerning the necessity to implement more controls or change the EOPs.
The disagreement/questions were not fully resolved and no changes were made.
After the inspectors identified that controls were lacking to prevent placing the plant in this unanalyzed condition, the licensee implemented appropriate controls at both units.
The licensee was already working on Technical Specification changes to reflect the required controls.
The EOPs, however, have not been changed to reflect the required AFW flows.
The licensee is still evaluating the necessity for the change.
The issue of reflecting design basis AFW flows in the EOPs is an unresolved Item (50-334/94-24-02 and 50-412/94-25-02) pending NRC review of the licensee's determination.
5.0 PLANT SUPPORT (71750, 71707) 5.1 Radiological Controls Posting and control of radiation and high radiation areas were inspected.
Radiation work permit compliance and use of personnel monitoring devices were checked.
Conditions of step-off pads, disposal of protective clothing, radiation control job coverage, area monitor operability and calibration (portable and permanent), and personnel frisking were observed on a sampling


I 14 basis. Licensee personnel were observed to be properly implementing the radiological protection program.
14 basis.
5.2   Security Implementation of the physical security plan was observed in various plant areas with regard to the following: protected area and vital area barriers were well maintained and not compromised; isolation zones were clear; personnel and vehicles entering and packages being delivered to the protected area were properly searched and access control was~in accordance with approved licensee procedures; persons granted access to the site were badged to indicate whether they have unescorted access or escorted authorization; security access controls to vital areas were maintained and persons in vital areas were authorized; security posts were adequately staffed and equipped, security personnel were alert and knowledgeable regarding position requirements, and that written procedures were available; and adequate illumination was maintained. Licensee personnel were observed to be properly implementing and following the Physical Security Plan.
Licensee personnel were observed to be properly implementing the radiological protection program.
5.3   Housekeeping Plant housekeeping controls were monitored, including control and storage of flammable material and other potential safety hazards. The inspectors conducted detailed walkdowns of accessible areas of both Unit 1 and Unit 2.
5.2 Security Implementation of the physical security plan was observed in various plant areas with regard to the following:
protected area and vital area barriers were well maintained and not compromised; isolation zones were clear; personnel and vehicles entering and packages being delivered to the protected area were properly searched and access control was~in accordance with approved licensee procedures; persons granted access to the site were badged to indicate whether they have unescorted access or escorted authorization; security access controls to vital areas were maintained and persons in vital areas were authorized; security posts were adequately staffed and equipped, security personnel were alert and knowledgeable regarding position requirements, and that written procedures were available; and adequate illumination was maintained.
Licensee personnel were observed to be properly implementing and following the Physical Security Plan.
5.3 Housekeeping Plant housekeeping controls were monitored, including control and storage of flammable material and other potential safety hazards.
The inspectors conducted detailed walkdowns of accessible areas of both Unit 1 and Unit 2.
There has been improvement in housekeeping since the last inspection period, and the inspectors have noted management attention to housekeeping.
There has been improvement in housekeeping since the last inspection period, and the inspectors have noted management attention to housekeeping.
6.0   ADMINISTRATIVE 6.1   Preliminary Inspection Findings Exit At periodic intervals during this inspection, meetings were held with senior plant management to discuss licensee activities and inspector areas of concern. Following conclusion of the report period, the resident inspector staff conducted an exit meeting on November 16, 1994, with Beaver Valley management summarizing inspection activity and findings for this period.
6.0 ADMINISTRATIVE 6.1 Preliminary Inspection Findings Exit At periodic intervals during this inspection, meetings were held with senior plant management to discuss licensee activities and inspector areas of concern.
6.2   Attendance at Exit Meetings Conducted by Region-Based Inspectors During this inspection period, the inspectors attended the following exit meetings:
Following conclusion of the report period, the resident inspector staff conducted an exit meeting on November 16, 1994, with Beaver Valley management summarizing inspection activity and findings for this period.
Inspection Reot o             Reporting Inspector Dates                    Sujc October 14, 1994       Engineering             94-22/23           R. Paolino October 14, 1994       Unit-1 SRO Exams       94-21             P. Bissett October 28, 1994       EDSFI Open Items       94-25/26           R. Bhatia November 10, 1994       MOV Open Items         94-23/24           F. Bower
6.2 Attendance at Exit Meetings Conducted by Region-Based Inspectors During this inspection period, the inspectors attended the following exit meetings:
Inspection Reporting Dates Sujc Reot o Inspector October 14, 1994 Engineering 94-22/23 R. Paolino October 14, 1994 Unit-1 SRO Exams 94-21 P. Bissett October 28, 1994 EDSFI Open Items 94-25/26 R. Bhatia November 10, 1994 MOV Open Items 94-23/24 F. Bower I


15 6.3   NRC Staff Activities Inspections were conducted on both normal and backshift hours:     18.8 hours of direct inspection were conducted on backshift; 20.5 hours were conducted on deep backshift. The times of backshift hours were adjusted weekly to assure randomness.
15 6.3 NRC Staff Activities Inspections were conducted on both normal and backshift hours: 18.8 hours of direct inspection were conducted on backshift; 20.5 hours were conducted on deep backshift.
W. Lazarus, Chief, Region I Section 3B, visited the site1 on   October 27 and 28, and J. Linville, Chief, Projects Branch 3, on   November   and 2, 1994. During both visits, discussions were held with   the inspectors and utility management and tours were conducted of the site.
The times of backshift hours were adjusted weekly to assure randomness.
W. Lazarus, Chief, Region I Section 3B, visited the site on October 27 and 28, and J. Linville, Chief, Projects Branch 3, on November 1 and 2, 1994.
During both visits, discussions were held with the inspectors and utility management and tours were conducted of the site.


Westinghouse Technology Advanced Manual Chapter 5 TRANSIENTS
Westinghouse Technology Advanced Manual Chapter 5 TRANSIENTS


Westinghouse      Four-Loop Design Transients Westina'house Tecbnololpv Advanced               Manual                   Wsigos             orLo                           einTaset TABLE OF CONTENTS 5.0 WESTINGHOUSE FOUR-LOOP DESIGN TRANSIENTS                                       ...................                                                            5.0-1 5.0-1 5.1 Introduction .................................................
Westina'house Tecbnololpv Advanced Manual Wsigos orLo einTaset TABLE OF CONTENTS 5.0 WESTINGHOUSE FOUR-LOOP DESIGN TRANSIENTS 5.1 Introduction 5.2 Transient Analysis.............................................
5.0-2 5.2 Transient Analysis .............................................
5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 Energy Equilibrium....................
Energy Equilibrium ....................                                                                                                            5.0-2 5.2.1 5.2.2   Reactivity Balance .....................                                                                                                           5.0-4 5.2.3  Steam Generators .....................                                                                                                             5.0-5 5.2.4  Instrument Failures ....................                                                                                                           5.0-6 5.2.5  A ccidents ...........................
Reactivity Balance.....................
5.0-6 5.0-7 5.3 Parameter Behavior during Transients ...............
Steam Generators Instrument Failures....................
5.0-7 5.3.1 Pressurizer Pressure ............................                                      ..      .      .    .    .    .      .    .  .
A ccidents...........................
5.0-7 5.3.2 Bank D Rod Position ............................                                      ...........
5.3 Parameter Behavior during Transients...............
5.0-8 5.3.3   Nuclear Power ................................
5.3.1 Pressurizer Pressure 5.3.2 Bank D Rod Position............................
5.0-8 5.3.4   Generator Load ................................
5.3.3 Nuclear Power................................
5.0-8 5.3.5   Tavg/Tref   ....................................
5.3.4 Generator Load................................
5.0-9 5.3.6 Pressurizer Level ..............................                                        ...........
5.3.5 Tavg/Tref 5.3.6 Pressurizer Level 5.3.7 Charging Flow................................
5.0-9 5.3.7 Charging Flow ................................                                          ..      .      .    ..    .. ,      .    .      .
5.3.8 Steam Dump Demand 5.3.9 Steam Flow..................................
5.0-9 5.3.8 Steam Dump Demand ...........................                                            ...        ,    .      o.      .  .    ..
5.3.10 Feedwater flow................................
5.0-9 5.3.9 Steam Flow ..................................                                            . .        .    .    .    .    .    . .    .
5.3.11 Steam Generator Level...........................
5.0-9 5.3.10 Feedwater flow ................................
5.3.12 Steam Pressure................................
5.0-10 5.3.11 Steam Generator Level ...........................                                        ..      .        .    .    .    .    .    .  .
LIST OF TABLES 5-1 Transient Information.............................................
5.0-10 5.3.12 Steam Pressure ................................
LIST OF FIGURES 5-1 NSSS Response................................................
LIST OF TABLES 5-1 Transient Information .............................................                                                                                           5.0-11 LIST OF FIGURES 5.0-15 5-1 NSSS Response ................................................
+/-~~~i I..
                                                                                  +/-~~~i                                                                             I..
1Of)
1Of)
                                                                                                                                                                      &#xa3;. OA USNRC Technical Training Center                                    Z.V-I                                                                                 e-.-_o P*.*   1*ev
OA
&#xa3;.
5.0-1 5.0-1 5.0-2 5.0-2 5.0-4 5.0-5 5.0-6 5.0-6 5.0-7 5.0-7 5.0-7 5.0-8 5.0-8 5.0-8 5.0-9 5.0-9 5.0-9 5.0-9 5.0-9 5.0-10 5.0-10 5.0-11 5.0-15 Z.V-I Westinghouse Four-Loop Design Transients
: o.
e-.- _o P*.*
1*ev USNRC Technical Training Center


I Westinghouse Technology Advanced Manual                Westinghouse Four-Loop Design Transients Westinghouse Technology Advanced Manual                 Westinghouse Four-Loop Design Transients LIST OF TRANSIENTS 5.0     Power Changes 5.01   Ramp Load Increase: 50% - 100%, 5%/min 5.02   Ramp Load Decrease: 100% - 50%, 5%/min 5.03   Rapid Load Decrease: 100% - 90%
Westinghouse Technology Advanced Manual Westinghouse Four-Loop Design Transients LIST OF TRANSIENTS 5.0 Power Changes 5.01 Ramp Load Increase: 50% - 100%, 5%/min 5.02 Ramp Load Decrease: 100% - 50%, 5%/min 5.03 Rapid Load Decrease: 100% - 90%
5.04   Rapid Load Decrease: 100% - 15%
5.04 Rapid Load Decrease: 100% - 15%
5.1     Power Changes with Complications 5.11   Manual Reactor Trip 5.12   Rapid Load Decrease: 100% - 50%, Rods in Manual 5.13   Rapid Load Decrease: 100% - 50%, Steam Dumps Off 5.14   Rapid Load Decrease: 100% - 50%, Steam Dumps Off, Rods in Manual 5.2     Control Rod Transients 5.21   Dropped Rod (Shutdown Bank A Rod M-14) 5.22   Fast Rod Withdrawal, 45% Load 5.23   Fast Rod Withdrawal from Source Range 5.3     Instrument Failures Affecting Rod Control and Steam Dumps 5.31   Loop #1 Cold-Leg RTD Fails High 5.32   Loop #1 Hot-Leg RTD Fails High, 25% Load 5.33   Power Range Channel NI-41 Fails High 5.34   Steam Dump Loss-of-Load Controller Fails to Maximum Demand 5.35   Impulse Pressure Channel PT-505 Fails Low 5.36   Impulse Pressure Channel PT-505 Fails High 5.4     Instrument Failures Affecting Pressurizer Pressure and Level 5.41   Controlling Pressurizer Pressure Channel Fails High 5.42   Controlling Pressurizer Level Channel Fails Low 5.43   Controlling Pressurizer Pressure Channel Fails Low Rev  1296 USNRC Technical     Training Center Technical Training   Center                                                 Rev  1296
5.1 Power Changes with Complications 5.11 Manual Reactor Trip 5.12 Rapid Load Decrease: 100% - 50%, Rods in Manual 5.13 Rapid Load Decrease: 100% - 50%, Steam Dumps Off 5.14 Rapid Load Decrease: 100% - 50%, Steam Dumps Off, Rods in Manual 5.2 Control Rod Transients 5.21 Dropped Rod (Shutdown Bank A Rod M-14) 5.22 Fast Rod Withdrawal, 45% Load 5.23 Fast Rod Withdrawal from Source Range 5.3 Instrument Failures Affecting Rod Control and Steam Dumps 5.31 Loop #1 Cold-Leg RTD Fails High 5.32 Loop #1 Hot-Leg RTD Fails High, 25% Load 5.33 Power Range Channel NI-41 Fails High 5.34 Steam Dump Loss-of-Load Controller Fails to Maximum Demand 5.35 Impulse Pressure Channel PT-505 Fails Low 5.36 Impulse Pressure Channel PT-505 Fails High 5.4 Instrument Failures Affecting Pressurizer Pressure and Level 5.41 Controlling Pressurizer Pressure Channel Fails High 5.42 Controlling Pressurizer Level Channel Fails Low 5.43 Controlling Pressurizer Pressure Channel Fails Low USNRC Technical Training Center Rev 1296 Rev 1296 I
Westinghouse Technology Advanced Manual Westinghouse Four-Loop Design Transients USNRC Technical Training Center


Westinghouse Technology Advanced Manual                Westinghouse Four-Loop Design  Transients LIST OF TRANSIENTS (CONT'D) 5.5     Instrument Failures Affecting Steam Generator Water Level Control 5.51   Controlling Steam Generator Level Channel Fails Low 5.52   Controlling Steam Generator Level Channel Fails High 5.53   Controlling Steam Generator Feed Flow Channel Fails Low 5.54   Controlling Steam Generator Feed Flow Channel Fails High 5.6     Equipment Failures 5.61   Trip of #1 Main Feed Pump 5.62   Inadvertent MSIV Closure 5.63   RCP Trip 5.7   Accidents 5.71   Atmospheric Relief Valve Fails Open 5.72   Large Steam Break Inside Containment with Loss of Offsite Power, 10-9 amps in I.R.
LIST OF TRANSIENTS (CONT'D) 5.5 Instrument Failures Affecting Steam Generator Water Level Control 5.51 Controlling Steam Generator Level Channel Fails Low 5.52 Controlling Steam Generator Level Channel Fails High 5.53 Controlling Steam Generator Feed Flow Channel Fails Low 5.54 Controlling Steam Generator Feed Flow Channel Fails High 5.6 Equipment Failures 5.61 Trip of #1 Main Feed Pump 5.62 Inadvertent MSIV Closure 5.63 RCP Trip 5.7 Accidents 5.71 Atmospheric Relief Valve Fails Open 5.72 Large Steam Break Inside Containment with Loss of Offsite Power, 10-9 amps in I.R.
5.73   Large Steam Break Inside Containment, 100% Power 5.74   Large Steam Break Downstream of MSIVs, 10-9 amps in I.R.
5.73 Large Steam Break Inside Containment, 100% Power 5.74 Large Steam Break Downstream of MSIVs, 10-9 amps in I.R.
5.75   Steam Generator Tube Rupture in SG #1 5.76   6-in. Cold-Leg Break 5.77   Loss-of-Feedwater ATWS
5.75 Steam Generator Tube Rupture in SG #1 5.76 6-in. Cold-Leg Break 5.77 Loss-of-Feedwater ATWS U"
                      .  ..    .                    "                                      V.,-
V.,- 170i.
U"  170i.
USNRC Technical Training Center Westinghouse Four-Loop Design Transients Westinghouse Technology Advanced Manual
0... U-I USNRC Technical Training Center
: 0...
U-I


Westinghouse Four-Loop Design Transients W-.tjn ho~use   Tec'hnology Advanced Manual                     VsihoeFurLpDsgnTaint 5.0       WESTINGHOUSE FOUR-LOOP                           relatively minor changes in setpoints, capacities, DESIGN TRANSIENTS                                or plAnt configurations could cause significant differences in indicated responses.
W-.tjn ho~use Tec'hnology Advanced Manual VsihoeFurLpDsgnTaint 5.0 WESTINGHOUSE FOUR-LOOP DESIGN TRANSIENTS Learning Objectives:
Learning Objectives:
: 1. Given a set of transient curves and Table 5-1, demonstrate an understanding of plant characteristics and control, protection, and safeguards systems by:
During analysis and study of the curves, the
: a. Explaining why the parameter values are trending as shown at selected numbered portions of the curves,
: 1. Given a set of transient curves and Table 5-1,        student should concentrate on explaining the demonstrate an understanding of plant                changes in various parameters caused by the characteristics and control, protection, and        initiating event and by the subsequent operation safeguards systems by:                              of control, protection, and safeguards systems.
: b. Explaining plant effects caused by param eters reaching certain values at selected numbered points, and
When explaining a numbered point, the student
: c. Explaining the cause(s) of the reactor trip and/or engineered safety features (ESF) actuation, if either occurs.
: a. Explaining why the parameter values are          should always try to relate "cause" and "effect" trending as shown at selected numbered            (e.g., pressurizer level is increasing because the portions of the curves,                          reactor coolant system [RCS] average tempera
5.1 Introduction The transient curves contained in this chapter were compiled and analyzed by staff members of the NRC's Technical Training Center (TTC).
: b. Explaining plant effects caused by param          ture is increasing, and the coolant is expanding eters reaching certain values at selected        into the pressurizer). Do not place too much numbered points, and                              emphasis on an isolated portion of or a minor
They were produced from the dynamic responses of the Trojan (a Westinghouse four-loop reactor plant) training simulator. Specific parameter responses of the simulator were recorded by a data acquisition program and then graphed with a graphics program.
: c. Explaining the cause(s) of the reactor trip        deviation in the graph of a particular parameter and/or engineered safety features (ESF)          unless it is associated with a numbered point.
The instructor explanations provided in class for these curves are the results of analysis by the TTC staff during the actual simulator "runs" and during subsequent staff seminars.
actuation, if either occurs.                    Generally, a numbered point will bracket a portion of a curve, indicating that the student Introduction                                    should try to explain why a parameter is trending 5.1 or changing in the bracketed area. If a numbered The transient curves contained in this chapter        point is associated with a reactor trip or engi neered safety features actuation, the student were compiled and analyzed by staff members of should attempt to explain not only that the protec the NRC's Technical Training Center (TTC).
For each transient, the sequence of numbered points has been established to aid the instructor's classroom presentation.
tive action has occurred but also what reactor trip They were produced from the dynamic responses signal or ESF actuation signal is present.
Caution is advised when trying to apply these simulator curves to any operating plant. Even relatively minor changes in setpoints, capacities, or plAnt configurations could cause significant differences in indicated responses.
of the Trojan (a Westinghouse four-loop reactor plant) training simulator. Specific parameter The following general notes are applicable to responses of the simulator were recorded by a all transients unless other information is provid data acquisition program and then graphed with a            ed:
During analysis and study of the curves, the student should concentrate on explaining the changes in various parameters caused by the initiating event and by the subsequent operation of control, protection, and safeguards systems.
graphics program.
When explaining a numbered point, the student should always try to relate "cause" and "effect" (e.g., pressurizer level is increasing because the reactor coolant system [RCS] average tempera ture is increasing, and the coolant is expanding into the pressurizer). Do not place too much emphasis on an isolated portion of or a minor deviation in the graph of a particular parameter unless it is associated with a numbered point.
: 1. Pressurizer pressuire is from one of the The instructor explanations provided in class four pressuirizer pressuie instruments. In for these curves are the results of analysis by the a few traniients, wide-range RCS pres TTC staff during the actual simulator "runs" and sure from one of the pressure detectors during subsequent staff seminars. For each on the residual heat removal (RHR) transient, the sequence of numbered points has system suction line is also provided.
Generally, a numbered point will bracket a portion of a curve, indicating that the student should try to explain why a parameter is trending or changing in the bracketed area. If a numbered point is associated with a reactor trip or engi neered safety features actuation, the student should attempt to explain not only that the protec tive action has occurred but also what reactor trip signal or ESF actuation signal is present.
been established to aid the instructor's classroom presentation.
The following general notes are applicable to all transients unless other information is provid ed:
: 1. Pressurizer pressuire is from one of the four pressuirizer pressuie instruments. In a few traniients, wide-range RCS pres sure from one of the pressure detectors on the residual heat removal (RHR) system suction line is also provided.
: 2. Bank D rod position is from the digital rod position indication system.
: 2. Bank D rod position is from the digital rod position indication system.
Caution is advised when trying to apply these simulator curves to any operating plant. Even
.lZ.1 Rev 1296 USNRC Technical Tralning Center
                                                .lZ.1                                                   Rev 1296
*7 o q3-- JL Westinghouse Four-Loop Design Transients
                                                      *7 o q3--JL USNRC Technical Tralning Center


I-Westinghouse Technology Advanced Manual Westn~buse echoloa     Adance     MaualWestinizhouse                 Four-Loon Design Transients
Westn~buse echoloa Adance MaualWestinizhouse Four-Loon Design Transients
: 3. Nuclear power is from one of the four                     four main steam lines but is indicative of excore nuclear instruments.                            the pressure in any steam line.
: 3. Nuclear power is from one of the four excore nuclear instruments.
: 4. Generator load is in electrical MW.                   13. Additional parameters are monitored and graphed if they are pertinent to the tran
: 4. Generator load is in electrical MW.
: 5. Average RCS temperature (Tayg) is the                     sient analysis.
: 5. Average RCS temperature (Tayg) is the Tavg from one of the four coolant loops, derived from the narrow-range resistance temperature detectors (RTDs) in the bypass manifold. The programmed Tavg for a particular turbine load (Tref) is a function of turbine impulse pressure.
Tavg from one of the four coolant loops, derived from the narrow-range resistance           14. When a transient is caused by a control temperature detectors (RTDs) in the                     system response to an instrument failure, bypass manifold. The programmed Tavg                   the output of a redundant instrument is for a particular turbine load (Tref) is a               graphed to display the actual changes in function of turbine impulse pressure.                  the parameter of interest.
: 6. Pressurizer level is from one of the three pressurizer level detectors.
: 6. Pressurizer level is from one of the three           15. Initial plant conditions not available from pressurizer level detectors.                           the transient curves are given by the instructor during the introduction to the
: 7. Charging flow is from the flow transmit ter downstream of the'charging pumps and includes flow supplied to both the normal charging line and to reactor coolant pump seal injection.
: 7. Charging flow is from the flow transmit                   transient and listed in a box adjacent to ter downstream of the'charging pumps                   the transient curves. For transients used and includes flow supplied to both the                 on the final exam, the initial conditions normal charging line and to reactor                     are given as part of the problem state coolant pump seal injection.                            ments.
: 8. Steam dump demand is the ouput of either the loss-of-load, the turbine trip, or the steam pressure controller, whichever is in service.
: 8. Steam dump demand is the ouput of                 5.2    Transient Analysis either the loss-of-load, the turbine trip, or the steam pressure controller, whichever           The following sections discuss various is in service.                                  aspects of transient analysis.
: 9. Steam flow (W,) is the flow in one of the four main steam lines but is indicative of total steam flow.
: 9. Steam flow (W,) is the flow in one of the         5.2.1 Energy Equilibrium four main steam lines but is indicative of total steam flow.                                   Transient analysis begins with an examina tion of the stored energy of the reactor coolant.
: 10. Feedwater flow (Wf) is the flow supplied to one of the four steam generators but is indicative of total feedwater flow.
: 10. Feedwater flow (Wf) is the flow supplied        As shown in Figure 5-1, the internal energy of to one of the four steam generators but is      the reactor coolant is dependent on two factors, indicative of total feedwater flow.            the energy input from the core and the energy removal by the secondary system (steam genera
: 11. Steam generator level is from one of the three narrow-range level detectors on one of the four steam generators but is indica tive of the level in any steam generator.
: 11. Steam generator level is from one of the        tors). If the energy input equals the energy three narrow-range level detectors on one      removal, then the internal energy of the reactor of the four steam generators but is indica      coolant is not changing. Therefore, the average tive of the level in any steam generator.      coolant temperature is stable. However, if an upset in the energy equilibrium occurs, then the
: 12. Steam pressure (Pstm) is from one of the three pressure detectors on one of the four main steam lines but is indicative of the pressure in any steam line.
: 12. Steam pressure (Pstm) is from one of the        internal energy of the reactor coolant changes, three pressure detectors on one of the          resulting in a change in coolant temperature.
: 13. Additional parameters are monitored and graphed if they are pertinent to the tran sient analysis.
5.0-2                                         Rev 1296 USNRC Technical       Training Center Technical Training    Center              5.0-2                                         Rev 1296
: 14. When a transient is caused by a control system response to an instrument failure, the output of a redundant instrument is graphed to display the actual changes in the parameter of interest.
: 15. Initial plant conditions not available from the transient curves are given by the instructor during the introduction to the transient and listed in a box adjacent to the transient curves. For transients used on the final exam, the initial conditions are given as part of the problem state ments.
5.2 Transient Analysis The following sections discuss various aspects of transient analysis.
5.2.1 Energy Equilibrium Transient analysis begins with an examina tion of the stored energy of the reactor coolant.
As shown in Figure 5-1, the internal energy of the reactor coolant is dependent on two factors, the energy input from the core and the energy removal by the secondary system (steam genera tors). If the energy input equals the energy removal, then the internal energy of the reactor coolant is not changing. Therefore, the average coolant temperature is stable. However, if an upset in the energy equilibrium occurs, then the internal energy of the reactor coolant changes, resulting in a change in coolant temperature.
USNRC Technical Training Center 5.0-2 Rev 1296 Rev 1296 I-Westinghouse Technology Advanced Manual USNRC Technical Training Center 5.0-2


Westinghouse Technology Advanced Manual                         Westinghouse Four-Loop Design Transients When a change in coolant temperature occurs, the           of a change from an initial equilibrium between density of the reactor coolant changes. The                 "theenergy input to and energy removal from the reactor coolant.
Westinghouse Technology Advanced Manual When a change in coolant temperature occurs, the density of the reactor coolant changes. The changes in temperature and density affect several of the' parameters that are shown in the transient curves of this chapter.
changes in temperature and density affect several of the' parameters that are shown in the transient curves of this chapter.                                         A change in the Stored energy of the reactor "coolant-canl&#xfd; identified by comparing the reactor Assume that with an initial equilibrium             -power and'the steam demand on the steam between energy production and energy removal,               generators. Generally, if the turbine load is less a transient occurs that results in a reduction in tlie     than the reactor power, then the average coolant rate ofdenergy removal (e.g., a turibine load             temperature is increasing, and conversely, if the Sreduction).' Since the rate of energy production         'turbine'load is greater than the reactor power, (reactor power) can not immediately drop, the'             then the average coolant temperature is decreas internal energy of the reactor coolant increases,         ing. Any time the turbine is not in service or an additional steam demand from steam dump and the average coolant temperature increases.
Assume that with an initial equilibrium between energy production and energy removal, a transient occurs that results in a reduction in tlie rate of denergy removal (e.g., a turibine load Sreduction).' Since the rate of energy production (reactor power) can not immediately drop, the' internal energy of the reactor coolant increases, and the average coolant temperature increases.  
*    .When the coolant temperature increases, the                 operation or a steam break is present, a compari
.When the coolant temperature increases, the density of the coolant decreases. This decrease in density results in an increase in the volume of the reactor coolant, causing an insurge into the pressurizer and an increase in pressurizer level.
* density of the coolant decreases. This decrease             son of steam flow and reactor power leads to the in density results in an increase in the volume of         same c6nclusion's. 'Once the direction of the the reactor coolant, causing an insurge into the           energy mismatch is known, the changes in pressurizer and an increase in pressurizer level.           coolant temperature and in pressurizer level and The pressurizer level insurge compresses the               pressure can be explained.
The pressurizer level insurge compresses the steam bubble, and pressurizer pressure increases.
steam bubble, and pressurizer pressure increases.
Now consider an increase in the rate of energy removal by the secondary system (e.g., a turbine load increase) from equilibriium condi tions. Initially, the rate of energy removal from the reactor coolant exceeds the rate of energy production by the reactor, the internal energy of:  
The two examples in the 'previous discussion Now consider an increase in the rate of               are representative of two types of transients. In energy removal by the secondary system (e.g., a the first type, reactor power exceeds the rate of turbine load increase) from equilibriium condi             'energy rem6val by the secondary; if the mismatch tions. Initially, the rate of energy removal from           is extreme, the'transient is referred to as an the reactor coolant exceeds the rate of energy             overheiting event. This type of transient in production by the reactor, the internal energy of: cludes turbine trips, load rejections, and normal
.the reactor coolant decreases, and the average.
      .the reactor coolant decreases, and the average. pow'er decreases. In the second type, the rate of
coolant temperature decreases. When the coolant temperature decreases, the density of the coolant*
  ,-    coolant temperature decreases. When the coolant           energy removal by the secondary excieeds reactor temperature decreases, the density of the coolant* pbwer;'if the mismatch is extieme, the transient is increases. The immediate consequence of aii               referred to as an', overcooling or excessive heat increase in coolant density is an outsurge from' transfer event. Examples of this' type of transient the pressurizer and a corresponding decrease in "arenormal power increases, steam dump opera pressurizer level. When the pressurizer'le'vel             tion, steam generator power-operated relief valve decreases, the volume of the steam bubble                   (PORV)openings, turbine valve failures, and increases. The expanding steam bubble results in'. steam line breaks.
increases. The immediate consequence of aii increase in coolant density is an outsurge from' the pressurizer and a corresponding decrease in pressurizer level. When the pressurizer'le'vel decreases, the volume of the steam bubble increases. The expanding steam bubble results in'.
a decrease from the initial pressurizer pressure'.
a decrease from the initial pressurizer pressure'.
In addition to determining the direction and In each of the examples discussed above, the" - m fgiitude of the-energy input/energy removal reactor coolant temperature and density and the           mismatch, the student must analyze the responses pressurizer level and pressure change as a result          of the control systems. If nuclear power exceeds RV    iYb
In each of the examples discussed above, the" reactor coolant temperature and density and the pressurizer level and pressure change as a result Westinghouse Four-Loop Design Transients of a change from an initial equilibrium between "the energy input to and energy removal from the reactor coolant.
        "-USNRC   Technical Training   Center, Training Center,                +/-.Ii-i
A change in the Stored energy of the reactor "coolant-can l&#xfd; identified by comparing the reactor
: 5. 0-.5                                     Rtev 1296
-power and'the steam demand on the steam generators. Generally, if the turbine load is less than the reactor power, then the average coolant temperature is increasing, and conversely, if the
        'USNRC Technical
'turbine'load is greater than the reactor power, then the average coolant temperature is decreas ing. Any time the turbine is not in service or an additional steam demand from steam dump operation or a steam break is present, a compari son of steam flow and reactor power leads to the same c6nclusion's. 'Once the direction of the energy mismatch is known, the changes in coolant temperature and in pressurizer level and pressure can be explained.
The two examples in the 'previous discussion are representative of two types of transients. In the first type, reactor power exceeds the rate of
'energy rem6val by the secondary; if the mismatch is extreme, the'transient is referred to as an overheiting event. This type of transient in cludes turbine trips, load rejections, and normal pow'er decreases. In the second type, the rate of energy removal by the secondary excieeds reactor pbwer;'if the mismatch is extieme, the transient is referred to as an', overcooling or excessive heat transfer event. Examples of this' type of transient "are normal power increases, steam dump opera tion, steam generator power-operated relief valve (PORV)openings, turbine valve failures, and steam line breaks.
In addition to determining the direction and  
- m fgiitude of the-energy input/energy removal mismatch, the student must analyze the responses of the control systems. If nuclear power exceeds
'USNRC Technical Training Center,  
+/-.Ii-i RV iYb Rtev 1296
: 5. 0-.5
"-USNRC Technical Training Center,


a Westinghouse Technoldgy' Advanced' Manual                        Westinghouse Four-Loop Design-Trilnsients Westinghouse Technology Advanced Manual                           Westinghouse Four-Loop Design- Transients turbine load, Tavg increases.: If Tavg increases           be added by the power defect and compensated above Tref, then the' control rods are inserted by         by a change in control rod position. The power the rod control system (assuming automatic                 defect (the power coefficient integrated over a operation). Also, the pressurizer level increases.         power change) accounts for the change in reactiv If the increase in level exck'eds the increase in the       ity associated with the'changes in fuel tempera pressurizer level setpoint, the pressurizer level          ture and moderator temperature, with the modera control system decreases charging flow. The                tor temperature assumed to be-maintained at accompanying increase in pressurizer pressure is            programmed values. When the operat'or changes compared to the pressure setpoint in the pressur            the turbine load at the turbine electrohydraulic izer pressure control system. The 'control system          control (EHC) station, the resulting primary-to reduces the output of the proportional heaters            secondary mismatch causes the average coolant and, if the pressure error is large enough, opens          temperature to initially increase or decrease. The the spray valves. Finally, if the increase in              rod control system (if in automatic) responds to pressurizer pressure is large enough, the pressur          the Tavg/Tref error and the power mismatch izer PORVs open. The rod control system and                associated with the load'change by inserting or the pressurizer level and pressure control systems        withdrawing rods.' When the new steady state will react in similar but opposite fashions to a          has been reached at the end of the load change, transient in which turbine load exceeds nuclear            the reactivity balance (p = 0) is restored, with the power.                                                    reactivity 'associated with the power defect completely balanced by the reactivity added by 5.2.2 Reactivity Balance                                    the change in control rod position.
Westinghouse Technology Advanced Manual Westinghouse Four-Loop Design-Transients turbine load, Tavg increases.: If Tavg increases above Tref, then the' control rods are inserted by the rod control system (assuming automatic operation). Also, the pressurizer level increases.
Transient analysis also involves an examina                As an 'example, consider a turbine load tion of the reactivity balance The transients in            reduction with the rod control system in automat this section can involve changes'in fuel tempera            ic. Initially, the drop in load relative to the ture, moderator temperature, '1and control rod            unchanged nuclear power causes the average position, any, of which can 'idd positive or              reactor coolant temperature to increase, and the negative reactivity to an initial statelof equilibrium    temperature and power mismatch circuits of the reactivity (p = 0). For the transients of this            rod control system call for control rod insertion.
If the increase in level exck'eds the increase in the pressurizer level setpoint, the pressurizer level control system decreases charging flow. The accompanying increase in pressurizer pressure is compared to the pressure setpoint in the pressur izer pressure control system. The 'control system reduces the output of the proportional heaters and, if the pressure error is large enough, opens the spray valves. Finally, if the increase in pressurizer pressure is large enough, the pressur izer PORVs open. The rod control system and the pressurizer level and pressure control systems will react in similar but opposite fashions to a transient in which turbine load exceeds nuclear power.
section, the fuel and moderator temperature                The control rod insertion suppresses nuclear coefficients of reactivity are always negative. No        power and drives down Tang to match the de transient time span is l6ng enough' fr changes in          creasing tref. Meanwhile, the fuel temperature is fission product (poison) concentrations to signifi        decreasing with the decrease in nuclear power.
5.2.2 Reactivity Balance Transient analysis also involves an examina tion of the reactivity balance The transients in this section can involve changes'in fuel tempera ture, moderator temperature, '1and control rod position, any, of which can 'idd positive or negative reactivity to an initial statelof equilibrium reactivity (p = 0). For the transients of this section, the fuel and moderator temperature coefficients of reactivity are always negative. No transient time span is l6ng enough' fr changes in fission product (poison) concentrations to signifi cantly, affect reactivity, and no transient involves
cantly, affect reactivity, and no transient involves      When the load change is complete, the primary
,an operator-controlled change in boron concen tration. If the transient, terminates at a new steady-state endpoint witiou't 'a plant trip, the positive reactivity added by one source must be completely balanced by the niegative reactivity added by another.,
,an operator-controlled change in boron concen              power again equals the secondary load, and the tration. If the transient, terminates at a new            positive reactivity addition associated with the steady-state endpoint witiou't 'a plant trip, the          power defect (both fuel and moderator tempera positive reactivity added by one source must be            tures are lower at the transient endpoint) is completely balanced by the niegative reactivity            completely balanced by the negative reactivity added by another.,                                          added by the control rod insertion.
During a normal load change, reactivity will be added by the power defect and compensated by a change in control rod position. The power defect (the power coefficient integrated over a power change) accounts for the change in reactiv ity associated with the'changes in fuel tempera ture and moderator temperature, with the modera tor temperature assumed to be-maintained at programmed values. When the operat'or changes the turbine load at the turbine electrohydraulic control (EHC) station, the resulting primary-to secondary mismatch causes the average coolant temperature to initially increase or decrease. The rod control system (if in automatic) responds to the Tavg/Tref error and the power mismatch associated with the load'change by inserting or withdrawing rods.' When the new steady state has been reached at the end of the load change, the reactivity balance (p = 0) is restored, with the reactivity 'associated with the power defect completely balanced by the reactivity added by the change in control rod position.
During a normal load change, reactivity will                Next, consider the load reduction with the
As an 'example, consider a turbine load reduction with the rod control system in automat ic. Initially, the drop in load relative to the unchanged nuclear power causes the average reactor coolant temperature to increase, and the temperature and power mismatch circuits of the rod control system call for control rod insertion.
                            - -    -                          A                                     ii.
The control rod insertion suppresses nuclear power and drives down Tang to match the de creasing tref. Meanwhile, the fuel temperature is decreasing with the decrease in nuclear power.
ztv  i-me iu Training Center USNRC Technical Training USNRC                            Center             .3.U-4                                         Rev 1276O
When the load change is complete, the primary power again equals the secondary load, and the positive reactivity addition associated with the power defect (both fuel and moderator tempera tures are lower at the transient endpoint) is completely balanced by the negative reactivity added by the control rod insertion.
Next, consider the load reduction with the

A ii.
i-me USNRC Technical Training Center ztv iu a
Westinghouse Technoldgy' Advanced' Manual Westinghouse Four-Loop Design-Trilnsients
.3.U-4 Rev 1276O USNRC Technical Training Center


Westinighouse Technolog~y Advanced Manual                         Westinghouse Four-Loop Design Transients Westin2house Tecbnoloy        Advanced    Manual                Westinghouse  Four-Loop Design Transients rod control system in manual. The primary-to             transients involves-the changes that occur in secondary power mismatch increases the coolant           steam generator level and pressure. The initial temperature and thereby adds negative reactivity..       changes in steam generator level that are caused The negative reactivity addition decreases reactor       by changes in steam flow from'the steam genera power. The decrease in reactor power adds,               tor are ,called "shrink" and "swell." Many positive reactivityyia the fuel temperature coeffi-.     explanations are used to characterize these cient (the fuel temperature is decreasing), result       phenomena. According to one such explanation, ing in a dampening of the power decrease. As             a load change causes a change in the pressure of long as the rate of reactor energy production is         the-saturated steam generators, resulting in greater than the rate of energy removal by the           changes in the boiling rate and steam d6nsity. As turbine, the coolant temperature continues to rise.       a result, the steam volumes within the tube
Westin2house Tecbnoloy Advanced Manual Westinghouse Four-Loop Design Transients rod control system in manual. The primary-to secondary power mismatch increases the coolant temperature and thereby adds negative reactivity..
    -The transient is terminated when the rate of             bundle and riser regions of the steam generators
The negative reactivity addition decreases reactor power. The decrease in reactor power adds, positive reactivityyia the fuel temperature coeffi-.
    .energy input to the coolant by the reactor exactly       either increase or decrease, with an accompany
cient (the fuel temperature is decreasing), result ing in a dampening of the power decrease. As long as the rate of reactor energy production is greater than the rate of energy removal by the turbine, the coolant temperature continues to rise.  
_matches the rate of energy, removal by the sec           ing change inthe feedwater flows from the ondary system, and the positive reactivity addi           downcomer regions (where steam generator tion associated with the decrease in fuel tempera         levels are measured).
-The transient is terminated when the rate of  
    -ture exactly matches the negative reactivity addition associated with the increase in coolant               For example, during a turbine load increase, temperature. The endpoint conditions are equal             the increased steam flow decreases the pressure values of reactor and secondary power and a Tavg           in each steam generator. The pressure is now that is higher than that at the start of the transient. lower ihan the saturation pressure for the prevail ing steam generator temperature, resulting in an The- examples discussed above involve                 increase in the boiling rate and an accompanying changes initiated by the secondary plant. How             expansion of the steam volume in the tube bundle S,     ever, transients can be initiated in the primary         region. This"epansi6n Irestricts' flow from the system. An uncontrolled rod withdrawal and a             downcomer region to the tube bundle region,
.energy input to the coolant by the reactor exactly
    ,dropped rod are -two examples.- However, the              resulting in an increasing level. In addition, the considerations of any existing energy mismatch,           increased steam flow causes an increase in control system actions, and the effects of reactivi       moisture removal in the moisture separators and a
_matches the rate of energy, removal by the sec ondary system, and the positive reactivity addi tion associated with the decrease in fuel tempera
  ',ty coefficients remain applicable. For the tran             corresponding increase in recirculation of sients in this section, the moderator and fuel             feedwater'from the moisture separators to the
-ture exactly matches the negative reactivity addition associated with the increase in coolant temperature. The endpoint conditions are equal values of reactor and secondary power and a Tavg that is higher than that at the start of the transient.
  &#xa3;_ temperature coefficients and the reactivity chang           downcomei, which contribute's to the increase in es associated with rod motion account for the              downcomer level. This le',el increase is referred changes in reactor power. In actual plant opera            to as a swell. Following the initial change in tion, long-term changes in the concentrations of            level, the steam generator water. level control Ssysteni' (SGWLCS) returns the level to the fission product poisons and operator-controlled            -normal progriammed value through a reduction in changes in the boron concentration must also be considered.                                    ,          feedwatef flow.
The-examples discussed above involve changes initiated by the secondary plant. How S,
5.2.3,Steam Generators                                        Conversely, a decrease in steam demand results in a temporary steam generator level Another consideration in the analyses of              decrease. The decreased steam flow increases
ever, transients can be initiated in the primary system. An uncontrolled rod withdrawal and a  
                                                            -5.0-5                                             -1 InIr USNRC Technical Training Center--,                                                                  ev   L*'
,dropped rod are -two examples.- However, the considerations of any existing energy mismatch, control system actions, and the effects of reactivi
',ty coefficients remain applicable. For the tran sients in this section, the moderator and fuel  
&#xa3;_ temperature coefficients and the reactivity chang es associated with rod motion account for the changes in reactor power. In actual plant opera tion, long-term changes in the concentrations of fission product poisons and operator-controlled changes in the boron concentration must also be considered.
5.2.3,Steam Generators Another consideration in the analyses of transients involves-the changes that occur in steam generator level and pressure. The initial changes in steam generator level that are caused by changes in steam flow from'the steam genera tor are,called "shrink" and "swell."
Many explanations are used to characterize these phenomena. According to one such explanation, a load change causes a change in the pressure of the-saturated steam generators, resulting in changes in the boiling rate and steam d6nsity. As a result, the steam volumes within the tube bundle and riser regions of the steam generators either increase or decrease, with an accompany ing change inthe feedwater flows from the downcomer regions (where steam generator levels are measured).
For example, during a turbine load increase, the increased steam flow decreases the pressure in each steam generator. The pressure is now lower ihan the saturation pressure for the prevail ing steam generator temperature, resulting in an increase in the boiling rate and an accompanying expansion of the steam volume in the tube bundle region. This" epansi6n Irestricts' flow from the downcomer region to the tube bundle region, resulting in an increasing level. In addition, the increased steam flow causes an increase in moisture removal in the moisture separators and a corresponding increase in recirculation of feedwater'from the moisture separators to the downcomei, which contribute's to the increase in downcomer level. This le',el increase is referred to as a swell. Following the initial change in level, the steam generator water. level control Ssysteni' (SGWLCS) returns the level to the  
-normal progriammed value through a reduction in feedwatef flow.
Conversely, a decrease in steam demand results in a temporary steam generator level decrease. The decreased steam flow increases USNRC Technical Training Center--,
-5.0-5
-1 In Ir Westinighouse Technolog~y Advanced Manual Westinghouse Four-Loop Design Transients ev L*'


Wistinahouse Teclinology Advanced Manual                    Westinghouse    Four-Loop Design Transients Wetnhos     ecnlv       AdacdMnalWsigos                               Fu-opDsinTaset steam generator pressure. The increased pres           transmitter failing low. The inaccurate level is sure now exceeds the saturation pressure for the      provided to the SGWLCS; the function of the prevailing steam generator temperature, and the        SGWLCS is to maintain the steam generator level boiling rate decreases, resulting in a contraction    at the setpoint'value. The first question in the of the steam volume in the tube bundle region.        above list is now answered. The SGWLCS The decreased steam volume in the tube bundle          controls'the steam generator level at setpoint by region permits increased flow from the                controlling the 'psition of the main feedwater downcomer region, resulting in an initial de          regulating valve. The second question is now crease in level in the*downcomer region. Also,          answered. Finially, if the steam generator level is the decreased steam flow causes a decrease in          low, the feedwater regulating valve opens further moisture removal in te moisture separators and a        to increase the level in the steam generator. Since corresponding decrease in recirculation of              the SGWLCS has no way of "knowing" that it feedwater from the moisture separators to the          has a faulty input, this response occurs even with downcomer, which contributes to the decrease in        an initially normal, steam generator level. Now downcomer level. This initial level decrease is        consider the resulting effects. Feedwater flow referred to as a shrink.                                now exceeds steam flow, and the steam generator level increase's: This example illustrates the basic 5.2.4 Instrument Failures                              questiojs to' be' kept in mind for analyses of transients initiated by instrument failures.
Wetnhos ecnlv AdacdMnalWsigos Fu-opDsinTaset steam generator pressure. The increased pres sure now exceeds the saturation pressure for the prevailing steam generator temperature, and the boiling rate decreases, resulting in a contraction of the steam volume in the tube bundle region.
A knowledge of control system functions and actions that are taken at particular setpoints is      5.2.5 Accidents necessary to analyze instrument failure transients.
The decreased steam volume in the tube bundle region permits increased flow from the downcomer region, resulting in an initial de crease in level in the*downcomer region. Also, the decreased steam flow causes a decrease in moisture removal in te moisture separators and a corresponding decrease in recirculation of feedwater from the moisture separators to the downcomer, which contributes to the decrease in downcomer level. This initial level decrease is referred to as a shrink.
A failure of an instrument which feeds an input to          Analyses of accidents generally involve the a control systemrcan be analyzed by asking the        trends in primary and secondary levels and following questions:                                  pressures and the responses of plant safeguards systems. Iri the case of a loss of coolant accident
5.2.4 Instrument Failures A knowledge of control system functions and actions that are taken at particular setpoints is necessary to analyze instrument failure transients.
: 1. What is the- function of the control sys        (LOCA), the pressurizer pressure and level drop, tem?                                          but the steam generator pressures and levels are
A failure of an instrument which feeds an input to a control systemrcan be analyzed by asking the following questions:
: 2. What actiohs does the control system take      largely unaffected. Since a steam generator tube to accomplish its function?                    rupture (SGTR) is a special form of LOCA, the
: 1. What is the-function of the control sys tem?
: 3. What actions are taken if the ictual value      primary conditions will change similarly during of the parameter is above or below the          an SGTR, while the level in the affected steam setpoint value?                                generator increases with the influx of reactor coolant through the rupture. Steam line breaks In short, if the output of a failed instrument is      "canbe-groUped into breaks upstream of the main supplied to a control system, the student should      steam isolation'valves (MSIVs) and downstream determine the response of the control system and      of the MSIVs. During a break upstream of the how the controlled component changes plant            isolation valves, the steam pressure in the affect conditions.                                            ed steam generator decreases more rapidly than the pressures in the unaffected steam generators.
: 2. What actiohs does the control system take to accomplish its function?
As an illustration of this technique, consider    Following isolation of the faulted steam generator the case of a controlling steam generator level        by its check ,alve, the pressures in the intact Key  Lhb Technical Training USNRC Technical                 Center Training Center             b.U-D                                         K ev 1296
: 3. What actions are taken if the ictual value of the parameter is above or below the setpoint value?
In short, if the output of a failed instrument is supplied to a control system, the student should determine the response of the control system and how the controlled component changes plant conditions.
As an illustration of this technique, consider the case of a controlling steam generator level transmitter failing low. The inaccurate level is provided to the SGWLCS; the function of the SGWLCS is to maintain the steam generator level at the setpoint'value. The first question in the above list is now answered. The SGWLCS controls'the steam generator level at setpoint by controlling the 'psition of the main feedwater regulating valve. The second question is now answered. Finially, if the steam generator level is low, the feedwater regulating valve opens further to increase the level in the steam generator. Since the SGWLCS has no way of "knowing" that it has a faulty input, this response occurs even with an initially normal, steam generator level. Now consider the resulting effects. Feedwater flow now exceeds steam flow, and the steam generator level increase's: This example illustrates the basic questiojs to' be' kept in mind for analyses of transients initiated by instrument failures.
5.2.5 Accidents Analyses of accidents generally involve the trends in primary and secondary levels and pressures and the responses of plant safeguards systems. Iri the case of a loss of coolant accident (LOCA), the pressurizer pressure and level drop, but the steam generator pressures and levels are largely unaffected. Since a steam generator tube rupture (SGTR) is a special form of LOCA, the primary conditions will change similarly during an SGTR, while the level in the affected steam generator increases with the influx of reactor coolant through the rupture. Steam line breaks "can be-groUped into breaks upstream of the main steam isolation'valves (MSIVs) and downstream of the MSIVs. During a break upstream of the isolation valves, the steam pressure in the affect ed steam generator decreases more rapidly than the pressures in the unaffected steam generators.
Following isolation of the faulted steam generator by its check,alve, the pressures in the intact USNRC Technical Training Center Key Lhb USNRC Technical Training Center Wistinahouse Teclinology Advanced Manual Westinghouse Four-Loop Design Transients b.U-D K ev 1296


Westinghouse    Four-Loop Design Transients Westinehouse Technoloey     Advanced Manual                     Wsicos           orLo         einTaset steam generators should recover, while the                   order with which the graphs of the parameters are affected steam generator blows down to atmo                 presented.
Westinehouse Technoloey Advanced Manual Wsicos orLo einTaset steam generators should recover, while the affected steam generator blows down to atmo spheric pressure. A break downstream of the MSIVs results in,equal pressure drops in all steam generators, which are terminated by MSIV closure.
spheric pressure. A break downstream of the MSIVs results in ,equal pressure drops in all               5.3.1 Pressurizer Pressure steam generators, which are terminated by MSIV closure. Of course, the overcooling of the                       1. Pressurizer pressure is affected by reactor coolant caused by a steam break also                         components controlled by the pressurizer lowers pressurizer pressure and level.                               pressure control system. This is particu larly evident during transients involving For any accident, an ESF actuation is indicat                   the failure of the controlling pressure ed   by the change in charging flow upon the                         channel.
Of course, the overcooling of the reactor coolant caused by a steam break also lowers pressurizer pressure and level.
isolation of normal charging and the initiation of               2. AK rapid change in pressurizer level can high head injection, and by the change in,                           have such a large effect on the dimen feedwater flow upon the isolation of main                             sions of the pressurizer steam bubble feedwater and the initiation of the auxiliary                         and, as a result, on pressurizer'pressure feedwater system. During steam line breaks and                       that the pressurizer pressure control some small LOCAs, high head injection eventual                       system cannot 'immediately restore ly reverses the drop in pressurizer level caused                     pressure to setpoint.
For any accident, an ESF actuation is indicat ed by the change in charging flow upon the isolation of normal charging and the initiation of high head injection, and by the change in, feedwater flow upon the isolation of main feedwater and the initiation of the auxiliary feedwater system. During steam line breaks and some small LOCAs, high head injection eventual ly reverses the drop in pressurizer level caused by overcooling of the reactor coolant or by inventory loss. For some transients, plots of high, intermediate, and low head injection are provided to illustrate the responses of the emer gency core cooling systems to an ESF actuation and plant conditions, and plots of containment pressure are provided to illustrate the progress of the accident and the response of containment pressure suppression systems.
by overcooling of the reactor coolant or by                     3. This parameter is an input into the OTAT inventory loss. For some transients, plots of                       trip and turbine runback setpoint calcula high, intermediate, and low head injection are                       tions and can cause the sei46ints to provided to illustrate the responses of the emer                     increase or decrease. -Evidence of a gency core cooling systems to an ESF actuation                       turbine runback can ebeseen on the and plant conditions, and plots of containment                       generator load plot.
In an actual reactor, plant, indications of accidents would include the responses of radia tion detectors. Elevated containment radiation levels would result from a LOCA, and higher secondary radiation indications would result from a primary-to-secondary leak.
pressure are provided to illustrate the progress of the accident and the response of containment               5.3.2 Bank D Rod Position' pressure suppression systems.
No radiation indications are included as part of the transient curves provided in this manual.
: 1. Bank D rod position is affected by the In an actual reactor, plant, indications of                     powermismatch and temperature mis accidents would include the responses of radia                       match inputs t6the rod control system.
5.3  
tion detectors. Elevated containment radiation                   2. It is" possible for the power mismatch levels would result from a LOCA, and higher                         circuit output to be equal and opposite to secondary radiation indications would result from                     e temperature mismatch circuit output.
-Parameter Behavior during Tran sients The following descriptions of parameter behavior during transients are provided in ihe order with which the graphs of the parameters are presented.
a primary-to-secondary leak. No radiation                           Thiscon'dition results in'no rod motion, indications are included as part of the transient                   even thobugh" a Tref- Tavg difference exists.
5.3.1 Pressurizer Pressure
curves provided in this manual.
: 1. Pressurizer pressure is affected by components controlled by the pressurizer pressure control system. This is particu larly evident during transients involving the failure of the controlling pressure channel.
: 3. Thef ailure -ofan the input to the power 5.3     -Parameter   Behavior during Tran                           mismatch circuit causes rapid rod motion sients                                                     initiallydu'e t6othe high rate of change of nuclear powei relative to turbine load; the The following descriptions of parameter                         output of the power mismatch circuit then behavior during transients are provided in ihe                       decays 'exponentially, allowing any
: 2. AK rapid change in pressurizer level can have such a large effect on the dimen sions of the pressurizer steam bubble and, as a result, on pressurizer'pressure that the pressurizer pressure control system cannot 'immediately restore pressure to setpoint.
                                                      -  a  -                                        ---- 'want RiCY LYO "USNRC Technical Training -Center              *&deg; *:* &deg; U &deg; rl                                        Rev 12.76
: 3. This parameter is an input into the OTAT trip and turbine runback setpoint calcula tions and can cause the sei46ints to increase or decrease. -Evidence of a turbine runback can ebe seen on the generator load plot.
:' Westing house Technology Advanced Manual Westnahuse echolo~ Adance          MaualWestinehouse                Four-Loon Design' Transients existing temperature mismatch to gradual              drops below 90% of the throttle pressure ly increase its impact on rod control.               for rated power. The response of this
5.3.2 Bank D Rod Position'
: 4. A step drop in bank D rod position to 0                EHC system featur'e is evident in certain steps is indicative of a reactor trip.               generatoi load reductions in some tran sients:*
: 1. Bank D rod position is affected by the powermismatch and temperature mis match inputs t6the rod control system.
5.3.3 Nuclear Power                                        4. A turbine runback is indicated by an abrupt change in load to a new lower Nuclear power responds to reactivity effects            value. "
: 2. It is" possible for the power mismatch circuit output to be equal and opposite to e temperature mismatch circuit output.
associated with fuel temperature, moderator                5. A step drop in generator load to 0 MW is temperature, and control 'rod, position. No                  indicative of a turbine trip.
Thiscon'dition results in'no rod motion, even thobugh" a Tref-Tavg difference exists.
transient time span is long enough for changes in fissi6n product (poison) concentrations to signifi      5.3.5 Tref/Tavg cantly affect reactivity.' No transient involves an operator-controlled change in'boron concentra              1. Since Tref varies linearly with impulse tion; changes in the coolant boron concentration              pressure, it reflects changes in generator occur only during transients involving significant            load:
: 3. Thef ailure -of an the input to the power mismatch circuit causes rapid rod motion initiallydu'e t6othe high rate of change of nuclear powei relative to turbine load; the output of the power mismatch circuit then decays 'exponentially, allowing any a  
injection of the refueling' water storage tank            2. Tavg is generated 'from the hot-leg and contents.                                                    cold-leg'temperatures (TH and Tc) mea sured inr the resistance temperature 5.3.4 Generator Load                                          detectoi (RTD) bypass manifolds. This arrangement contributes to the inherent
'want RiCY LYO "USNRC Technical Training -Center
: 1. During power level changes, the change                dela~y between the time a Tavg change in generator load is usually the initiating          occurs'and the time the Ta.g change is event. A load change can be input                    indicated. The delay involved is due to gradually by the operator with the selec            the coolant loop transport time and the tion of a new demanded load and loading              time required for coolant to flow through rate or rapidly via operation of the control        the brpass manifold to the narrow-range valve position limiter.                              RTD locations. Therefore, during a rapid
* &deg; *:* &deg; U &deg; rl Westinghouse Four-Loop Design Transients Rev 12.76
: 2. The Trojan GE turbine EHC system                      transient the pressurizer level provides a generates a demanded control valve                  better initial 'indication of a coolant position for a giveh demanded load and              temperitu're change (see section 5.3.6 does not incorporate impulse pressure                below).
feedback. Thus, once the control valves          3. Tavg is a reflection of the balance between reach their'deman'ded positions, they will          the rate of energy production in the not respond to loadz changes if the de              primary 'and the rate of energy removal by manded load remains unchanged. With                  the secondary. If the two are equal, Tayg the control valves in fixed positions, the            will remain constant. Any imbalance, generator load varies with the secondary            whether initiated in the primary or sec side steamr1pressure.                                ondary, causes a change in Tayg.
: 3. The Trojan GE EHC system includes an initial pressure limiter Which closes the control valves' when -throttle pressure USNRC Technical Training Center                     5.0-8                                      Rev 1296


Westing~house Technology Advanced Manual                      Westinghouse    Four-Loop    Design Transients Westinbouse      TechnoIoy    Advanced Manual                  Westinghouse    Four-Loop Design Transients 5.3.6 Pressurizer Level                                            the RCS pressure and the position of FCV-121, which continues to modulate
Westnahuse echolo~
: 1. A change in pressurizer level is often a                  in response to pressurizer level control direct reflection of a change in reactor                 system commands.
Adance MaualWestinehouse Four-Loon Design' Transients existing temperature mismatch to gradual ly increase its impact on rod control.
coolant density and thus provides an indication of a primary temperature              5.3.8 Steam Dump Demand change.
: 4. A step drop in bank D rod position to 0 steps is indicative of a reactor trip.
: 2. A decrease in pressurizer level can be                 During power operation a steam dump indicative of a loss of coolant inventory.       demand indication reflects a Tavg - Tref difference
5.3.3 Nuclear Power Nuclear power responds to reactivity effects associated with fuel temperature, moderator temperature, and control 'rod, position.
: 3. A somewhat small but visible change in            of greater than 5 F (the loss-of-load controller is pressurizer level can result from a change      in service). Following a turbine trip, an existing in coolant density associated with a             demand indicates that Ta'g exceeds the no-load moderately large pressure change.                Tavg (the turbine trip controller is in service).
No transient time span is long enough for changes in fissi6n product (poison) concentrations to signifi cantly affect reactivity.' No transient involves an operator-controlled change in'boron concentra tion; changes in the coolant boron concentration occur only during transients involving significant injection of the refueling' water storage tank contents.
During plant heatups and startups, an existing 5.3.7 Charging Flow                                      demand indicates that steam pressure exceeds the no-load steam pressure setpoint of 1092 psig. A
5.3.4 Generator Load
: 1. Generally, charging flow varies with the         demand indication does not necessarily mean that position of charging flow control valve          the steam dumps are opening; an arming signal FCV-121, which responds to the output            must also be present. The best confirmation of of the pressurizer level control system (all    steam dump operation is a change in steam flow.
: 1. During power level changes, the change in generator load is usually the initiating event.
transients begin with charging flow            When steam dump demand is indicated, an supplied by one centrifugal charging            increase in steam flow indicates that dump valves pump). Charging flow increases when            are open.
A load change can be input gradually by the operator with the selec tion of a new demanded load and loading rate or rapidly via operation of the control valve position limiter.
the pressurizer level is less than the level setpoint and decreases when the level is        5-.3.9 Steam Flow greater than the setpoint. Often during a transient the pressurizer level and the              Steam flow responds to changes in turbine level setpoint (a function of auctioneered      control valve position, steam generator PORV high Tavg) are changing in the same              operation, steam generator safety valve opera direction simultaneously but not in step,      tion, and steam dump operation.
: 2. The Trojan GE turbine EHC system generates a demanded control valve position for a giveh demanded load and does not incorporate impulse pressure feedback. Thus, once the control valves reach their'deman'ded positions, they will not respond to loadz changes if the de manded load remains unchanged. With the control valves in fixed positions, the generator load varies with the secondary side steamr1pressure.
so that charging flow undergoes "swings" in which it first increases and        5.3.10      Feedwater Flow then decreases, or vice versa.
: 3. The Trojan GE EHC system includes an initial pressure limiter Which closes the control valves' when -throttle pressure drops below 90% of the throttle pressure for rated power. The response of this EHC system featur'e is evident in certain generatoi load reductions in some tran sients:*
: 2. An ESF actuation signal causes a charac                1.,,Feedwater flow6 is governed by the teristic perturbation in charging flow                  "positionof the main feedwater regulating during which the second centrifugal                      valve,, which is controlled by the charging pump starts, the normal charg                  SGWLCS' ing line isolates, and charging flow                2.,,At the 6outset of a transient, the change in becomes seal injection only. This pertur                feedwater flow is governed by the feed bation appears on the charging flow plot                flow/steam flow mismatch. As the as a "zigzag." The steady-state charging                transient 'progresses and the level error flow after an ESF actuation depends on                    has a chance to build, the level error z'.vv 17o USNRC Technical Training Center           -      , D.U- 7                                          ReCv Jld,7
: 4. A turbine runback is indicated by an abrupt change in load to a new lower value. "
: 5. A step drop in generator load to 0 MW is indicative of a turbine trip.
5.3.5 Tref/Tavg
: 1. Since Tref varies linearly with impulse pressure, it reflects changes in generator load:
: 2. Tavg is generated 'from the hot-leg and cold-leg'temperatures (TH and Tc) mea sured inr the resistance temperature detectoi (RTD) bypass manifolds. This arrangement contributes to the inherent dela~y between the time a Tavg change occurs'and the time the Ta.g change is indicated. The delay involved is due to the coolant loop transport time and the time required for coolant to flow through the brpass manifold to the narrow-range RTD locations. Therefore, during a rapid transient the pressurizer level provides a better initial 'indication of a coolant temperitu're change (see section 5.3.6 below).
: 3. Tavg is a reflection of the balance between the rate of energy production in the primary 'and the rate of energy removal by the secondary. If the two are equal, Tayg will remain constant. Any imbalance, whether initiated in the primary or sec ondary, causes a change in Tayg.
USNRC Technical Training Center Rev 1296
:' Westing house Technology Advanced Manual 5.0-8


Wistinghouse Technology Advanced -Manual                   Westinghouse Four-Loop Design Transients Westinghouse Technology Advanced Manual                     Westinghouse Four-Loop Design Transients signal will dominate feedwater flow                   and safety valves and steam line breaks.
Westinbouse TechnoIoy Advanced Manual Westinghouse Four-Loop Design Transients 5.3.6 Pressurizer Level
changes.
: 1. A change in pressurizer level is often a direct reflection of a change in reactor coolant density and thus provides an indication of a primary temperature change.
: 2. A decrease in pressurizer level can be indicative of a loss of coolant inventory.
: 3. A somewhat small but visible change in pressurizer level can result from a change in coolant density associated with a moderately large pressure change.
5.3.7 Charging Flow
: 1. Generally, charging flow varies with the position of charging flow control valve FCV-121, which responds to the output of the pressurizer level control system (all transients begin with charging flow supplied by one centrifugal charging pump). Charging flow increases when the pressurizer level is less than the level setpoint and decreases when the level is greater than the setpoint. Often during a transient the pressurizer level and the level setpoint (a function of auctioneered high Tavg) are changing in the same direction simultaneously but not in step, so that charging flow undergoes "swings" in which it first increases and then decreases, or vice versa.
: 2. An ESF actuation signal causes a charac teristic perturbation in charging flow during which the second centrifugal charging pump starts, the normal charg ing line isolates, and charging flow becomes seal injection only. This pertur bation appears on the charging flow plot as a "zigzag." The steady-state charging flow after an ESF actuation depends on the RCS pressure and the position of FCV-121, which continues to modulate in response to pressurizer level control system commands.
5.3.8 Steam Dump Demand During power operation a steam dump demand indication reflects a Tavg - Tref difference of greater than 5 F (the loss-of-load controller is in service). Following a turbine trip, an existing demand indicates that Ta'g exceeds the no-load Tavg (the turbine trip controller is in service).
During plant heatups and startups, an existing demand indicates that steam pressure exceeds the no-load steam pressure setpoint of 1092 psig. A demand indication does not necessarily mean that the steam dumps are opening; an arming signal must also be present. The best confirmation of steam dump operation is a change in steam flow.
When steam dump demand is indicated, an increase in steam flow indicates that dump valves are open.
5-.3.9 Steam Flow Steam flow responds to changes in turbine control valve position, steam generator PORV operation, steam generator safety valve opera tion, and steam dump operation.
5.3.10 Feedwater Flow 1.,,Feedwater flow6 is governed by the "position of the main feedwater regulating valve,, which is controlled by the SGWLCS' 2.,,At the 6outset of a transient, the change in feedwater flow is governed by the feed flow/steam flow mismatch.
As the transient ' progresses and the level error has a chance to build, the level error z'.vv 17o USNRC Technical Training Center
, D.U-7 Westing~house Technology Advanced Manual Westinghouse Four-Loop Design Transients ReCv Jld,7
 
Westinghouse Technology Advanced Manual Westinghouse Four-Loop Design Transients signal will dominate feedwater flow changes.
: 3. Feedwater' flow often undergoes many oscillations during i transient. Large swings in feed flow correspond to significant changes in main feed regulat ing valve position; small-amplitude fluctuations in feed flow may be consid ered as normal steady-state operation.
: 3. Feedwater' flow often undergoes many oscillations during i transient. Large swings in feed flow correspond to significant changes in main feed regulat ing valve position; small-amplitude fluctuations in feed flow may be consid ered as normal steady-state operation.
: 4. The feedwater flow indication following the isolation of main feedwater reflects auxiliary feedwater addition to the steam generator. In'the control room, main feedwater flow and auxiliary feedwater flow are indicated on separate meters.
: 4. The feedwater flow indication following the isolation of main feedwater reflects auxiliary feedwater addition to the steam generator. In'the control room, main feedwater flow and auxiliary feedwater flow are indicated on separate meters.
5.3.11     Steam Generator Level
5.3.11 Steam Generator Level
: 1. A rapid change in steam demand causes a shrink or swell to '6ccur (see section 5.2.3).
: 1. A rapid change in steam demand causes a shrink or swell to '6ccur (see section 5.2.3).
: 2. A change in the reactor coolant tempera ture, especially a decrease,-can result in a change in the secondary temperature of the steam generators' and changes in steam density and steam generator level.
: 2. A change in the reactor coolant tempera ture, especially a decrease,-can result in a change in the secondary temperature of the steam generators' and changes in steam density and steam generator level.
: 3. Following the isolation of main feedwater, level is affected by auxiliary feedwater addition.
: 3. Following the isolation of main feedwater, level is affected by auxiliary feedwater addition.
5.3.12     Steam Pressure
5.3.12 Steam Pressure
: 1. In general, steam pressure increases with a load decrease and decreases with a load increase.
: 1. In general, steam pressure increases with a load decrease and decreases with a load increase.
: 2. Steam pressure can be affected by-a change in Tavg if the'change is large enough to affect the conditions governing primary-to-secondary heat transfer (see section 5.3.11).
: 2. Steam pressure can be affected by-a change in Tavg if the'change is large enough to affect the conditions governing primary-to-secondary heat transfer (see section 5.3.11).
: 3. A rapid drop in steam pressure can reflect operation'of the steam generator PORVs u4i                                      Rev.1296 USNRC Technical Training Center                   5 .U-JLU                                   Rev 1296
: 3. A rapid drop in steam pressure can reflect operation'of the steam generator PORVs USNRC Technical Training Center 5
and safety valves and steam line breaks.
u4i Rev.1296 Wistinghouse Technology Advanced -Manual Westinghouse Four-Loop Design Transients
.U-JLU Rev 1296


Westinghouse Technology Advanced Manual                     Westinghouse Four-Loop Design Transients Westinghouse Technology Advanced Manual                    Westinghouse Four-Loop Design Transients TABLE 5-1         TRANSIENT -INFORMATION I. Setpoints A. Reactor Coolant Temperature (*F) 564           Low Tavg 557   - 584.7 Tavg program from 0% to 100% power 553            Low-low Tavg (P-12)
Westinghouse Technology Advanced Manual Westinghouse Four-Loop Design Transients TABLE 5-1 TRANSIENT -INFORMATION I. Setpoints A. Reactor Coolant Temperature (*F) 564 557 - 584.7 553 Low Tavg Tavg program from 0% to 100% power Low-low Tavg (P-12)
B. Pressurizer Level (% level) 92            High level reactor trip 25 - 61.5      Level program from 0% to 100% power 17            Low level heater cutoff and letdown isolation C. Pressurizer Pressure (psig) 2485           Code safety valves open 2385           High pressure reactor trip 2335           PORVs open         w 2310           Spray valves full open, 2260           Spray valves begin to open 2250           Variable heaters full off 2235           Nominal operating pressure 2220           Variable heaters full on 2218           Backup heaters off 2210         Backup heaters on 1915           Low pressure ESF block permissive (P-1 1) 1865           Low pressure reactor trip 1807           Low pressure ESF actuation D. Steam Generator Level (% level) 69             High level turbine trip, feedwater isolation, trip of main feed pumps (P-14) 44            Program level from 20% to 100% power 44        'Level program from 0% to 20% power, 25.5          Low level reactor trip (with steam flow > feed flow by 1.51 X 106 lbm/hr) 11.5          Low-low level reactor trip, AFW actuation KY  LYD
B. Pressurizer Level (% level)
-.... USNRC Technical Training Center         I         5.,U -11                                 . Rev  1296
High level reactor trip Level program from 0% to 100% power Low level heater cutoff and letdown isolation C. Pressurizer Pressure (psig) 2485 Code safety valves open 2385 High pressure reactor trip 2335 PORVs open w
2310 Spray valves full open, 2260 Spray valves begin to open 2250 Variable heaters full off 2235 Nominal operating pressure 2220 Variable heaters full on 2218 Backup heaters off 2210 Backup heaters on 1915 Low pressure ESF block permissive (P-1 1) 1865 Low pressure reactor trip 1807 Low pressure ESF actuation D. Steam Generator Level (% level) 69 44 44 25.5 11.5 High level turbine trip, feedwater isolation, trip of main feed pumps (P-14)
Program level from 20% to 100% power  
'Level program from 0% to 20% power, Low level reactor trip (with steam flow > feed flow by 1.51 X 106 lbm/hr)
Low-low level reactor trip, AFW actuation KY LYD
-.... USNRC Technical Training Center I
92 25 - 61.5 17 Westinghouse Technology Advanced Manual Westinghouse Four-Loop Design Transients Rev 1296 5.,U -11


I Westinghouse Technology Advanced Manual Wesingoue Tchnloy AvanedManalWestinphouse                             Fniur-Tnn flhivsa - r-E. Steam Dump System Controller Inputs (*F) 5 - 16.4       Generates 0 - 100% output from loss-of-load controller 0 - 27.7        Generates 0 - 100% output from turbine trip controller F. Nuclear Instrumentation
Wesingoue Tchnloy AvanedManalWestinphouse Fniur-Tnn flhivsa -
: 1. Source Range (cps) 105       High flux reactor trip
r-E. Steam Dump System Controller Inputs (*F) 5 - 16.4 0 - 27.7 Generates 0 - 100% output from loss-of-load controller Generates 0 - 100% output from turbine trip controller F. Nuclear Instrumentation
: 2. Intermediate Range 25% current equivalent         High flux reactor trip 20% current equivalent         High flux rod stop 10-10 amps                     Source range block permissive (P-6)
: 1. Source Range (cps) 105 High flux reactor trip
: 3. Power Range (% power) 109                           High flux, high setpoint reactor trip 103                            High power rod stop, 39                              Loss of loop flow permissive (P-8) 25                              High flux, low setpoint reactor trip 10                            Nuclear at-power block perm'hissive (P- 10)
: 2. Intermediate Range 25% current equivalent 20% current equivalent 10-10 amps
          +5 (w/ 2-sec time constant)    Positive high flux rate reactor trip
: 3. Power Range (% power) 109 103 39 25 10
          -5 (w/ 2-sec time constant)    Negative high flux rate reactor trip G. Main Steam Pressure (psig) 1170-1230      Range of code safety valve lift setpoints 1125          Atmospheric relief valve lift setpoint 600            Low steam pressure ESF actuation (with high steam flow)
+5 (w/ 2-sec time constant)
-5 (w/ 2-sec time constant)
G. Main Steam Pressure (psig) 1170-1230 1125 600 High flux reactor trip High flux rod stop Source range block permissive (P-6)
High flux, high setpoint reactor trip High power rod stop, Loss of loop flow permissive (P-8)
High flux, low setpoint reactor trip Nuclear at-power block perm'hissive (P-10)
Positive high flux rate reactor trip Negative high flux rate reactor trip Range of code safety valve lift setpoints Atmospheric relief valve lift setpoint Low steam pressure ESF actuation (with high steam flow)
H. ESF Actuation Signals High steam flow (variable setpoint) coincident with low steam pressure (600 psig) or low-low Tavg (553"F)
H. ESF Actuation Signals High steam flow (variable setpoint) coincident with low steam pressure (600 psig) or low-low Tavg (553"F)
High steam line AP: I steam line 100 psig lower than at least 2 of the remaining 3 Low pressurizer pressure: 1807 psig High containment pressure: 3.5 psig Manual USNRC Technical Training Center                   5.0-12                                         Rev 129 i
High steam line AP: I steam line 100 psig lower than at least 2 of the remaining 3 Low pressurizer pressure: 1807 psig High containment pressure: 3.5 psig Manual USNRC Technical Training Center 5.0-12 Rev 129 i I
Westinghouse Technology Advanced Manual


- Westinghouse Technology Advanced Manual                   ,Westinghouse Four-Loop Design Transients I. Containment Spray System Actuation Signals High-high containment pressure: 30 psig Manual II. Significant Parameters (Typical Values)
Westinghouse Technology Advanced Manual I. Containment Spray System Actuation Signals High-high containment pressure: 30 psig Manual II. Significant Parameters (Typical Values)
A. Reactivity Values
A. Reactivity Values
: 1. Moderator Temperature Coefficient (no-load)
: 1. Moderator Temperature Coefficient (no-load)
Line 719: Line 1,271:
: 2. Doppler-Only Power Coefficient BOL: -13 pcm/% power EOL: -11 pcm/% power
: 2. Doppler-Only Power Coefficient BOL: -13 pcm/% power EOL: -11 pcm/% power
: 3. Power Defect at 100% power BOL: -1500 pcm EOL: -2400 pcm
: 3. Power Defect at 100% power BOL: -1500 pcm EOL: -2400 pcm
: 4. Control Rod Worths                                                     1 Bank:             1000 pcm Individual:       150 pcm Differential worth: to 12 pcnrlstep 4
: 4. Control Rod Worths Bank:
1000 pcm Individual:
150 pcm Differential worth: 4 to 12 pcnrlstep
: 5. Xenon Reactivity (BOL)
: 5. Xenon Reactivity (BOL)
Equilibrium at 100% power: -2741 pcm Peak following reactor trip: -5200 pcm
Equilibrium at 100% power: -2741 pcm Peak following reactor trip:  
: 6. Reactor Makeup Parameters Boric acid worth:           8 pcm/ppm (BOL)
-5200 pcm
Maximum dilution rate:     120 gpm Maximum boration rate:     40 gpm (4 weight % boric acid)
: 6. Reactor Makeup Parameters Boric acid worth:
Automatic makeup rate:     80 gpm total blended flow
8 pcm/ppm (BOL)
                            -. .  .                    in 12*                             R ev 1296 USNRC Technical Training Center
Maximum dilution rate:
120 gpm Maximum boration rate:
40 gpm (4 weight % boric acid)
Automatic makeup rate:
80 gpm total blended flow in 12*
R ev 1296 USNRC Technical Training Center
,Westinghouse Four-Loop Design Transients 1


Westinghouie Technology 'Advanced Manual              -. 'Westinehouse  Four-Loop  Design Transients Westinghouse Technology     Advanced Manual               Westinehouse   Four-Loon Desien Transients B. System and Component Parameters
Westinghouse Technology Advanced Manual Westinehouse Four-Loon Desien Transients B. System and Component Parameters
: 1. RCS Range of AT from 0% to 100% power: 0 - 59*F
: 1. RCS Range of AT from 0% to 100% power: 0 - 59*F
: 2. Pressurizer 1% change in level per "F change in Tavg 130 gal per % level 10 psi change in pressure per % change in level 10 psi change in pressure per "F change in Tavg
: 2. Pressurizer 1% change in level per "F change in Tavg 130 gal per % level 10 psi change in pressure per % change in level 10 psi change in pressure per "F change in Tavg
: 3. Main Steam System No-load pressure (corresponds to Tavg of 557"F):     1092 psig Full-load pressure:                                   792 psig Steam flow per generator (100% power):               3.77 X 106 ibm/hr Total steam flow (100% power):                       15.07 X 106 lbm/hr
: 3. Main Steam System No-load pressure (corresponds to Tavg of 557"F):
: 4. ECCS Maximum Pressures for Injection (psig) 2670       HPI pumps 1520        SI pumps 650        Cold-leg accumulators 200        RHR pumps USNRC Technical Training Center                 5.0-14                                   Rev 1296
Full-load pressure:
Steam flow per generator (100% power):
Total steam flow (100% power):
: 4. ECCS Maximum Pressures for Injection (psig) 2670 1520 650 200 1092 psig 792 psig 3.77 X 106 ibm/hr 15.07 X 106 lbm/hr HPI pumps SI pumps Cold-leg accumulators RHR pumps USNRC Technical Training Center 5.0-14 Rev 1296 Westinghouie Technology 'Advanced Manual
-. 'Westinehouse Four-Loop Design Transients


Ir z
74 Ir z V)
V)
C" Cl)
C" Cl)
Cl)
Cl)  
&#xfd;:V Ul CD CD 74
&#xfd;:V Ul CD CD


Westinghouse Technology Advanced Manual Chapter 6 PLANT DIFFERENCES (Later)
Westinghouse Technology Advanced Manual Chapter 6 PLANT DIFFERENCES (Later)


Westinghouse Technology Advanced Manual Chapter 7 PLANT EVENTS Section 7.1     Zion Loss of DC Power 7.2     V. C. Summer Inadvertent Criticality 7.3     Water Hammer at San Onofre 7.4     Salem Load Reduction 7.5     Sequoyah Incore Thimble Tube Ejection Event
Westinghouse Technology Advanced Manual Chapter 7 PLANT EVENTS Section 7.1 Zion Loss of DC Power 7.2 V. C. Summer Inadvertent Criticality 7.3 Water Hammer at San Onofre 7.4 Salem Load Reduction 7.5 Sequoyah Incore Thimble Tube Ejection Event


Westinghouse Technology Advanced Manual Section 7.1 Zion Loss of DC Power
Westinghouse Technology Advanced Manual Section 7.1 Zion Loss of DC Power


Zion Loss of DC Power Wac*;   lnahnups Technolocry   Advanced ManualZinLsofD                                                       Pwe TABLE OF CONTENTS 7.1-1 7.1 ZION LOSS OF DC POWER ........................................
Wac*;
7.1-1 7.1.1     Introduction     ..............................................
lnahnups Technolocry Advanced ManualZinLsofD Pwe TABLE OF CONTENTS 7.1 ZION LOSS OF DC POWER........................................
7.1-1 7.1.1.1     PlantStatus .......................................
7.1.1 Introduction 7.1.1.1 PlantStatus.......................................
7.1-1 7.1.1.2     Description of Zion Electrical Distribution ...................
7.1.1.2 Description of Zion Electrical Distribution...................
7.1-2 7.1.2     Loss of DC Control Power ....................................
7.1.2 Loss of DC Control Power 7.1.3 Problems and Corrective Actions Taken............................
7.1-2 7.1.3     Problems and Corrective Actions Taken ............................
7.1.4 Sum m ary 7.1.5 Reference................................................
7.1-2 7.1.4     Summ ary ................................................
LIST OF TABLES 7.1-1 Sequence of Events: Zion Unit 2 Loss of DC Control Power September 1976.....
7.1-3 7.1.5     Reference ................................................
LIST OF FIGURES 7.1-1 Zion Unit 2 Electrical Distribution Rev 0196 7.1-1 7.1-1 7.1-1 7.1-1 7.1-2 7.1-2 7.1-2 7.1-3 7.1-5 7.1-7 Zion Loss of DC Power 4.
LIST OF TABLES 7.1-5 7.1-1   Sequence of Events: Zion Unit 2 Loss of DC Control Power September 1976 .....
II--lt USNRC Technical Training Center
LIST OF FIGURES 7.1-7 7.1-1   Zion Unit 2 Electrical Distribution               ..................................
                            ..                                                .                              Rev 0196 4 . II--lt USNRC Technical Training Center


Westinahouse Technolosy Advanced Manual                                                  Zion Loss of DC Power Westinghouse TecbnoloEv Advanced Manual                                                   Zion Loss of DC Power 7.1       ZION LOSS OF DC POWER                             former 241, and 4.16-kV buses 242 and 244 were being supplied by system auxiliary trans Learning, Objectives:                                       former 242. Diesel generator 2A was tied to the system through 4.16-kV bus 248 and was loaded
Westinghouse TecbnoloEv Advanced Manual Zion Loss of DC Power 7.1 ZION LOSS OF DC POWER Learning, Objectives:
: 1. State the cause of the loss of dc power at                to approximately 3300 kW while undergoing an
: 1. State the cause of the loss of dc power  
    " Zion.                                                   extended test run. Battery 211 was.undergoing a monthly equalizing charge and was disconnected
" Zion.  
,2.- Explain how the loss of dc control poimier                from 125-Vdc ,control -bus 211, :which was affected the following:                                 powered from the Unit 1 125-Vdc control bus 111 via a cross-tie.
,2.- Explain how the loss of dc control poim affected the following:
: a. Main control board indications.
: a. Main control board indications.
: b. Ability to control and/or trip equipmc-nt          .7.1.1.2 Description -of Zion Electrical
: b. Ability to control and/or trip equipmc  
      -'-automatically, remote manually,- a nd          - -                Distribution
-'-automatically, remote manually,- a
          -locally.
-locally.
                                                      -     7The Zion electrical distribution is shown in 3.: Discuss the causes of the reactor trip and 1the. Figure 7.1-1. The nonsafety-related electrical engineered safety features (ESF) actuati.on distribution system for Zion -Unit 2 consists of signal.                                            Sfive 4.16-kV service buses. The normal power supply to the service buses is the unit auxiliary
3.: Discuss the causes of the reactor trip and 1 engineered safety features (ESF) actuati signal.
: 4. Discuss the cbrrective-measures taken a!s a               transformer, with the reserve supply from the result of this incident.                              -system auxiliary transformer. The unit auxiliary transformer is located on the output side of the 7.1.1 Introduction                                            main generator, and the system auxiliary trans former is connected to the main grid. Bus 241 Zion Unit 2 is a fou'r-loop Westinghoi ise               supplies the electric driven main feedwater pump design plant located in Zion,; Illinois. It is ralted          and is the reserve supply for Unit 1 safeguards at 3250 MWt and 1098 MWe.                                      buses. The otheroservice buses carry the large
: 4. Discuss the cbrrective-measures taken a!
                                                            -   non-emergency loads associated with the plant, 7.1.1.1 Plant-Status                                          such as circulating water pumps, reactor coolant
result of this incident.
                                                            -pumps, condensate pumps, etc. Also, buses At the time of the incident, September 1976,, .242, 243, and 244 supply normal power to the the unit was operating at 25% reactor power v6ith        --Unit     2 safeguards buses.
7.1.1 Introduction Zion Unit 2 is a fou'r-loop Westinghoi design plant located in Zion,; Illinois. It is ral at 3250 MWt and 1098 MWe.
the load being increased. The 2C main feedwELter, pump and the main feedwater regulating val ves                     The safeguards buses consist of three 4.16 were in automatic, and the main feedwaLter                    kV buses, which are normally supplied from the regulating bypass.valves were in the process of               three service buses mentioned above. The being closed (2A and 2B bypass valves were                    reserve power supply for these buses is bus 141 partially open).    .
7.1.1.1 Plant-Status At the time of the incident, September 19 the unit was operating at 25% reactor power v the load being increased. The 2C main feedwE pump and the main feedwater regulating val were in automatic, and the main feedwa regulating bypass.valves were in the process being closed (2A and 2B bypass valves w partially open).
from Unit 1. :Theo emergency power is supplied S--by diesel generators, one of which is a swing Electrically, the main'generator was synct.Lro-         diesel (can be used to supply Unit 1 or Unit 2).
Electrically, the main'generator was synct.
nized with the grid. The 4.16-kV buses 243 and 245 were being supplied by unit auxiliary trgmns-, -           -~The     125-Vdc buses receive their power from S-                                         .  ... .. . ...    ..    .. D A109 USNRC Technical Training Center                   /.l-J.
nized with the grid. The 4.16-kV buses 243 245 were being supplied by unit auxiliary trg former 241, and 4.16-kV buses 242 and 244 were being supplied by system auxiliary trans former 242. Diesel generator 2A was tied to the system through 4.16-kV bus 248 and was loaded at to approximately 3300 kW while undergoing an extended test run. Battery 211 was.undergoing a monthly equalizing charge and was disconnected ier from 125-Vdc,control -bus 211, :which was powered from the Unit 1 125-Vdc control bus 111 via a cross-tie.
-nt.7.1.1.2 Description -of Zion Electrical nd -
Distribution
-7The Zion electrical distribution is shown in the.
Figure 7.1-1. The nonsafety-related electrical  
.on distribution system for Zion -Unit 2 consists of Sfive 4.16-kV service buses. The normal power supply to the service buses is the unit auxiliary s a transformer, with the reserve supply from the  
-system auxiliary transformer. The unit auxiliary transformer is located on the output side of the main generator, and the system auxiliary trans former is connected to the main grid. Bus 241 ise supplies the electric driven main feedwater pump ted and is the reserve supply for Unit 1 safeguards buses. The otheroservice buses carry the large  
- non-emergency loads associated with the plant, such as circulating water pumps, reactor coolant  
-pumps, condensate pumps, etc.
Also, buses 76,,.242, 243, and 244 supply normal power to the 6ith
--Unit 2 safeguards buses.
: Lter, ves The safeguards buses consist of three 4.16 Lter kV buses, which are normally supplied from the of three service buses mentioned above.
The ere reserve power supply for these buses is bus 141 from Unit 1. :Theo emergency power is supplied S--by diesel generators, one of which is a swing Lro-diesel (can be used to supply Unit 1 or Unit 2).
and mns-, -
-~The 125-Vdc buses receive their power from S-D A109 USNRC Technical Training Center Westinahouse Technolosy Advanced Manual Zion Loss of DC Power
/.l-J.


Westinghouse Technology Advanced Manual                                         Zion Loss of DC Power Westinghouse Technology    Advanced Manual                                      Zion Loss of DC Power battery chargers powered from the 480-Vac vital       This results in a lineup of buses 242 and 245 on buses. Each of these buses supplies two               auxiliary transformer 241 and buses 243 and 244 inverters, which power the 120-Vac instrument         on system auxiliary transformer 242. This buses. The 120-Vac buses can also receive             alignment would prevent more than one bus from power directly froffi the 480-Vac vital buses via     being de-energized on a loss of dc power and 480/120-Vac transformers: The system normally         prevent overloading a diesel generator that was uses the inverters to power the 120-Vac buses,         paralleled to the system during a loss of a dc bus.
Westinghouse Technology Advanced Manual Zion Loss of DC Power battery chargers powered from the 480-Vac vital buses.
with the transformers as a backup power supply.        A separate procedure was to be developed for the O diesel generator.
Each of these buses supplies two inverters, which power the 120-Vac instrument buses. The 120-Vac buses can also receive power directly froffi the 480-Vac vital buses via 480/120-Vac transformers: The system normally uses the inverters to power the 120-Vac buses, with the transformers as a backup power supply.
7.1.2 Loss of DC Control Power The possibility of eliminating the trip of all The loss of dc control power was the result       reactor coolant: pumps on two-out-of-four of an operator improperly opening the tie breaker     underfrequency was examined. After a discus between 125-Vdc bus 111 and 211 prior to               sion with Westinghouse, this was ruled out due reconnecting battery 211 to bus 211. The result       to the possibility of causing a sequential loss of was a loss of dc power to the loads supplied           flow accident, which is an unanalyzed accident.
7.1.2 Loss of DC Control Power The loss of dc control power was the result of an operator improperly opening the tie breaker between 125-Vdc bus 111 and 211 prior to reconnecting battery 211 to bus 211. The result was a loss of dc power to the loads supplied from bus 211. The results of the loss of these loads are discussed in the attached sequence of events.
from bus 211. The results of the loss of these loads are discussed in the attached sequence of           The installation of an automatic transfer events.                                                switch to change the computer power supply from the battery fed inverter to regulated ac 7.1.3 Problems and Corrective Actions                  power was to be performed. This would be done Taken                                          rapidly enough to ensure no loss of data from the computer.
7.1.3 Problems and Corrective Actions Taken The first measure to be considered was a key lock system on the dc breakers which would require the breakers to be operated in the proper sequence during realignment: This idea was rejected due to personnel safety considerations.
The first measure to be considered was a key lock system on the dc breakers which would                Two modifications associated with the main require the breakers to be operated in the proper      control board annunciators were performed.
The diesel generator which was destroyed by fire was removed and repaired. Tlhe diesel was then tested to ensure it met the original specifica tions. The outage required for this repair was approximately 6 weeks.
sequence during realignment: This idea was            First, annunciators for the ac buses were sup rejected due to personnel safety considerations.      plied from ac power from the opposite unit.
The procedure-for aligning the 4.16-kV service buses was 'riised to place two buses with the same source of dc control 'power on different transformers. The service buses which provide power to the 4.16-kV ESF buses (except for the bus supplied by the 0 diesel generator) would be supplied by the system transformer.
Secondly, mimic buses were added to the control The diesel generator which was destroyed by        board to provide indication of power status for fire was removed and repaired. Tlhe diesel was        the dc distribution system.
This results in a lineup of buses 242 and 245 on auxiliary transformer 241 and buses 243 and 244 on system auxiliary transformer 242. This alignment would prevent more than one bus from being de-energized on a loss of dc power and prevent overloading a diesel generator that was paralleled to the system during a loss of a dc bus.
then tested to ensure it met the original specifica tions. The outage required for this repair was        7.1.4 Summary approximately 6 weeks.
A separate procedure was to be developed for the O diesel generator.
This incident is important in that it demon The procedure- for aligning the 4.16-kV            strates the importance of maintaining proper dc service buses was 'riised to place two buses          control power in the plant, and the consequences with the same source of dc control 'power on          of a loss of the dc control power. In this case, different transformers. The service buses which        the loss resulted in a reactor trip and an ESF provide power to the 4.16-kV ESF buses (except        actuation, filling the pressurizer relief tank to the for the bus supplied by the 0 diesel generator)        point of breaking the rupture disk, and causing would be supplied by the system transformer.          significant, damage to an emergency diesel Center             1.1-h                                           Key UIYO USNRC Technical USNRC                Training Center Technical Training                      I. I-ZO                                         Rev  0196
The possibility of eliminating the trip of all reactor coolant: pumps on two-out-of-four underfrequency was examined. After a discus sion with Westinghouse, this was ruled out due to the possibility of causing a sequential loss of flow accident, which is an unanalyzed accident.
The installation of an automatic transfer switch to change the computer power supply from the battery fed inverter to regulated ac power was to be performed. This would be done rapidly enough to ensure no loss of data from the computer.
Two modifications associated with the main control board annunciators were performed.
First, annunciators for the ac buses were sup plied from ac power from the opposite unit.
Secondly, mimic buses were added to the control board to provide indication of power status for the dc distribution system.
7.1.4 Summary This incident is important in that it demon strates the importance of maintaining proper dc control power in the plant, and the consequences of a loss of the dc control power. In this case, the loss resulted in a reactor trip and an ESF actuation, filling the pressurizer relief tank to the point of breaking the rupture disk, and causing significant, damage to an emergency diesel USNRC Technical Training Center 1.1-h Key UIYO Rev 0196 Westinghouse Technology Advanced Manual Zion Loss of DC Power USNRC Technical Training Center I. I-ZO


Zion Loss of DC Power Ca 3tSflt air,      ***E*%''J 4: 6 U W"O'  fr 11 h - -In Sj
,Y 3tSflt 6 Z5tA3
,Y            Z5tA3 IV                                    Advanced Manual generator.
***E*%''J  

generator.
It should be noted that each plant could have a different response to a loss of dc control power due to differences in the designs of their electrical distribution systems. The incident at Zion Unit 2, however, demonstrates the importance of this source of power to safe operation.
It should be noted that each plant could have a different response to a loss of dc control power due to differences in the designs of their electrical distribution systems. The incident at Zion Unit 2, however, demonstrates the importance of this source of power to safe operation.
7.1.5 Reference Nuclear Power Experience Manual, Volume PWR-2, Section XI, Subsection A, entries 166 and 192.
7.1.5 Reference Nuclear Power Experience Manual, Volume PWR-2, Section XI, Subsection A, entries 166 and 192.
Riv 0196 USNRC Technical Training Center                   7.1-3               Rev 0196
USNRC Technical Training Center 7.1-3 Zion Loss of DC Power Riv 0196 Ca air, W"O' 11 -
Sj IV 4:
U fr h -In Advanced Manual Rev 0196


SZion    Loss of DC Power "TABLE 7.1-1 Sequence of Events: Zion Unit-2 Loss of DC Control Power September 1976
"TABLE 7.1-1 Sequence of Events: Zion Unit-2 Loss of DC Control Power September 1976  
-I     Equipment operator opens the tie breaker between 125-Vdc control bus 111 and bus 211
-I Equipment operator opens the tie breaker between 125-Vdc control bus 111 and bus 211  
  -   prior to paralleling bus 211 with battery 211.,
- prior to paralleling bus 211 with battery 211.,
: 2. DC control power lost to the following loads:
: 2. DC control power lost to the following loads:
: a. 4.16-kV buses 241, 243, 245, and 248,
: a. 4.16-kV buses 241, 243, 245, and 248,
: b. All generator and transformer relaying and -metering, and c: All main control board annunciator windows and horns.
: b. All generator and transformer relaying and -metering, and c: All main control board annunciator windows and horns.
: 3. Underfrequency relays on 2B and 2D RCPs drop out, generating a reactor coolant pump
: 3. Underfrequency relays on 2B and 2D RCPs drop out, generating a reactor coolant pump  
    *-trip   signal to all reactor coolant pumps. 2A and 2C RCPs trip (pumps 2B and 2D do not trip due to loss of dc control power to their breakers).
*-trip signal to all reactor coolant pumps. 2A and 2C RCPs trip (pumps 2B and 2D do not trip due to loss of dc control power to their breakers).
: 4. -Reactor trips on loss'of two reactor coolant pumps with power greater than 10% (P-7).
: 4. -Reactor trips on loss'of two reactor coolant pumps with power greater than 10% (P-7).
: 5. 'Reactor trip causes a turbine trip. However, the main generator does not automatically trip "dtieto loss'of the dc power. Main generator motorizes.
: 5. 'Reactor trip causes a turbine trip. However, the main generator does not automatically trip "dtie to loss'of the dc power. Main generator motorizes.
: 6. Running main feed pump does not automatically trip due to loss of generator relaying (main
: 6. Running main feed pump does not automatically trip due to loss of generator relaying (main  
    - feed pumps at Zion tripon 'a main generator trip) and cannot be tripped from the main in control board. Due to the shrink in the steam generators, the pump goes to full speed rapidly  due response to the low steam generator levels. 2A and 2B steam generators refill 1.5 to the partially open main feedwater bypass valves (about 3000 gpm for approximately minutes).
- feed pumps at Zion tripon 'a main generator trip) and cannot be tripped from the main control board. Due to the shrink in the steam generators, the pump goes to full speed in response to the low steam generator levels. 2A and 2B steam generators refill rapidly due to the partially open main feedwater bypass valves (about 3000 gpm for approximately 1.5 minutes).
in the
: 7. The rapid cooldown caused by the overfeeding causes a drop in the steam pressure in the 2A and 2B steam generators. This results in an ESF actuation on 100 psid differential pressure. The ESF signal causes a feedwater isolation signal and shuts the bypass valves.
: 7. The rapid cooldown caused by the overfeeding causes a drop in the steam pressure psid differential 2A and 2B steam generators. This results in an ESF actuation on 100 valves.
: 8. The main generator output breakers and the field breaker are opened manually at the control board (dc control power to the breaker trip coils is transferred to another source).
pressure. The ESF signal causes a feedwater isolation signal and shuts the bypass at the control
: 9. 4.16-kV buses 243 and 245 do not automatically transfer from the unit auxiliary transformer to the system auxiliary transformer because of loss of DC power.
: 8. The main generator output breakers and the field breaker are opened manually board (dc control power to the breaker trip coils is transferred to another source).
USNRC Technical Training Center
the unit auxiliary
: 7. 1 - 5 Rev 0196 SZion Loss of DC Power
: 9. 4.16-kV buses 243 and 245 do not automatically transfer from transformer to the system auxiliary transformer because of loss of DC power.
: 7. 1 - 5         .  -                          Rev 0196 USNRC Technical Training Center


Westinghouse TechnoloLv Advanced Manual                                    '_ Zion Loss of DC Power Wetin house - Techno1ov    Advanced Manual                                     Zion Loss of DC Power TABLE 7.1-1 (CONTINUED)
Wetin house  
- Techno1ov Advanced Manual Zion Loss of DC Power 4
n.nr Rcv UlYD USNRC Technical Training Center TABLE 7.1-1 (CONTINUED)
Sequence of Events: Zion Unit 2 Loss of DC Control Power September 1976,
Sequence of Events: Zion Unit 2 Loss of DC Control Power September 1976,
: 10. Diesel generator 2A attempts to carry the loads of buses 243 and 245 through transformer 241. Since the diesel is only sized for ESF loads, these buses overload the generator. The overload condition results in the diesel generator overheating and catching on fire.
: 10.
: 11. Running main feedwater pump is manually tripped by the shift engineer at the EHC station.
Diesel generator 2A attempts to carry the loads of buses 243 and 245 through transformer 241. Since the diesel is only sized for ESF loads, these buses overload the generator. The overload condition results in the diesel generator overheating and catching on fire.
: 12. Attempts are made to manually trip the running diesel generator; however, the smoke and fire prevent success. Eventually; the generator windings burn open, and the components powered from the affected buses coast to a stop. Cardox is initiated to extinguish the fire.
: 11.
: 13. The pressiirizer safety valves lift (maximum RCS pressure of 2550 psig) and continue to lift several times. The pressurizer relief tank rupture disk breaks, resulting in about 2500 gallons of water spilling into the containment. The safeties are lifting due to the input of water from the ECCS equipment (high head injection) which started with the ESF actuation.
Running main feedwater pump is manually tripped by the shift engineer at the EHC station.
: 14. DC bus 211 is reenergized. Control board annunciators are restored, 2B and 2D RCP breakers are opened, and the 4.16-kV buses are-re-energized from the unit auxiliary transformer (inoperable for about 20 minutes).
: 12.
: 15. ESF signal is reset and diesel 2A is tripped. All safeguards pumps are stopped. About 7650 gallons of water was injected into the plant.
Attempts are made to manually trip the running diesel generator; however, the smoke and fire prevent success. Eventually; the generator windings burn open, and the components powered from the affected buses coast to a stop. Cardox is initiated to extinguish the fire.
4                                        Rcv. UlYD n.nr USNRC Technical Training Center                                                              ReCv   UJ17
: 13.
The pressiirizer safety valves lift (maximum RCS pressure of 2550 psig) and continue to lift several times. The pressurizer relief tank rupture disk breaks, resulting in about 2500 gallons of water spilling into the containment. The safeties are lifting due to the input of water from the ECCS equipment (high head injection) which started with the ESF actuation.
: 14.
DC bus 211 is reenergized. Control board annunciators are restored, 2B and 2D RCP breakers are opened, and the 4.16-kV buses are-re-energized from the unit auxiliary transformer (inoperable for about 20 minutes).
: 15.
ESF signal is reset and diesel 2A is tripped. All safeguards pumps are stopped. About 7650 gallons of water was injected into the plant.
Westinghouse TechnoloLv Advanced Manual
'_ Zion Loss of DC Power ReCv UJ17


I UNIT   ~~~1~~
I UNIT  
241 0
~~~1~~
LN               NO     NIO           I NO  NO        NO MA1               J 1           ESF 247             ESF 248             ESF 249 00
241 NO NO NO 0
_J        480Batt;FROM 480Catter                              r  Jy UNIT GEERTO                 11,--kNOtw                             Baet
LN NO NIO I
                                                    ;3ry r r yc*       *,c ,
MA1 J
From UniS1F2__3-qI                             Ty1c1Di2l12, CoInvrtPer bL L
1 ESF 247 ESF 248 ESF 249 From UniS1F2__3-00 GEERTO 11,--kNOtw Baet  
;3ry r
r yc*  
*,c,
_J 480Batt;FROM 480Catter r
Jy UNIT qI Ty1c1 Di2l12, CoInvrt Per bL L


Westinghouse Technology Advanced Manual Section 7.2 V. C. Summer Inadvertent Criticality
Westinghouse Technology Advanced Manual Section 7.2 V. C. Summer Inadvertent Criticality


V.C. Summer Inadvertent Criticality Wactin hnuicq   Tpechnoloar   Advanced ManualV..Sm                                                                     e     Ind   rttCiicit TABLE OF CONTENTS 7.2 V. C. SUMMER INADVERTENT CRITICALITY                               .........................                                                7.2-1 7.2-1 7.2.1  Introduction ............................                                      ..................
Wactin hnuicq Tpechnoloar Advanced ManualV..Sm e Ind rttCiicit TABLE OF CONTENTS 7.2 V. C. SUMMER INADVERTENT CRITICALITY 7.2.1 Introduction 7.2.2 Causes................................
7.2-1 7.2.2  Causes ................................                                     ...              &deg;..............
7.2.3 Safety Implications........................
7.2-2 7.2.3  Safety Implications ........................                                .........                        &deg;&deg;.......
7.2.4 Generic Implications.......................
7.2-2 7.2.4  Generic Implications .......................                                                                                         7.2-3 7.2.5  Corrective Actions ........................                                                                                          7.2-3
7.2.5 Corrective Actions........................
                                                                                        .... &deg;..&deg;&deg;&deg;........
7.2.6 Summ ary..............................
7.2.6  Summ ary ..............................
LIST OF TABLES 7.2-1 Incorrect ECRPs..............................................
LIST OF TABLES 7.2-5 7.2-1   Incorrect ECRPs ..............................................
ew
ew    -                                                                          Rv    0191
-
                                                                .. h1 I/.,A-!
Rv 0191 I.. h1 USNRC Technical Training Center 7.2-1 7.2-1 7.2-1 7.2-2 7.2-2 7.2-3 7.2-3 7.2-5
USNRC Technical Training Center                                                                                                            Rev 0196
/.,A-!
V.C. Summer Inadvertent Criticality
&deg;..............  
&deg;&deg;.......  
.... &deg;..&deg;&deg;&deg;........
Rev 0196


Westing~house Technology -Advanced Manual                                      V.C.- Summer Inadvertent Criticality
,7.2 V. C. SUMMER INADVERTENT.
      ,7.2     V. C. SUMMER INADVERTENT.                                 mined to be 168 steps on control bank D (CBD).
mined to be 168 steps on control bank D (CBD).
CRITICALITY                                               The trainee 'was, instructed to withdraw the control banks until the CBD position reached 100 Learning Objectives:                                              steps. It was thought that this would provide a convenient. stopping point with a sufficient
CRITICALITY Learning Objectives:
: 1. Briefly discuss the V. C. Summer start                        margin prior to criticality. Based on calculations accident.-                                                    after the event, the reactor actually went critical when CBD reached about 40 steps, but no one in 2.- Explain the causes of the accident.                          the control room realized that the reactor had attained criticality. The trainee continued to add
: 1. Briefly discuss the V. C. Summer start accident.-
: 3. Explain the, safety implications of the acci                  positive reactivity after the reactor was critical dent.                          "            I I            with continued rod withdrawal. The SRO blocked the source range reactor trip when the P
2.- Explain the causes of the accident.
: 4. Explain what procedural limitations and                        6 permissive was received without noticing the administrative controls should have prevented                rate at which reactor power was increasing.
: 3. Explain the, safety implications of the acci dent.
          - this accident.                                              - Without the 105 cps trip from the source range instruments to stop the power increase, reactor "7.2.1 Introduction                                              power increased to approximately 6% of rated thermal power with a startup rate of about 16-17 V. C. Summer Nuclear Station is a single                Sdpm (based on post-accident calculations) before unit three-loop Westinghouse plant located in                    the reactor tripped on high positive flux rate in
I I
      --Fairfield County, South Carolina, and operated                    the power range. -Control bank D was at about
: 4. Explain what procedural limitations and administrative controls should have prevented this accident.
...-    by South Carolina Electric and Gas Co. The                        76 steps when the trip occurred.
"7.2.1 Introduction V. C. Summer Nuclear Station is a single unit three-loop Westinghouse plant located in
plant began commercial operation on January 1, 1982.                                                            -7.2.2.Causes On February 28, 1985, during a startup, the                       The reactor startup which took place around reactor experienced an inadvertent criticality                     1:30 p.m. on February 28 followed intermittent which resulted in a reactor trip. A combination                   operation of the unit during the previous month.
--Fairfield County, South Carolina, and operated by South Carolina Electric and Gas Co. The plant began commercial operation on January 1, 1982.
of errors associated with improper, operation,,,,,, One of the primary causes of the inadvertent "inadequate supervision of an operator trainee; -:,criticality was the incorrect calculation of the and miscalculation of the estimated critical rod-                 ECRP. The calculation for the startup used the position (ECRP) led to the inadvertent criticality..',, power block ,method of predicting xenon and The event could have been easily prevented by':: samarium reactivity worths, which can produce better.- training, supervision and procedural -,;significant errors.if the power history is intermit control. The reactor protection system func-: tent. The ECRP calculation was made based on a tioned as designed to shut the reactor down                 -    brief period (three hours) of power operation before any fuel damage was-experienced.       .        --.      earlier in the day rather than on previous periods
The trainee 'was, instructed to withdraw the control banks until the CBD position reached 100 steps. It was thought that this would provide a convenient. stopping point with a sufficient margin prior to criticality. Based on calculations after the event, the reactor actually went critical when CBD reached about 40 steps, but no one in the control room realized that the reactor had attained criticality. The trainee continued to add positive reactivity after the reactor was critical with continued rod withdrawal. The SRO blocked the source range reactor trip when the P 6 permissive was received without noticing the rate at which reactor power was increasing.  
                  -- ,,,                "..of,                                extended operation. -Another problem with the The startup was being conducted by a reactor                 calculation involyed using middle of life (MOL) operator trainee under the supervision of a senior               rod worth curves rather than beginning of life reactor operator (SRO). The ECRP was deter-                       (BOL) curves, which would have been more
- Without the 105 cps trip from the source range instruments to stop the power increase, reactor power increased to approximately 6% of rated thermal power with a startup rate of about 16-17 Sdpm (based on post-accident calculations) before the reactor tripped on high positive flux rate in the power range. -Control bank D was at about 76 steps when the trip occurred.  
                                                  --    -    - -Y -    -    ~1     . ~           -        .          ),... Ain,<Z~Y L~
-7.2.2.Causes On February 28, 1985, during a startup, the The reactor startup which took place around reactor experienced an inadvertent criticality 1:30 p.m. on February 28 followed intermittent which resulted in a reactor trip. A combination operation of the unit during the previous month.
SUSNRC Technical Training Center -             .I         / . 15 - I -                                         tLIev    UFJ.
of errors associated with improper, operation,,,,,, One of the primary causes of the inadvertent "inadequate supervision of an operator trainee; -:,criticality was the incorrect calculation of the and miscalculation of the estimated critical rod-ECRP. The calculation for the startup used the position (ECRP) led to the inadvertent criticality..',, power block,method of predicting xenon and The event could have been easily prevented by':: samarium reactivity worths, which can produce better.- training, supervision and procedural -, ;significant errors.if the power history is intermit control. The reactor protection system func-:
tent. The ECRP calculation was made based on a tioned as designed to shut the reactor down brief period (three hours) of power operation before any fuel damage was-experienced.
earlier in the day rather than on previous periods  
"..of extended operation. -Another problem with the The startup was being conducted by a reactor calculation involyed using middle of life (MOL) operator trainee under the supervision of a senior rod worth curves rather than beginning of life reactor operator (SRO). The ECRP was deter-(BOL) curves, which would have been more
-Y  
~1  
~  
),...
Ain,<Z~Y L~
SUSNRC Technical Training Center -
.I
/. 15 - I -
Westing~house Technology -Advanced Manual V.C.- Summer Inadvertent Criticality ev tLI UFJ.


1 Westinghouse Technology 'Advanced       Manual                   V.C. Summer Inadvertent Criticality       Y V.C. Su    mer Inadvertent Criticalitv appropriate. The licensee's pr6cedure lacked any     the power range neutron flux trip (low setpoint) guidance regarding when the change should have        would activate at 35% power (the positive rate been made to the MOL curves:                          trip is not assumed to activate). The peak power attained, limited by the fuel doppler coefficient, is The operator performing the startup was a        about 600% of rated thermal power (the energy trainee and did not have an NRC license. This is      release from an instantaneous power pulse would allowable if the trainee has received sufficient      be very low). No fuel or clad damage results, training to be able to perform the task normally      and the departure from nucleate boiling ratio performed by licensed personnel and is directly      remains greater than 1.3, according to the analy supervised by a licensed operator. The trainee        sis. The V. C. Summer inadvertent criticality apparently had not received appropriate training      event was bounded by the accident analysis with because he did not know what the indications of      considerable margin.
Westinghouse Technology 'Advanced Manual V.C. Summer Inadvertent Criticality appropriate. The licensee's pr6cedure lacked any guidance regarding when the change should have been made to the MOL curves:
reactor criticality are and he did' not know that plant procedures required that the Excore instru      7.2.4 Generic Implications mentation should be moniiored for indications of criticality any time positive reactivity is being        The inability to accurately predict criticality is added to the core.                                    a safety concern because technical specifications require that the calculation be performed to verify Supervision of the trainee was inadequate,      that the reactor will be critical with rods with even though several reactor operators and senior      drawn above the rod insertion limit. This is reactor operators were' in the control room          necessary to ensure that there is enough negative performing other tasks related to the startup.        reactivity available from the control rods that the None of the licensed' operators recognized            "reactorcan be made subcritical from all operating criticality and the supervising senior operator      conditions assuming the worst case conditions.
The operator performing the startup was a trainee and did not have an NRC license. This is allowable if the trainee has received sufficient training to be able to perform the task normally performed by licensed personnel and is directly supervised by a licensed operator. The trainee apparently had not received appropriate training because he did not know what the indications of reactor criticality are and he did' not know that plant procedures required that the Excore instru mentation should be moniiored for indications of criticality any time positive reactivity is being added to the core.
even blocked the source range trip as reactor power was increasing into the intermediate range.        Even though the inadvertent criticality event was bounded by an aiialyzed accident, it demon 7.2.3 Safety Implications                            strated significant weaknesses in the utility's procedures and training for licensed operators.
Supervision of the trainee was inadequate, even though several reactor operators and senior reactor operators were' in the control room performing other tasks related to the startup.
An event more severe than the February 28        The plants procedure did-not provide adequate inadvertent criticality is analyzed in the V. C.      guidance for the calculation of an ECRP during a Summer final safety analysis report. The uncon        period of unstable or unpredictable xenon behav "trolledrod cluster control assembly bank with        ior. Adequate guidance on the correct source of d**wal from a subcritical condition (a Condition      data was not available as demonstrated by the use "IIfault'of moderate freqtency) is' analyzed to      of the incorrect rod worth curves.
None of the licensed' operators recognized criticality and the supervising senior operator even blocked the source range trip as reactor power was increasing into the intermediate range.
determine if acceptable fuel limits are maintained during the transient. The event is initiated with a      -The major contributor to the incorrect ECRP simultaneous withdrawal of two sequential            calculation at Summer was the incorrect determi "control banks having a maximum combined              nation of the reactivity worth of xenon. Summer worth at a maximum speed of 105 pcm/sec (the          and other licensees typically used the power addition rate was deiermined to be 10 pcm/sec for    block history method to calculate the equivalent the 2/28/85 event). The analysis determined that      power for determining xenon and samarium 7.2-2                                         Rev   0196 USNRC               Training Center Technical Training USNRC Technical                Center             7.2-2                                         Rev 0196
7.2.3 Safety Implications An event more severe than the February 28 inadvertent criticality is analyzed in the V. C.
Summer final safety analysis report. The uncon "trolled rod cluster control assembly bank with d**wal from a subcritical condition (a Condition "II fault'of moderate freqtency) is' analyzed to determine if acceptable fuel limits are maintained during the transient. The event is initiated with a simultaneous withdrawal of two sequential "control banks having a maximum combined worth at a maximum speed of 105 pcm/sec (the addition rate was deiermined to be 10 pcm/sec for the 2/28/85 event). The analysis determined that the power range neutron flux trip (low setpoint) would activate at 35% power (the positive rate trip is not assumed to activate). The peak power attained, limited by the fuel doppler coefficient, is about 600% of rated thermal power (the energy release from an instantaneous power pulse would be very low). No fuel or clad damage results, and the departure from nucleate boiling ratio remains greater than 1.3, according to the analy sis. The V. C. Summer inadvertent criticality event was bounded by the accident analysis with considerable margin.
7.2.4 Generic Implications The inability to accurately predict criticality is a safety concern because technical specifications require that the calculation be performed to verify that the reactor will be critical with rods with drawn above the rod insertion limit. This is necessary to ensure that there is enough negative reactivity available from the control rods that the "reactor can be made subcritical from all operating conditions assuming the worst case conditions.
Even though the inadvertent criticality event was bounded by an aiialyzed accident, it demon strated significant weaknesses in the utility's procedures and training for licensed operators.
The plants procedure did-not provide adequate guidance for the calculation of an ECRP during a period of unstable or unpredictable xenon behav ior. Adequate guidance on the correct source of data was not available as demonstrated by the use of the incorrect rod worth curves.  
-The major contributor to the incorrect ECRP calculation at Summer was the incorrect determi nation of the reactivity worth of xenon. Summer and other licensees typically used the power block history method to calculate the equivalent power for determining xenon and samarium USNRC Technical Training Center 7.2-2 Rev 0196 1
Rev 0196 V.C. Su mer Inadvertent Criticalitv Y
USNRC Technical Training Center 7.2-2


_V.C. Summer Inadvertent      Criticality U1ectin housei   Technology AdIvanced ManualV..Sm                                   e   Iadetn       Crialt reactivity worths. With this method the core               recurrence. Procedural inadequacies were power level readings are logged periodically in           addressed, and inverse multiplication plots were order to describe the previous core power histo           used for subsequent startups to predict criticality ry. Xenon reactivity is based on the hourly               and to verify the accuracy of ECRPs. These average core power for the 36 hours prior to               actions did not prevent the problem that occurred shutdown. Samarium reactivity is based on the              on 5/11/85. Administrative controls on the daily average power for the eight days prior to           conduct of training were improved to ensure shutdown. In determining the reactivity worth of           proper supervision of on-the-job training.
U1ectin housei Technology AdIvanced ManualV..Sm e
xenon and samarium, each logged entry has a different coefficient or multiplier associated with             Following a special inspection by USNRC it. The entries nearest to the time of shutdown           Region II, enforcement action was taken for the are the most heavily weighted. The power block             procedural violations and inadequacies. In method of determining the equivalent power level           additon, the licensed operator supervising the for estimating xenon and samarium reactivities is         evolution received a letter of reprimand.
Iadetn Crialt reactivity worths. With this method the core power level readings are logged periodically in order to describe the previous core power histo ry. Xenon reactivity is based on the hourly average core power for the 36 hours prior to shutdown. Samarium reactivity is based on the daily average power for the eight days prior to shutdown. In determining the reactivity worth of xenon and samarium, each logged entry has a different coefficient or multiplier associated with it. The entries nearest to the time of shutdown are the most heavily weighted. The power block method of determining the equivalent power level for estimating xenon and samarium reactivities is not very accurate when previous reactor opera tion is intermittent at widely varying power levels. It was determined that some of the ECRP calculations were in error by more than 50 rod steps when non-equilibrium critical data were used.
not very accurate when previous reactor opera tion is intermittent at widely varying power               7.2.6 Summary levels. It was determined that some of the ECRP calculations were in error by more than 50 rod                 The major contributor to the incorrect ECRP steps when non-equilibrium critical data were             calculation at Summer was the incorrect determi used.                                                     nation of the reactivity worth of xenon. Similar instances of incorrect ECRP calculations have Other methods, such as computer programs,             occurred on numerous occasions at Westing are available to determine xenon and samarium             house plants. The use of inverse multiplication worths for use in ECRP calculations. Although             plots to predict criticality and to verify the accura potentially more accurate and not subject to               cy of ECRPs and the proper monitoring of calculation errors, problems are still possible           available indications help to prevent uncontrolled with computer programs. Improper data input               criticalities and power excursions.
Other methods, such as computer programs, are available to determine xenon and samarium worths for use in ECRP calculations. Although potentially more accurate and not subject to calculation errors, problems are still possible with computer programs. Improper data input and software errors during development and updating of the software can introduce problems during use.
and software errors during development and updating of the software can introduce problems during use.
Similar instances of incorrect ECRP calcula tions have occurred on numerous occasions at Westinghouse plants, but proper monitoring of available indications have prevented uncontrolled criticalities and power excursions. Table 7.2-1 is a partial listing of similar events.
Similar instances of incorrect ECRP calcula tions have occurred on numerous occasions at Westinghouse plants, but proper monitoring of available indications have prevented uncontrolled criticalities and power excursions. Table 7.2-1 is a partial listing of similar events.
7.2.5 Corrective Actions Following the incident at V. C. Summer, the licensee initiated corrective actions to prevent
7.2.5 Corrective Actions Following the incident at V. C. Summer, the licensee initiated corrective actions to prevent recurrence.
                        . ..                       ,7       2                                         R ev 0196E
Procedural inadequacies were addressed, and inverse multiplication plots were used for subsequent startups to predict criticality and to verify the accuracy of ECRPs. These actions did not prevent the problem that occurred on 5/11/85.
                                                        . A. ,
Administrative controls on the conduct of training were improved to ensure proper supervision of on-the-job training.
Following a special inspection by USNRC Region II, enforcement action was taken for the procedural violations and inadequacies.
In additon, the licensed operator supervising the evolution received a letter of reprimand.
7.2.6 Summary The major contributor to the incorrect ECRP calculation at Summer was the incorrect determi nation of the reactivity worth of xenon. Similar instances of incorrect ECRP calculations have occurred on numerous occasions at Westing house plants. The use of inverse multiplication plots to predict criticality and to verify the accura cy of ECRPs and the proper monitoring of available indications help to prevent uncontrolled criticalities and power excursions.
,7 2
R ev 0196E
. A.,
USNRC Technical Training Center
USNRC Technical Training Center
_V.C. Summer Inadvertent Criticality


V.C. Summer Inadvertent Criticality Westin husec Technoloav Advanced ManualVC.Sm                             eIadretCrialy TABLE 7.2-1       Incorrect ECRPs Date         Plant               Primary Cause 5/11/85     V.C. Summer         Incorrect ECRP, went critical below the RIL, inverse multiplication plot failed to identify error.
Westin husec Technoloav Advanced ManualVC.Sm eIadretCrialy 1D--
5/17/85     McGuire 2           Incorrect ECRP, went critical below the RIL, error caused by incorrect Xenon worth program.
fl1o TABLE 7.2-1 Incorrect ECRPs Date Plant Primary Cause 5/11/85 V.C. Summer Incorrect ECRP, went critical below the RIL, inverse multiplication plot failed to identify error.
8/23/84     Turkey Point 3     Incorrect ECRP, went critical 85 steps below ECRP, calculation error.
5/17/85 McGuire 2 Incorrect ECRP, went critical below the RIL, error caused by incorrect Xenon worth program.
5/12/84     Turkey Point 3       Incorrect ECRP, went critical 145 steps below ECRP, calculation error.
8/23/84 Turkey Point 3 Incorrect ECRP, went critical 85 steps below ECRP, calculation error.
10/31/84     Turkey Point 4     Unable to achieve criticality, calculation error resulted in improper boron addition to RCS.
5/12/84 Turkey Point 3 Incorrect ECRP, went critical 145 steps below ECRP, calculation error.
5/15/85       Turkey Point 3     Incorrect ECRP, used wrong RCS temperature in calculation (525"F vs. 535"F) 1D--    fl1o INkl* *g U ,IkJ V US-NRC Technical Training Center             4 *.,, -
10/31/84 Turkey Point 4 Unable to achieve criticality, calculation error resulted in improper boron addition to RCS.
5/15/85 Turkey Point 3 Incorrect ECRP, used wrong RCS temperature in calculation (525"F vs. 535"F) 4 *.,, -
US-NRC Technical Training Center V.C. Summer Inadvertent Criticality INkl* *g U,Ik J V


Westinghouse Technology Advanced Manual Section 7.3 Water Hammer at San Onofre
Westinghouse Technology Advanced Manual Section 7.3 Water Hammer at San Onofre


                                                                                              -.-  Water Hammer at San Onofre Westinahn,,sp Technology Advanced Manual                                                             WtrHme                 tSnOor
Westinahn,,sp Technology Advanced Manual WtrHme tSnOor
                                "" TABLE OF CONTENTS 7.3 WATER HAMMER AT SAN ONOFRE ................................                                                                   7.3-1 7.3-1
"" TABLE OF CONTENTS 7.3 WATER HAMMER AT SAN ONOFRE................................
    ".7.3.History of Water Hammer at Nuclear Power Plants ...........                                      .........
".7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 History of Water Hammer at Nuclear Power Plants...........
                                                                                                                        .I..        7.3-2 7.3.2    Water Hammer .......................................
Water Hammer  
7.3-3 7.3.3    San Onofre Water Hammer Incident ..............................
.I..
7.3-4 7.3.4    Plant Conditions Leading to Water Hammer ..........................
San Onofre Water Hammer Incident Plant Conditions Leading to Water Hammer..........................
                                                                                                          .........                7.3-6 7.3.5    Water Hammer-Induced Damage .....................
Water Hammer-Induced Damage 7.3.5.1
7.3-6 7.3.5.1    Piping and Piping Support Damage ...............
-7.3.5.2 7.3.5.3 7.3.5.4 Piping and Piping Support Damage...............
7.3-7
Feedwater Loop B Flow Control Station Damage..............
            -7.3.5.2    Feedwater Loop B Flow Control Station Damage ..............
AFW Piping Damage...............................
7.3-7 7.3.5.3    AFW Piping Damage ...............................
Valve M alfunctions........................
                                                                                                            ............          7.3-7 7.3.5.4    Valve Malfunctions ........................
7.3.6 Valve In-Service Testing...............
7.3-7 7.3.6   Valve In-Service Testing ...............                  .......................
7.3.7 Valve Failure Findings 7.3.8 Flash Evaporator Unit.................
7.3-8 7.3.7   Valve Failure Findings ................                  .......................
7.3.9 Turbine Breakable Diaphragms (Rupture Disks) 7.3.10 Summary.........................
7.3-9 7.3.8   Flash Evaporator Unit .................                  .......................
LIST OF TABLES 7.3-1 Description of Feedwater Pipe Damage Following SONGS-I Water Hammer 7.3-2 Inspection Findings...........................................
7.3-9 7.3.9   Turbine Breakable Diaphragms (Rupture Disks)                   .......................
7.3-1 7.3-1 7.3-2 7.3-3 7.3-4 7.3-6 7.3-6 7.3-7 7.3-7 7.3-7 7.3-7 7.3-8 7.3-9 7.3-9 7.3-10 7.3-11 7.3-12 92&
7.3-10 7.3.10  Summary .........................                         .*..............o..-...
y ft0196 USNRC Technical Training Center,
LIST OF TABLES
I Water Hammer at San Onofre
                                                                                                                          .... 7.3-11 7.3-1 Description of Feedwater Pipe Damage Following SONGS-I Water Hammer                                                        7.3-12 7.3-2 Inspection Findings ...........................................
.*..............o..-...
_                          ,'.  :.    .              ..                                    92& y  ft0196 USNRC Technical Training Center ,            , ,      I


Water Hammer at San Onofre W-.ct;n ohnuse Technoloov   Advanced Manual                               WtrHme         tSnOor LIST OF FIGURES 7.3-1 Filling of a Voided Feedwater Line .................................                         7.3-13 7.3-2 San Onofre Electrical System .....................................                           7.3-15 7.3-3 Condensate System ...........................................                               7.3-17 7.3-4 M ain Feed System ............................................                               7.3-19 7.3-5 Auxiliary Feedwater System .....................................                             7.3-21 7.3-6 SONGS-1 Feedwater Flow Diagram ................................                             7.3-23 7.3-7 SONGS-1 Loop B Steam Generator Flow Control Station -.................                       7.3-25 7.3-8 SONGS-i Auxiliary Feedwater System ..............................                             7.3-27 7.3-9 FW Loop B Piping and Support Layout ..............................                            7.3-29 7.3-10 Overview of Feedwater Piping and Support Damage Due to Water Hammer           .....          7.3-31 7.3-11 Typical Swing Check Valve ......................................                            7.3-33 7.3-12 Check Valve FWS-346 .........................................                               7.3-35 7.3-13 Check Valve FWS-348 .........................................                               7.3-37
W-.ct;n ohnuse Technoloov Advanced Manual WtrHme tSnOor LIST OF FIGURES 7.3-1 Filling of a Voided Feedwater Line.................................
                          -..  .                      'v 2*                                 1   a., nil-I Olt USNRC Technical Training Center                        I . .- lI                               *,CV   UJ~l
7.3-13 7.3-2 San Onofre Electrical System.....................................
7.3-15 7.3-3 Condensate System...........................................
7.3-17 7.3-4 M ain Feed System............................................
7.3-19 7.3-5 Auxiliary Feedwater System.....................................
7.3-21 7.3-6 SONGS-1 Feedwater Flow Diagram................................
7.3-23 7.3-7 SONGS-1 Loop B Steam Generator Flow Control Station -.................
7.3-25 7.3-8 SONGS-i Auxiliary Feedwater System..............................
7.3-27 7.3-9 FW Loop B Piping and Support Layout 7.3-29 7.3-10 Overview of Feedwater Piping and Support Damage Due to Water Hammer 7.3-31 7.3-11 Typical Swing Check Valve 7.3-33 7.3-12 Check Valve FWS-346.........................................
7.3-35 7.3-13 Check Valve FWS-348.........................................
7.3-37
'v 2*
1 a.,
nil-I Olt I..-
lI Water Hammer at San Onofre USNRC Technical Training Center
*,CV UJ~l


Westinahonse      Technology  Advanced  Manual                                      Water Hammer at San Onofre Wptinphn,,q       TrhnnIov    Advanced Manual                                       Water Hammer at San Onofre 7.3: WATER HAMMER AT SAN                                       heat and cool down after a reactor trip.
Wptinphn,,q
ONOFRE lFollowing the SGWH that occurred at Indian Learning Objectives:                                          ,Point Unit 2,in 1972, which resulted in a circumferential weld failure in one of the
TrhnnIov Advanced Manual Water Hammer at San Onofre 7.3: WATER HAMMER AT SAN ONOFRE Learning Objectives:
: 1. Describe three types of water hammer and                     feedwater line's, the NRC required all utilities to their causes.                                            submit design and operational information describing design features for avoiding SGWH.
: 1. Describe three types of water hammer their causes.
: 2. -Describe corrective actions that were taken to               In 1978, the generic subject of water hammer was classified as-an unresolved safety issue (USI prevent previous' steam generator w'ater, hammer problems.                                          A-I) and received increased NRC and industry attention.
: 2. -Describe corrective actions that were take prevent previous' steam generator w hammer problems.
                                                    'ater
: 3. Describe the damage caused by the w hammer event at San Onofre Nuclear Ge 4.+ Describe how multiple check valve fail contributed to the initiation of the m
: 3. Describe the damage caused by the w hammer event at San Onofre Nuclear Ge.ner-                       SGWH can occur -following a reactor trip when the steam generator top feedring drains and refills with cold auxiliary feedwater. NRC 4.+ Describe how multiple check valve fail ures             attention was directed at t&e f'eedring design and internal steam generator (SG) components near
, hammer at SONGS-I
      - contributed to the initiation of the meater
: 5. Discuss how check valve testing require the-American Society of Mechanical l neers Boiler and Pressure Vessel Code c
      , hammer at SONGS-I                                            "the feedwater (FW) nbzzle. Experience had revealed that internal damage to the feedring and
' have prevented the SONGS-i water har incident.
: 5. Discuss how check valve testing require d by.                 supports could occur. Modifications implement the-American Society of Mechanical l 'ngi-               ed to prevent SGWH genierally inv6lied installa neers Boiler and Pressure Vessel Code c-ould             tion of J-tubes to prevent _the draindown of
7.3.1-History of Water Hammer at IS clear Power Plants, During the early 1970s, the NRC be' aware of the increasing frequency of hammer events in nuclear power plant sy.
          ' have prevented the SONGS-i water haramer              . feedrings, short horizontal runs of FW piping incident.                                                adjacent to SG feedwater nozzles to minimize the magnitude of water hammerfs, and limits on auxiliary feedwater (AFW) system flow rates to 7.3.1-History of Water Hammer at IS[u-clear Power Plants,                                  avoid the rapid refill of SGs. with cold water. In general, attentio'n focused on the internal struc
*- "and became concerned about-the potential "lenges to system integrity and operabilit]
                                                                      -ture and design of the sieam generator rather than During the early 1970s, the NRC be'came water             on conditions in the FW lines and flow control aware of the increasing frequency of
could result from these incidents. For prc ized water reactors, the major contributor to incidents was a phenomenon called steam g&#xa2;
                                                    ;tems             components.,
.tor. water,.hammer (SGWH).. Althoug significance of these events varied from pl
hammer events in nuclear power plant sy.
-plant, the NRC 'was concerned that a ls
*- "and became concerned about-the potential chal-.
- SGWH could cause a complete loss of feed and affect the ability of a plant to remove heat and cool down after a reactor trip.
Y'that                   The NRC was dware'of the 'iossibility of "lenges to system integrity and operabilit]
lFollowing the SGWH that occurred at Indian  
could result from these incidents. For prc.ssur-                 developing c6ndensation-induced water hammer ized water reactors, the major contributor to these 'extending back into the 'feedwater'piping as a enera-             result of line voiding because of a water hammer incidents was a phenomenon called steam g&#xa2; h the occurrence at the KRSKO plant in Yugoslavia in
,Point Unit 2,in 1972, which resulted in a circumferential weld failure in one of the and feedwater line's, the NRC required all utilities to submit design and operational information describing design features for avoiding SGWH.
    .tor. water,.hammer (SGWH). . Althoug ant to, 1979. Limriitd 'information on that event sug significance of these events varied from pl evere 'gests that leaky checlk valves 'or pre-operation
n to In 1978, the generic subject of water hammer  
      -plant, the NRC 'was concerned that a ls
'ater, was classified as-an unresolved safety issue (USI A-I) and received increased NRC and industry attention.  
[water             pump testing (i.e6.,'start anid trip test), or both, SGWH could cause a complete loss of feed decay, were'the underlying ,causes. Similar occurrences and affect the ability of a plant to remove Vw    (11Q1
'ater  
___                        -    -                  I.-,-'-,
.ner-SGWH can occur -following a reactor trip when the steam generator top feedring drains and refills with cold auxiliary feedwater. NRC ures attention was directed at t&e f'eedring design and eater internal steam generator (SG) components near "the feedwater (FW) nbzzle. Experience had revealed that internal damage to the feedring and d by.
                                                          ,,            '1 USNRC Technical Training Center _                                                                         Rev 0196
supports could occur. Modifications implement
'ngi-ed to prevent SGWH genierally inv6lied installa
-ould tion of J-tubes to prevent _the draindown of amer
. feedrings, short horizontal runs of FW piping adjacent to SG feedwater nozzles to minimize the magnitude of water hammerfs, and limits on
[u-auxiliary feedwater (AFW) system flow rates to avoid the rapid refill of SGs. with cold water. In general, attentio'n focused on the internal struc came
-ture and design of the sieam generator rather than water on conditions in the FW lines and flow control  
;tems components.,
chal-.
Y' that The NRC was dware'of the 'iossibility of  
.ssur-developing c6ndensation-induced water hammer these  
'extending back into the 'feedwater'piping as a enera-result of line voiding because of a water hammer h the occurrence at the KRSKO plant in Yugoslavia in ant to, 1979. Limriitd 'information on that event sug evere  
'gests that leaky checlk valves 'or pre-operation
[water pump testing (i.e6.,'start anid trip test), or both,
: decay, were'the underlying,causes. Similar occurrences I.-,-'  
'1 Vw (11Q1 USNRC Technical Training Center _
Water Hammer at San Onofre Westinahonse Technology Advanced Manual Rev 0196


3-Westinghouse Technology Advanced       Manual                           Water Hammer at San Onofre had not been reported for U.S. plants, and           transient is a'fluid shock wave in -which the apparently check valve failures were not consid     pressure change is the result of the conversion of ered a significant contributor to feedwater system   kinetic energy into pressure waves (compression water hammer by'the NRC. Implicit in the             waves) or the conversion of pressure into kinetic reliance the NRC placed on J-tubes to prevent       energy (rarefaction waves). Regardless of the steam generator feedring voiding to prevent         underlying causes, this phenomenon is generally SGWH, was the assumption that,feedwater             referred to as water hammer.
Westinghouse Technology Advanced Manual Water Hammer at San Onofre had not been reported for U.S. plants, and apparently check valve failures were not consid ered a significant contributor to feedwater system water hammer by'the NRC. Implicit in the reliance the NRC placed on J-tubes to prevent steam generator feedring voiding to prevent SGWH, was the assumption that,feedwater system check valves do not leak. It appears that the NRC did not consider feedwater piping water hammer due to failed check valves to be a sub stantial contributor and did not pursue this issue further.
system check valves do not leak. It appears that the NRC did not consider feedwater piping water         A water hammer event can be characterized as hammer due to failed check valves to be a sub       one of the following three major types:
7.3.2 Water Hammer This section discusses the water" hammer which occurred at'SONGS-il, its underlying causes, and the damage incurred. Since failed check valves' ifi the feedwater pipiig' were the underlying cause,' this section also discusses valve nfiaintenance and in-service testing related to these valves. To clarify' the discussions that follow, a brief review of water hammer phenom ena and commonly accepted definitions are provided.
stantial contributor and did not pursue this issue further.                                             1. "Classical water hammer" generally identifies a fluid shock, accompanied by noise, which 7.3.2 Water Hammer                                       results from the sudden, nearly instantaneous stoppage of a moving fluid column. Unex This section discusses the water" hammer           pected valve closures, backflow against a which occurred at'SONGS-il, its underlying               check-valve, and pump startup into voided causes, and the damage incurred. Since failed           lines where valves are closed downstream are check valves' ifi the feedwater pipiig' were the         common underlying causes of classical water underlying cause,' this section also discusses         hammer and are generally well understood.
Hydraulic instabilities occur frequently in pipifig networks'as a result of changes in fluid velocity or pressure. Some of the better under stood occurrences include induced flow tran sients due to starting and stopping pumps, opening and closing valves, water filling voided (empty) lines, and pressure changes due to pipe breaks or ruptures. 'As a consequence 'of the change in fluid velocity or pressure, pressure waves are creafed'which propagate throughout the fluid within the piping network and produce audible noise, line' vibrations and, if sufficient energy transfer occurs between" the pressure wave and the pressure boundary, structural damage to piping, piping'supports, and attached equipment.
valve nfiaintenance and in-service testing related to these valves. To clarify' the discussions that       Analytical methods have been developed to follow, a brief review of water hammer phenom           predict loads for this type of fluid hammer ena and commonly accepted definitions are              and include the effects of initial pressure, provided.                                              fluid inertia, piping dimensions and layout, pipe wall elasticity, fluid bulk modulus, valve Hydraulic instabilities occur frequently in        operating characteristics (time to open or pipifig networks'as a result of changes in fluid        close), etc.
More' specifically, this pressure transient is a'fluid shock wave in -which the pressure change is the result of the conversion of kinetic energy into pressure waves (compression waves) or the conversion of pressure into kinetic energy (rarefaction waves). Regardless of the underlying causes, this phenomenon is generally referred to as water hammer.
velocity or pressure. Some of the better under stood occurrences include induced flow tran          2. "Condensation-induced water hammer" sients due to starting and stopping pumps,              resul& when cold water (such as auxiliary opening and closing valves, water filling voided        feedwater) comes in contact with steam.
A water hammer event can be characterized as one of the following three major types:
(empty) lines, and pressure changes due to pipe        Conditions conducive to this type of water breaks or ruptures. 'As a consequence 'of the            hammer are an abundant steam source and a change in fluid velocity or pressure, pressure          long empty horizontal pipe run being refilled waves are creafed'which propagate throughout            slowly with cold water. The cold water the fluid within the piping network and produce        draws energy from the steam, with the rate of audible noise, line' vibrations and, if sufficient      energy itrnsfer being governed by local flow energy transfer occurs between" the pressure            conditions. As the steam condenses, addi wave and the pressure boundary, structural              tional steam will flow countercurrent to the damage to piping, piping'supports, and attached        cold water,- and as the pipe fills up (i.e., the equipment. More' specifically, this pressure            void decreases) the steam velocity increases, Rev   U19t USNRC USNRC Technical Training CenterCenter                                                        Rev 0196
: 1. "Classical water hammer" generally identifies a fluid shock, accompanied by noise, which results from the sudden, nearly instantaneous stoppage of a moving fluid column. Unex pected valve closures, backflow against a check-valve, and pump startup into voided lines where valves are closed downstream are common underlying causes of classical water hammer and are generally well understood.
Analytical methods have been developed to predict loads for this type of fluid hammer and include the effects of initial pressure, fluid inertia, piping dimensions and layout, pipe wall elasticity, fluid bulk modulus, valve operating characteristics (time to open or close), etc.
: 2. "Condensation-induced water hammer" resul& when cold water (such as auxiliary feedwater) comes in contact with steam.
Conditions conducive to this type of water hammer are an abundant steam source and a long empty horizontal pipe run being refilled slowly with cold water. The cold water draws energy from the steam, with the rate of energy itrnsfer being governed by local flow conditions. As the steam condenses, addi tional steam will flow countercurrent to the cold water,- and as the pipe fills up (i.e., the void decreases) the steam velocity increases, USNRC Technical Training Center Rev U19t 3-USNRC Technical Training Center Rev 0196


      .Westinghouse Technology-Advanced Manual -                                                , Water Hammer at San Onofre Westinghouse Technology Advanced Manual                                                    Water Hammer at San Onofre setting up waves on the surface of the water,,,                       occurred principally, in pressurized water eventually, entraining water and causing slug                         reactors (PWRs) with ,steam generators "flow. Slug &#xfd;flow entraps steam pockets and                         ,,,having top feedrings for feedwater injection.
Westinghouse Technology Advanced Manual Water Hammer at San Onofre setting up waves on the surface of the water,,,
          .promotes significant heat transfer between the:                       The underlying causes are similar to those steam and colder water. Figure 7.3-1 illus                     -; discussed above (i.e., the voiding of the trates in simplified form the flow conditions                         horizontal feedring and feedwater piping which would come about during the refilling                           immediately adjacent to the steam generator of a voided horizontal feedwater line. Once                           and the subsequent injection of cold water).
eventually, entraining water and causing slug "flow. Slug &#xfd;flow entraps steam pockets and  
slug flow conditions commence, a steam                               Damage -from SGWH has generally been pocket will suddenly condense, creating a                             confined to the feedring and its supports and localized depressurization instantaneously.                           to the steam generator feedwater nozzle "Theresulting pressure imbalance across the                           region. However, damage to feedwater line slug (approximately 700 psi at SONGS-i)                               snubbers and supports has also occurred. An causes the slug to accelerate away from the                           SGWH resulted in a fractured weld in a source of pressure and toward the region of,-.                       feedwater line at Indian Point Nuclear Power
.promotes significant heat transfer between the:
*.:
steam and colder water. Figure 7.3-1 illus trates in simplified form the flow conditions which would come about during the refilling of a voided horizontal feedwater line. Once slug flow conditions commence, a steam pocket will suddenly condense, creating a localized depressurization instantaneously.  
* condensation.-*                                       .              Plant Unit 2 in 1972.
"The resulting pressure imbalance across the slug (approximately 700 psi at SONGS-i) causes the slug to accelerate away from the source of pressure and toward the region of,-.
Condensation is extremely rapid, and predict                 7.3.3 San Onofre Water. Hammer Inci ing its exact location is impossible. When the
condensation.-*
* dent .
Condensation is extremely rapid, and predict ing its exact location is impossible. When the water slug suddenly strikes water in a previ ously filled pipe, it produces a traveling pressure wave which imposes loads of the magnitude that would be induced by classical water hammer in the piping network. This phenomenon, called condensation-induced water hammer, occurred at SONGS-1.
      -  . water slug suddenly strikes water in a previ
occurred principally, in pressurized water reactors (PWRs) with,steam generators
      -      ously filled pipe, it produces a traveling                           San Onofre Nuclear Generating Station Unit pressure wave which imposes loads of the                     1, operated by the Southern California Edison magnitude that would be induced by classical                  Company (SCE), is a 450-MWe Westinghouse water hammer in the piping network. This                      pressurized water reactor located on the Pacific phenomenon, called condensation-induced                      Ocean, approximately four miles south of San water hammer, occurred at SONGS-1.                          Clemente, California. The plant received an NRC S-. -            ,        :'operating license in
,,,having top feedrings for feedwater injection.
The underlying causes are similar to those
-; discussed above (i.e., the voiding of the horizontal feedring and feedwater piping immediately adjacent to the steam generator and the subsequent injection of cold water).
Damage -from SGWH has generally been confined to the feedring and its supports and to the steam generator feedwater nozzle region. However, damage to feedwater line snubbers and supports has also occurred. An SGWH resulted in a fractured weld in a feedwater line at Indian Point Nuclear Power Plant Unit 2 in 1972.
7.3.3 San Onofre Water. Hammer Inci
* dent.
San Onofre Nuclear Generating Station Unit 1, operated by the Southern California Edison Company (SCE), is a 450-MWe Westinghouse pressurized water reactor located on the Pacific Ocean, approximately four miles south of San Clemente, California. The plant received an NRC S-
:'operating license in
* I.
* I.
Predicting loads associated       with this type of water hammer is extremely difficult because. -                        At 4:51 a.m.-on November 21, 1985, with of the interactive and complex hydrodynaamic                 the plant operating at 60 percent power, a ground and heat transfer phenomena which precede -:fault was detected by protective relays associated
Predicting loads associated with this type of water hammer is extremely difficult because.
            -the sudden condensation. Yoid fraction (or,-, with a transformer which was supplying power how empty the pipe is) and subcooling (or                   to one of two safety-related 4160-V electrical how much colderthe water is than the satura- -buses (see Figure 7.3-2). The resulting isolation tion temperature of the steam when steam and* 'of the transformer caused the safety-related bus water come in contact) are two important .to de-energize and, tripped all feedwater and parameters currently used lin models for                     condensate pumps on the east side of the plant.
At 4:51 a.m.-on November 21, 1985, with of the interactive and complex hydrodynaamic the plant operating at 60 percent power, a ground and heat transfer phenomena which precede  
predicting this type of water hammer occur-                 The pumps on the.west side of the plant were rence and its associated loads.-. -                   :.,unaffected, since their power was supplied from S,.,         *                  ..another bus.:The continued operation of the west
-:fault was detected by protective relays associated  
: 3. :."Steam generator water hammer" is a conden-, feedwater and condensate pumps, in combination Ssation-induced water hammer which has- .with the failure of the east feedwater pump
-the sudden condensation. Yoid fraction (or,-,
                                      -      -                  -    -.    -,        ,----,                      -  T.....
with a transformer which was supplying power how empty the pipe is) and subcooling (or to one of two safety-related 4160-V electrical how much colderthe water is than the satura- -buses (see Figure 7.3-2). The resulting isolation tion temperature of the steam when steam and* 'of the transformer caused the safety-related bus water come in contact) are two important  
Rtv    fl1fl U1,,
.to de-energize and, tripped all feedwater and parameters currently used lin models for condensate pumps on the east side of the plant.
USNRC Technical Training Center                 S.. .. I * .,* -- ,.* '                                       Rev   0176
predicting this type of water hammer occur-The pumps on the.west side of the plant were rence and its associated loads.-. -
:.,unaffected, since their power was supplied from S,.,  
..another bus.:The continued operation of the west
: 3. :."Steam generator water hammer" is a conden-,
feedwater and condensate pumps, in combination Ssation-induced water hammer which has-.with the failure of the east feedwater pump T.....
fl1fl
Rtv U1,,
USNRC Technical Training Center S.... I *.,* -,.* '
.Westinghouse Technology-Advanced Manual -
, Water Hammer at San Onofre Rev 0176


Westinghouse Technology Advanced Manual                                       Water Hammer at San Onofre Westinghouse Technology Advanced Manual                                      Water Hammer at San Onofre discharge check valve to close, resulted in the         Later, operators isolated the feedwater lines from overpressurization and rupture of an east-side           the steam generators, as required by procedure, flash evaporator low pressure heater unit. The           which resulted in refilling the feedwater lines in operators, as required by emergency procedures           the containment building. Before all feedwater dealing with electrical systems, tripped the             lines'were refilled, a severe water hammer reactor and turbine-generator. As a result, the         occurred that bent and cracked one feedwater plant experienced its first complete loss of steam       pipe in the containment building, damaged its generator feedwater and in-plant ac electrical         associated pipe supports and snubbers, broke a power since it began operation.                         feedwater, control valve actuator yoke, and stretched the studs, lifted the bonnet, and blew The subsequent four-minute loss of in-plant         the gasket' of a four-in. feedwater check valve.
Westinghouse Technology Advanced Manual Water Hammer at San Onofre discharge check valve to close, resulted in the overpressurization and rupture of an east-side flash evaporator low pressure heater unit. The operators, as required by emergency procedures dealing with electrical systems, tripped the reactor and turbine-generator. As a result, the plant experienced its first complete loss of steam generator feedwater and in-plant ac electrical power since it began operation.
electrical power started 'the, emergency diesel         The damaged check valve developed a significant generators (which by design did not load), de           steam/water leak, the second leak in the event.
The subsequent four-minute loss of in-plant electrical power started 'the, emergency diesel generators (which by design did not load), de energized all safety-related pumps and motors, significantly reduced the number of control room instruments available, produced spurious indica tions of safety injection system actuation, and caused the NRC red phone on thie operator's desk to ring. Restoration of in-plant electric power was delayed by the unexpected response of an automatic sequence that should have established conditions for delayed remote-manual access to offsite power still available in the switchyard.
energized all safety-related pumps and motors, significantly reduced the number of control room             Despite these problems, operators later instruments available, produced spurious indica         succeeded in recovering level indications in the tions of safety injection system actuation, and         two steam generators not directly associated with caused the NRC red phone on thie operator's             the feedwater piping leak. With the re-establish desk to ring. Restoration of in-plant electric         ment of steam generator levels, the operators power was delayed by the unexpected response           safely brought the plant to a stable cold shutdown of an automatic sequence that should have               condition, without a significant release of radio established conditions for delayed remote-manual       activity to the environment (an existing primary access to offsite power still available in the         to-secondary' leak was not exacerbated) and switchyard.                                            without significant additional damage to plant equipment.
The loss of steam generator feedwater was the direct result of the loss of p6wer to the two main feedwater and one auxiliary feedwater pump motors, and the designed three-minute startup delay of the steam-powered auxiliary feedwater pump. The loss of the feedwater pumps, in combinationrwith the failure of four additional feedwater check valves to close,  
The loss of steam generator feedwater was the direct result of the loss of p6wer to the two           A brief description of how the SONGS-1 main feedwater and one auxiliary feedwater             mechanical-and electrical systems involved in this pump motors, and the designed three-minute             event function-and interact is provided. Under startup delay of the steam-powered auxiliary             standing the major differences between this plant feedwater pump. The loss of the feedwater               and more recently designed pressurized water pumps, in combinationrwith the failure of four         reactors will clarify the basis for operator actions.
'allowed the loss of ihvdhit6ry from all three steam generators and the partial voiding of the long horizontal runs 6f fe~dwateirpiping Within the containment building. The subseq uent automatic start of feedwater injection by tlie'steam-powered auxiliary feed waier'pmpuni did not result in the recovery of steiam generator levels because the "backflow of steam and water to "the leak in the evaporator carried the'auxiliary feedwater with it.
additional feedwater check valves to close,
Later, operators isolated the feedwater lines from the steam generators, as required by procedure, which resulted in refilling the feedwater lines in the containment building. Before all feedwater lines'were refilled, a severe water hammer occurred that bent and cracked one feedwater pipe in the containment building, damaged its associated pipe supports and snubbers, broke a feedwater, control valve actuator yoke, and stretched the studs, lifted the bonnet, and blew the gasket' of a four-in. feedwater check valve.
'allowed the loss of ihvdhit6ry from all three steam       7.3.4 Plant Conditions Leading to Water generators and the partial voiding of the long                   Hammer horizontal runs 6f fe~dwateirpiping Within the containment building. The subseq uent automatic             The plant conditions at SONGS-I which led start of feedwater injection by tlie'steam-powered       to a steam condensation-induced water hammer auxiliary feed waier'pmpuni did not result in the       included the voiding of long horizontal lengths of recovery of steiam generator levels because the         feedwater lines, which allowed the backflow of "backflow of steam and water to "the leak in the         steam from all steam generators before operators evaporator carried the'auxiliary feedwater with it.     isolated the FW lines (by closing motor-operated 7.3-4                                           Rev 0196 USNRC USNRC Technical     Training Center Technical Training  Center            7 .3-4                                           Rev 0196
The damaged check valve developed a significant steam/water leak, the second leak in the event.
Despite these problems, operators later succeeded in recovering level indications in the two steam generators not directly associated with the feedwater piping leak. With the re-establish ment of steam generator levels, the operators safely brought the plant to a stable cold shutdown condition, without a significant release of radio activity to the environment (an existing primary to-secondary' leak was not exacerbated) and without significant additional damage to plant equipment.
A brief description of how the SONGS-1 mechanical-and electrical systems involved in this event function-and interact is provided. Under standing the major differences between this plant and more recently designed pressurized water reactors will clarify the basis for operator actions.
7.3.4 Plant Conditions Leading to Water Hammer The plant conditions at SONGS-I which led to a steam condensation-induced water hammer included the voiding of long horizontal lengths of feedwater lines, which allowed the backflow of steam from all steam generators before operators isolated the FW lines (by closing motor-operated USNRC Technical Training Center 7.3-4 Rev 0196 USNRC Technical Training Center Westinghouse Technology Advanced Manual Water Hammer at San Onofre 7.3-4 Rev 0196


Westinghouse Technologiy Ailvanced Manual                                        - ,Water Hammer at San Onofre Westin!house Technoloav Advanced Manual                                             Water Hammer at San Onofre valves MOV-20, 21, and 22), and the subsequent               steam generators by the steam blowing down refilling of the FW lines with relatively cold (i.e.,         through the failed check valves in all three FW
Westin!house Technoloav Advanced Manual Water Hammer at San Onofre valves MOV-20, 21, and 22), and the subsequent refilling of the FW lines with relatively cold (i.e.,
:less than 100*F) AFW. Figures 7.3-3, 7.3-4,                   control stations and out the leak in the flash 7.3-5, 7.3-6, 7.3-7. and 7.3-8 illustrate the                 evaporator.
:less than 100*F) AFW. Figures 7.3-3, 7.3-4, 7.3-5, 7.3-6, 7.3-7. and 7.3-8 illustrate the Sflowpaths, valves and other equipment affected by this water hammer.
Sflowpaths, valves and other equipment affected by this water hammer.                                               Following restoration of unit-power, the motor-driven AFW pump started automatically, Upon detection of the fault on the C auxiliary           increasing the indicated -AFW, flow rate to a transformer, relay-protection de-energized 4.16               preset rate of 155 gpm per steam generator.
Upon detection of the fault on the C auxiliary transformer, relay-protection de-energized 4.16 kV bus 2C, de-energizing east-side main feedwater - (MFW) pump FWS-G-3A.
,            kV bus 2C, de-energizing east-side main                       However, all three steam generator levels contin feedwater - (MFW) pump FWS-G-3A. The                         ued to drop since the FW check valves remained continued operation of west-side MFW pump                     open, the main steam -system had not been FWS-G-3B, due to the unusual electrical align-,             jisolated, and steam generator blowdown had not ment, combined with the -failure of east-side                 been isolated.. Subsequently, in accordance with MFW pump discharge check valve FWS-438 to,,                   an emergency operating procedure for reactor trip K-S        ,,seat; resulted in the overpressurization and failure           response, operators isolated the failed FW check of the east flash evaporator tube and shell. The               valves by shutting the three FW control isolation
The continued operation of west-side MFW pump FWS-G-3B, due to the unusual electrical align-,
      - -subsequent unit trip de-energized the west-side                   valves, MOV-20, 21, and 22, at approximately
ment, combined with the -failure of east-side MFW pump discharge check valve FWS-438 to,,
            .MFW pump and denied power to electric-driven                 4:55 -a.m.-, Isolation of the feedwater trains
S K-  
    -       -AFWpump AFW-G-1OS. -With the cessation of                     occurred before the water hammer in the FW line "flowto the steam generators, the failure of check           to SG B.
,,seat; resulted in the overpressurization and failure of the east flash evaporator tube and shell. The  
valve FWS-438, and the failure of the check
- -subsequent unit trip de-energized the west-side  
* valves in the SG feedwater supply lines (valves                       Subsequent to the,isolation of the main FW FWS-346, FWS-345, and FWS-398), a path                       lines, and recognition in the control Iroom that was provided for the blowdown of all three                   -both      AFW pumps were delivering water, the
.MFW pump and denied power to electric-driven  
        ,:-,steam-
-AFW pump AFW-G-1OS. -With the cessation of "flow to the steam generators, the failure of check valve FWS-438, and the failure of the check
          -'          generators through their respective             -operators      became concerned about overcooling of feedwater lines to the atmosphere through the                 the reactor coolant system and the decrease in
* valves in the SG feedwater supply lines (valves FWS-346, FWS-345, and FWS-398), a path was provided for the blowdown of all three  
          'failed flash evaporator.'                                       pressurizer level, The operators decreased the AFW flows from 155 gpm to zero,.and then The drop in the steam generator water levels             increased them to 40 gpm. Refilling the FW
,: -,steam-generators through their respective feedwater lines to the atmosphere through the  
          *, following the unit trip initiated the AFW system,             lines downstream of the flow control stations Sbut the electric pump was de-energized, and                     was thus halted and then resumed at a much steam-driven AFW pump AFW-G-10 took 3.5                       lower flow rate.
'failed flash evaporator.'
minutes to deliver flow because of a programmed warmup period for the turbine. Thus, for three               cnThe slow refilling of the FW lines within the to four minutes 'no flow was being provided to "containmentbuilding continued from when AFW the steam generators, ,and ,the leaking check                 flow was first throttled to when the water ham valves permitted the horizontal feedwater lines to       -    mer was reported to have occurred seven minutes void. Further, the initiation of AFW.flow at a               later by a plant equipment operator. As noted rate of about 135 gpm from the steam-driven                   previously, conditions conducive to steam pump was not effective in halting the voiding,               condensation-induced water hammer in the
The drop in the steam generator water levels  
      -       because flow was being carried away from the : feedwater lines were present for quite some time.
*, following the unit trip initiated the AFW system, Sbut the electric pump was de-energized, and steam-driven AFW pump AFW-G-10 took 3.5 minutes to deliver flow because of a programmed warmup period for the turbine. Thus, for three to four minutes 'no flow was being provided to the steam generators,,and,the leaking check valves permitted the horizontal feedwater lines to void. Further, the initiation of AFW.flow at a rate of about 135 gpm from the steam-driven pump was not effective in halting the voiding, because flow was being carried away from the steam generators by the steam blowing down through the failed check valves in all three FW control stations and out the leak in the flash evaporator.
S. .. ..        .    .  .- ' *'        P   ..    . . .. ..                  . .l*_. a i rflt R*e&#xa5;     U17LY0 USNRC Technical Training Center               =..-
Following restoration of unit-power, the motor-driven AFW pump started automatically, increasing the indicated -AFW, flow rate to a preset rate of 155 gpm per steam generator.
However, all three steam generator levels contin ued to drop since the FW check valves remained open, the main steam -system had not been jisolated, and steam generator blowdown had not been isolated.. Subsequently, in accordance with an emergency operating procedure for reactor trip response, operators isolated the failed FW check valves by shutting the three FW control isolation valves, MOV-20, 21, and 22, at approximately 4:55 -a.m.-, Isolation of the feedwater trains occurred before the water hammer in the FW line to SG B.
Subsequent to the,isolation of the main FW lines, and recognition in the control Iroom that
-both AFW pumps were delivering water, the  
-operators became concerned about overcooling of the reactor coolant system and the decrease in pressurizer level, The operators decreased the AFW flows from 155 gpm to zero,.and then increased them to 40 gpm. Refilling the FW lines downstream of the flow control stations was thus halted and then resumed at a much lower flow rate.
cnThe slow refilling of the FW lines within the "containment building continued from when AFW flow was first throttled to when the water ham mer was reported to have occurred seven minutes later by a plant equipment operator. As noted previously, conditions conducive to steam condensation-induced water hammer in the
: feedwater lines were present for quite some time.
S.
P  
.l*_. a i rflt R*e&#xa5; U17LY0 USNRC Technical Training Center  
=..-
Westinghouse Technologiy Ailvanced Manual
-,Water Hammer at San Onofre


I Westinghouse Technology Advanced Manual                                    Water Hammer at San Onofre Westinghouse Technology     Advanced Manual                               Water Hammer at San Onofre The gross failure of upstream check valves,           large to damage pipe supports and piping and to which permitted water to, drain from the               transmit loads through the containment building feedwater lines and be replaced with steam, was       penetration structure outward to the'loop B the underlying cause for water hammer. Leaky          feedwater regulating station. No damage was check valves have been previously cited in            evident tO-the steam generator B feedring or reports of other water hammer occurrences. Five        nozzle region that can be attributed to water check valves are known to have been failed            hammer, nor was there evident damage to or during the SONGS-I event.                              movement of the piping between support HOOC and the steam generator B feedwater nozzle.
Westinghouse Technology Advanced Manual Water Hammer at San Onofre The gross failure of upstream check valves, which permitted water to, drain from the feedwater lines and be replaced with steam, was the underlying cause for water hammer. Leaky check valves have been previously cited in reports of other water hammer occurrences. Five check valves are known to have been failed during the SONGS-I event.
7.3.5 Water Hammer-Induced Damage                      Table 7.3-1 and Figures 7.3-9 and 7.3-10 illustrate the piping and support damage.
7.3.5 Water Hammer-Induced Damage The following sections detail water hammer induced damage to loop B feedwater piping and supports, to the loop B FW flow'control station, and to the loop B AFW piping and-describe the existing damage to feedwater system check valves.
The following sections detail water hammer induced damage to loop B feedwater piping and          7.3.5.2     Feedwater Loop B Flow Con supports, to the loop B FW flow'control station,                    trol'Station Damage and to the loop B AFW piping and-describe the existing damage to feedwater system check                  Figure 7.3-11 shows the typical internal valves.                                                arrangement of a swing check valve.' The water hammer originating in the feedwater line within 7.3.5.1    Piping and Piping Support                  the containment building generated a'water slug Damage                                      which transmitted a pressure wave upstream to the loop Bflow control station. Check valves Damage to the loop B FW piping was con            FWS-346 and FWS-378, downstream of the fined to plastic yielding of the-northeast elbowv      control valves, were designed to prevent and to a visible crack on the outside of 'the pipe,    backflow,' although post-event inspection re extending approximately 80 inches axially. The          vealed that the closure disk for FWS-346 (see crack penetrated approximately 30 percent of the        Figure 7.3-12) was lying in the bottom of the pipe wall at its deepest point froim the outside and    valve chamber. Thus, any closed valve upstream approximately 25 percent on average.' Damage to        of the check valve would be subjected to the supports was severe in some instafi6es. This          water hammer loads. In addition to check valve siction provides a description of the damage          FWS-378, flow control valve FCV-457 and visible after the FW' piping insulation was re        m~tor-operated valve MOV-20 were subjected to moved.                                                the water hammer loads; because they had been closed' by operators following the emergency Figure 7.3-9 shows the loop B FW piping            operating procedures.
7.3.5.1 Piping and Piping Support Damage Damage to the loop B FW piping was con fined to plastic yielding of the-northeast elbowv and to a visible crack on the outside of 'the pipe, extending approximately 80 inches axially. The crack penetrated approximately 30 percent of the pipe wall at its deepest point froim the outside and approximately 25 percent on average.' Damage to supports was severe in some instafi6es. This siction provides a description of the damage visible after the FW' piping insulation was re moved.
layout and identifies the piping support stations where damage occurred. This figure also pro                Because check valve FWS-378 was intact vides directional orientation and indicates piping    and operational, it was subjected to water ham dimensions. Figure 7.3-10 shows principal              mer'loads and absorbed much of the water areas' of damage and indicates how the pipe            hammer energy,' whereupon the bonnet studs moved.                                                yielded and the gasket was forced outward against the studs. The failure of the gasket The water hammer forces were sufficiently          relieved much of the internal pressure, thereby 7.3-6                                       Rev 0196 Training Center USNRC Technical Training       Center           7.3-6                                       Rev 0196
Figure 7.3-9 shows the loop B FW piping layout and identifies the piping support stations where damage occurred. This figure also pro vides directional orientation and indicates piping dimensions.
Figure 7.3-10 shows principal areas' of damage and indicates how the pipe moved.
The water hammer forces were sufficiently large to damage pipe supports and piping and to transmit loads through the containment building penetration structure outward to the'loop B feedwater regulating station. No damage was evident tO-the steam generator B feedring or nozzle region that can be attributed to water hammer, nor was there evident damage to or movement of the piping between support HOOC and the steam generator B feedwater nozzle.
Table 7.3-1 and Figures 7.3-9 and 7.3-10 illustrate the piping and support damage.
7.3.5.2 Feedwater Loop B Flow Con trol'Station Damage Figure 7.3-11 shows the typical internal arrangement of a swing check valve.' The water hammer originating in the feedwater line within the containment building generated a'water slug which transmitted a pressure wave upstream to the loop Bflow control station. Check valves FWS-346 and FWS-378, downstream of the control valves, were designed to prevent backflow,' although post-event inspection re vealed that the closure disk for FWS-346 (see Figure 7.3-12) was lying in the bottom of the valve chamber. Thus, any closed valve upstream of the check valve would be subjected to the water hammer loads. In addition to check valve FWS-378, flow control valve FCV-457 and m~tor-operated valve MOV-20 were subjected to the water hammer loads; because they had been closed' by operators following the emergency operating procedures.
Because check valve FWS-378 was intact and operational, it was subjected to water ham mer'loads and absorbed much of the water hammer energy,' whereupon the bonnet studs yielded and the gasket was forced outward against the studs. The failure of the gasket relieved much of the internal pressure, thereby USNRC Technical Training Center 7.3-6 Rev 0196 Rev 0196 I
Westinghouse Technology Advanced Manual Water Hammer at San Onofre USNRC Technical Training Center 7.3-6


,I- . Westinghouse Technology -Advanced Manual ,
Wesingous TehnoogyAdvnce Maual-  
* Wesingous     TehnoogyAdvnce Maual-                                     -Water   Hammer at San Onofre
-Water Hammer at San Onofre
        - minimizing damage. to other equipment andI                        plant operation shall be on -a frequency valves at this station. Valve FCV-457 did incuir                  determined by the intervals between shut
- minimizing damage. to other equipment and valves at this station. Valve FCV-457 did incui
      . damage to the flow-actuator yoke and a ben, t                     -downs as follows:, for intervals of 3 months
. damage to the flow-actuator yoke and a ben,  
-    -valve      stem.    ,                                      -        or longer, exercise during each shutdown; for intervals of less than 3 months, full-stroke 7.3.5.3      AFW Piping Damage                              , -.exercise is not required unless 3 months have passed since last shutdown exercise.
-valve stem.,
The AFW injection points to the mair
7.3.5.3 AFW Piping Damage The AFW injection points to the mair
        -feedwater piping at SONGS-1 lie in the "breeze -                    Additionally, the NRC staff position on cold way" upstream of the containment building steel1          shutdown testing of valves is as follows:
-feedwater piping at SONGS-1 lie in the "breeze way" upstream of the containment building steel shell. The AFW, lines run horizontally and ther vertically to tie into the main feedwater lines, Water hammer loads were imposed on AFW loo1 B piping.. Although pipe movement extended several -hundred feet upstream, there was nc evidence of piping damage.
shell. The AFW, lines run horizontally and ther vertically to tie into the main feedwater lines,
7.3.5.4 Valve Malfunctions Post-event disassembly and examination ou valves that contributed to water hammer condi.
* 1. -The licensee is to commence testing as Water hammer loads were imposed on AFW loo1
tions confirmed that check valve failures were the underlying causes forthe occurrence of watel hammer. Inspection findings identified the valvt conditions listed in Table 7.3-2.
* soon-as the cold shutdown condition is B piping.. Although pipe movement extendedI                              achieved, but not later than 48 hours after several -hundred feet upstream, there was nc                              shutdown, and continue until complete or evidence of piping damage.                                                until the plant is ready to return to power.
7.3.6. Valve In-Service Testing, The ASME Boiler and Pressure Vessel Code Section-XI, which specifies valve in-service testing, (IST), requirements for valves like tht SONGS-1 feedwater check valves, states:
7.3.5.4 Valve Malfunctions                                    -   2. Completion of all valve testing is not a prerequisite for returning to power.
Valves shall be.exercised to the positior required to fulfill their function unless sucl operation is not practical during plant opera.
Post-event disassembly and examination ouf valves that contributed to water hammer condi.                    3. Any testing not completed during one tions confirmed that check valve failures were the                        cold shutdown should be performed underlying causes forthe occurrence of watel r                       -:   during any subsequent cold shutdowns, hammer. Inspection findings identified the valvt          S               5starting from the last test performed at the conditions listed in Table 7.3-2.                        S       .-    previous cold shutdown.
tion.... Valves that cannot be exercisec during plant operation shall be specificall3
7.3.6. Valve In-Service Testing,                                  All feedwater system check valves are period
. identified by the owner and shall be full stroke exercised during cold shutdowns Full-stroke exercising during cold shutdown for all valves not full-stroke exercised durinf I
                                                                  -  ically tested in the closed position. The main and The ASME Boiler and Pressure Vessel Code              bypass feedwater regulating check valves are Section- XI, which specifies valve in-service              normally tested in cold shutdown (mode 5) and testing, (IST), requirements for valves like tht          .the feedwater pump discharge check valves are SONGS-1 feedwater check valves, states:                    tested in hot standby (mode 3).
plant operation shall be on -a frequency r
Valves shall be.exercised to the positior 1-               7There
determined by the intervals between shut t  
                                                                                !      are 121 valves that are subject to IST required to fulfill their function unless suclh, during. cold shutdown. Although IST was operation is not practical during plant opera.        performed during each outage, all of the valves tion.... Valves that cannot be exercisecI were not tested. Consequently, the feedwater during plant operation shall be specificall3 -,valves had been tested only one time since
-downs as follows:, for intervals of 3 months or longer, exercise during each shutdown; for intervals of less than 3 months, full-stroke  
              . identified by the owner and shall be full -          October 1984. The available opportunities for stroke exercised during cold shutdowns                valve 1ST were not always fully utilized due to Full-stroke exercising during cold shutdown    s     higher priority operational requirements.
, -.exercise is not required unless 3 months have passed since last shutdown exercise.
          ,. for all valves not full-stroke exercised durinf 7.3                                                     Rev 0196 USNRC Technical
Additionally, the NRC staff position on cold 1
_.. ."USNRC                   Training Center Technical Training   Center           7.3              m                                    -Rev. 0196
shutdown testing of valves is as follows:
* 1. -The licensee is to commence testing as soon-as the cold shutdown condition is I
achieved, but not later than 48 hours after shutdown, and continue until complete or until the plant is ready to return to power.  
- 2. Completion of all valve testing is not a prerequisite for returning to power.
f
: 3. Any testing not completed during one cold shutdown should be performed r  
-: during any subsequent cold shutdowns, S
5starting from the last test performed at the S
previous cold shutdown.
All feedwater system check valves are period ically tested in the closed position. The main and bypass feedwater regulating check valves are normally tested in cold shutdown (mode 5) and  
.the feedwater pump discharge check valves are tested in hot standby (mode 3).
1-7 !
There are 121 valves that are subject to IST h, during. cold shutdown.
Although IST was performed during each outage, all of the valves I
were not tested. Consequently, the feedwater  
-,valves had been tested only one time since October 1984. The available opportunities for valve 1ST were not always fully utilized due to s
higher priority operational requirements.
USNRC Technical Training Center 7.3 Rev 0196 7.3 m
-Rev.
0196 Westinghouse Technology -Advanced Manual,
* I
_..."USNRC Technical Training Center


Westinghouse Techiiology Advanced Manual,                                      Water Hammer at San Onofre Westinghouse Technology Advanced Manual                                       Water Hammer at San Onofre Surveillance' test procedures for verification       made that "little or no flow" has occurred.
Westinghouse Technology Advanced Manual Water Hammer at San Onofre Surveillance' test procedures for verification of check valve closure for the main feed pump discharge check valves, (FWS-438 and FWS 439) require one main feed pump to be running while the other pump is stopped. The discharge valve at the idle pump is then opened and the pressure is monitored between' the pump and its discharge check valve. An increase in pressure or an operator observation that the pump is rotating backwards would indicate that the check valve is not closed. While providing reasonable assurance of check valve cl6oure, this testing method also subjects the' low pressure pump suction piping to some relatively high pressures if the check valve fails to close (as in the Novem ber 1985 event), and thus'damage is possible to such components as the flash evaporator.
of check valve closure for the main feed pump discharge check valves, (FWS-438 and FWS                       Valves FWS-345 and FWS-346 failed the 439) require one main feed pump to be running             IST on February 24, 1985, when tested during while the other pump is stopped. The discharge           mode 5 (cold shutdown). Maintenance work valve at the idle pump is then opened and the             orders were prepared to repair both valves.
Testing with the idle pump suction valve shut would provide a more rigorous test.
pressure is monitored between' the pump and its           However, on February 26, 1985, "Non-routine discharge check valve. An increase in pressure           and Increased Frequency IST" was performed or an operator observation that the pump is               during mode 3 (hot standby), and' the valves rotating backwards would indicate that the check         passed. During mode 3 the steam generator valve is not closed. While providing reasonable           pressure increased the differential pressure assurance of check valve cl6oure, this testing           available to seat the check valves (to approxi method also subjects the' low pressure pump               mately 700 psi) and thereby enabled them to suction piping to some relatively high pressures         pass. The work orders were then cancelled, and if the check valve fails to close (as in the Novem       no corrective maintenance was performed.
Surveillance test procedures for verifying closure of other main feedw'ater check valves require testing to be performed during cold shutdown with the steam generators filled to a level above the feedrings. The motor-operated valve upstream of each check valve is closed, and the drain valve between this valve 'and the associ ated check valve is opeiied. 'The column of water in the steam generator -provides approximately 4.5 psi of differential pressure across the valve to provide the closing force on the check valve disc.
ber 1985 event), and thus'damage is possible to such components as the flash evaporator.                 7.3.7 Valve Failure Findings Testing with the idle pump suction valve shut would provide a more rigorous test.                             Check valve failures caused by partial disas sembly 'while in service do not appear to be Surveillance test procedures for verifying         unique to SONGS-1 or to the valve manufacturer closure of other main feedw'ater check valves             (MCC Pacific). A limited review of licensee require testing to be performed during cold               event reports (LERs) indicates that these valve shutdown with the steam generators filled to a           failures are not unique.
The procedure states that the 'section of piping between the motor-operated valve and check valve is to be drained, and that "little or no flow" from the drain should be v-erifie'd.
level above the feedrings. The motor-operated valve upstream of each check valve is closed, and               Failures of FWS-438 and FWS-439, the the drain valve between this valve 'and the associ         main feed pump'discharge check valves, may ated check valve is opeiied. 'The column of water         have been due to inadequate valve design, since in the steam generator -provides approximately           the disc-retaining nut of each valve was not 4.5 psi of differential pressure across the valve to       provided with a positive locking device that provide the closing force on the check valve disc.       should have reduced the probability of the disc The procedure states that the 'section of piping         working loose, wedging into the valve seat, and between the motor-operated valve and check               failing open. Additionally, excessive clearances valve is to be drained, and that "little or no flow"     between the hinge and disc assemblies allowed from the drain should be v-erifie'd. This test           the discs to rotate past the anti-rotation devices.
This test procedure leaves the 'surveillance operator to "make the decision about how much flow is "little" and thus indicative of positive verification of chieck valve closure. The IST records do not provide a means of determining whether flow occurs or its extent, or for verifying complete valve cavity drainage before a determination is made that "little or no flow" has occurred.
procedure leaves the 'surveillance operator to "make the decision about how much flow is                     The, failure of FWS-346, the B feedwater "little" and thus indicative of positive verification    header check'valve, may have been caused by the of chieck valve closure. The IST records do not          inadequate hardness of the disc-attaching stud, provide a means of determining whether flow              which allowed the threads to strip and the end to occurs or its extent, or for verifying complete          mushroom over, conditions contributing to the valve cavity drainage before a determination is          ultimate valve' failure. However, the service USNRC Technical Training Center                    n7.3-8                                           Rev 0196
Valves FWS-345 and FWS-346 failed the IST on February 24, 1985, when tested during mode 5 (cold shutdown). Maintenance work orders were prepared to repair both valves.
However, on February 26, 1985, "Non-routine and Increased Frequency IST" was performed during mode 3 (hot standby), and' the valves passed. During mode 3 the steam generator pressure increased the differential pressure available to seat the check valves (to approxi mately 700 psi) and thereby enabled them to pass. The work orders were then cancelled, and no corrective maintenance was performed.
7.3.7 Valve Failure Findings Check valve failures caused by partial disas sembly 'while in service do not appear to be unique to SONGS-1 or to the valve manufacturer (MCC Pacific). A limited review of licensee event reports (LERs) indicates that these valve failures are not unique.
Failures of FWS-438 and FWS-439, the main feed pump'discharge check valves, may have been due to inadequate valve design, since the disc-retaining nut of each valve was not provided with a positive locking device that should have reduced the probability of the disc working loose, wedging into the valve seat, and failing open. Additionally, excessive clearances between the hinge and disc assemblies allowed the discs to rotate past the anti-rotation devices.
The, failure of FWS-346, the B feedwater header check'valve, may have been caused by the inadequate hardness of the disc-attaching stud, which allowed the threads to strip and the end to mushroom over, conditions contributing to the ultimate valve' failure. However, the service n7.3-8 Rev 0196 USNRC Technical Training Center Westinghouse Techiiology Advanced Manual, Water Hammer at San Onofre


- - , Westinehouse -Technology Advanced Manual                                          W~ater Hammer-at San Onofre Westinzhouse Technolov Advanced Manual                                           Water Hammer at San Onofre conditions (i.e., flow-induced vibration) experi-.       This pressure caused a tube failure in the east enced by this valve may also have been a major           evaporator condenser. The flash evaporator shell contributor to failure. The failures of FWS-345,         was subsequently, overpressurized, resulting in and FWS-398, the A and C feedwater header               the failure of the shell.. After the loss of all in check valves, may have been due to similar               plant ac power, the remaining (west) main feed service conditions.                                     pump coasted down, and the failed main feedwater regulating valve check valves (FWS The cracks in the seating surface of FWS             345, 346, and 398) allowed backflow from all 378, the four-in, check valve in the B loop               steam generators through failed valve FWS-438 bypass line, appear to be service related. How           to the failed-tube in the east flash evaporator ever, these cracks may have been caused by the            condenser. This backflow continued until the significant forces on the valve from the water           .operators closed motor-operated ,feedwater hammer.                                                   header isolation valves MOV-20, 21, and 22, and main feedwater regulating valves FCV-456, 457, Failure of the yoke of FCV-457, the loop B           and 458.
Westinzhouse Technolov Advanced Manual Water Hammer at San Onofre conditions (i.e., flow-induced vibration) experi-.
feedwater regulating valve, was probably due to lack of sufficient support or bracing of the valve               Helium leak checks were performed on all operator during the pipe movement caused-by               east feedwater heaters, revealing no leakage water hammer loading.                                    beyond that expected from normal operation.
enced by this valve may also have been a major contributor to failure. The failures of FWS-345, and FWS-398, the A and C feedwater header check valves, may have been due to similar service conditions.
The west feedwater heaters were leak tested 7.3.8 Flash Evaporator Unit                             before the unit was returned to service. The failure of the flash evaporator had no direct safety During the event, the east condensate header         significance.          .
The cracks in the seating surface of FWS 378, the four-in, check valve in the B loop bypass line, appear to be service related. How ever, these cracks may have been caused by the significant forces on the valve from the water hammer.
was overpressurized, resulting in catastrophic Breakable -Diaphragms failure of the east flash evaporator tubes and -7.3.9 Turbine (Rupture Disks) shell. The evaporator unit is in a shell which also houses two stages of low pressure feedwater heaters and drain coolers. The flash evaporators                 During the event, steam was observed had not been used for several years, and extrac           issuing  from the low pressure turbine breakable Each low pressure turbine has four tion steam to them had been isolated. The diaphragms.
Failure of the yoke of FCV-457, the loop B feedwater regulating valve, was probably due to lack of sufficient support or bracing of the valve operator during the pipe movement caused-by water hammer loading.
evaporator condenser is part of the condensate             breakable diaphragms designed to protect the system flowpath. The design pressure of the               turbine casing from overpressurization. The flash evaporator condenser and fourth- and fifth           diaphragms, made of thin lead, are designed to point low pressure feedwater heater tubes is 350           break if the turbine exhaust pressure, normally psig, while the shell-side design pressure is 15           subatmospheric, reaches 5 psig. The diaphragms psig. The low pressure feedwater heaters were             are supported against external atmospheric in service during the water hammer event.                 pressure and normally seal the turbine casing against air in-leakage. All diaphragms were When bus 2C was de-energized and the east               intact prior to the water hammer event.
7.3.8 Flash Evaporator Unit During the event, the east condensate header was overpressurized, resulting in catastrophic failure of the east flash evaporator tubes and shell. The evaporator unit is in a shell which also houses two stages of low pressure feedwater heaters and drain coolers. The flash evaporators had not been used for several years, and extrac tion steam to them had been isolated. The evaporator condenser is part of the condensate system flowpath. The design pressure of the flash evaporator condenser and fourth-and fifth point low pressure feedwater heater tubes is 350 psig, while the shell-side design pressure is 15 psig. The low pressure feedwater heaters were in service during the water hammer event.
main feed pump tripped, failed discharge check valve FWS-438 allowed the west main feedwater                   Four of the diaphragms ruptured during the on low pressure turbine 1 and one on pump to pressurize the east condensate header. event, three Lenter .,        I
When bus 2C was de-energized and the east main feed pump tripped, failed discharge check valve FWS-438 allowed the west main feedwater pump to pressurize the east condensate header.
* 3   -   7.
This pressure caused a tube failure in the east evaporator condenser. The flash evaporator shell was subsequently, overpressurized, resulting in the failure of the shell.. After the loss of all in plant ac power, the remaining (west) main feed pump coasted down, and the failed main feedwater regulating valve check valves (FWS 345, 346, and 398) allowed backflow from all steam generators through failed valve FWS-438 to the failed-tube in the east flash evaporator condenser. This backflow continued until the  
Technical Training USNRC Technical     Training C~enter           I  o      *#                                      Rev A106
.operators closed motor-operated,feedwater header isolation valves MOV-20, 21, and 22, and main feedwater regulating valves FCV-456, 457, and 458.
Helium leak checks were performed on all east feedwater heaters, revealing no leakage beyond that expected from normal operation.
The west feedwater heaters were leak tested before the unit was returned to service. The failure of the flash evaporator had no direct safety significance.
-7.3.9 Turbine Breakable -Diaphragms (Rupture Disks)
During the event, steam was observed issuing from the low pressure turbine breakable diaphragms. Each low pressure turbine has four breakable diaphragms designed to protect the turbine casing from overpressurization. The diaphragms, made of thin lead, are designed to break if the turbine exhaust pressure, normally subatmospheric, reaches 5 psig. The diaphragms are supported against external atmospheric pressure and normally seal the turbine casing against air in-leakage.
All diaphragms were intact prior to the water hammer event.
Four of the diaphragms ruptured during the event, three on low pressure turbine 1 and one on USNRC Technical Training Lenter I
* 3 - 7.
I o
USNRC Technical Training C~enter.,
W~ater Hammer-at San Onofre
- -, Westinehouse -Technology Advanced Manual Rev A106


X_
Westinghouse Technology Advanced Manual Water Hammer at San Onofre low pressure turbine 2.
Westinghouse Technology Advanced Manual                         Water Hammer at San Onofre low pressure turbine 2. Rupture of the dia phragms is not considered unusual for conditions existing after a loss of all ac power with contin ued energy addition into the main condenser, and is of no safety significance.
Rupture of the dia phragms is not considered unusual for conditions existing after a loss of all ac power with contin ued energy addition into the main condenser, and is of no safety significance.
7.3.10       Summary On November 21, 1985, Southern California Edison's San Onofre Nuclear Generating Station Unit 1, located south of San Clemente, Califor nia, experienced a partial loss of in-plant ac electrical power while the'plant was operating at 60 percent power. Following a'manual reactor trip, the plant lost all in-plant AC power for four minutes and experienced a severe incidence of water hammer in the feedwater system which caused a leak, damaged plant equipment, and challenged the integrity of the plant's heat sink.
7.3.10 Summary On November 21, 1985, Southern California Edison's San Onofre Nuclear Generating Station Unit 1, located south of San Clemente, Califor nia, experienced a partial loss of in-plant ac electrical power while the'plant was operating at 60 percent power. Following a'manual reactor trip, the plant lost all in-plant AC power for four minutes and experienced a severe incidence of water hammer in the feedwater system which caused a leak, damaged plant equipment, and challenged the integrity of the plant's heat sink.
The most significant aspect of the event involved the failure of five safety -i'elated check valves in the feedwater system. These failures appeared in less than a year, without detection, and jeopar dized the integrity of safety systems. The event involved a number of equip'ment 'malfunctions, operator error, and proceduial deficiencies.
The most significant aspect of the event involved the failure of five safety -i'elated check valves in the feedwater system. These failures appeared in less than a year, without detection, and jeopar dized the integrity of safety systems. The event involved a number of equip'ment 'malfunctions, operator error, and proceduial deficiencies.
                                                      '2   1Ab                   R   filaIr uD.W J3 -. A1 USNRC Technical Training Center
'2 1Ab R
uD.W filaIr X_
USNRC Technical Training Center J -.
3 A1


- .Westing~house"'Teehnology          Advanced Manual        ,                          - Water Hammer at San Onofre TABLE 7.3-1
TABLE 7.3-1  
                        -Description     of-Feedwater Pipe-Damage Following SONGS-1 Water
-Description of-Feedwater Pipe-Damage Following SONGS-1 Water Hammer Support  
                                                          "-      Hammer Support               -Description of Component, Locations             - Damage. Motion, Etc.
-Description of Component, Locations  
HOOC',-                 This snubber station, the closest to the SG B, showed no visible damage or HOOB             -      pipe movement. The feedwater pipe turns vertically, and at an angle, to rise HOOA                     approximately 10 feet to mate with the SG feedwater inlet nozzle.
- Damage. Motion, Etc.
HOOD         - -    . These support stations were the first that showed damage (or movement)
HOOC',-
H005                   'caused by water hammer. Dent in pipe that resulted when the pipe hit the H006                   concrete comer and then rebounded.
This snubber station, the closest to the SG B, showed no visible damage or HOOB pipe movement. The feedwater pipe turns vertically, and at an angle, to rise HOOA approximately 10 feet to mate with the SG feedwater inlet nozzle.
HOOG                   Movement of approximately 12 inches, slippage of vertical support pads off
HOOD  
      -                      channel beam structures and downward drop of FW pipe.
. These support stations were the first that showed damage (or movement)
HOOH,                   Horizontal and vertical support pads displaced southward approximately 12 inches.
H005  
120                     Evidence of first lateral motion (eastward); deformed vertical structure, and then axial rebounding which displaced pipe supports approximately 12 inches southward.
'caused by water hammer. Dent in pipe that resulted when the pipe hit the H006 concrete comer and then rebounded.
HOOK                     Damage incurred at the support structure downstream of the southeast elbow.
HOOG Movement of approximately 12 inches, slippage of vertical support pads off channel beam structures and downward drop of FW pipe.
: HOOH, Horizontal and vertical support pads displaced southward approximately 12 inches.
120 Evidence of first lateral motion (eastward); deformed vertical structure, and then axial rebounding which displaced pipe supports approximately 12 inches southward.
HOOK Damage incurred at the support structure downstream of the southeast elbow.
The damage incurred by the structure illustrates the magnitude of pipe motion which occurred during the water hammer pulse.
The damage incurred by the structure illustrates the magnitude of pipe motion which occurred during the water hammer pulse.
HOOL                     Lateral movement (westward) of pipe which resulted in sheared vertical support structure. Concrete and support plate damaged by water hammer, nuts were loosened and bolts were missing in wall plates.
HOOL Lateral movement (westward) of pipe which resulted in sheared vertical support structure.
HOOM                     Piping and support damage just downstream of where FW B line takes a 90 degree bend to exit the containment building.
Concrete and support plate damaged by water hammer, nuts were loosened and bolts were missing in wall plates.
_. . . . .... .. . ......    .  .            Rev 0196 USNRC Technical Iraining C.,enter
HOOM Piping and support damage just downstream of where FW B line takes a 90 degree bend to exit the containment building.
Rev 0196 USNRC Technical Iraining C.,enter
.Westing~house"'Teehnology Advanced Manual
-Water Hammer at San Onofre


Water Hammer at San Onofre TABLE 7.3-2 Inspection Findings Valve                       Description                         As Found FWS-345                     MFW Reg Check                       Disc separated from hifige arm, SGA                                                             disc stud broken (threaded portion).
TABLE 7.3-2 Inspection Findings Valve Description As Found FWS-345 MFW Reg Check Disc separated from hifige arm, SGA disc stud broken (threaded portion).
FWS-346                     MFW Reg Check                       Disc separated from hingearm, SG B                                                           disc stud deformed.
FWS-346 MFW Reg Check Disc separated from hingearm, SG B disc stud deformed.
FWS-398                     MFW Reg Check                     Disc nut loose. Disc partially SG C                                                           open. Disc caught inside of seat ring.
FWS-398 MFW Reg Check Disc nut loose. Disc partially SG C open.
FWS-438                     FWP Discharge Check                 Disc nut loose. Disc partially open. Disc caught inside of seat ring. (Figure 7.3-13)
Disc caught inside of seat ring.
FWS-439                     FWP Discharge Check                 Disc nut loose. Disc partially open. Anti-rotation lug lodged under hinge arm.
FWS-438 FWP Discharge Check Disc nut loose. Disc partially open. Disc caught inside of seat ring. (Figure 7.3-13)
USNR         T chiclTrinn                     Cntr02
FWS-439 FWP Discharge Check Disc nut loose. Disc partially open. Anti-rotation lug lodged under hinge arm.
                                        / ...j - 1/-                                         A*.*V UA31*
USNR T
USNRC Technical Training Cente
chiclTrinn Cntr02 USNRC Technical Training Cente Water Hammer at San Onofre A*.*V UA31*
/...j - 1/-


0988 CONDENSATION SURI SI   E t fl
0988 CONDENSATION SURI SI E
: a. Stop Valve Has Closed and Refill Starts       --    W b
t fl
: b. Cold Water Has Filled Bottom of Pipe               AFW FEASW
: a. Stop Valve Has Closed and Refill Starts W
: c. Pipe is Nearly Full and Surface Waves Form SllU V=*
b
: d. Slug Flow Conditions are Established         I-.FW Figure 7.3-1       Filling of a Voided Feedwater Line 7.3-13
: b. Cold Water Has Filled Bottom of Pipe AFW
: c. Pipe is Nearly Full and Surface Waves Form FEASW
: d. Slug Flow Conditions are Established I-.FW Figure 7.3-1 Filling of a Voided Feedwater Line 7.3-13 SllU V=*


PHS OUkMO a2LN2 *015 C   .0W   WIU IS21U C .5W     *1LW2 joalso, Solos
a2LN2
                                                          =S Sl
OUkMO
* isita4d   *gMoIst A OiW S1 a
*015 C  
I   =i412
.0W WIU IS21U C.5W *1LW2
                                                        *.,W3     s
joalso, Solos
                                                            -. 4,,
=S Sl
                                                  ,        -"S       ,,
* isita4d  
                                                        .pon Figure 7.3-2     San Onofre Electrical System 7.3-15
*gMoIst A OiW I =i412  
*.,W3 s
4,,  
-"S  
.pon Figure 7.3-2 San Onofre Electrical System 7.3-15 PHS S1 a


0988 II'11!a 2"=
0988 I I'11!a 2"=
N                                           N I
N I 2
2 I
N I 2
2 S=
S=
ia I
II I
I' If II U
S I
I          U' IN$!
U' IN$!
C 5
ii a
S                        I I
Figure 7.3-3 Condensate System 7.3-17 ia I
ii U
I' If U
a Figure 7.3-3     Condensate System 7.3-17
C 5 I
U


0988 Figure 7.3-4   Main Feed System 7.3-19
0988 Figure 7.3-4 Main Feed System 7.3-19


0988 Figure 7.3-5 Auxiliary Feedwater System 7.3-21
0988 Figure 7.3-5 Auxiliary Feedwater System 7.3-21


    -n CY (0
-n CY CO, (0
0 z
0 z CD CD CD OL m  
CD CD CD CO,  OL m
-n 0
    -n 0
FWS IM3 0
FWS IM3 0
(D co 01)
(D co 01)
Line 1,086: Line 1,835:
0988 La I
0988 La I
L.a E
L.a E
I I
I E
E Figure 7.3-7 SONGS-1 Loop B Steam Generator Flow Control Station 7.3-25
Figure 7.3-7 SONGS-1 Loop I
B Steam Generator Flow Control Station 7.3-25


0988
0988
            =L rVlc Figure 7.3-8 SONGS-1 Auxiliary Feedwater System 7.3-27
=L rVlc Figure 7.3-8 SONGS-1 Auxiliary Feedwater System 7.3-27


0988 40 S
0988 40 S
4            U 11 :
U 6
6 4%
11 4
Ira
4%  
            /                  ,.
/
                                            \Z FLd i1i Fiur .39   WLop       ipngad       upot ayu 7.3-29
Ira  
\\Z FLd i1i Fiur  
.39 WLop ipngad upot ayu 7.3-29


0988 2   3 I   &#xa3;
0988 2
                          !=
3 I  
BE I A' "IL                        /
&#xa3; "IL I
* I
!=
                                      /
BE
:-5
:-5 A
                                                      =/= /
I  
IS S!'
/  
ii i Figure 7.3-10   Overview of Feedwater Piping and Support Damage Due to Water Hammer 7.3-31
/
=/=  
/
S!'
IS ii i Figure 7.3-10 Overview of Feedwater Piping and Support Damage Due to Water Hammer 7.3-31


09BB VALVE SONNET BONNET STUD j
09BB VALVE SONNET BONNET STUD j
VALVE BODY Figure 7.3-11 Typical Swing Check Valve 7.3-33
VALVE BODY Figure 7.3-11 Typical Swing Check Valve 7.3-33


0981 i    ANTI-ROTATION BARS VALVE FWS- 346 AS ASSEMBLED WORN PIN HOLE PACTED PIN WORN THREADS VALVE FWS-34" AS FOUND Figure 7.3-12   Check Valve FWS-346 7.3-35
0981 ANTI-ROTATION BARS VALVE FWS-346 AS ASSEMBLED WORN PIN HOLE PACTED PIN WORN THREADS VALVE FWS-34" AS FOUND Figure 7.3-12 Check Valve FWS-346 7.3-35 i


0988
VALVE FWS-438 AS ASSEMBLED S*~ROT*ATE:
.9 -      VALVE FWS-438 AS ASSEMBLED S*~ROT*ATE:
VALVE FWS-438 AS FOUND Figure 7.3-13 Check Valve FWS-348 7.3-37 0988
VALVE FWS-438 AS FOUND Figure 7.3-13     Check Valve FWS-348 7.3-37
.9


Westinghouse Technology Advanced Manual Section 7.4 Salem Load Reduction
Westinghouse Technology Advanced Manual Section 7.4 Salem Load Reduction


Salem. Load Reduction W
W,._
vv
h-..~nuc Tr.&#xfd;h~nnl Ad~vanced Manual Sae od euto TABLE,OF CONTENTS 7.4 SALEM LOAD REDUCTION...........................................
  ,._     h-..~nuc   Tr.&#xfd;h~nnl     Ad~vanced Manual                                                   Sae       od euto TABLE ,OF CONTENTS 7.4 SALEM LOAD REDUCTION ...........................................                                                     7.4-1
7.4-1  
      .7.4.1 Introduction ...................                          ..........................                      7.4-1 7.4.2 Load Reduction ............................................                                               7.4-1 7.4.2.1       Feedwater Heater and Moisture Separator Reheater Drain Tank Level Control System Failure ...............................                                  7.4-1 7.4.2.2       Urgent Failure of the Rod Control System ...................                             7.4-1 7.4.2.3       Operation of the Steam Dump System ......................                               7.4-1 7.4.2.4       Main Steam Isolation Valves Knocked off Open Seats ...........                           7.4-2 7.4.2.5       Stuck-Open Spray Valve ..............................                                    7.4-2 7.4.2.6       Stuck-Open Steam Generator Safety Valve ..................                              7.4-2 7.4.3 Areas of Concern and Corrective Action Taken                     .......................                   7.4-2 7.4.3.1       Operation with Elevated Reactor Coolant System Temperature .....                         7.4-2 7.4.3.2     Loss of Feedwater Pump Suction Pressure ..................                               7.4-3 7.4.3.3     Resetting of Steam Dumps .............................                                   7.4-3 7.4.3.4     Operation with Stuck-Open Steam Generator Safety Valve ........                         7.4-3 7.4-3 7.4.4 Main Steam Isolation Valve Operation .............................
.7.4.1 Introduction 7.4-1 7.4.2 Load Reduction............................................
7.4.5 Summ ary ................................................                                                  7.4-3 7.4-4 7.4.6 References ...............................................
7.4-1 7.4.2.1 Feedwater Heater and Moisture Separator Reheater Drain Tank Level Control System Failure 7.4-1 7.4.2.2 Urgent Failure of the Rod Control System...................
LIST OF TABLES
7.4-1 7.4.2.3 Operation of the Steam Dump System......................
                                                                                                          .........      7.4-5 7.4-1         Sequence of Events: Salem Unit 2 Load Reduction of January 14,1982 USNRC Technical Training Center                                 I     -      -.                                 ID   AlWk 04 k
7.4-1 7.4.2.4 Main Steam Isolation Valves Knocked off Open Seats...........
7.4-2 7.4.2.5 Stuck-Open Spray Valve 7.4-2 7.4.2.6 Stuck-Open Steam Generator Safety Valve 7.4-2 7.4.3 Areas of Concern and Corrective Action Taken.......................
7.4-2 7.4.3.1 Operation with Elevated Reactor Coolant System Temperature.....
7.4-2 7.4.3.2 Loss of Feedwater Pump Suction Pressure..................
7.4-3 7.4.3.3 Resetting of Steam Dumps.............................
7.4-3 7.4.3.4 Operation with Stuck-Open Steam Generator Safety Valve........
7.4-3 7.4.4 Main Steam Isolation Valve Operation.............................
7.4-3 7.4.5 Summ ary 7.4-3 7.4.6 References 7.4-4 LIST OF TABLES 7.4-1 Sequence of Events: Salem Unit 2 Load Reduction of January 14,1982 7.4-5 USNRC Technical Training Center I
Salem. Load Reduction vv
.OLaLaI Lt UO.
it b.7 ID AlW 04 k
k


Westin'ghouse Technology Advanced Manual                                      Salem Load Reduction Westinghouse Technology   Advanced         Manual                             Salem Load Reduction LIST OF FIGURES 7.4-1   Simplified Condensate and Feed System ..............................                 7.4-7 7.4-2   Primary Parameters during Load Rejection .............................               7.4-9 7.4-3   Plant Parameters during Load Rejection ..............................               7.4-11 7.4-4  Code Safety Valve ............................................                       7.4-13 7.4-5   Main Steam Isolation Valve ......................................                   7.4-15 USNRC Technical Training Center                           7.4-ii                         Rev 0196
Westinghouse Technology Advanced Manual Salem Load Reduction LIST OF FIGURES 7.4-1 Simplified Condensate and Feed System..............................
7.4-2 Primary Parameters during Load Rejection.............................
7.4-3 Plant Parameters during Load Rejection..............................
7.4-4 Code Safety Valve............................................
7.4-5 Main Steam Isolation Valve......................................
USNRC Technical Training Center 7.4-ii 7.4-7 7.4-9 7.4-11 7.4-13 7.4-15 Rev 0196 Westin'ghouse Technology Advanced Manual Salem Load Reduction


    "-Westin-rhousi* 'Technology Advanced Manual                                                      -Salem Load -Reduction Westin2house Technolo2v       AIvanced  Manual                                                 Salem Load 'Reduction 7.4       SALEM LOAD .REDUCTION                               'resulting transient, and the operator actions.
Westin2house Technolo2v AIvanced Manual Salem Load 'Reduction 7.4 SALEM LOAD.REDUCTION "Learning Objectives:
                                                                  .,Refer to Figures 7.4-2 and 7.4-3 for graphs of "Learning Objectives:                '                              various parameters during the load reduction.
1 1. Briefly discuss the cause of the'load re tion at Salem.
: 11. Briefly discuss the cause of the'load re duc-                 ,7.4.2.1 Feedwater Heater and Moisture tion at Salem.    -        -      ,        -:  '.,,            '    Separator Reheater Drain Tank
: 2. Explain the validity of the decision to co ue operation with a stuck-open steam gei "t6i safety valve.
                                                                                      -Level Control System Failure
: 3. Discuss the changes in plant proced
: 2. Explain the validity of the decision to co ntin-               - -- :'
" which'resulted from this incident.
ue operation with a stuck-open steam geinera-                    The initiating event was a failure of the level "t6isafety valve.                                          ,control.system in the 21,feedwater heater and
' 7.4.1Intfroduction Salem Unit 2 is a four-loop Westingh "design plant. It is rated at 3411'MWt and MWe. At th&#xfd; time of the incident,,Januar 1982, the unit was operating at 97% re power with an electrical load of 1060 MWe.
                                                        -                moisture, separator -reheater drain tank. This
'condensate polishing system was in service steam generator feed pump suction pressure 330-340 psig..(Refer to Figure 7.4-1.)
: 3. Discuss the changes in plant procedlures                      failure resulted in a decrease in .-the suction
Due to previous problems associated wil heater drain system and the main feedwater I
          " which'resulted from this incident.                          pressure of the main feedwater pumps. When the temporary alarm was received, the operator
'suction pressure, a temporary low su pressure alarm was installed to give the opei a warning of a problem at 300 psig. 'The o tors w~re'to take action accordifig to establ guidelines 'for the low suction'pressure receiving the alarm.
-' '  7.4.1Intfroduction                                                took action in accordance with the guidelines by' reducing turbine power (by reducing the turbine Salem Unit 2 is a four-loop Westingh ouse                 'governor valve position limit setpoint using the "designplant. It is rated at 3411'MWt and 1158                     control pushbutton) and by bypassing the con MWe. At th&#xfd; time of the incident,,Januar y 14,                     densate polishing system.
The feedwater p o tripped if suction pressure reached 215 psig 7.4.2 Load Reduction The lbad reduction'transient was the res five separate and unrelated failures in the There were two operator actions which wer of importance. The following paragraph provide'a brief discussion of the failure
                                                                          - .I .I         "
'resulting transient, and the operator actions.  
1982, the unit was operating at 97% re actor power with an electrical load of 1060 MWe. The                     7.4.2.2 .,Urgent Failure of -the Rod
.,Refer to Figures 7.4-2 and 7.4-3 for graphs of various parameters during the load reduction.
      'condensate polishing system was in service and                                 Control System .
duc-  
steam generator feed pump suction pressureSwas 330-340 psig. .(Refer to Figure 7.4-1.)                                Upon the -reduction of secondary load, primary temperature started to increase. The Due to previous problems associated wilth the               operator manually inserted control rods to reduce heater drain system and the main feedwater Ipump                  temperature. When he did, he received an urgent
,7.4.2.1 Feedwater Heater and Moisture Separator Reheater Drain Tank  
      'suction pressure, a temporary low su ction.                       failure in the power cabinet, which placed a hold pressure alarm was installed to give the opeirators,               signal on all rods, including control bank D rods, a warning of a problem at 300 psig. 'The opera-           - controlled by that power cabinet. Since bank D tors w~re'to take action accordifig to establ ished               rods are the first to insert into the core, no rod guidelines 'for the low suction'pressure upon                   .motion other than a trip was available. The receiving the alarm. The feedwater p umps                     . operator took action to borate at 10 gpm to reduce o tripped if suction pressure reached 215 psig                . Tavg in accordance with procedure.
-Level Control System Failure ntin-nera-The initiating event was a failure of the level  
7.4.2.3     Operation of,the Steam Dump 7.4.2 Load Reduction System
,control.system in the 21,feedwater heater and moisture, separator -reheater drain tank. This lures failure resulted in a decrease in.-the suction pressure of the main feedwater pumps. When the temporary alarm was received, the operator took action in accordance with the guidelines by' reducing turbine power (by reducing the turbine ouse  
                                                      ,ult The lbad reduction'transient was the res of                     .        -      - ..      ..
'governor valve position limit setpoint using the 1158 control pushbutton) and by bypassing the con y 14, densate polishing system.
five separate and unrelated failures in the plant.                      Due to the load decrease on the turbine, the There were two operator actions which wer e also                   steam dumps were armed. When Tavg increased tofive degrees above Tref, the steam dumps of importance. The following paragraph s will-Tavg. At this time, reactor provide'a brief discussion of the failure s, the- -opened to maintain AIdf
actor
                                                              -              -                                        &#xa3;vv   ULYIJ USNRC Technical Training Center                 1. 7.4-1 7          -*                                          R~ev 019.6
-.I  
.I The 7.4.2.2., Urgent Failure of -the Rod and Control System Swas Upon the -reduction of secondary load, primary temperature started to increase. The th the operator manually inserted control rods to reduce pump temperature. When he did, he received an urgent ction.
failure in the power cabinet, which placed a hold
: rators, signal on all rods, including control bank D rods, pera- - controlled by that power cabinet. Since bank D ished rods are the first to insert into the core, no rod upon  
.motion other than a trip was available. The umps  
. operator took action to borate at 10 gpm to reduce  
. Tavg in accordance with procedure.
7.4.2.3 Operation of, the Steam Dump System  
,ult of plant.
Due to the load decrease on the turbine, the e also steam dumps were armed. When Tavg increased s will-tofive degrees above Tref, the steam dumps s, the- -opened to maintain Tavg. At this time, reactor

AIdf
&#xa3;vv ULYIJ USNRC Technical Training Center 7
: 1. 7.4-1 R~ev 019.6
"-Westin-rhousi* 'Technology Advanced Manual
-Salem Load -Reduction


Westin?-house Technology Advanced Manual                                        Salem Load Reduction Westinghouse Technology     Advanced Manual                                     Salem Load Reduction power was approximately 89%, turbine load was       izer level decrease associated with the dropping 21%,'and the flow to the steam dumps was 53%         Tavg and the influence of the spray valves. When of total steam flow. Upon entering the control       spray valve demand decreased to zero, only one room, the shift supervisor noticed the primary-to   valve indicated shut. The operator took manual turbine load imbalance and ordered the operator     control of the second valve and manually shut it.
Westinghouse Technology Advanced Manual Salem Load Reduction power was approximately 89%, turbine load was 21%,'and the flow to the steam dumps was 53%
to increase the turbine load., As turbine load was   Pressurizer pressure decreased to a minimum of increased, the dump valves started to modulate       2050 psig. Heaters were used to restore pressure closed, and Tayg became steady. The operator         to normal.
of total steam flow. Upon entering the control room, the shift supervisor noticed the primary-to turbine load imbalance and ordered the operator to increase the turbine load., As turbine load was increased, the dump valves started to modulate closed, and Tayg became steady. The operator believed the plant to be in a stable condition and reset the steam dumps., When the dumps were reset, primary power was 84%, turbine load was 38%, and the flow to the steam dumps was 20%
believed the plant to be in a stable condition and reset the steam dumps., When the dumps were 7.4.2.6 Stuck-Open Steam Generator reset, primary power was 84%, turbine load was                   Safety Valve 38%, and the flow to the steam dumps was 20%
of total steam flow (four dumps were full open, and the other eight duimps-were modulated).
of total steam flow (four dumps were full open,           Steam pressure increased enough to open the and the other eight duimps- were modulated).         steam generator safeties due to the increased Tavg Resetting the steam-dumps removed the loss-of       mentioned in section 7.4.2.4. About one hour load arming signal, which caused all steam dump     after the transient, the unit was stable except for valves to rapidly shut. Tavg peaked at 592&deg;F,       one steam generator safety valve which had stuck which resulted in an increase in pressurizer level   open. Attempts were made to reseat the safety by from 54% to 78%, and an increase in pressurizer     varying steam pressure. Lowering Tavg below pressure from 2200 psig to 2340 psig. The '.T ref to reduce steam pressure and cycling the pressurizer spray valves opened'to reduce prima    atmospheric relief valve to further reduce steam ry pressure.                                        pressure would not cause the safety valve to shut. The plant was kept at power while the 7.4.2.4 Main Steam Isolation Valves                  supervisors decided what action to take. It was Knocked 'off Open Seats                  finally decided to try to reseat the partially open safety valve. A visual check of the valve re The increase in primary Tavg which resulted      vealed that the lifting disc associated with the from shutting the steam dumps caused an in          manual lifting arm had rotated about two full crease in steam temperature and pressure on the      turns down the valve stem and prevented the secondary side. This sudden increase in pressure    valve from shutting (refer to Figure 7.4-4). The caused two main steam isolation valves (MSIVs)      manual lifting arm was removed, and the valve to be knocked 'off their fully open seats. The      shut. This action ended the transient.
Resetting the steam-dumps removed the loss-of load arming signal, which caused all steam dump valves to rapidly shut. Tavg peaked at 592&deg;F, which resulted in an increase in pressurizer level from 54% to 78%, and an increase in pressurizer pressure from 2200 psig to 2340 psig. The pressurizer spray valves opened'to reduce prima ry pressure.
operator immediately reopened the valves when he noticed the intermediate indication. Refer to    7.4.3 Areas of Concern and Corrective section 7.4.4 and Figure 7.4-5 for details con              Action Taken cerning the MSIVs.
7.4.2.4 Main Steam Isolation Valves Knocked 'off Open Seats The increase in primary Tavg which resulted from shutting the steam dumps caused an in crease in steam temperature and pressure on the secondary side. This sudden increase in pressure caused two main steam isolation valves (MSIVs) to be knocked 'off their fully open seats. The operator immediately reopened the valves when he noticed the intermediate indication. Refer to section 7.4.4 and Figure 7.4-5 for details con cerning the MSIVs.
7.4.3.1 Operation with Elevated Reac 7.4.2.5 Stuck-Open Spray Valve                                  tor Coolant System Tempera ture The combihed' effects of the increase in turbine'load and boration started to reduce Tavg.        The cause of the rod control system urgent Pressurizer pressure dropped due to the pressur-    failure was a failed firing card in the power 7.4-Z                                         Rev 0196 USNRC Technical                Center Training Center Technical Training                    7.4-2                                         Rev 0196
7.4.2.5 Stuck-Open Spray Valve The combihed' effects of the increase in turbine'load and boration started to reduce Tavg.
Pressurizer pressure dropped due to the pressur-izer level decrease associated with the dropping Tavg and the influence of the spray valves. When spray valve demand decreased to zero, only one valve indicated shut. The operator took manual control of the second valve and manually shut it.
Pressurizer pressure decreased to a minimum of 2050 psig. Heaters were used to restore pressure to normal.
7.4.2.6 Stuck-Open Steam Generator Safety Valve Steam pressure increased enough to open the steam generator safeties due to the increased Tavg mentioned in section 7.4.2.4. About one hour after the transient, the unit was stable except for one steam generator safety valve which had stuck open. Attempts were made to reseat the safety by varying steam pressure. Lowering Tavg below
'.T ref to reduce steam pressure and cycling the atmospheric relief valve to further reduce steam pressure would not cause the safety valve to shut. The plant was kept at power while the supervisors decided what action to take. It was finally decided to try to reseat the partially open safety valve. A visual check of the valve re vealed that the lifting disc associated with the manual lifting arm had rotated about two full turns down the valve stem and prevented the valve from shutting (refer to Figure 7.4-4). The manual lifting arm was removed, and the valve shut. This action ended the transient.
7.4.3 Areas of Concern and Corrective Action Taken 7.4.3.1 Operation with Elevated Reac tor Coolant System Tempera ture The cause of the rod control system urgent failure was a failed firing card in the power USNRC Technical Training Center 7.4-Z Rev 0196 Westin?-house Technology Advanced Manual Salem Load Reduction 7.4-2 USNRC Technical Training Center Rev 0196


                                                                                      -Salem  Load Reduction WpC'tin husei~   Tpv-hnnloov Advanced Manual                                           SlmLa         euto cabinet. The rod control system responded                 7.4.4 Main. Steam Isolation Valve Opera tion    ,
WpC'tin husei~
properly to this failure in that rods were inhibited from moving. When temperature reached its peak of 592&deg;F, the technical specification for                 Refer to Figure 7.4-5. The valves are 32 x maximum temperature for departure from nucle                24 x 32-in. Hopkinson parallel slide gate valves ate boiling considerations was exceeded. The                with double discs. Each is operated by means of action taken was to borate and increase turbine            an integral piston and cylinder, utilizing steam power to reduce temperature. Procedures were                within the valve and piping. -The piston, attached modified to require a plant trip if the rod control        ,to the valve stem, is at the lower.end of the cylinder when the valve is in the open position.
Tpv-hnnloov Advanced Manual SlmLa euto cabinet.
system fails and Tayg exceeds its technical specification limit.                                        It has a small orifice to permit pressure equaliza tion in the open position. A vent line from the 7.4.3.2      Loss of Feedwater Pump Suc                    upper end of the cylinder branches to two dia tion Pressure                                phragm-operated dump valves, which are con nected in parallel to provide redundant control of the main valve.
The rod control system responded properly to this failure in that rods were inhibited from moving. When temperature reached its peak of 592&deg;F, the technical specification for maximum temperature for departure from nucle ate boiling considerations was exceeded. The action taken was to borate and increase turbine power to reduce temperature. Procedures were modified to require a plant trip if the rod control system fails and Tayg exceeds its technical specification limit.
The procedures for the loss of feedwater pump suction pressure were updated to provide Upon receipt of a closure signal, the dump more guidance to the operator. A second pro posed change was to replace the existing conden            valves open and release steam from the upper side of the main valve piston, closing the valve.
7.4.3.2 Loss of Feedwater Pump Suc tion Pressure The procedures for the loss of feedwater pump suction pressure were updated to provide more guidance to the operator. A second pro posed change was to replace the existing conden sate pumps with pumps of higher head to provide better suction pressure to the main feedwater pumps.
sate pumps with pumps of higher head to provide The valve is designed to close within five sec better suction pressure to the main feedwater pumps.                                                      onds. The movement of the valve is damped at the upper end of its travel by a hydraulic cylinder Resetting of Steam Dumps                      and piston (snubber) mounted integrally on the 7.4.3.3 valve. The snubber incorporates an integral Procedures for the operation of the steam              electric motor-operated hydraulic power unit, which permits remote manual operation of the dump system were not properly reviewed by the main valve at conventional speed.
7.4.3.3 Resetting of Steam Dumps Procedures for the operation of the steam dump system were not properly reviewed by the onsite review committee. Operator training was scheduled to retrain the operators on the proper operation of the steam dump system.
onsite review committee. Operator training was scheduled to retrain the operators on the proper Each MSIV has detent mechanisms which operation of the steam dump system.
7.4.3.4 Operation with Stuck-Open Steam Generator Safety Valve The decision to continue operation with a stuck-open steam generator safety valve was a valid decision. If the plant had been shut down, it would have cooled down in an uncontrollable manner, since a stuck-open safety valve consti tutes a small, unisolable steam break.
maintain the valve in the closed or open position, Operation with Stuck-Open                      yet permit operation when a sufficient differential 7.4.3.4 Steam Generator Safety Valve                  pressure across the steam piston is established (a minimum of 100 psi) or when the valve is operated hydraulically.
7.4.4 Main. Steam Isolation Valve Opera tion Refer to Figure 7.4-5. The valves are 32 x 24 x 32-in. Hopkinson parallel slide gate valves with double discs. Each is operated by means of an integral piston and cylinder, utilizing steam within the valve and piping. -The piston, attached  
The decision to continue operation with a stuck-open steam generator safety valve was a              7.4.5 Summary valid decision. If the plant had been shut down, it would have cooled down in an uncontrollable This transient did not result in any safety manner, since a stuck-open safety valve consti concerns for the NRC. However, it does pro tutes a small, unisolable steam break.
,to the valve stem, is at the lower.end of the cylinder when the valve is in the open position.
vide a good example of how an operator can act either to solve or to compound a problem.
It has a small orifice to permit pressure equaliza tion in the open position. A vent line from the upper end of the cylinder branches to two dia phragm-operated dump valves, which are con nected in parallel to provide redundant control of the main valve.
                                                      * 'I -3 4.4-.5,                                           'D    njog USNRC Technical Training Center
Upon receipt of a closure signal, the dump valves open and release steam from the upper side of the main valve piston, closing the valve.
The valve is designed to close within five sec onds. The movement of the valve is damped at the upper end of its travel by a hydraulic cylinder and piston (snubber) mounted integrally on the valve. The snubber incorporates an integral electric motor-operated hydraulic power unit, which permits remote manual operation of the main valve at conventional speed.
Each MSIV has detent mechanisms which maintain the valve in the closed or open position, yet permit operation when a sufficient differential pressure across the steam piston is established (a minimum of 100 psi) or when the valve is operated hydraulically.
7.4.5 Summary This transient did not result in any safety concerns for the NRC. However, it does pro vide a good example of how an operator can act either to solve or to compound a problem.
USNRC Technical Training Center
* 'I -3
'D njog 4.4-.5,
-Salem Load Reduction


I
..Westinghouse Technology Advanced Manual Salem Load Reduction Resetting the steam dumps caused the transient to last longer, and the decision to operate with the stuck-open steam generator safety valve prevent ed an unnecessary transient on the plant.
..Westinghouse Technology Advanced Manual                   Salem Load Reduction Resetting the steam dumps caused the transient to last longer, and the decision to operate with the stuck-open steam generator safety valve prevent ed an unnecessary transient on the plant.
7.4.6 References
7.4.6 References
: 1. PSEG "Sequefice'of Events Report for Salem Unit 2 Load Reduction," January 14, 1982.
: 1. PSEG "Sequefice'of Events Report for Salem Unit 2 Load Reduction," January 14, 1982.
Line 1,177: Line 1,975:
: 4. NUREG/BR-0051, "Power Reactor Events,"
: 4. NUREG/BR-0051, "Power Reactor Events,"
Sept. 1984, Vol. 6, No. 2.
Sept. 1984, Vol. 6, No. 2.
i(CV UIYO USNRC Technical             Center Training Center Technical Training                  7.4-4 7.4-4 -' '            Rev Ul96
USNRC Technical Training Center 7.4-4 i(CV UIYO I
7.4-4 Rev Ul96 USNRC Technical Training Center


                                                                          ,-  Salem Load Reduction Westin housep Tecthnoloov Advanc~ed Manual                                   Sae     od     euto TABLE 7.4-1 Sequence of Events:
Westin housep Tecthnoloov Advanc~ed Manual Sae od euto TABLE 7.4-1 Sequence of Events:
Salem Unit 2 Load Reduction of January 14, 1982 Time         Event                                                   -
Salem Unit 2 Load Reduction of January 14, 1982 Time Event 0104 Slight dip in heater drain pump flow on recorder chart.
0104         Slight dip in heater drain pump flow on recorder chart.
0105 Heater drain tank high level alarm.
0105         Heater drain tank high level alarm.
0106 Intermittent, then steady main feedwater pump low suction pressure alarm (300 psig).
0106         Intermittent, then steady main feedwater pump low suction pressure alarm (300 psig).
Operator' initiated manual load reduction at EHC panel by intermittently reducing the governor valve position limit.
Operator' initiated manual load reduction at EHC panel by intermittently reducing the governor valve position limit.
Bypassed condensate polishers.
Bypassed condensate polishers.
Line 1,189: Line 1,987:
This prevented further rod motion in automatic or manual.
This prevented further rod motion in automatic or manual.
Commenced manual boration at 10 gpm.
Commenced manual boration at 10 gpm.
0107         Low suction pressure alarm cleared when polishers were completely bypassed.
0107 Low suction pressure alarm cleared when polishers were completely bypassed.
Turbine load reduction stopped at 450 MWe, continued to decrease to 230 MWe.
Turbine load reduction stopped at 450 MWe, continued to decrease to 230 MWe.
0108           High steam flow alarms due to steam dumps opening. Four steam dump
0108 High steam flow alarms due to steam dumps opening. Four steam dump  
              'valves were fully open and the remaining eight valves were modulating.
'valves were fully open and the remaining eight valves were modulating.
0109           Tavg decreasing from 582"F.
0109 Tavg decreasing from 582"F.
Main feedwater pump low suction pressure alarm (300 psig).
Main feedwater pump low suction pressure alarm (300 psig).
Shift Supervisor entered control room. Ordered turbine load increase to reduce Sprimary-to-secondary load mismatch.
Shift Supervisor entered control room. Ordered turbine load increase to reduce Sprimary-to-secondary load mismatch.
0110         Low suction pressure alarm cleared.
0110 Low suction pressure alarm cleared.
0113         Began turbine load increase.
0113 Began turbine load increase.
Steam dumps holding Tavg steady at 574"F.
Steam dumps holding Tavg steady at 574"F.
                                                -  A P     '    "'                      D..
A P  
                                                                                            - RY    A1O OLU USNRC Technical Training Center -                                                         -  e*v/ LLl
D..
A1O
- RY OLU USNRC Technical Training Center -
Salem Load Reduction e*v/
LLl


Wpcti*hnn*p                                                                Salem Load Reduction W-fitn house Technoloo-   Advanc~edManualSamLadRucin.-
W-fitn house Technoloo-Advanc~ed ManualSamLadRucin.-
TABLE 7.4-1 (CONTINUED) Sequence of Events:
TABLE 7.4-1 (CONTINUED) Sequence of Events:
Salem Unit 2 Load Reduction -of January 14, 1982 0117         Operator reset steam dumps. This removes the load rejection arming signal, and all dump valves shut.
Salem Unit 2 Load Reduction -of January 14, 1982 0117 Operator reset steam dumps. This removes the load rejection arming signal, and all dump valves shut.
MSIV open lights were out for 2 and 4 SGs. Operator tapped the open pushbutton, and the open lights come on.
MSIV open lights were out for 2 and 4 SGs. Operator tapped the open pushbutton, and the open lights come on.
0118         Primary pressure and Tavg peaked (2340 psig and 592"F). Sprays full open on pressurizer.
0118 Primary pressure and Tavg peaked (2340 psig and 592"F). Sprays full open on pressurizer.
0120         Tavg decreasing. Steam generator safety valve lifted.
0120 Tavg decreasing. Steam generator safety valve lifted.
0123         Stopped boration at 98 gallons.
0123 Stopped boration at 98 gallons.
0135         Spray demand at zero. One spray valve did not indicate shut. Operator took valve to manual, tapped close, and light came on.
0135 Spray demand at zero. One spray valve did not indicate shut. Operator took valve to manual, tapped close, and light came on.
0138         Pressurizer pressure at minimum (2050 psig) and increasing. Heaters on.
0138 Pressurizer pressure at minimum (2050 psig) and increasing. Heaters on.
Sprays shut.
Sprays shut.
0148         Safety valve still open.
0148 Safety valve still open.
0150         Pressurizer pressure control in automatic.
0150 Pressurizer pressure control in automatic.
0210         Conditions stable at 46% power, 480 MWe. Safety valve still open.
0210 Conditions stable at 46% power, 480 MWe. Safety valve still open.
0230         Cycled steam generator atmospheric relief valve 3 times to try to seat safety valve. Did not work.
0230 Cycled steam generator atmospheric relief valve 3 times to try to seat safety valve. Did not work.
0521         Removed manual operating handle from safety valve. Valve closed.
0521 Removed manual operating handle from safety valve. Valve closed.
0730         Restored rod control.
0730 Restored rod control.
Key ULYD 7.4-0                                     Rev 0196 USNRC Technical Training Center
Key ULYD USNRC Technical Training Center Wpcti*hnn*p Salem Load Reduction 7.4-0 Rev 0196


0289 Containment Figure 7.4-1 Simplified Condensate and Feed System 7.4-7
Figure 7.4-1 Simplified Condensate and Feed System 7.4-7 0289 Containment


PZR   T       PZR LVL   avg   PRESS 70   600   2400 60   590   2300 s0     580 2200 (0    40   570 2100 30   560   2000 to                           ,            N N N   N   C)
PZR T
C O a  T-  M            a 0                                                   0 0 0 0 o                          0   0    0. 0 0 0 o,  0 0     0   0 TIME -- o 0
PZR LVL avg PRESS 70 600 2400 60 590 2300 s0 580 2200 40 570 2100 30 560 2000 to 0
Figure 7.4-2   Primary Parameters During Load Rejection CO
o O a T-M a
N N
N N
M C)
C o,
0 0
0 0
0 0
: 0.
0 0
0 0
0 0
0 TIME --
o Figure 7.4-2 Primary Parameters During Load Rejection (0
0 CO


MWe Pwr, Stm Flow 1000 107.
MWe Pwr, Stm Flow 1000 107.
900 800 700 O00 500     50
900 800 700 O00 500 50 400 300 200 100 0
-.4 400
W o
0 n
M t-a N0 CI 00 N
o 0
0 0
0 0
0 0
0 0
0 10 0
0 0
TIME O
0 N
0, WD Figure 7.4-3 Plant Parameters During Load Rejection
-.4  
-L
-L
-L
-L 300 200 100 0
W o 0        n                          M      t- a 00                          CI  N0    N ,-
0 10 0  0 o    0    0    0  0    0    0      0      0    0  0 TIME ---  O 0
N 0,
Figure 7.4-3  Plant Parameters During Load Rejection  WD


                                                                                                          "A TRAIN MOTOR   HYDRAULIC CYLINDER 3PUMP       &                                                                            NORMALLY U PISTON                                                                         DE-ENERGIZED AIR TO CLOSE t-                                                                                                   VENT TO ATMOS.
"A TRAIN MOTOR HYDRAULIC CYLINDER 3PUMP U PISTON NORMALLY DE-ENERGIZED AIR TO CLOSE SPEED REGULATOR STEAM CYCLINDER STEAM PISTON MSIV MOTOR OPERATED 3-WAY VALVE VALVE DISCS VENT TO ATMOS.
MOTOR OPERATED SPEED                                                    3-WAY VALVE                  VENT VALVE ClD    REGULATOR 0  STEAM CYCLINDER C)    STEAM PISTON                                                      NORMALLY IN MID-POSITION 01 "B" TRAIN 013 CO 0
VENT VALVE NORMALLY IN MID-POSITION "B" TRAIN AIR TO CLOSE
                                                                                                                      'BA"IR SUPPLY HEADER 0
'BA" IR SUPPLY HEADER NORMALLY DE-ENERGIZED VENT TO ATMOS.
NORMALLY z                                                                                                          DE-ENERGIZED AIR TO CLOSE VENT TO ATMOS.
NOTE: Schematic shown with the MSIV open, and all vent valves aligned for power operations.
VALVE DISCS MSIV NOTE: Schematic shown with the MSIV open, and all vent valves aligned for power operations.
a ClD 0
a
t-01 C) 013 CO 0
0 z


0289 Figure 7.4-4   Code Safety Valve 7.4-13
0289 Figure 7.4-4 Code Safety Valve 7.4-13


Westinghouse Technology Advanced Manual Section 7.5 Sequoyah Incore Thimble Tube Ejection Event
Westinghouse Technology Advanced Manual Section 7.5 Sequoyah Incore Thimble Tube Ejection Event


Secuovah _Incore Thimble Tube Ejection Event Westinphouse Technololpv   Advanced Manual                         SeuvbIceThmlTbeEetnEet TABLE OF CONTENTS 7.5 SEQUOYAH INCORE THIMBLE TUBE EJECTION EVENT .................                                           7.5-1 7.5.1 Introduction ..............................................                                      7.5-1 7.5.2 Incore Neutron Monitoring System Description .......................                             7.5-1 7.5.2.1    Transfer Device Assemblies and Isolation Valves                                      7.5-2 7.5.2.2   Interconnecting Tubing Runs .............                                             7.5-3 7.5.2.3    Detector and Drive Cable Assemblies ........                                         7.5-3 7.5.2.4    Leak Detection System ..................                                             7.5-4 7.5.2.5    System Summary .....................                                                 7.5-4 7.5-4 7.5.3   Event Background ..........................................
Westinphouse Technololpv Advanced Manual SeuvbIceThmlTbeEetnEet TABLE OF CONTENTS 7.5 SEQUOYAH INCORE THIMBLE TUBE EJECTION EVENT.................
7.5-5 7.5.4   Event Description ...........................................
7.5.1 Introduction 7.5.2 Incore Neutron Monitoring System Description.......................
7.5-7 7.5.5  Event Summary ............................................
7.5.2.1 7.5.2.2 7.5.2.3 7.5.2.4 7.5.2.5 Transfer Device Assemblies and Isolation Valves Interconnecting Tubing Runs.............
7.5-7 7.5.6   Similar Event: Zion Unit 1, January 20,1984 ........................
Detector and Drive Cable Assemblies........
7.5-7 7.5.7   Seal Table Leaks: Lessons Learned ...............................
Leak Detection System..................
LIST OF TABLES 7.5-1   Sequence of events   ............................................                                  7.5-9 LIST OF FIGURES Incore Instrumentation System ....................................                                 7.5-11 7.5-1 7.5-13 7.5-2   Typical Incore Drive Unit .......................................
System Summary.....................
7.5-15 7.5-3   Thimble Tube Cleaning Tool .....................................
7.5.3 Event Background 7.5.4 Event Description...........................................
7.5-17 7.5-4   Seal Table Design ............................................
7.5.5 Event Summary............................................
7.5-19 7.5-5  Sequoyah Incore Instrument Room .................................
7.5.6 Similar Event: Zion Unit 1, January 20,1984 7.5.7 Seal Table Leaks: Lessons Learned...............................
7.5-21 7.5-6   Ejected Thimble Tube D-12 ......................................
LIST OF TABLES 7.5-1 Sequence of events LIST OF FIGURES 7.5-1 Incore Instrumentation System....................................
                                                            *D  .     -".                                     A,109 USNRC Technical Training Center 1.z-I                                         VT
7.5-2 Typical Incore Drive Unit.......................................
7.5-3 Thimble Tube Cleaning Tool.....................................
7.5-4 Seal Table Design............................................
7.5-5 Sequoyah Incore Instrument Room.................................
7.5-6 Ejected Thimble Tube D-12......................................
7.5-1 7.5-1 7.5-1 7.5-2 7.5-3 7.5-3 7.5-4 7.5-4 7.5-4 7.5-5 7.5-7 7.5-7 7.5-7 7.5-9 7.5-11 7.5-13 7.5-15 7.5-17 7.5-19 7.5-21
*D A,109 Secuovah _Incore Thimble Tube Ejection Event V T USNRC Technical Training Center 1.z-I


Westinphouse Technoloty Advanced Manual                   Sequoyah Incore Thimble Tube Ejection Event Westinhoue      TechnoIov Advanced Manual                Seauoyah Incore Thimble Tube Ejection Event 7.5 , SEQUOYAH INCORE THIMBLE                           tors required for power distribution measure TUBE EJECTION EVENT                             ments. The ejection of the D-12 thimble tube, which occurred during -the cleaning activity, "Learning Objectives:                                   caused a significant RCS leak requiring a unit shutdown and cooldown. It also created an I. 'State the purpose of the incore instrumenta         intense radiological hazard during the recovery tion system.                                       due to radiation from the 12-ft portion of the thimble tube which had been activated by the
Westinhoue TechnoIov Advanced Manual Seauoyah Incore Thimble Tube Ejection Event 7.5, SEQUOYAH INCORE THIMBLE TUBE EJECTION EVENT "Learning Objectives:
: 12. Briefly describe how the incore flux detector         neutron flux in the core.
I. 'State the purpose of the incore instrumenta tion system.
system is designed as part of the reactor coolant system (RCS) pressure boundary.                   This section reviews the design and functions of the incore neutron monitoring system. The
: 12. Briefly describe how the incore flux detector system is designed as part of the reactor coolant system (RCS) pressure boundary.
: 3. Describe the plant response to the ejected tube       Sequoyah incore thimble tube ejection event is "event.                                             described so that the consequences of the event, in terms of its effect on the plant and the hazards 4., Describe how the operators responded to the           of the cleanup and recovery effort, can be exam event and what was required to stop the RCS         ined.
: 3. Describe the plant response to the ejected tube "event.
leak.
4., Describe how the operators responded to the event and what was required to stop the RCS leak.
7.5.2 Incore Neutron Monitoring System
                                                                      -Description
: 5. Describe the radiological hazards created by the ejected thimble tube.,
: 5. Describe the radiological hazards created by the ejected thimble tube.,
The purpose of the incore neutron monitoring 7.5.1 Introduction                                       system isto provide information on the neutron flux distribution at selected core locations. The Sequoyah Nuclear Plant is a -four-loop             incore instrumentation system provides data Westinghouse plant located in eastern Tennessee.       --acquisition only, and performs no operational The'plafit was designed and constructed and is           plant control functions. The data obtained from operated'by the Tennessee Valley Authority               the incore instrumentation system, in conjunction (TVA). Unit I received an operating license in           with previously determined analytical informa tion, can be used to determine the three-dimen "February of, 1980. On April 19, 1984, incore instrument thimble D-12 of Unit 1 was forced out         sional fission power distribution in the core at any time throughout core life.
7.5.1 Introduction Sequoyah Nuclear Plant is a -four-loop Westinghouse plant located in eastern Tennessee.
of the reactor vessel into the incore instrument room in containment by RCS pressure. Unit 1 The incore neutron monitoring instrumenta was at 30% power, with maintenance in progress tion consists of-movable miniature incore flux for cleaning out the interior of the thimble tube.
The'plafit was designed and constructed and is operated'by the Tennessee Valley Authority (TVA). Unit I received an operating license in "February of, 1980. On April 19, 1984, incore instrument thimble D-12 of Unit 1 was forced out of the reactor vessel into the incore instrument room in containment by RCS pressure. Unit 1 was at 30% power, with maintenance in progress for cleaning out the interior of the thimble tube.
detectors with sufficient sensitivity to permit The unit was recovering from a refueling outage measurement of localized,-potentially'significant at the time; and 'personnel were performing neutron flux distribution ,ariations Nfithin the restart testing while the maintenance work was.in reactor core. The movable nminiature fission progress. -Sequoyah,-as well as other Westing chamber detectors contain U 3 0 8 (uranium oxide) house plants, had experienced problems with enriched to greater than 90 percenit in U-235 to internal fouling of the incore thimble tubes provide exceptionally detailed flux mapping of Wlhich blocked insertion of the incore flux detec-
The unit was recovering from a refueling outage at the time; and 'personnel were performing restart testing while the maintenance work was.in progress. -Sequoyah,-as well as other Westing house plants, had experienced problems with internal fouling of the incore thimble tubes Wlhich blocked insertion of the incore flux detec-tors required for power distribution measure ments. The ejection of the D-12 thimble tube, which occurred during -the cleaning activity, caused a significant RCS leak requiring a unit shutdown and cooldown.
                            ..   .   -,                     I  ....                                Re~vfl19Q USNRC Technical Training Center                 1.'11                                              Rev 0196
It also created an intense radiological hazard during the recovery due to radiation from the 12-ft portion of the thimble tube which had been activated by the neutron flux in the core.
This section reviews the design and functions of the incore neutron monitoring system. The Sequoyah incore thimble tube ejection event is described so that the consequences of the event, in terms of its effect on the plant and the hazards of the cleanup and recovery effort, can be exam ined.
7.5.2 Incore Neutron Monitoring System
-Description The purpose of the incore neutron monitoring system isto provide information on the neutron flux distribution at selected core locations. The incore instrumentation system provides data
--acquisition only, and performs no operational plant control functions. The data obtained from the incore instrumentation system, in conjunction with previously determined analytical informa tion, can be used to determine the three-dimen sional fission power distribution in the core at any time throughout core life.
The incore neutron monitoring instrumenta tion consists of-movable miniature incore flux detectors with sufficient sensitivity to permit measurement of localized,-potentially'significant neutron flux distribution,ariations Nfithin the reactor core. The movable nminiature fission chamber detectors contain U308 (uranium oxide) enriched to greater than 90 percenit in U-235 to provide exceptionally detailed flux mapping of I
Re~vfl19Q 1.'11 USNRC Technical Training Center Sequoyah Incore Thimble Tube Ejection Event Westinphouse Technoloty Advanced Manual Rev 0196


We'stinghouse Technology Advanced Manual                  Sequoyah Incore Thimble Tube Ejection Event Westinghouse Technology Advanced Manual                   Sequoyah Incore Thimble Tube Ejection Event the reactor core. The fission chamber dimen             moved aside when necessary for movement of sions'are 0.199 in. in 'diameter and 2.1 in. in         the retractable detector thimbles.
Westinghouse Technology Advanced Manual Sequoyah Incore Thimble Tube Ejection Event the reactor core. The fission chamber dimen sions'are 0.199 in. in 'diameter and 2.1 in. in length. A stainless steel detector shell encapsu lates each fission chamber. The stainless steel shell is welded to the leading end'of a helical wrap drive cable. As this drive cable is moved by the drive unit, the attached incore flux detector is positioned to the desired core or storage location.
length. A stainless steel detector shell encapsu lates each fission chamber. The stainless steel               The drive units push the hollow helical-wrap shell is welded to the leading end'of a helical         drive cables, with the miniature fission chamber wrap drive cable. As this drive cable is moved         detectors attached, into the core. The helical by the drive unit, the attached incore flux detector   wrap cables have small-diameter coaxial cables is positioned to the desired core or storage             threaded through their hollow centers for trans location.                                                mitting the current signals produced by the miniature fission chamber detectors.
Figure 7.5-1 shows the basic system for the insertion of the movable miniature fission cham ber detectors into'the core.' Retractable detector thimbles, into which the miniature detectors are driven, are positioned as shown.
Figure 7.5-1 shows the basic system for the insertion of the movable miniature fission cham               The six detectors, a typical number for a ber detectors into'the core.' Retractable detector       Westinghouse four-loop large megawatt unit, are thimbles, into which the miniature detectors are         have designations A through F. During normal driven, are positioned as shown.                         operation each detector is used to measure the relative neutron flux in the detector thimbles Since these retractable detector thimbles are     connected to the correspondingly lettered ten-path sealed at the leading (reactor) end, they are dry       rotary transfer device; i.e., detector A is normally "inside. The thimbles thus serve as a pressure           selected to a core path provided by the A ten-path barrier between the RCS' pressure (2500 psig           transfer device. However, by manipulating the design) and the atmosphere. Mechanical high             appropriate five-path transfer device, the operator pressure seals between the retractable thimbles         can route each detector through several other "andthe conduits are provided at the'seal table.         paths. Each detector can be sent into each path of I&#xfd;nstruimentation penetrations in the bottom of the     the next sequentially lettered ten-path transfer reactor vessel, which are'essentially extensions         device to serve as an operational spare detector of the reactor vessel, allow the insertion of the       for those thimbles (i.e., the A detector can retractable detector thimbles. -Dhring normal           substitute for the B detector, B for C, C for D, plant operation, these thimblek-are stationary.         etc.). For detector normalization purposes, each The retractable detector thimbles are retracted         detector can be routed separately into a common from the core only' during 'refueling or core           calibration path; thus providing direct correlation maintenance periods, during Which the RCS is             of the detectors. Each detector can also be routed depressurized.                                           into any path associated with common ten-path transfer device C, or to a shielded area for The drive system for insertion of the minia         storage.
Since these retractable detector thimbles are sealed at the leading (reactor) end, they are dry "inside. The thimbles thus serve as a pressure barrier between the RCS' pressure (2500 psig design) and the atmosphere. Mechanical high pressure seals between the retractable thimbles "and the conduits are provided at the'seal table.
ture fission chamber'detectois consists of drive units, limit switch &#xfd;ssemblies, five-path rotary         7.5.2.1    Transfer Device Assemblies transfer devices, ten-path rotary transfer devices,                 and Isolation Valves "and is1ltion valves, as shown in Figure 7.5-2.
I&#xfd;nstruimentation penetrations in the bottom of the reactor vessel, which are'essentially extensions of the reactor vessel, allow the insertion of the retractable detector thimbles. -Dhring normal plant operation, these thimblek-are stationary.
Th&#xfd; drive units are'mounted permanently on a             Five-Path Rotary Transfer Devices and platform, with the remaining components be             Limit Switches tween the drive units and the seal table mounted o a movable support assembly, which can be                   1. One five-path rotary transfer device is ev  uio USNRC Technical Training Center                 "I Z -                                           Rev 0196
The retractable detector thimbles are retracted from the core only' during 'refueling or core maintenance periods, during Which the RCS is depressurized.
The drive system for insertion of the minia ture fission chamber'detectois consists of drive units, limit switch &#xfd;ssemblies, five-path rotary transfer devices, ten-path rotary transfer devices, "and is1ltion valves, as shown in Figure 7.5-2.
Th&#xfd; drive units are'mounted permanently on a platform, with the remaining components be tween the drive units and the seal table mounted o a movable support assembly, which can be moved aside when necessary for movement of the retractable detector thimbles.
The drive units push the hollow helical-wrap drive cables, with the miniature fission chamber detectors attached, into the core. The helical wrap cables have small-diameter coaxial cables threaded through their hollow centers for trans mitting the current signals produced by the miniature fission chamber detectors.
The six detectors, a typical number for a Westinghouse four-loop large megawatt unit, are have designations A through F. During normal operation each detector is used to measure the relative neutron flux in the detector thimbles connected to the correspondingly lettered ten-path rotary transfer device; i.e., detector A is normally selected to a core path provided by the A ten-path transfer device. However, by manipulating the appropriate five-path transfer device, the operator can route each detector through several other paths. Each detector can be sent into each path of the next sequentially lettered ten-path transfer device to serve as an operational spare detector for those thimbles (i.e., the A detector can substitute for the B detector, B for C, C for D, etc.). For detector normalization purposes, each detector can be routed separately into a common calibration path; thus providing direct correlation of the detectors. Each detector can also be routed into any path associated with common ten-path transfer device C, or to a shielded area for storage.
7.5.2.1 Transfer Device Assemblies and Isolation Valves Five-Path Rotary Transfer Devices and Limit Switches
: 1. One five-path rotary transfer device is USNRC Technical Training Center
ev uio "I Z -
We'stinghouse Technology Advanced Manual Sequoyah Incore Thimble Tube Ejection Event Rev 0196


Senuovah Incore Thimble Tube Ejection Event Westinghouse Technoloffi Advanced Manual                     SeovbnceThmlTueEctnEet provided with each drive unit for rou ting          path transfer devices-send signals to the path the detector into one of the five poss ible          display panel on the control console for verifica detector paths. The five-path tran sfer              tion of proper core path.
Westinghouse Technoloffi Advanced Manual SeovbnceThmlTueEctnEet provided with each drive unit for rou the detector into one of the five poss detector paths. The five-path tran device consists of an S-shaped I mounted in a rotating assembly. 'I assembly is bearing-mounted at each and can be aligned with any one of five outlet paths. When an electi signal is applied to change the dete path, the S-shaped tube is moved to selected outlet path,position.
device consists of an S-shaped Iube mounted in a rotating assembly. 'I[his              Isolation Valve Assemblies assembly is bearing-mounted at each end and can be aligned with any one of *the                   Manually operated stainless-steel isolation five outlet paths. When an electirical              valves (one for each thimble) are provided for signal is applied to change the dete ctor           closing the retractable detector thimble runs after path, the S-shaped tube is moved to the              removal of the detector and drive cable. When selected outlet path ,position. Cam-               closed, the valve forms a 2500-psig barrier to actuated micro-switches send signalIs to           prevent steam leakage from the core in the event the control console for feedback of path           of a thimble rupture.
C actuated micro-switches send signal the control console for feedback of selection.
selection.
: 2. A &deg;withdrawal limit switch, actuatec the detector, is provided near the ink each five-path transfer device.
7.5.2.2 Interconnecting Tubing Runs
7 switch prevents operation of the five rotary transfer device unless the dete
: 2. A &deg;withdrawal limit switch, actuatecI by the detector, is provided near the ink et of             Interconnecting tubing runs are supplied for each five-path transfer device. 7rhis              connecting all components of the system from the switch prevents operation of the five path         drive units to the seal table. The interconnecting rotary transfer device unless the deteSctor        tubing runs between the isolation valves and the
-and cable are in the withdrawn posi, The switch also stops automatic v drawal when the detector reaches withdrawal limit switch.
        -and cable are in the withdrawn posi,tion.           seal table have design requirements of 2500 psig The switch also stops automatic vvith-               and 650"F.
Wye Units Wye unit assemblies are mounted as reqi to reduce the amount of interconnecting tu "between the five-path and ten-path rotary tral assemblies. Wye units are also installed betN the five-path transfer devices and the calibrn path.
drawal when the detector reaches the withdrawal limit switch.                            7.5.2.3 Detector and Drive Cable As semblies Wye Units The carbon-steel drive cables are 0.199 in. in Wye unit assemblies are mounted as reqiiired            diameter with hollow cores and are helically to reduce the amount of interconnecting tu bing wrapped to permit meshing with the detector "betweenthe five-path and ten-path rotary tralnsfer          drive wheel. A 0.040-in.-diameter coaxial cable assemblies. Wye units are also installed betN%veen is threaded through the 0.065-in. Inside diameter the five-path transfer devices and the calibrnation          of the drive cable and terminates at the trailing path.                                                        end, with several feed of slack ending in a "Subminaxplug. The drive ,cables (when new)
Ten-Path Rotary Transfer Devices Each ten-path rotary transfer device is ca]
Ten-Path Rotary Transfer Devices                  -          are approximately 175 ft long. This length allows one or two subsequent cuts of 12-14 ft Each ten-path rotary transfer device is ca]pable         each before they become too short for use. Such replacement of of routing a movable incore detector into ea ch of cuts may be required for factory ten selectable flux thimbles. Cam-actt Lated                 detectors onto existing drive cables.
of routing a movable incore detector into ea ten selectable flux thimbles.
microswitches send signals to the control coi for feedback of path selection. Detector-acti path indicator switches near the outlets of th, S.
Cam-actt microswitches send signals to the control coi for feedback of path selection. Detector-acti path indicator switches near the outlets of th, S.
                  .  ..    ..  .                  '7        2*                                      U-Rev 196 USNRC Technical Training C.enter                     1 .0**,q                                          Rev 0196
'7 2
* U-Rev 196 ting path transfer devices-send signals to the path ible display panel on the control console for verifica sfer tion of proper core path.
ube
[his Isolation Valve Assemblies end
* the Manually operated stainless-steel isolation rical valves (one for each thimble) are provided for ctor closing the retractable detector thimble runs after the removal of the detector and drive cable. When am-closed, the valve forms a 2500-psig barrier to Is to prevent steam leakage from the core in the event path of a thimble rupture.
7.5.2.2 Interconnecting Tubing Runs I by et of Interconnecting tubing runs are supplied for rhis connecting all components of the system from the path drive units to the seal table. The interconnecting Sctor tubing runs between the isolation valves and the tion.
seal table have design requirements of 2500 psig vith-and 650"F.
the 7.5.2.3 Detector and Drive Cable As semblies The carbon-steel drive cables are 0.199 in. in iired diameter with hollow cores and are helically bing wrapped to permit meshing with the detector nsfer drive wheel. A 0.040-in.-diameter coaxial cable  
%veen is threaded through the 0.065-in. Inside diameter ation of the drive cable and terminates at the trailing end, with several feed of slack ending in a "Subminax plug. The drive,cables (when new) are approximately 175 ft long. This length allows one or two subsequent cuts of 12-14 ft pable each before they become too short for use. Such ch of cuts may be required for factory replacement of Lated detectors onto existing drive cables.
1.0**,q USNRC Technical Training C.enter Senuovah Incore Thimble Tube Ejection Event Rev 0196


Westinghouse Technology Advanced&Manual c   ASequoah                           Incore Thimble Tube Ejection Event 7.5.2.4     Leak Detection System                   provided core location. The information obtained is collected by the plant computer, which either The leak detection system consists of a liquid   directly analyzes the data obtained or records it level-actuated switch and a 0.25-in. ac solenoid     for analysis by more sophisticated computers operated drain valves. Each 10-path transfer         offsite.
c ASequoah Incore Thimble Tube Ejection Event 7.5.2.4 Leak Detection System The leak detection system consists of a liquid level-actuated switch and a 0.25-in. ac solenoid operated drain valves. Each 10-path transfer device enclosure is aligned to the plant drain system via the drain valve. The enclosures facilitate drainage into the level switch.
device enclosure is aligned to the plant drain system via the drain valve. The enclosures           7.5.3 Event Background facilitate drainage into the level switch.
Water leaking from a transfer device enters the leak detection system and causs the level to rise.
Sequoyah Unit 1 had experienced plugged Water leaking from a transfer device enters     incore detector thimble tubes periodically since the leak detection system and causs the level to     before initial criticality. The problem had existed rise. The level switch' opens'the solenoid           since initial system operability checks conducted operated valve, allowing the leaking water to         in about 1978 or 1979. The reason for the drain and at the same time sending an alarm to the   blockage had not been conclusively determined control cabinet. Where practical, the level switch   by the TVA staff, but it was believed to be related and drain valve are permanently attached to the      to dirt or excess lubricant contamination during transfer device enclosures. The drain line is        system construction. The Unit 2 incore instru disconnected during refueling.                        ment'system had not experienced a similar frequency of tube blockage.
The level switch' opens'the solenoid operated valve, allowing the leaking water to drain and at the same time sending an alarm to the control cabinet. Where practical, the level switch and drain valve are permanently attached to the transfer device enclosures. The drain line is disconnected during refueling.
7.5.2.5      System Summary Maintenance on the Unit 1 thimble tubes had Miniature fission chamber detectors can be      been extensive. Tube cleaning was conducted on remotely positioned withinin retractable guide        all 58 tubes at least twice prior to initial criticality, thimbles to provide flux mapping of the core.        on nine tubes during a September 1981 outage, Each detector is welded to the leading end of a      on nine additional tubes during the cycle 2 helical-wrap drive cable and to a sheathed coaxial    refueling outage, and on nine tubes (some were instrumentation cable. The retractable guide          being cleaned for the second time) during the thimbles are closed at their leading ends, and      cycle 3 refueling outage. Prior to the startup after serve as the pressure, boundary between RCS          the latter outage, system testing revealed that 23 pressure and atmosphere.                              of 58 thimble tubes were blocked. Forty-four tubes are required to be operable to meet opera The drive assemblies are motor operated,        bility and surveillance requirements for core flux with hobbed wheels engaging the helical drive        mapping, but startup of the unit is permitted with cables, take-up reels and position encoders. The    the system inoperable. Operability would have to five-path transfer devices are used to select the    be demonstrated before surveillance testing and mode of operation (normal, calibrate, storage,      low power physics testing could commence.
7.5.2.5 System Summary Miniature fission chamber detectors can be remotely positioned withinin retractable guide thimbles to provide flux mapping of the core.
etc.). A five-path transfer device is provided for each detector/drive assembly. A ten-path transfer        Unit 1 entered mode 1 on April 18, 1984, device is supplied for each detector/drive assem    and reached 30% power on the same day.
Each detector is welded to the leading end of a helical-wrap drive cable and to a sheathed coaxial instrumentation cable. The retractable guide thimbles are closed at their leading ends, and serve as the pressure, boundary between RCS pressure and atmosphere.
bly and is used to route a detector into any one of  Preparation was in progress to clean the blocked up to ten selectable paths. A "flux mapping"        thimble tubes' Startup test procedures required consists of a moving detector scan of each          that power be, held at 30% until equilibrium 7.5-4                                           Rev   0196 USNRC               Training Center Technical Training USNRC Technical                Center           7.5-4                                             Rev 0196
The drive assemblies are motor operated, with hobbed wheels engaging the helical drive cables, take-up reels and position encoders. The five-path transfer devices are used to select the mode of operation (normal, calibrate, storage, etc.). A five-path transfer device is provided for each detector/drive assembly. A ten-path transfer device is supplied for each detector/drive assem bly and is used to route a detector into any one of up to ten selectable paths. A "flux mapping" consists of a moving detector scan of each provided core location. The information obtained is collected by the plant computer, which either directly analyzes the data obtained or records it for analysis by more sophisticated computers offsite.
7.5.3 Event Background Sequoyah Unit 1 had experienced plugged incore detector thimble tubes periodically since before initial criticality. The problem had existed since initial system operability checks conducted in about 1978 or 1979. The reason for the blockage had not been conclusively determined by the TVA staff, but it was believed to be related to dirt or excess lubricant contamination during system construction. The Unit 2 incore instru ment'system had not experienced a similar frequency of tube blockage.
Maintenance on the Unit 1 thimble tubes had been extensive. Tube cleaning was conducted on all 58 tubes at least twice prior to initial criticality, on nine tubes during a September 1981 outage, on nine additional tubes during the cycle 2 refueling outage, and on nine tubes (some were being cleaned for the second time) during the cycle 3 refueling outage. Prior to the startup after the latter outage, system testing revealed that 23 of 58 thimble tubes were blocked. Forty-four tubes are required to be operable to meet opera bility and surveillance requirements for core flux mapping, but startup of the unit is permitted with the system inoperable. Operability would have to be demonstrated before surveillance testing and low power physics testing could commence.
Unit 1 entered mode 1 on April 18, 1984, and reached 30% power on the same day.
Preparation was in progress to clean the blocked thimble tubes' Startup test procedures required that power be, held at 30% until equilibrium USNRC Technical Training Center 7.5-4 Rev 0196 Rev 0196 Westinghouse Technology Advanced& Manual USNRC Technical Training Center 7.5-4


Westinghouse Technology -Advanced Manual                Sequoyah- Incore Thimble Tube Ejection Event Westinahouse Technolo2y     Advanced Manual           Sequovah Incore Thimble Tube Ejection Event xenon conditions were reached so that flux             device mounting platform was rolled out of the mapping could be conducted. This would                 way. The hand tool was then attached to the require about two days, and TVA management             selected tube at the seal table, and the brush cable intended to have the thimble tubes cleaned during     was driven into and retracted from the tube with a this period. -All previous cleaning had been done     mechanical hand-crank device.
Westinahouse Technolo2y Advanced Manual Sequovah Incore Thimble Tube Ejection Event xenon conditions were reached so that flux mapping could be conducted.
during .cold shutdown conditions, so additional.
This would require about two days, and TVA management intended to have the thimble tubes cleaned during this period. -All previous cleaning had been done during.cold shutdown conditions, so additional.
planning and research was required to support         7.5.4 Event Description the work with-the RCS-at normal operating pressure and temperature. The plant engineering             Tube cleaning commenced while the unit was supervisor had attended a presentation made by         stabilizing at 30% power. After five thimble the staff of the Trojan Nuclear Plant several years   tubes were cleaned, the job foreman was unsure earlier which covered dry brush cleaning of           if the cleaning brush was being inserted to the blocked thimble tubes with the unit operating.         ends of the ,tubes. The maintenance group The Trojan staff was apparently faced with the         decided to insert the tool into an unblocked prospect of shutting -down the unit because of         thimble tube to determine the number of turns of thimble tube blockage, so it undertook the.           the hand crank required to completely insert the cleaning project to restore the minimum number         brush. With the cleaning tool attached to the tube of detector paths to an operable status to allow      at location D-12, the insertion began during the flux mapping and prevent a shutdown.                  evening of April 19. The cleaning brush had been inserted approximately 15 ft when the shift The TVA engineering staff obtained addition      change took place. The second-shift cleaning al information from several other utilities which      crew took over and began inserting the brush. At supported the Trojan information. It also con          the 78th turn (one turn = 10 in.), the tool handler tacted a vendor which provided thimble tube            noted that more pressure was required to turn the cleaning services, but the vendor used a wet          crank. During the 79th turn, when the brush was brushing method which could not be used,              about 80 ft into the tube, the personnel perform because the high RCS temperatures would cause          ing the work noticed water starting to leak out of the flushing water to flash to steam. The incore      the high pressure fitting (see Figure 7.5-4) at the monitoring system vendor was contacted; it* seal table. The cleaning crew immediately indicated that it knew of no restrictions or engi      evacuated the incore instrument room, noting that neering reasons why the tubes could not be dry,      -,the thimble tube was being forced out of the seal brushed during operation at power.                    table and that water and steam were spraying into the room. At about 9:00 p.m., the crew foreman Based on the information obtained, plant          attempted to contact the control room but was management directed the tube cleaning to be done      unable to use the telephone in the personnel air with a special tool (see Figure 7.5-3). The tool      lock because of a maintenance problem.
planning and research was required to support the work with-the RCS-at normal operating pressure and temperature. The plant engineering supervisor had attended a presentation made by the staff of the Trojan Nuclear Plant several years earlier which covered dry brush cleaning of blocked thimble tubes with the unit operating.
consisted of a cable similar to an incore flux
The Trojan staff was apparently faced with the prospect of shutting -down the unit because of thimble tube blockage, so it undertook the.
detector cable with a brush attached to the end of         In the control room, the pressurizer level the cable. In order to access the thimble tubes," --indication was decreasing, and -the operators mechanical joints (referred to as low pressure         responded by increasing charging flow from 85 seals) in the tubes were disconnected at the seal to 130 gpm. This action stopped the pressurizer table in containment, and the 10-path transfer         level decrease, and the level began to increase.
cleaning project to restore the minimum number of detector paths to an operable status to allow flux mapping and prevent a shutdown.
                                                      -    -                                              (ttflt
The TVA engineering staff obtained addition al information from several other utilities which supported the Trojan information. It also con tacted a vendor which provided thimble tube cleaning services, but the vendor used a wet brushing method which could not be used, because the high RCS temperatures would cause the flushing water to flash to steam. The incore monitoring system vendor was contacted; it*
                                                                                                  - ziev
indicated that it knew of no restrictions or engi neering reasons why the tubes could not be dry, brushed during operation at power.
                                                                                                -       uiyo Rev U0196 USNRC Technical Training Center
Based on the information obtained, plant management directed the tube cleaning to be done with a special tool (see Figure 7.5-3). The tool consisted of a cable similar to an incore flux device mounting platform was rolled out of the way. The hand tool was then attached to the selected tube at the seal table, and the brush cable was driven into and retracted from the tube with a mechanical hand-crank device.
7.5.4 Event Description Tube cleaning commenced while the unit was stabilizing at 30% power. After five thimble tubes were cleaned, the job foreman was unsure if the cleaning brush was being inserted to the ends of the,tubes.
The maintenance group decided to insert the tool into an unblocked thimble tube to determine the number of turns of the hand crank required to completely insert the brush. With the cleaning tool attached to the tube at location D-12, the insertion began during the evening of April 19. The cleaning brush had been inserted approximately 15 ft when the shift change took place. The second-shift cleaning crew took over and began inserting the brush. At the 78th turn (one turn = 10 in.), the tool handler noted that more pressure was required to turn the crank. During the 79th turn, when the brush was about 80 ft into the tube, the personnel perform ing the work noticed water starting to leak out of the high pressure fitting (see Figure 7.5-4) at the seal table.
The cleaning crew immediately evacuated the incore instrument room, noting that  
-,the thimble tube was being forced out of the seal table and that water and steam were spraying into the room. At about 9:00 p.m., the crew foreman attempted to contact the control room but was unable to use the telephone in the personnel air lock because of a maintenance problem.
detector cable with a brush attached to the end of In the control room, the pressurizer level the cable. In order to access the thimble tubes," --indication was decreasing, and -the operators mechanical joints (referred to as low pressure responded by increasing charging flow from 85 seals) in the tubes were disconnected at the seal to 130 gpm. This action stopped the pressurizer table in containment, and the 10-path transfer level decrease, and the level began to increase.

(ttflt ziev uiyo USNRC Technical Training Center Westinghouse Technology -Advanced Manual Sequoyah-Incore Thimble Tube Ejection Event
- Rev U0196


. Westinghouse Technology Advanced Manual                Sequoyah-Incore Thimble Tube Ejection Event Westinghouse Technology     Advanced Manual           Sequoyah Incore Thimble Tube Ejection Event This indicated that the leak rate was less than the   300 rem/hr at the end of the tube closest to the 45-gpm increase in charging flow. Later esti          seal table, and greater than 1000 rem/hr at the mates showed the leak rate to be approximately      center of the ejected tube (see Figures 7.5-5 and 30 gpm.                                              7.5-6). Pictures were taken to aid in later recov ery planning.- Later, a second entry was made to After frisking out of the contaminated area,    take additional pictures. Two individuals were in the foreman went-to the control room and notified    the area for only seven minutes and received the shift engineer of what had taken place. Table    doses of 1.966 and 1.939 rem.
Westinghouse Technology Advanced Manual Sequoyah Incore Thimble Tube Ejection Event This indicated that the leak rate was less than the 45-gpm increase in charging flow. Later esti mates showed the leak rate to be approximately 30 gpm.
7.5-1 is a chronology of the event.
After frisking out of the contaminated area, the foreman went-to the control room and notified the shift engineer of what had taken place. Table 7.5-1 is a chronology of the event.
Once the unit was placed in cold shutdown A power reduction of one percent/min was        (mode 5) and depressurized with the vessel water initiated, and the radiological emergency proce      level below the' elevation of the seal table, the dure for an RCS leak rate greater than 10 gpm        event was over from an operational standpoint.
A power reduction of one percent/min was initiated, and the radiological emergency proce dure for an RCS leak rate greater than 10 gpm was initiated. With steam generator level control in manual at 12% power, the unit tripped on low low level in steam generator 1.. The NRC was notified of the event. During the event, an ice condenser ice bed temperature recorder, an area radiation monitor, a particulate radiation monitor, two pressurizer level transmitters, two pressuriz er pressure transmitters, and six non-qualified instruments failed, apparently due to high tem perature and high humidity in the incore instru ment room.
was initiated. With steam generator level control    An engineered safety features actuation had been in manual at 12% power, the unit tripped on low      unnecessary because the rate of inventory loss low level in steam generator 1.. The NRC was        from the RCS was small enough to be'overcome notified of the event. During the event, an ice      with normal charging flow. Some infstrumenta condenser ice bed temperature recorder, an area      tion located in the incore instrument room was radiation monitor, a particulate radiation monitor,  lost during the event, apparently due to the high two pressurizer level transmitters, two pressuriz    temperatures and humidity. The loss of the er pressure transmitters, and six non-qualified      instrumentation was of no consequence during instruments failed, apparently due to high tem      the event, but the condition and environmental perature and high humidity in the incore instru      qualification of the equipment had to be evaluated ment room.                                          as part of the recovery effort.
On April 20, Unit I entered mode 5, and depressurization of the RCS Was initiated. On
On April 20, Unit I entered mode 5, and              Because of the extremely hazardous radiation depressurization of the RCS Was initiated. On        levels caused by the ejected thimble tube (high
-April 21, the reactor vessel level was lowered to an elevation of 701 ft. Since the elevation of the seal table was 702 ft., the only leakage would be "dut to the nitrogen c6ver gas in the pressurizer.
-April 21, the reactor vessel level was lowered to    range radiation detection equipment later showed an elevation of 701 ft. Since the elevation of the  the actual level to be up to 4000 rem/hr at the end seal table was 702 ft., the only leakage would be    of the tube), it was immediately concluded that "dut to the nitrogen c6ver gas in the pressurizer. the recovery had to be well planned and executed Later calculations indicated that about 16,000 gal  to ensure that the risk to personnel would be of water were lost from the RCS during this          minimized. After evaluating several alternatives, event.                                              TVA decided to cut off the end of the thimble tube that was activated and move it to a location At approximately 9:00 a.m. on April 21, the      in the containment 'where it could be cut into first post-event entry was made into the incore      pieces by a remotely controlled robot and placed instrument room.' Personnel ieported that the        in a shielded container. Once this was accom thimble tube was completely ejected from the        plished, the cleanup and recovery of the incore conduit and twisted throughout the room.              instrument room could proceed with minimal Radiation surveys indicated levels of two to three  radiation exposure to personnel.
Later calculations indicated that about 16,000 gal of water were lost from the RCS during this event.
rem/hr at the entrance to the seal table area, 200-7.5-6                                       Rev 0196
At approximately 9:00 a.m. on April 21, the first post-event entry was made into the incore instrument room.' Personnel ieported that the thimble tube was completely ejected from the conduit and twisted throughout the room.
'USNRC       Technical Training Center USNRC Technical                Center            7.5-6                                       Rey 0196
Radiation surveys indicated levels of two to three rem/hr at the entrance to the seal table area, 200-300 rem/hr at the end of the tube closest to the seal table, and greater than 1000 rem/hr at the center of the ejected tube (see Figures 7.5-5 and 7.5-6). Pictures were taken to aid in later recov ery planning.- Later, a second entry was made to take additional pictures. Two individuals were in the area for only seven minutes and received doses of 1.966 and 1.939 rem.
Once the unit was placed in cold shutdown (mode 5) and depressurized with the vessel water level below the' elevation of the seal table, the event was over from an operational standpoint.
An engineered safety features actuation had been unnecessary because the rate of inventory loss from the RCS was small enough to be'overcome with normal charging flow. Some infstrumenta tion located in the incore instrument room was lost during the event, apparently due to the high temperatures and humidity. The loss of the instrumentation was of no consequence during the event, but the condition and environmental qualification of the equipment had to be evaluated as part of the recovery effort.
Because of the extremely hazardous radiation levels caused by the ejected thimble tube (high range radiation detection equipment later showed the actual level to be up to 4000 rem/hr at the end of the tube), it was immediately concluded that the recovery had to be well planned and executed to ensure that the risk to personnel would be minimized. After evaluating several alternatives, TVA decided to cut off the end of the thimble tube that was activated and move it to a location in the containment 'where it could be cut into pieces by a remotely controlled robot and placed in a shielded container. Once this was accom plished, the cleanup and recovery of the incore instrument room could proceed with minimal radiation exposure to personnel.
USNRC Technical Training Center 7.5-6 Rev 0196 Rey 0196
. Westinghouse Technology Advanced Manual Sequoyah-Incore Thimble Tube Ejection Event
'USNRC Technical Training Center 7.5-6


Westinghouse Technologv, Advanced Manual                  Sequoyah,Incore Thimble Tube Ejection Event Westinbouse TechnoIoy. Advanced Manual                   Sequoyah Incore Thimble Tube Ejection Event 7.5.5 Event Summary                                     pressure was reduced to 1000 psig. These efforts reduced but did not stop the-leak. The Subsequent analysis by TVA indicated that         system pressure and temperature were reduced to the failure of the high pressure seal (high pres     S400 psig and 370'F, and another attempt to repair sure Swagelok/Gyrolok fitting) that allowed the         the leak was made. The -repairmen noticed a RCS pressure to eject the D-12 thimble tube was         slight bowing between the high pressure-seal and caused by the dry brush cleaning tool. The               the thimble isolation valve. It was believed that cleaning tool had been modified from the original       this bowing caused the Swagelok fitting to be vendor design with the addition of a rigid base,         improperly seated, thus causing the leak. To which caused excessive force from operation of           correct the problem, -two bolts holding the the hand crank to be transmitted to the tube and         isolation valve to the valve bracket were removed fitting. Repeated stressing of the fitting eventual     to allow straightening of the thimble tube.
Westinbouse TechnoIoy. Advanced Manual Sequoyah Incore Thimble Tube Ejection Event 7.5.5 Event Summary Subsequent analysis by TVA indicated that the failure of the high pressure seal (high pres sure Swagelok/Gyrolok fitting) that allowed the RCS pressure to eject the D-12 thimble tube was caused by the dry brush cleaning tool. The cleaning tool had been modified from the original vendor design with the addition of a rigid base, which caused excessive force from operation of the hand crank to be transmitted to the tube and fitting. Repeated stressing of the fitting eventual ly caused it to fail. Subsequent review of the event by a TVA safety review group and by the NRC showed that though the event was not necessarily significant from an operational standpoint, it revealed significant breakdowns in administrative controls in maintenance and procedural areas. The NRC issued Information Notice 84-55: "Seal Table Leaks at PWRs,"
ly caused it to fail. Subsequent review of the          However, the two bolts and bracket were the event by a TVA safety review group and by the         ,primary support devices holding the fitting in NRC showed that though the event was not                 place. When they. were removed, ifie fitting necessarily significant from an operational             broke loose, causing an.,unisolable reactor standpoint, it revealed significant breakdowns in       coolant leak of approximately, 10 gpm in contain administrative controls in maintenance and               ment. The area was immediately evacuated.
which described the event and a similar event at Zion Generating Station Unit 1, and strongly recommended that all seal table maintenance take place only during cold shutdown conditions.
procedural areas. The NRC issued Information             Later, upon examination of the fittings, it was Notice 84-55: "Seal Table Leaks at PWRs,"               found that the ferrules of all but seven of the which described the event and a similar event at         thimbles had moved 1/32 to 3/8 in. up from their Zion Generating Station Unit 1, and strongly             original positions toward the edges of the con recommended that all seal table maintenance take         duits.
Enforcement action was later taken against TVA because of the breakdowns that led to the occur rence of the ejected thimble tube.
place only during cold shutdown conditions.
7.5.6 Similar Event: Zion Unit 1, Janu ary 20, 1984 On January 20, 1984, a reactor coolant leak was observed in the seal table room at Zion Generating Station Unit 1 (reported by LER 50 29511984-005). The unit was in hot shutdown with a plant heatup in progress.
Enforcement action was later taken against TVA               A review of the procedure for assembly of because of the breakdowns that led to the occur         -the high pressure and low pressure seals within rence of the ejected thimble tube.                       the Swagelok fittings revealed that the low pressure fittings could pull up the ferrules, 7.5.6 Similar Event: Zion Unit 1, Janu                   causing -improper fitting of the high pressure ary 20, 1984                                     seals. This is believed to explain the initial leak.
The RCS temperature and pressure were 445"F and 2235 psig, respectively. Inspection of the seal table by plant personnel revealed that a leak was located at a point where the high pressure seal mates to the conduit for incore thimble E-1 1. An attempt to repair the leak was made when the system pressure was reduced to 1000 psig.
Overtorquing of the fittings during the initial On January 20, 1984, a reactor coolant leak         attempt to correct the leak probably overstressed was observed in the seal table room at Zion ,the ferrule and allowed it to break loose when the Generating Station Unit 1 (reported by LER 50 Srestraint was removed.. ..
These efforts reduced but did not stop the-leak. The system pressure and temperature were reduced to S400 psig and 370'F, and another attempt to repair the leak was made. The -repairmen noticed a slight bowing between the high pressure-seal and the thimble isolation valve. It was believed that this bowing caused the Swagelok fitting to be improperly seated, thus causing the leak. To correct the problem, -two bolts holding the isolation valve to the valve bracket were removed to allow straightening of the thimble tube.
29511984-005). The unit was in hot shutdown with a plant heatup in progress. The RCS                 7.5.7 Seal Table Leaks:, Lessons temperature and pressure were 445"F and 2235                   .Learned psig, respectively. Inspection of the seal table by plant personnel revealed that a leak was located             Even though the Sequoyah and Zion inci at a point where the high pressure seal mates to         dents appear to have been caused by different the conduit for incore thimble E-1 1. An attempt         circumstances, both events point out the need for to repair the leak was made when the system             adequate controls and precautions to ensure
However, the two bolts and bracket were the
                                                                - - -- - - - -- -      ~-.   - - Z~XY   ~
,primary support devices holding the fitting in place. When they. were removed, ifie fitting broke loose, causing an.,unisolable reactor coolant leak of approximately, 10 gpm in contain ment. The area was immediately evacuated.
1JL7 "USNRC Technical Training Center-           -    7'.z - I                                         Rev
Later, upon examination of the fittings, it was found that the ferrules of all but seven of the thimbles had moved 1/32 to 3/8 in. up from their original positions toward the edges of the con duits.
A review of the procedure for assembly of
-the high pressure and low pressure seals within the Swagelok fittings revealed that the low pressure fittings could pull up the ferrules, causing -improper fitting of the high pressure seals. This is believed to explain the initial leak.
Overtorquing of the fittings during the initial attempt to correct the leak probably overstressed
,the ferrule and allowed it to break loose when the Srestraint was removed....
7.5.7 Seal Table Leaks:, Lessons
.Learned Even though the Sequoyah and Zion inci dents appear to have been caused by different circumstances, both events point out the need for adequate controls and precautions to ensure
~-.  
~
Z~XY 1JL7 "USNRC Technical Training Center-7'. z - I Westinghouse Technologv, Advanced Manual Sequoyah,Incore Thimble Tube Ejection Event Rev


&#xfd;Westinghouse Technology Advanced' Manual             Sequoyah Incore Thimble Tube Ejection Event Westinghouse Technology Advanced        Manual        Sequoyah Incore Thimble Tube Ejection Event personnel and plant safety while during mainte nance on high pressure systems, especially activities involving the seal table. Each event occurred with the reactor at elevated temperatures and pressures, and, in'the case of Sequoyah, the plant was at 30% reactor power. In both cases maintenance was conducted on a high pressure system with what was equivalent to single-valve protection. For both plant and personnel safety considerations, maintenance should not normally be performed on high 'pressure systems with the RCS at high pressures and temperatures and with only single-valve protecti6n. To preclude the types of events describeed, in this section from occurring, every effo't should be made to sched ule seal table maintenance during cold shutdown conditions. Also, the need for maintenance of any system under hot, pressurized conditions should be thoroughly evaluated before personnel are alloied to perform the w&#xfd;ork. Licensees were urged to review their maintenance procedures to ensure that maintenance under these conditions is minimized.
Westinghouse Technology Advanced Manual Sequoyah Incore Thimble Tube Ejection Event personnel and plant safety while during mainte nance on high pressure systems, especially activities involving the seal table. Each event occurred with the reactor at elevated temperatures and pressures, and, in'the case of Sequoyah, the plant was at 30% reactor power. In both cases maintenance was conducted on a high pressure system with what was equivalent to single-valve protection. For both plant and personnel safety considerations, maintenance should not normally be performed on high 'pressure systems with the RCS at high pressures and temperatures and with only single-valve protecti6n. To preclude the types of events describeed, in this section from occurring, every effo't should be made to sched ule seal table maintenance during cold shutdown conditions. Also, the need for maintenance of any system under hot, pressurized conditions should be thoroughly evaluated before personnel are alloied to perform the w&#xfd;ork. Licensees were urged to review their maintenance procedures to ensure that maintenance under these conditions is minimized.
No one was injured during the Sequoyah and Zion events, and the operators brought the plants to a cold shutdown condition without undue problems. However, both of these events caused problems associated with theidiological cleanup efforts. In th6 case of Seqiibyah, a highly radioactive component was ejected from the core.
No one was injured during the Sequoyah and Zion events, and the operators brought the plants to a cold shutdown condition without undue problems. However, both of these events caused problems associated with the idiological cleanup efforts.
In th6 case of Seqiibyah, a highly radioactive component was ejected from the core.
This required that extra6rdinary -measures be taken'during the decontamination of the room.
This required that extra6rdinary -measures be taken'during the decontamination of the room.
Increased personnel exp~osure and downtime of the plant due to the cleanup and repair efforts provide'additiohal incentives for precautions against maintenance under iimilar conditions.
Increased personnel exp~osure and downtime of the plant due to the cleanup and repair efforts provide'additiohal incentives for precautions against maintenance under iimilar conditions.  
"USNRC Technical Training Center                 7. 5-8                                 Rev 0196
"USNRC Technical Training Center
: 7. 5-8 Rev 0196
&#xfd;Westinghouse Technology Advanced' Manual Sequoyah Incore Thimble Tube Ejection Event


Westinahouse Techno.. v Advanced Manual             Senuovah Incore Thimble Tube Ejection Event TABLE 7.5-1         Sequence of Events April 19, 1984 2110                 Pressurizer level was decreasing and charging flow was increased by 45 gpm (from 85 gpm to 130 gpm).
Westinahouse Techno..
2116                Pressurizer level stopped decreasing, indicating that the leak rate was less than 45 gpm (later estimates showed leakage to be approximately 30 gpm).
v Advanced Manual Senuovah Incore Thimble Tube Ejection Event TABLE 7.5-1 Sequence of Events April 19, 1984 2110 2116 2117 2120 2125 2133 2152 2205 April 20. 1984 0932 1114 1400 April 21. 1984 0715 Pressurizer level was decreasing and charging flow was increased by 45 gpm (from 85 gpm to 130 gpm).
2117                Reactor power reduction began at 1%/min 2120                Radiological Emergency Plan initiated 2125                Reactor power at 18% (Tavg at 525"F and pressure at 2235 psig) 2133                Unit tripped on low-low level in steam generator 1 (feedwater control in manual) 2152                  NRC notified of event as required by 10 CFR 50.72 2205                  Controlled cooldown and depressurization of plant begun (Tavg at 500"F and pressure at 1900 psig)
Pressurizer level stopped decreasing, indicating that the leak rate was less than 45 gpm (later estimates showed leakage to be approximately 30 gpm).
April 20. 1984 0932                Unit entered mode 5 and depressurization of RCS initiated 1114                RCS pressure at 250 psig - leak rate estimated to be 18 gpm 1400                  RCS pressure at 40 psig - leak rate estimated to be 5.4 gpm April 21. 1984 0715                  Vessel water level lowered to about 1 foot below elevation of seal table (only leakage was due to N2 blanket in the pressurizer). Total leakage later estimated to be 16,000 gallons.
Reactor power reduction began at 1 %/min Radiological Emergency Plan initiated Reactor power at 18% (Tavg at 525"F and pressure at 2235 psig)
In                                   ID,     Al of
Unit tripped on low-low level in steam generator 1 (feedwater control in manual)
                                                / .a-                                           V&#xfd;K; T k I.
NRC notified of event as required by 10 CFR 50.72 Controlled cooldown and depressurization of plant begun (Tavg at 500"F and pressure at 1900 psig)
USNRC Technical Training Center
Unit entered mode 5 and depressurization of RCS initiated RCS pressure at 250 psig - leak rate estimated to be 18 gpm RCS pressure at 40 psig - leak rate estimated to be 5.4 gpm Vessel water level lowered to about 1 foot below elevation of seal table (only leakage was due to N2 blanket in the pressurizer). Total leakage later estimated to be 16,000 gallons.
In ID, Al of USNRC Technical Training Center
/.a-V&#xfd;K; T
k I.


0199-3 "THIMBLE GUIDE TUBE WELD UNION Figure 7.5-1 In-Core Instrumentation
0199-3 "THIMBLE GUIDE TUBE WELD UNION Figure 7.5-1 In-Core Instrumentation


0199-3
-STORAGE REEL HELICAL WRAP DRIVE CABLE  
                                -STORAGE REEL HELICAL WRAP DRIVE CABLE
-DRIVE WHEEL 5-PATH ROTARY TRANSFER
                                -DRIVE WHEEL 5-PATH ROTARY TRANSFER "INTERCONNECTING TUBING WYE UNIT ISOLATION VALVE HIGH PRESSURE SEAL SEAL TABLE "MINIATURE NEUTRON DETECTION Figure 7.5-2 Drive System for In-Core Instrumentation
" INTERCONNECTING TUBING WYE UNIT ISOLATION VALVE HIGH PRESSURE SEAL SEAL TABLE "MINIATURE NEUTRON DETECTION Figure 7.5-2 Drive System for In-Core Instrumentation 0199-3


('bIb LOW PRESSURE SEAL r//////,,o            HIGH PRESSURE S Figure 7.5-3     Thimble Tube Cleaning Tool 7.5-15
('bIb LOW PRESSURE SEAL Figure 7.5-3 HIGH PRESSURE S Thimble Tube Cleaning Tool 7.5-15 r//////,,o


LOW PRESSURE SEAL THIMBLE TUBE HIGH PRESSURE SEAL s -- FULL RCS PRESSURE THIMBLE GUIDE                   1,11 III lIl Eli I:
LOW PRESSURE SEAL THIMBLE TUBE HIGH PRESSURE SEAL THIMBLE GUIDE 1,11 III lIl Eli Fm I :  
Fm      S7~             SEAL TABILE
'II s
                                    'II Figure 7.5-4     Seal Table Design 7.5-17
-- FULL RCS PRESSURE S7~
SEAL TABILE Figure 7.5-4 Seal Table Design 7.5-17


      '1 CD
'1 CD  
      -4 a;...,
-4 CiD CD  
CiD CD
-.4 0
-.4
(D 0
* 0 (D
0 CD a;...,
0 0
CD


iTi      i I''
iT i i i  
I            i   i I
" I \\
I LLLLL*
I''
i
LLLLL*
* i  -       r
4IN 4-__
_! I                         i 4IN                                                                                  -I
I -;
                                                                  -I             _
I ~
4-__                                                                        -!14
~ -
                                                                                *-.it II I             -
I I I
1 it71 II I     '   &deg;    '                I  I I I I
-!14
I I               I    .* - I 'i
*-.it it71
                                                                      .1   I     I'I i .       "  \
I I I
-I I
I j
I 'i
.1 I I'I E1T F7I TPT+/-
i*,i at I
I I
Figure 7.5-6 Ejected Thimble Tube D-12 7.5-21
' i i i
II
&deg; '
I I
i i
I i
i r
I II 1
I I
t
: i.
I I
I I
                                    , S..
S..  
1 t
)
                                                  -      i. I
                                                            !',*. E1T F7I TPT+/-
I
I
                                                        , )        '
_! I
I -;            I I i            i*,i        at I    I  I I ~  ~-        I
-I I
* i
I 1
                                                        ' i i       I    I  ! .
i I
Figure 7.5-6          Ejected Thimble Tube D-12 7.5-21}}
I i}}

Latest revision as of 15:06, 16 January 2025

Part 4 of 4 - Westinghouse Advanced Course R-504P
ML023030334
Person / Time
Site: Beaver Valley
Issue date: 09/19/2002
From:
Westinghouse
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2002-0343
Download: ML023030334 (157)


Text

Westinghouse Technology Advanced Manual Section 4.11 Risk Management

Westinghouse Technology Advanced Manual Risk Management TABLE OF CONTENTS 4.11 RISK MANAGEMENT........................................

4.11.1 Introduction...........................................

4.11.2 H istory........................................

4.11.2.1 Deterministic Analysis 4.11.2.2 Probabilistic Risk Assessment.......................

4.11.2.3 Severe Accident Policy............................

4.11.3 Risk-Based Regulation....................................

4.11.4 PRA Policy Statement and Implementation Plan...................

4.11.4.1 4.11.4.2 4.11.4.3 4.11.4.4 4.11.4.5 4.11.5 Summary Risk Management....................

Configuration Management.............

On-Line Maintenance.................

Maintenance Rule Inspection of Configuration Management....

4.11-1 4.11-1 4.11-1 4.11-1 4.11-2 4.11-4 4.11-6 4.11-8 4.11-9 4.11-10

.4.11-10 4.11-11 4.11-14 S............................................

4.11-15 4.11-16 4.11.6 References.................................

LIST OF TABLES 4.11-1 Insights from Review of Plant IPEs.................................

4.11-19 Rev 0396 USNRC Technical Training Center Westinghouse Technology Advanced Manual Risk Management 4.11-i

WestnghuseTecholoy Avancd Mnua R~d M~~rnmU, LIST OF FIGURES 4.11-1 4.11-2 4.11-3 4.11-4 4.11-5 4.11-6 4.11-7 4.11-8 4.11-9 4.11-10 4.11-11 4.11-12 4.11-13 4.11-14 4.11-15 4.11-16 4.11-17 4.11-18 4.11-19 Deterministic Analysis.......................................

Probabilistic Risk Assessment..................................

Elements of PRA..........................................

Historical Perspective.......................................

Major Contributors to Core Damage by Accident Types.................

Relative Importance Factors for BWR Systems......................

Relative Importance Factors for PWR Systems.......................

Risk-Based Regulation.......................................

PRA Policy Statement.......................................

PRA Implementation Plan.....................................

Risk and Configuration Management - Definitions....................

Risk M anagement Factors.....................................

Maintenance Rule - Objectives..................................

M aintenance Rule - Scope.....................................

Configuration Risk Monitoring Methods...........................

Preventive Maintenance Equipment Out-of-Service Matrix...............

Risk Monitoring............................................

Risk M onitoring Predictive....................................

Risk Profile for Allowed Outage Time Determination...................

4.11-21 4.11-23 4.11-25 4.11-27 4.11-29 4.11-31 4.11-33 4.11-35 4.11-37 4.11-39 4.11-41 4.11-43 4.11-45 4.11-47 4.11-49 4.11-51 4.11-53 4.11-55 4.11-57 ATTACHMENTS NRC Inspection Report Nos. 50-334/94-24 and 50-412/94-25.........

4.11-59 Rev 0396 4.11-ii

-1 Westinghouse Technology Advanced Manual Risk ha3nsb a

-+

Ik USNRC Technical Training Center

Westinghouse Technology Advanced Manual Risk Management 4.11 RISK MANAGEMENT Learning Objectives:

1. Describe what is meant by the term "defense in depth," and explain how nuclear power plants have been designed to incorporate this concept.
2. Describe how probabilistic risk assessments (PRAs) of nuclear power plants can comple ment deterministic analyses.
3. Define the term "configuration management,"

and explain why configuration management is necessary in managing risk at nuclear power plants.

4. Describe methods that are used by nuclear utilities to incorporate risk insights into maintenance planning.
5. Describe how PRA results are used by the NRC for risk-based regulation.

4.11.1 Introduction Nuclear power plants in the U.S. have been designed and constructed in accordance with deterministic analyses. The design bases of each nuclear unit are documented in its Final Safety Analysis Report (FSAR), which is updated yearly as the Updated Safety Analysis Report (USAR). Nuclear power plant operation, includ ing maintenance and surveillance of safety-related equipment, is controlled and restricted by techni cal specification requirements.

Throughout the history of commercial nuclear power, the regulatory agencies (the AEC and Slater, the NRC) and the nuclear industry have continued to research and implement new and/or better methods of operating, maintaining, testing, and analyzing nuclear plants and equipment to reduce risk and to ensure safety. This section discusses the major regulatory and industry actions that have been or are being incorporated to address operational and accident risk manage ment in nuclear power plants.

4.11.2 History 4.11.2.1 Deterministic Analysis Nuclear power plants in the U. S. have been designed and constructed in accordance with deterministic analyses. Deterministic analyses involve standard good engineering practices, calculations, and judgements; and in the case of nuclear power plants, design bases which include the assumption.of worst-case conditions for accident analyses. Examples of these worst-case conditions include the assumptions of an initial reactor power of greater than 100%, restrictive power distributions within the core, conservative engineering factors, the minimum-required accident mitigation equipment available, and pipe breaks of all possible sizes.

In a large nuclear generating station with a core output rated at over 3000 MW thermal, about six pounds of fission products are pro duced each day that the unit is operated at full power. To protect the public from these fission products during normal and accident situations, a "defense in depth," or multiple levels of assur ance and safety, exists to minimize risk to the public from nuclear power plant operation.

-A multiple, barrier concept was used in designing and building nuclear units. The first barrier against fission product release is the fuel cladding. The fuel cladding is a cylindrical sheath that is designed to contain fuel pellets and fission products during normal and abnormal transients. The second barrier, if isolated, is the reactor coolant pressure boundary. This barrier is designed to withstand high pressures and Rev 1)396 USNRC Technical Training Center 4.11-1 Westinghouse Technology Advanced Manual Risk Management Rev 0396

°

Westn~huse echolo~

Adance MaualRisk Manatement temperatures. The thickness of this barrier varies 1m the reactor vessel tickness of several inches

,he steam generator tube thickness of less than one-tenth of an inch. Since the reactor coolant pressure boundary surrounds the first barrier, it should contain any fission products which escape from the cladding. The containment (reactor building) provides the final barrier. There are many approved containment designs; each contains the reactor coolant system and consti tutes a barrier to the release of radioactivity to the public. These barriers and the protection against the loss of each barriei are requiied by the Code of Federal Regulations.

Engineered safety features (ESFs) are provid ed in nuclear power plants to mitigate the conse quences of reactor plant accidents. Sections of the General Design Criteria in'Appendix A of 10 CFR, Part 50 require that specific systems be provided to serve as ESF systems. Containment systems, a residual heat removal (RHR) system, emergency core cooling systems. (ECCSs),

containment heat removal systems, containment atmosphere cleanup systems, and certain cooling water systems are typical of the systems required to be provided as ESF systems. Each of the ESF systems is designed to withstand a single failure without the loss of its protective functions during or following an accide nt condition. However, this single failure is limited to either an active failure during the injection phase following an accident, or an active or a passive failure during the recirculation phase. Most accident analyzes assume the loss of offsite power. This loss of offsite power is considered in addition to the "single active failure."

The engineered safety features which contain active components are designed with two inde pendent trains. Examples of systems'e'nploying this design feature are-the ECCSs, in which either train can satisfy 'all the' requiiements to safely shut down the plant -61m eet the final acceptance criteria following an accident. Redun dant pumps, valves, instrument sensors, instru ment strings, and logic devices are required to ensure that no single failure will prevent at least one of these trains from performing its intended function.

All engineered safety feature systems must be physically separated so that a catastrophic failure of one systeff will not prevent another engi neered safety feature system from performing its intended function. Electrical power to the engi neered safety features comes from the transmis sion grid via transformers, breakers and busses.

Redundant diesel generators are normally the standby power supply.

ESF systems are designed to remain func tional if a safe shutdown earthquake occurs and are thus designated as Seismic Category I. The reactor coolant pressure boundary, reactor core and vessel internals, and systems or portions of systems that are required for emergency core cooling, post-accident containment heat removal, and post-accident containment atmosphere cleanup are designed to Seismic Category I requirements. ESF systems are also designed to include diversity. "Diversity" refers to different methods of providing the same safety protection or function.. Two systems which illustrate diversity are the containment fan cooler system and the contaihiment spray system. Each of these systems is designed to lower the pressure inside the containrient following a steam break or a loss of coolant accident inside the containment.

4.11.2.2 Probabilistic Risk Assessment A PRA is an engineering tool used to quanti fy the risk to a facility. Risk is defined as the likelihood and consequences of rare events at nuclear power plants. These events are generally referred to as severe accidents. The PRA aug ments traditional deterministic engineering USNRC Technical Training Center 4.11-2 Rev 0396 Rev 0396 I

Westinghouse Technolos, v Advanced Manual Risk Management 4.11-2 USNRC Technical Training Center

WestinEbouse TechnoloEy Advanced Manual Risk Management analyses by providing quantitative measures of safety and thus a means of addressing the relative significance of issues in relation to plant safety.

Basically, a nuclear power plant PRA answers three questions:

What can go wrong?

How likely is it?

What are the consequences?

Probabilistic risk assessment is a

multidisciplinary approach employing various methods, including system reliability, contain ment response modeling, and fission release and public consequence analyses, as depicted graphi cally in Figure 4.11-3. A PRA treats the entire plant and its constituent systems in an integrated fashion, and thus subtle interrelationships can be discovered that are important to risk. Another important attribute of probabilistic risk assess ment is that it involves analyses of both single and multiple failures. Multiple failures often lead to situations beyond the plant design basis and, in some cases, are more likely than single fail ures. By addressing multiple failures, a PRA can cover a broad spectrum of potential accidents at a plant.

The first comprehensive development and application of PRA techniques in the commercial nuclear power industry was the NRC-sponsored "Reactor Safety Study" (RSS). The principal objective of the RSS was to quantify the risk to the public from U.S. commercial nuclear power plants. The RSS analyzed both a BWR (Peach Bottom) and a PWR (Surry). The report of the RSS results, generally referred to as WASH 1400, was published in October of 1975. The results of the study can be summarized as fol lows: (1) risks from nuclear power plant opera tion are small as compared to non-nuclear haz ards; (2) the frequencies of core melt accidents are higher than previously thought (calculated to be approximately 5 X 10-5 per reactor year); (3) a 0

0 0

Rev Ui9b USNRC Technical Training Center variety of accident types are important; (4) design-basis accidents are not dominant contribu tors to risk; and (5) significant differences in containment designs are important to risk. The basic PRA approach developed by the RSS is still used today.

Because the RSS was the first broad-scale application of event-and fault-tree methods to a system as complex as a nuclear power plant, it was one of the more controversial documents in the history of reactor safety. The RSS also analyzed conditions beyond the design basis and attempted to quantify risk. A group called the Lewis Committee performed a peer review of the RSS and published a report, NUREG/CR-0400, to the NRC three years later to describe the effects of the RSS results on the regulatory process. The report concluded that although the RSS had some flaws and that PRA had not been formally used in the licensing process, PRA methods were the best available and should be used to assist in the allocation of the limited resources available for the improvement of safety.

The 1979 accident at Three Mile Island (TMI) substantially changed the character of the NRC's regulatory approach. The accident revealed that perhaps nuclear reactors might not be safe enough and that new policies and approaches were required. Based on comments and recom mendations from the Kemeny and Rogovin investigations of the TMI accident, a substantial program to research - severe accident phenomenology was initiated (i.e., those acci dents beyond the design basis which could result in core damage). It was also recommended that PRA be used more by the staff to complement its traditional, non-probabilistic methods of analyz ing nuclear plant safety. Rogovin also suggested in a report to the Commissioners and the public, NUREG/CR-1250,- that the NRC policy on severe accidents consider (1) more severe acci dents in the licensing process and (2)

Westinghouse Technology Advanced Manual Risk Management 4.11-3 Rev 0396

Westnghuse echolog Adance MaualRisk Manavement probabilistic safety goals to help define what is an acceptable level of plant safety.

In late 1980, the NRC sponsored a current assessment of severe accident risks for five commercial nuclear power plants' in a report called "Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants," NUREG 1150. This report included an update of the RSS risk assessments of Surry and Peach Bottom and provided the latest NRC version of the state of the art in PRA models, methods, and approach es.

A summary of the insights gained from early risk assessments are as follows:

1. As illustrated by the NUREG-1150 results and early! plant PRAs, the PRAs reflect details of plant sysiems, operations and physical layouts.

Since nuclear power plants in the U.S. are not stan dardized, the PRA results are very plant specific.

Reactor design, equipment, location, and operation (power levels, testing and maintenance, operator actions) have large impacts on the results. There fore, in detail, the results can differ significantly from plant to plant.

2. Even with the differences in the detailed results between plant studies, PRAs can be used for some generic applications as listed in NUREG-1050. Some examples are:

"* Regulatory activity prioritization,

"* Safety issue evaluation,

"* Resource allocation,

"* Inspection program implementation, and

"* NRC policy development.

3. Using PRA in the decision-making process has aided licensees in determin ing which design modifications are desirable from both risk-reduction and cost-benefit standpoints for the improve ment of plant safety. PRA results have more recently been used by licensees in enforcement discussions and in support of technical specification change requests.
4. PRAs have pointed out some general differences with respect to BWRs and PWRs as classes of plants. For example, NUREG-1 150 states that for BWRs, the principal initiating event contributors to core damage frequency are station black outs (SBOs) and anticipated transients without scram (ATWSs); for PWRs, the principal contributors to core damage frequency' are LOCAs. NUREG-1 150 also states that the core damage frequen cies for PWRs are higher than those for BWRs, because BWRs have more redundant 'methods of supplying water to the reactor coolant system. However, PWRs have lower probabilities of early containment failure given a core-damage sequence, since PWR containments are larger and can withstand higher pressures than BWR containments.

4.11.2.3 Severe Accident Policy In August of 1985, the NRC issued the "Policy Statement on Severe Accidents Regard ing Future Designs and Existing Plants" that introduced the Commission's plan to address severe accident issues for existing commercial nuclear power plants. The stated policy was that the public should be subject to no undue risk from the operation of commercial nuclear reac tors. A year later, in August of 1986, the NRC established' both qualitative and quantitative safety goals for the nuclear industry. The quali tative safety goals are as follows:

USNRC Technical Training Center 4.11-4 Rev 0396 Rev 0396 USNRC Technical Training Center

-1 Westinghouse Technology Advanced Manual b

4.11-4

Westinghouse Technology Advanced Manual Risk Management Individual members of the public should be provided a level of protection from the consequences of nuclear power plant opera tion such that individuals bear no significant additional risk to life and health.

Societal risks to life and health from nuclear power plant operation should be comparable to or less than the risks of generating electric ity by viable competing technologies and should not be significant additions to other societal risks.

The corresponding quantitative safety goals are:

The risk to the average individual in the vicinity of a nuclear power plant of prompt fatalities that might result from a reactor accident should not exceed one-tenth of one percent of the sum of prompt fatality risks resulting from other accidents to which members of the U.S. population are generally exposed.

The risk to the population near a nuclear power plant of cancer fatalities that might result from nuclear power plant operation should not exceed one-tenth of one percent of the sum of cancer fatality risks resulting from all other causes.

The average accident fatality rate in the U.S.

is approximately 5 X 10-4 per individual per year, so the quantitative value for the first goal is 5 X 10-7 per individual per year. The "vicinity of a nuclear power plant" is defined to be the area within one mile of the plant site boundary. The average U.S. cancer fatality rate is approximately 2 X 10-3 per year, so the quantitative value for the second goal is 2 X 10-6 per average individu al per year. The "population near a nuclear power plant" is defined as the population within 10 miles of the plant site.

N However, because of arbitrary assumptions in calculations, uncertainties in PRA analyses, and gaps in equipment reliability data bases, the safety goals are not definitive requirements, but serve as aiming points or numerical benchmarks.

In addition, it should be noted that the goals apply to the industry as a whole and not to individual plants. The safety goals are not in and of themselves meant to serve as the sole bases for licensing decisions. However, when information is available that is applicable to a specific licens ing decision, it is to be considered as one factor in the licensing.

Implementation of the NRC plan to address severe accident risk included development of plant-specific examinations that would reveal vulnerabilities to severe accidents and cost effective safety improvements that would reduce or eliminate the important vulnerabilities. In Generic Letter 88-20 dated November 23, 1988, all utilities with licensed nuclear power plants were requested to perform such examinations.

The specific objectives for these individual plant examinations (IPEs) are for each utility to:

"* Develop an overall appreciation of severe accident behavior,

"* Understand the most likely severe accident sequences that could occur at its plant, Gain a more quantitative understanding of the overall probability of core damage and radioactive material releases, and

" If necessary, reduce the overall probability of core damage and radioactive material release by appropriate modifications to procedures and hardware that would help prevent or mitigate severe accidents.

Many of the IPEs submitted to the NRC have USNRC Technical Training Center 4.11-5 Rev 0396 Westinghouse Technology Advanced Manual Risk Management 4.11-5 Rev 0396 USNRC Technical Training Center

Westinghouse TechnoIoy Advanced, Manual Risk Manaenient identified unique and/or important safety fea tures. Table 4.11-1 includes a list of insights obtained through analysis of 72 IPEs (25 BWRs and 47 PWRs) covering 106 commercial nuclear units (35 BWRs and 71 PWRs). The items in the list indicate vulnerabilities identified during the IPE process at various plants and modifica tions that may have been made to plant equipment or procedures to reduce the vulnerabilities and hence, the calculated core damage frequencies.

Risk-and reliability-based methods can be used for evaluating allowed outage times, sched uled or preventive maintenance, action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals, and analyses of plant configurations resulting from outages of systems or components. Because of the limitations in thie IPE process such as arbi trary assumptions in calculations, uncertainties in PRA analyses, and gips in equipment ireliability data bases, the insights identified in and of themselves do not require iny action by the individual licensee, btit'provide information on where vulnerabilities exist in its plant.

4.11.3 Risk-Based Regulation Technical specification requirements for nuclear power plants define the limiting condi tions for operationd (LCOs)' and surveillance requirements (SRs) to assire safety during operation. In general, these requirements are based on deterministic analyses and engineering judgements. Experiences with all modes of plant operation indicate thai some elements of the requirements are unnecessarily restrictive, while a few may not be conducive to safety. Improv ing these requirements involves many consider ations and is facilitated by the availability of plant-specific IPEs and' the development of related methods for analy'sis. Risk-based regula tion is a regulatory approach in which insights fronm PRAs are used in combination with deter-ministic system and engineering analyses to focus licensee and regulatory attention on issues commensurate with their importance to safety.

Examples of uses of risk insights for risk based regulation include the prioritization of generic safety issues, evaluation of regulatory requirements, assessment of design or operation al adequacy, evaluation of improved safety features, prioritizing inspection activities, evalua tion of events, and evaluation of technical specifi cation revision requests and enforcement issues.

Using risk-and reliability-based methods to improve technical specifications and other regula tory requirements has gained wide interest because they can:

Quantitatively evaluate risk impacts and justify changes in requirements based on objective risk arguments, and

"* Provide a defensible bases for improved requirements for regulatory applications.

Caution must be applied when using the results of risk assessments, however, because of the limitations of PRA methodology. The plant's initial PRA (and/or IPE) is a snapshot of the plant at the time the plant configuration and data were collected and analyzed. The analyses must be revised as modifications are made to the plant design, operating methods, procedures, etc., to maintain the risk assessment results current. In addition, a'PRA model is not a complete or accurate model of the plant during all modes of operation. For example, for PWRs, the removal of both boric acid makeup pumps from service is not very risky during mode I operations; howev er, these pumps are very importanit when the achievemeni of the required shutdown margin in mode 5 is considered. Other limitations of PRAs include the uncertainties in the equipment failure data bases, the level of understanding of physical USNRC Technical Training Center 4.11-6 Rev 0396 Westinghouse Technology Advanced, Manual Risk Management 4.11-6 USNRC Technical Training Center Rev 0396

Westinghouse Technology Advanced Manual Risk Manaaement processes, the uncertainties in quantifying human reliability, the sensitivity of results to analytical assumptions, and modeling constraints.

Quantitative risk estimates have played an important role in addressing and resolving regulatory issues including:

Anticipated transient without scram: Risk assessments contributed to development of the ATWS rule, 10CFR50.62, which re quires all PWRs to have equipment diverse and independent from the reactor protection system for auxiliary feedwater initiation and turbine trip, requires all CE and B&W PWRs and BWRs to have a diverse scram system, provides functional requirements for the standby liquid control systems of BWRs, and requires that BWRs have equipment for automatically tripping reactor coolant recircu lation pumps.

Auxiliary feedwater (AFW) system reliability:

The NRC has reviewed information provided on auxiliary feedwater systems in safety analysis reports. As part of each review, the NRC assures that an AFW system reliability analysis has been performed. The Standard Review Plan states that an acceptable AFW system should have an unreliability in the range of 10-4 to 10-5. Compensating factors such as other methods of accomplishing the safety functions of the AFW system or other reliable methods for cooling the reactor core during abnormal conditions may be consid ered to justify a larger unavailability of an AFW system.

Station blackout (loss of all ac power): Risk assessments contributed to development of the blackout rule, 10CFR50.63, which requires licensees to determine a plant specific station blackout duration, during which core cooling and containment intergrity would be maintained, and to have procedures addressing station blackout events. The rule allows utilities several design alternatives to ensure that an operating plant can safely shut down in the event that all ac power is lost.

One alternative is the installation of a full capacity alternate ac power source that is capable of powering at least one complete set of normal safe shutdown loads.

Backfits: There are many cases where PRAs have been used to support the backfit deci sion process. For example, after the TMI accident several TMI action plan issues evolved.

Consumers Power performed a PRA of the Big Rock Point nuclear plant to assist in identifying those TMI generated changes which might actually have an impact on the risk at the plant. As a result, Consum ers Power was able to negotiate exemptions on seven issues which did not significantly lower risk at Big Rock Point, saving over

$45 million. In addition, Consumers Power used the PRA to identify changes necessary to reduce the core damage frequency at Big Rock Point to an acceptable level. The cost of a change is generally considered to be the dollar cost associated with design, licensing, implementation, operation and maintenance.

Sometimes the cost of replacement power is included for a backfit requiring a plant shutdown to implement. The benefit of the change is the reduction in risk if the change is implemented. The most cost-effective change provides the most improvement in safety for the least cost. This type of cost-benefit analysis was done extensively during the ATWS rule-making process.

Risk-based inspections: A PRA provides information on dominant accident sequences and their minimal cut sets. This information has already been used to design the risk based portions of some plant-specific inspec-USNRC Technical Training Center 4.11-7 Rev 0396 Westinghouse Technology Advanced Manual Risk Management 4.11-7 Rev 0396 USNRC Technical Training Center

Westnghuse echolog Adance MaualRisk Manavement tion programs. Inspection programs can be prioritized to address the minimization of hardware challenges, the assurance of hard ware availability, and the effectiveness of plant staff actions as they relate to the sys tems and faults included in the dominant accident sequences. A PRA supports the assessment of a plant change by providing a quantitative measure of the relative level of safety associated with the change. This is accomplished by performinr sensitivity studies. A sensitivity study is a study of how different assumptions, configurations, data or other potential changes in the basis of the PRA impact the results.

The NRC staff is expected to use PRA results to assist in prioritizing regulatory activities, and plant inspectors are expected to use IPE results to prioritize inspection activities. The inspectors should be alert for situations which constitute near misses. That is, the inspector needs to recognize those events that come close to accident sequences. Recognizing the significance of events at the plant is especially important for those related to sequences initiated by an ATWS or an intersystem LOCA, whichi can have severe consequences.

Finally, the NRC staff will be involved in more and more discussions in which PRA results are used or misused to justify a particular action'or inaction.' Thierefore,.it is imp6rtant that the staff be familiar with the types of information that a PRA provides and that the staff can use PRA informationi accurately in discussions and decisions.

4.11.4 PRA Policy Statement and Implementation Plan Deterministic approaches to regulation consider a set of challenges'to -safety and deter mine how those challenges 'should be mitigated.

A probabilistic approach to regulation enhances and extends the traditional deterministic approach by:

"* Allowing consideration of a broader set of potential challenges to safety,

"* Providing a: logical means for prioritizing these challenges based on risk significance, and

"* Allowing consideration of a broader set of resources to defend against these challenges.

In August of 1995, the NRC issued the "Policy Statement on the Use of Probabilistic Risk Assessment Methods in Nuclear Regulatory Activities." The overall objectives of the policy statement are to improve the regulatory process through improved risk-informed safety decision making, through more efficient use of staff resources, through a reduction in unnecessary burdens on licensees, and through the strength ening of regulatory requirements. The policy statement contains the following elements regard ing the expanded NRC use of PRA:

Increased use of PRA in reactor regulatory matters should be implemented to the extent supported by the state of the art in PRA methods and data' and in a manner that complements the NRC's deterministic ap proach and supports the NRC's traditional defense-in-depth philosophy.

" PRA should be used to reduce unnecessary conservatism associated with current regula tory requirements. Where appropriate, PRA should be used to support additional regulato ry requirements.

PRA evaluations in support of regulatory decisions should be as realistic as possible, and appropriate supporting data should be publicly available.

"* Uncertainties in PRA evaluations need to be considered in applying the Commission's USNRC Technical Training Center 4.11-8 Rev 0396 Rey 0396 L_

Westinghouse Technology Advanced Manual 4.11-8 USNRC Technical Training Center

Westinghouse Technology Advanced Manual Risk Management safety goals for nuclear power plants.

An agency-wide plan has been developed to implement the PRA policy statement. The scope of the PRA implementation plan includes reactor regulation, reactor safety research, analysis and evaluation of operational experience, staff train ing, nuclear material, and low and high level waste regulations. The plan provides mecha nisms for monitoring programs and management oversight of PRA-related activities. The plan includes both ongoing and new PRA-related activities. The following are PRA-related regula tory activities that are underway within the NRC:

"* Graded quality assurance,

"* The maintenance rule,

"* In-service inspection and testing,

"* The IPE insights program,

"* PRA training for the staff, and

"* The reliability data rule.

4.11.4.1 Risk Management Risk management is a means of prioritizing resources and concerns to control the level of safety.

As discussed above, the NRC's and nuclear industry's use of risk analyses have shown that:

"* The risk from nuclear power plant operation is generally low,

"* Low cost improvements can sometimes have significant safety and economic benefits, and

"* Subtle design and operational differences make it difficult to generalize dominant risk contributors from plant to plant or for a class of plants.

Because each nuclear power plant is essen tially unique, the most powerful use of the PRA is as a plant-specific tool. PRAs can be used in two basic ways:

1. To support plant operations, mainte nance, inspection, and planning activities; and
2. To provide information regarding chang es to improve plant safety and reliability.

A plant's PRA can be used during all modes of plant operation to prioritize operations and maintenance resources to maintain safety at acceptable levels. This is accomplished, in part, by periodically updating the PRA results to keep current with plant configuration and component failure data. Importance measures can be used to indicate where preventive actions would be most beneficial and what is most important to maintain at acceptable safety levels. Based on the updated results, adjustments in plant activities and design can be made, as appropriate, to maintain the desired level of safety as indicated by the results of the PRA.

The PRA supports plant activities by provid ing information on the risk-significant areas in plant operation, maintenance, and design.

Operations, maintenance, inspection, and plan ning personnel can then appropriately address these areas to control the risk at acceptable levels.

The risk-significant areas are identified by the results of the PRA. These areas are where the most attention and effort should be focused.

Several useful PRA results are (1) dominant contributors (these indicate which failures are the largest contributors to the likelihood of accident sequences), (2) dominant accident sequences (these depict the failure paths that contribute most to core damage frequency), and (3) importance measures (these evaluate what contributes most to core damage, what would reduce the core damage frequency the most, and what has the greatest potential for increasing core damage frequency should it not be as reliable as desired).

The major contributors to core damage by acci dent type for the NUREG-1 150 PWR and BWR Rev 0396 USNRC Technical Training Center Westinghouse Technology Advanced Manual Risk Management 4.11-9

Westinghouse Technolo2y Advanced Manual Risk Management plants are shown in Figure 4.11-5, and the relative importance of BWR and PWR systems from NUREG-1050 are shown in Figures 4.11-6 and 4.11-7.

PRA results can be used in many ways during planning and olerational activities at a nuclear plant. The results have an important role in risk management, maintenance planning, and risk-based inspections.

4.11.4.2 Configuration Management Configuration management is one element of risk management and risk-based regulation.

Configuration risk refers to the risk associated with a specific configuratiori of the plant. A configuration usually refers to the status of a plant in which multiple components are simulta neously unavailable. The risk associated with simultaneous outages of multiple components can be much larger than that associated with single component outages. Technicai specifications forbid outages of redundant trains within a safety system, but many other combinations of compo nent outages can pose significant risk. In con trolling operational risk, these configurations need to be analyzed. The configuration manage ment process can be predictive in planning maintenance activities and 6utage schedules, and can be retrospective in evaluating the risk signifi cance of plant events.

When a component is taken out of service for maintenance or surveillance, it has ani associated downtime and risk. If the component is con trolled by an allowed outage time in the Technical specifications, then this dowvntime is limited by the allowed outage time. Configurition manage ment involves taking measures to avoid risk significant configurations. It involves managing multiple *equipment taken out of service at the same time, the outage times of compn'onents and systems, the availability of backup components and systems, and outage frequencies.

4.11.4.3 On-Line Maintenance Licensees are increasing the amount and frequency of maintenance performed during power operation. Licensees' expansion of the on-line maintenance concept without thorough consideration of the safety (risk) aspects raises significant concerns. The on-line maintenance concept extends the use of technical specification allowed outage times beyond the random single failure in a system and a judgement of a reason able time to effect repairs upon which the allowed outage times were based. Compliance with GDC single failure criteria is demonstrated during plant licensing by assuming a worst-case single failure, which often results in multiple equipment failures. This does not imply that it is acceptable to voluntarily remove equipment from service to perform on-line maintenance on the assumption that such actions are bounded by a worst-case single failure.

A simplified qualitative model (shown graphically in Figure 4.11-12) for evaluating risk can be thought of as including three factors combined in the following way:

Risk = Pi x Pm x Pc Where:

P, =. The probability of an initiating event, such as a LOCA, turbine trip, or loss of offsite power.

PM= The probability of not being able to mitigate the event, with core damage prevention as the measure of success ful mitigation.

USNRC Technical Training Center 4.11-10 Rev 0396 USNRC Technical Training Center Risk Managzement Westinghouse Technology Advanced Manual 4.11-10 Rev 0396

Westinghouse Technology Advanced Manual Risk Management Pc = The probability of not being able to mitigate the consequences, with containment integrity preservation as the measure of success.

The intersection of all three occurrences (initiating event occurs + mitigating equipment fails + containment fails) indicates a worst-case scenario, with core melt and subsequent radioac tive release to the public (a Chernobyl-type event, for example). The intersection of the initiating event and mitigating equipment failure would be a TMI-type event, in which there is core melt without a release. If the consequence of an event is defined as financial loss (a viable definition),

one would have to say that this intersection represents a serious scenario itself. Even consid ering the traditional definition of consequence (potential for core melt), the intersection of an initiating event and mitigating equipment failure is of concern to the utility and to the NRC.

An effective risk-assessment process includes consideration of the impact of maintenance activities on all three of these risk factors. It also considers the impact of maintenance activities on both safety-related and non-safety-related equip ment. Multiple or single maintenance activities that simultaneously, or within a short time frame, impact two or more risk factors tend to increase risk the greatest. In addition, on-line mainte nance tends to increase component unavailabilities. With increased scheduling of maintenance during power operation, the overall impact on train unavailability, when averaged over a year, has in many cases increased dramati cally and in some cases to the point of invalidat ing the assumptions licensees themselves have made in their plant-specific IPEs.

Licensees may not have thoroughly consid ered the safety (risk) aspects of doing more on line maintenance. Some licensees have used the concept of division or train outages to ensure that they do not have a loss of system function. In the extreme, this could result in all of the equip ment in a division being out of service at a time with unexamined risk consequences, while the licensee is in literal compliance with its plant's technical specifications.

For example, one facility that used a division or train approach had planned to take out of service the following equipment: the B AFW pump, the B Battery charger, the B service water pump, the B RHR pump, and the B charging pump. -Because redundant train equipment was available, no LCO was exceeded.

However, in the event of a design-basis transient,; such 'as a loss of offsite power precipitated by maintenance or instrumen tation calibration activities associated with non safety-related equipment in the switchyard, the plant would be in a configuration with significant risk implications due to the diminished capability to remove decay heat at a high pressure. This is an example of maintenance simultaneously increasing the probability of an initiating event, in this case the loss of offsite power, and diminish ing the plant's capability to mitigate the event.

There is a clear link between effective mainte nance and safety with regard to such issues as the number of plant transients -and challenges to safety systems and the associated need to maxi mize the operability, availability, and reliability of equipment important to safety. In many cases, the only plant changes needed to reduce the probability of core damage are procedure chang es. An example at one plant included staggering the quarterly tests of the station batteries to reduce the probability of common-cause failures of the dc power supplies.

4.11.4.4 Maintenance Rule The maintenance rule, 10CFR50.65, be comes effective in July of 1996. One objective of the rule is to monitor the effectiveness of Rev 0396 USNRC Technical Training Center 4.11-11 Westinghouse Technology Advanced Manual Risk Management

Westnghuse echolo~

Adance MaualRisk Minnaopmnt maintenance activities at, the plants for safety significant plant equipment in order to minimize the likelihood of failures and events caused by the lack of effective maintenance.

Another objective of the rule is to ensure that safety is not degraded when maintenance activities are per formed. The rule requires all nuclear power plant licensees to monitor the effectiveness of mainte nance activities at their plants. The rule provides for continued emphasis on the defense-in-depth principle by including selected balance-of-plant (BOP) structures, systems, and components (SSCs); integrates risk consideration into the maintenance process; establishes an enhanced regulatory basis for inspection and enforcement of BOP maintenance-related issues; and gives a strengthened regulatory basis for ensuring that the progress achieved is sustained in the future.

The maintenance rule is' a -results-oriented, perfoirmance-based rule. A resiults-oi'iented rule places a, greater burden on the licensee to develop the supporting details needed to implement the rule, as opposed to that necessary for compliance with a traditional prescriptive, process-oriented regulation.

The maintenance rule consists of three parts:

(1) goals and monitoring, (2) effective preventive maintenance, and (3) periodic evaluations and safety assessments.' The scope of the rule includes safety-related' structures, systems, and components that are relied upon to remain func tional during and following design-basis events to ensure reactor coolant pressure boundary integrity, reactor shutdown' capability, and the capability to prevent or mitigate the'consequences of a~cidents, and those non-safety-related SSCs (1) that are relied upon to mitigate accidents or tr insients or are used in emergency operating piocedures; (EOPs), (2) whose failure could prevent safety-related SSCs from fulfilling their intended functions, or (3) whose failure could cause a scram or safety system actuation.

The rule requires that licensees monitor the performance or condition of certain structures, systems and components (SSCs) against licens ee-established goals in a manner sufficient to provide reasonable assurance that those SSCs will be capable of performing their intended func tions. Such monitoring would take into account industry-wide operating experience. The extent of monitoring may vary from system to system, depending on the contribution to risk. Some monitoring at the component level may be neces sary; most of the monitoring could be done at the plant, system, or train level. Monitoring is not required where it has been demonstrated that an appropriate preventive maintenance program is effectively maintaining the performance of an SSC. Each licensee is required to evaluate the overall effectiveness of its maintenance activities at least every refueling cycle, again taking into account industry-wide operating experience, and to adjust its programs where necessary to ensure that the prevention of failures is appropriately balanced with the minimization of unavailability of SSCs. Finally, in performing monitoring and maintenance activities, licensees should assess the total plant equipment that is out of service and determine the overall effect on the performance of safety functions.

In June of 1995, the NRC published a report (NUREG-1526, "Lessons Learned from Early Implementation of the Maintenance Rule at Nine Nuclear Power Plants") which documents methods, strengths, and weaknesses found with the implementation of the rule at nine plant sites.

These licensees implemented the rule. using the guidance in NUMARC 93-01, "Industry Guide line for Monitoring the Effectiveness of Mainte nance at Nuclear Power Plants," which the NRC has endorsed in Regulatory Guide 1.160. Most licensees were thorough in determining which SSCs are within the scope of the rule. Some licensees incorrectly failed to classify a few non safety-related systems as being within the scope USNRC Technical Training Center 4.11-12 Rev 0396 USNRC Technical Training Center Rev 0396 Westinghouse Technology Advanced Manual b

4.11-12

Westinghouse TechnoIoy Advanced Manual Risk Mana2ement of the rule. These systems included control room annunciators, circulating water systems, reactor coolant pump vibration monitoring systems, extraction steam systems, condenser air removal systems, screen wash water systems, generator gas systems, and turbine lubricating oil systems.

The rule requires that reliability goals be established commensurate with safety (risk). In determining which SSCs are risk significant, the typical licensee uses an expert panel consisting of a multidisciplinary team of PRA, operations, and systems experts in a working group format. The panel uses deterministic and operational experi ence information to complement PRA or IPE insights (importance measures) to establish the relative risk significance of SSCs. The risk determination is then used when setting goals and monitoring as required by the rule. The rule requires that appropriate corrective action shall be taken when the performance or condition of an SSC does not meet established goals. Many licensees have assigned the task of determining the root cause and developing corrective action to the responsible system engineer at the site; at some sites the expert panel participates in the process. The relative risk significance of SSCs must be reevaluated based on new information, design changes, and plant modifications.

The rule addresses preventive maintenance activities in the following manner: "adjustments shall be made where necessary to ensure that the objective of preventing failures of [SSCs]

through maintenance is appropriately balanced against the objective of minimizing the effect of monitoring or preventive maintenance on the availability of [SSCs]." In other words, the unavailability of SSCs must be balanced with their reliability.

Various methods are being implemented by licensees to perform these evaluations. For example, unavailability and reliability can be evaluated and balanced as an integral part of monitoring against performance criteria, taking into account performance history, preventive maintenance activities, and out-of service times when developing the performance criteria. SSCs rendered unavailable because of preventive maintenance can be trended and evaluated, and adjustments can be made where necessary to balance the unavailability with reliability.

In addition, the risk contribution associated with the unavailability of the system caused by preventive maintenance activities and the risk contribution associated with the reliability of the SSC can be calculated and then used to evaluate adjustments needed to balance the contribution from each source to ensure consis tency with PRA or IPE evaluations. A fourth method involves using the PRA to determine values for unavailability and reliability which, if met, would ensure that certain threshold core damage frequency values would not be exceeded, and then establish performance criteria in accor dance with the resulting unavailability and reliability values.

The rule requires that when performing monitoring and preventive maintenance activities, an assessment of the total plant equipment that is out of service should be considered to determine the overall effect on performance of safety functions. As expected by the results-or perfor mance-oriented nature of the rule, various meth ods are being developed and implemented by licensees to fulfill this requirement. One method is a matrix approach, which involves listing preanalyzed configurations to supplement exist ing procedural guidance for voluntary on-line maintenance. The list of preanalyzed configura tions is developed using importance measures to rank configurations according to risk.

The equipment out-of-service matrix includes preanalyzed combinations of out-of-service equipment. A multilevel approach is then used to either (1) permit the concurrent activities, (2) require further evaluation, or (3) forbid the performance of the activities in parallel. A simpli-USNRC Technical Training Center 4.11-13 Rev 039b Rev 0396 o

USNRC Technical Training Center Westinghouse Technology Advanced Manual Risk Management 4.11-13

Westnghuse echolog Adance MaualRisk Manaivement fied example of an equipment out-of-service matrix is shown in Figure 4.11-16. Although the matrix approach is simple to use, it defines a limited number of combinations and may not address all operational situations and may unnec essarily limit operational flexibility.

Another method of monitoring the safety (risk) impact of plant configuration involves using the plant IPE to evaluate the changes in the core damage frequency resulting from equipment outages. In Figure 4.11-17, the core damage freoiuency was calculated, for each day, based on tl plant configuration, that existed at the time, and plotted against time. This plant actually operated during the charted time period more conservatively than in its IPE, since the time averaged core damage frequency, based on the actual plant configurations, was lower than the core damage frequency cal6ulated in accordance with the IPE methodology. The "spikes" in core damage frequency correspond to periods of more risk-intensive configurations. Using this method in the predictive mode, the analysis of changes in the core damage frequency would be done during the maintenance planning and scheduling pro cess. The maintenance schedule would be adjust ed to minimize significant spikes in the core damage frequency.

Figure 4.11-18 is a similar example from a different plant. This type of configuration control analysis is also being used at some foreign plants as the basis for risk-based technical specifications. In Figure 4.11-19, the magnitude of the' projected increase in core damage frequency determines the amount of time the plant is allowed to be in the analyzed configu ration. For example, if the calculated increase in core damage frequency is a factor of 10 or less aboVe the baseline, the allowed duration in that configuration is 30 days; if the calkulated increase is between a factor of 10 and a factor of 30 above the baseline, the allowed duration is 3 days. If the calculated increase in core damage frequency is greater than a factor of 30 above the baseline, then the configuration is not allowed.

Some licensees have implemented or are considering computer-based safety (risk) moni tors that will-calculate and display the risk chang es associated with changes in plant configuration.

Maintenance planners using the system in the predictive mode, or operators using the system on-line in real time, would be required by plant procedures to take predetermined actions and/or initiate further evaluations based on the magni tude of any indicated increase in risk (decrease in safety margin) due to a change in plant configura tion or operating condition. In order for this type of system to be used for other than full power operating conditions, development and imple mentation of PRA models for shutdown plant conditions would be necessary.

4.11.4.5 Inspection of Configuration Management The processes used by the licensees to schedule and:plah on-line maintenance should ensure that maintenance and testing schedules are appropriately modified to account for degraded or inoperable equipment. The following are exam ples of questions that should help to determine the operations/maintenance level of familiarity with the process employed by a licensee in managing its scheduled maintenance activities.

When planning on-line maintenance:

"* Does the licensee take probabilistic risk insights into account?

"* Does the licensee allow multiple train outag es?

"* How does the licensee take into account component and system dependencies?

"* How does the licensee assure that important combinations of equipment needed for accident mitigation are not unavailable at the same time?

"* By what process does the licensee determine USNRC Technical Training Center 4.11-14 Rev 0396 Rey 0396 4.11-14 I

Westinghouse Technology Advanced Manual Risk Man*oprnpnt USNRC Technical Training Center

Westinghouse Technology Advanced Manual Risk Management the procedures and testing to emphasize in minimizing component unavailability and reducing the potential for accident or transient initiation, including the impact of mainte nance activities involving non-safety-related equipment?

How does the licensee determine the maxi mum amount of time to allow for the mainte nance and how does it determine the risk associated with the decision?

At any given time, how much planned maintenance is in progress and how is it coordinated to minimize risk?

Are there occurrences of scheduled mainte nance activities that simultaneously, or within a short period of time, impact two or more of the risk factors discussed in section 4.11.4.3?

Specific guidance and inspection require ments for maintenance activities can be found in the NRC Inspection Manual, chapter 62700.

Attachment I contains an example of an inspec tion report that includes various items related to the inspection of risk and configuration manage ment:

IPE results were used to focus the inspectors' attention on the emergency switchgear ventilation, the loss of which was identified by the IPE as the initiator of the top-ranked sequence contributing to core damage fre quency (cover letter, Notice of Violation, and section 3.1.2 of the inspection report).

" The associated violation regarding the white control power light for the emergency switchgear ventilation fans was cited against 10CFR50, Appendix B, Criterion XVI, "Corrective Actions." After July, 1996, this type of violation could be cited against the maintenance rule, 10CFR50.65.

Section 4.4 of the report discusses the fact that the technical specifications allow certain configurations of plant equipment involving auxiliary feedwater pumps and high head safety injection pumps that could potentially place the plant in an unanalyzed condition.

This report illustrates how rigorous imple mentation of risk-based inspection techniques and insights with regard to the plant's configura tion management and on-line maintenance prac tices can identify and resolve safety-significant issues, thereby reducing risk and improving safety.

4.11.5 Summary Deterministic approaches to regulation consider a set of challenges to safety and deter mine how those challenges should be mitigated.

A probabilistic approach to regulation enhances and extends the traditional deterministic approach by (1) allowing consideration of a broader set of potential challenges to safety, (2) providing a logical means for prioritizing these challenges based on risk significance, and (3) allowing consideration of a broader set of resources to defend against these challenges.

Licensees are increasing the amount and frequency of maintenance performed during power operation. Licensees' expansion of the on-line maintenance concept without thoroughly considering the safety (risk) aspects raises significant concerns. The maintenance rule is being implemented to ensure that safety is not degraded during the performance of maintenance activities. The rule requires all nuclear power plant licensees to monitor the effectiveness of maintenance activities.

The attached inspection report's content reinforces some of the concepts discussed in this section, such as risk-informed inspections (using IPE results to prioritize inspection activities - see USNRC Technical Training Center

4. 11-1

Rev U3Yb USNRC Technical Training Center Westinghouse Technology Advanced Manual Risk Management 4.11-15 Rev 0396

Westri~huseTecholoy Adancd MaualRisk

¶!uiauýmpn section 3.1.2 of the inspection report) and maintenance rule applications (same section, which discusses maintenance trending, etc), and plant configurations which are allowed by the technical specifications but put the plant in an undesirable (unsafe/unanalyzed) condition (see section 4.4 of the inspection report).

4.11.6 References

1. "Reactor Safety Study - An Assessment of Accident Risks in U.S. Commercial Nuclear Power Plants" (WASH-1400), NUREG 75/014, U.S. Nuclear Regulatory Commis sion, Washington, DC, October 1975.
2. "Risk Assessment Review Group Report to the U.S. Nuclear Regulatory Commission,"

NUREG/CR-0400, September 1978.

3. "Report of the President's Commission on the Accident at Three Mile Island," J.G.

Kemeny et al., October 1979.

4. "Three Mile Island - A Report to the Com missioners and to the Public," NUREG/CR 1250, Vol. 1, January 1980.
5. "Interim Reliability Evaluation Program Procedures Guide," NUREG/CR-2728, U.S. Nuclear Regulatory Commission, Washington, DC, January 1983.
6. "PRA Procedures Guide," NUREG/CR 2300, U.S. Nuclear Regulatory Commis sion, Washington, DC, January 1983.
7. "Probabilistic Risk Assessment Reference Document," NUREG-1050, U.S. Nuclear Regulatory Commission, Washington, DC, September 1984.
8. "Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants," NUREG-1150, U.S. Nuclear Regulatory Commis sion, June 1989.
9. "Individual Plant Examination for Severe Accident Vulnerabilities," Generic Letter No.

88-20, U.S. Nuclear Regulatory Commis sion, Washington, DC, November 1988.

10. "Fundamentals of PRA," Idaho National Engineering Laboratory, Idaho Falls, ID, January 1990.

11."Analysis of Core Damage Frequency:

Internal Events Methodology," NUREG/CR 4550, Vol. 1, Rev. 1, SAND86-2048, Sandia National Laboratories, Albuquerque, NM, January 1990.

12."Fault Tree Handbook," NUREG-0492, U.S. Nuclear Regulatory Commission, Washington, DC, January 1981.

13. "Evaluation of Station Blackout Accidents at Nuclear Power Plants - Technical Findings Related to Unresolved Safety Issue A-44,"

NUREG-1032, U.S. Nuclear Regulatory Commission, Washington, DC, June 1988.

14. "Anticipated Transients Without Scram for Light Water Reactors," NUREG- 0480, Vol.

1, U.S. Nuclear Regulatory Commission, Washington, DC, April 1978.

15. "Study of the Value and Impact of Alternative Decay Heat Removal Concepts for Light Water Reactors," NUREG/CR-2883, Vol.

1,2,3, U.S. Nuclear Regulatory Commis sion, Washington, DC, June 1985.

16. "PRA Applications Program for Inspection at ANO-1," NUREG/CR-5058, U.S. Nuclear Regulatory' Commission, Washington, DC, March 1988.

USNRC Technical Training Center 4.11-16 Rev 0396 USNRC Technical Training Center Rev 0396 Westirighouse Technology Advanced Manual t,

4.11-16

Westinghouse Technology Advanced Manual Risk Management

17. "Insights on Plant Specific Unique and/or Important to Safety Features Identified from 72 IPEs for 106 BWR and PWR Units,"

U.S. Nuclear Regulatory Commission, Washington, DC, July 1995.

18."Handbook of Methods for Risk-Based Analyses of Technical Specifications,"

NUREG/CR-6141, December 1994.

19. "Lessons Learned from Early Implementation of The Maintenance Rule at Nine Nuclear Power Plants," NUREG-1526, U.S. Nuclear Regulatory Commission, Washington, DC, June 1995.
20. "Individuil Plant Examination: Submittal Guidance," NUREG-1335, U.S. Nuclear Regulatory Commission, Washington, DC, August 1989.
21. "Perspectives on Reactor Safety," NUREG CR-6042, SAND93-0971, Sandia National Laboratories, Albuquerque, NM, March 1994.
22. NRC Inspection Report Nos. 50-334/94-24 and 50-412/94-25, November 1994.

USNRC Technical Training Center 4.11-17 Rev 0396 Westinghouse Technology Advanced Manual Risk Management USNRC Technical Training Center 4.11-17 Rev 0396

Westinghouse Technology Advanced Manual Risk Management TABLE 4.11 -1 INSIGHTS FROM REVIEW OF PLAN'~T IPEs Insight Additional Nitrogen Supply Gas Turbine Genera tors Containment Venting Capability Additional Diesel Generators Bleed and Feed Description A backup nitrogen supply can usually reduce calculated core damage frequency (CDF) caused by loss of pneumatic power supply to important plant components such as safety/relief valves and main steam isolation valves inside containment.

Gas turbines can be an alternate ac power source to keep the plant functioning during a station blackout (SBO) or loss of offsite power (LOSP) during which even the emergency diesel genera tors (DGs) fail to start.

Containment venting can prevent core damage and provide containment overpressure protection under certain severe accident scenarios. Loss of containment heat removal has been identified in many BWR PRAs as a significant contributor to CDF. A hardened vent provides a means of removing heat from the containment, indepen dent of the RHR and plant service water sys tems.

Increased redundancy and diversity in electrical power supply systems substantially reduces the likelihood of certain accident events. Several IPEs identified the need to perform maintenance and testing of the DGs on a separate schedule using different personnel, and the need for operators to be thoroughly trained in its use.

Most PWRs have bleed and feed (once-through core cooling) capability. Bleed and feed requires high pressure injection pump(s) and PORVs.

Applicability BWR and PWR BWR and PWR BWR BWR and PWR PWR 1 ____________

USNRC Technical Training Center 4.11-lY Key tJ.IYO Westinghouse Technology Advanced Manual Risk Management 4.11-19 Rev 0396 USNRC Technical Training Center

Deterministic Analysis

  • Standard good engineering practices, calculations, and judgements Defense-In-Depth

"* Multiple fission product barriers

"* Redundancy

"* Diversity

"* Single Failure Criteria

"* Worst Case Assumptions Figure 4.11-1 Deterministic Analysis 4.11-21

Probabilistic Risk Assessment

"* What can go wrong?

"* Likelihood?

"* Consequences?

Results

"* Dominant Contributors

"* Dominant Accident Sequences

"* Importance Measures Figure 4.11-2 Probabilistic Risk Assessment 4.11-23

Level 2 Level 1 F--

Valve 1vav]

Vale

"~,Valve Plant and Sstem Design Data I LOCA s

'r anJenht1

-1$ý oCf Power

.TurbineTrtp

  • Steam Bmak I Extemal Eventt

-r.arhquake

.ncicb~dng Accident Initiators Event Tree r

Ar

[

-F L.......-

T al Tree

,, a a i a i

a a

a i

a I -

I a

a a

a i

l S

ault Tree Releae Categories FC FA FAC FD lSI I

10E-1 1OE-2 1OE-3 lOE-4 10E-5 IOE-6 1OE-7 Release Description 101E 10E3 10E5 Co nsequences Figure 4.11-3 Elements of PRA 0o Level 3 U'

History 1975 Reactor Safety Study (WASH-1400) 1980 Severe Accident Risks: An Assessment An Assessment for Five U.S. Nuclear Power Plants (NUREG-1150) 1985 Severe Accident Policy 1988 Individual Plant EHamination (IPE) Program (Generic Letter 88-20) 1993 Evaluation of Potential Severe Accidents During Low Power and Shutdown Operations (NUREG-6143)

Figure 4.11-4 Historical Perspective 4.11-27

1094 INT SYS LOCA TRANSIENT CO'.' -SEAL SGTR STATION BLACKOUT ATWS INT SYS LOCA STATION BLACKOUT "SW-SEAL LOCA SEQUOYAH INS S LO TRANSIEN" STATION BLACKOUT SURRY GRAND GULF Figure 4.11-5 PEACH BOTTOM Major Contributors To Core Damage By Accident Types 4.11-29 ZION LOCA TRANSII ATWS(

PWR SYSTEMS AFWS HPRS PCs DC HPIS CSIS sws EMERGENCY AC RHRS RPS PORV LPRS LPSI ESAD SUMP P,

-L I

I I II11111 Minwnum Maximum Relative Relative Importance Importance Averag Relative Importance I I 1 11111 I

I I 11111 a

0 0p I

I I I I I,,,,

I I I II III I 10.3 10-2 10-1 Relative Importance of PWR Systems considering dominant accident sequences from 15 PRAs Figure 4.11-7 Relative Importance Factors S rI I I I I II0 Source Nufleg-1050

il I-I po I

po I

t0 4

0 4

0 I

(0O

)

I I

"1 I

BWR SYSTEMS SWS PCS RPS HPCI LPCI SIR-VALVE EMERGENCY AC ADS FEEDWATER SYS RHRS RCIC DC POWER LPCS

.A I

I I III HII I

I I

I

'liii I

I I

I 11111 I

I I 111111 p 0 Maximum Relative Importance p0

-I 0

Me 0

0 0

pd

-0 S

0

-0 I I I 11111 I I I 11111 I

I I I I I I I 10-2 10-1 Relative Importance of BWR Systems considering dominant accident sequences from 15 PRAs 1

Source Nufleg-1050 Figure 4.11-6 Relative Importance Factors I

I I 111111I Minimum Relative Importance Average Relative Importance 10-3 0

(D I

I I I I I I I I I

I l

I I

K l

I I

I I

I

Risk-Based Regulation A regulatory approach in which insights derived from PRA are used in combination with deterministic and engineering analyses to focus licensee and regulatory attention on issues commensurate with their importance to safety.

0 RTWS Rule ( OCFR58.62)

Auxiliary Feedwater System Reliability Blackout Rule ( OCFR58.63)

Backfit ( 8CFR58.1 09)

Risk-Based Inspection Figure 4.11-8 Risk Based Regulation 4.11-35

PRA Policy Statement (August 16, 1 995)

Increased use of PRA in reactor regulatory matters should be implemented to the extent supported by state of the art in PRA methods and data and in a manner that complements the NRC's deterministic approach and supports the NRC's traditional defense-in-depth philosophy.

PRA should be used to reduce unnecessary conservatism associated with current regulatory requirements. Where appropriate, PRA should be used to support additional regulatory requirements.

PRA evaluations in support of regulatory decisions should be as realistic as possible and appropriate supporting data should be publicly available.

Uncertainties in PRA evaluations need to be considered in applying the Commission's safety goals for nuclear power plants.

Figure 4.11-9 PRA Policy Statement 4.11-37

PRA Implementation Plan

"* Agency-Wide Plan to Implement the PRA Policy Statement

"* Includes both on-going and new PRA related activities

"* Encourages risk-based initiatives from licensees PRA Applications

"* Graded Quality Assurance

"* Inservice Testing

"* Inservice Inspection

"* Technical Specifications Maintenance Rule IPE Insights Reliability Data Rule (proposed)

Figure 4.11-10 PRA Implementation Plan 4.11-39

Risk Management R means of prioritizing resources and concerns to control the leuel of safety (risk).

Configuration Management Managing the configuration of leuel of safety (risk).

plant systems to control the Figure 4.11-11 Risk and Configuration Management - Definitions 4.11-41

0196-X RISK MANAGEMENT FACTORS Risk = Pi X Pm X Pc Figure 4.11-12 Risk Management Factors 4.11-43

Maintenance Rule (I OCFR58.65)

Effective July 1996 Overall objective of rule is to monitor the effectiveness of maintenance actiuities...for safety significant plant equipment...in order to minimize the likelihood...of failures and events...caused by the lack of effective maintenance.

"* Goals and Monitoring

"* Effective Preventive Maintenance

"* Periodic Evaluations and Safety Assessments.

Figure 4.11-13 Maintenance Rule - Objectives 4.11-45

Scope Safety-related structures, systems, and components that are relied upon to remain functional during and following design basis events to ensure RCS pressure boundary integrity, reactor shutdown capability, safe shutdown capability, and the capability to prevent or mitigate the consequences of accidents non-safety-related SSCs (1) that are relied upon to mitigate accidents or transients or are used in emergency operating procedures (EOPs),

(2) whose failure could prevent safety-related SSCs from fulfilling their intended functions, or (3) whose failure could cause a scram or safety system actuation.

Figure 4.11-14 Maintenance Rule - Scope 4.11-47

Configuration Risk Monitoring Methods 0

Matrix approach (pre-analyzed configurations)

COF impact analysis Safety (risk) monitor Figure 4.11-15 Configuration Risk Monitoring Methods 4.11-49

IHPCI IRCIC lLPCI A LPCIB ICS A ICS B ALT INJ BALT INJ COND PCOND FWS R

I B BSTR I MPMPS MS ICHOR HPCI RCIC CS A CS B Or Very High Risk TSLCO<7 Or Medium Ops Mgr days Risk OK ReqdI I

I ALT INJ I AI ALT INJ B

4 4

4.

I 1

4 4

4.

I I

S J.

I I

4

4.

I 4

4 I

4 11 I

4 COND BSTR COND PMPS FW PMPS STA BAT CHGR TS ICO >7 And Risk Ops Supv days Low OK Reqd J

Figure 4.11-16 Preventive Maintenance Equipment Out-Of-Service Matrix 4.11-51 LPCI A LPCI B PM Not Allowed:

Risk Eval Reqd &

"TS LCO

<12 hrs Ops Mgr OK Reqd DG BAT CHGR I

1.001E-03 --

LL a 0 1.00E 4.40E 2.60E-05 1.60E-05 -->*

d TI L\\I1 Il 11 III V II

ýIAII A

    1. f!A;RR:

RNTR IW P

I New CDF W 9 I

7

-4

.i

-L oA (0

0

--L

-A*

Baseline IPE 0

New Average CDF c~o~O N

~

CO~

CD ICJ O

CU) 0 (a

Co) 0 Ný 00 m

N m

D If CJ0 0

II

ýJq 16..

2d 1A

!I...*I*I!..La....

I I

II II I I

J m

n n i i.

l i

i

=

= =-*...........

==

HH"Huu H !ill nMHH" HiMM I

I I

l IIII 1

I I1I I!

I W

IZT

0196-X UNIT 2 INSTANTANEOUS RISK GRAPH (A)

(B)

(C)

(D)

(E)

(F)

(G)

(H)

Emergency Chilled Water Pump P162 Control Transformer Replacement Train B Cold Leg Injection Valves 2HV9329/HV9323 Transformer Replacement Train B Cold Leg Injection Valves 2HV9326/HV9332 Transformer Replacement Diesel Generator 2G003 Annual Maintenance and HPSI 2P019 Preventive Maint.

Diesel Generator 2G003 Annual Maintenance and SWC 2P1 14 Preventive Maint.

AFW Pump P141 Preventive Maintenance AFW Pump P141 Preventive Maintenance and PPS Testing Diesel Generator 2G002 Annual Maintenance and SWC 2P1 12 Preventive Maint.

Core damage frequency (CDF) calculated for Mode 1 operations only.

Average CDF for 3 month period = 2.4E-05/yr.

Figure 4.11-18 Risk Monitoring Predictive 4.11-55 2.OOE-04 1.50E-04 M

0*

cI to E

0 1.OOE-04 5.OOE-05 G

FJ A

DF H

BC

'if' O.OOE+0O

FOREIGN REACTOR RISK PROFILE 35 I,-

100 200 300 Cumulative Target Lifetime Cumulative Average 12 Month Cumulative Average

-Point Actual 400 DAYS a

UI 0

(0 CD CD CD 0

3 s.1 30 25 20 15 10 5

-Factor of 10 kUn 0

0

- NRC Inspection Report Nos. 50-334/94-24 AND 50-412/94-25

November 29, 1994 Mr. James E. Cross Senior Vice President Nuclear Power Division Duquesne Light Company Post Office Box 4 Shippingport, Pennsylvania 15077

SUBJECT:

NOTICE OF VIOLATION (NRC INSPECTION REPORT NOS. 50-334/94-24 AND 50-412/94-25)

Dear Mr. Cross:

This refers to the inspection conducted by Messrs. L. Rossbach, P. Sena, and S. Greenlee of this office from October 11 to November 14, 1994.

The inspection included a review of activities at the Beaver Valley facility.

At the conclusion of the inspection, the findings were discussed with Messrs.

G. Thomas, T. Noonan, and other members of your staff.

Areas examined during the inspection are identified in the report.

The inspection consisted of interviews, observations, document reviews, and independent evaluations of activities important to public health and safety.

The purpose of the inspection was to determine whether activities authorized by the license were conducted safely and in accordance with NRC requirements.

Our inspection found that, overall, the activities observed were effective in assuring the safe operation of the Beaver Valley power plants.

However, based on the results of this inspection, certain of your activities appeared to be in violation of NRC requirements as specified in the enclosed Notice of Violation (Notice).

Specifically, a deficiency in the control circuitry for the Unit 2 emergency switchgear ventilation fans was not identified and corrected prior to NRC involvement, despite a history of related work requests.

This is of concern for three reasons:

First, your Unit 2 Individual Plant Examination (IPE) identified loss of emergency switchgear ventilation as the top ranked initiating sequence contributing to core damage frequency.

Although this implies that deficiencies in this system could be of high safety significance, your staff most directly responsible for assuring the reliability of this system were not aware of the IPE rankings.

Second, several work requests related to this circuit deficiency were worked in the past, but your staff did not identify the deficiency.

Third, programs such as maintenance trending, problem reporting, and system engineering did not identify the recurring nature of this problem and the need for further follow up.

We note that your staff has now corrected this circuit deficiency and that staff in operations, maintenance, and system engineering have now been informed of the IPE conclusions.

However, your attention to the root cause of these concerns is requested.

You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response.

In your response, you should document the specific actions taken and any additional actions you plan to prevent recurrence.

After reviewing your response to this Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its enclosures, and your response will be placed in the NRC Public Document Room.

Accordingly, your response should not, to the extent possible, include any personal privacy, proprietary, or safeguards information so that it can be released to the public and placed in the NRC Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

Your cooperation with us is appreciated.

Sincerely, Original Signed By:

James C. Linville, Chief Projects Branch No. 3 Division of Reactor Projects Docket Nos. 50-334; 50-412

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report Nos. 50-334/94-24 and 50-412/94-25 cc w/encls:

G. S. Thomas, Vice President, Nuclear Services T. P. Noonan, President, Nuclear Operations L. R. Freeland, General Manager, Nuclear Operations Unit K. D. Grada, Manager, Quality Services Unit N. R. Tonet, Manager, Nuclear Safety Department H. R. Caldwell, General Superintendent, Nuclear Operations K. Abraham, PAO (2 copies)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania State of Ohio I

ENCLOSURE 1 NOTICE OF VIOLATION Duquesne Light Company Docket Nos. 50-412 Beaver Valley Power Station, Unit 2 License Nos. NPF-73 During an NRC inspection conducted between October 11 and November 14,

1994, one violation of NRC requirements was identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"

10 CFR Part 2, Appendix C, the violation is listed below:

10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Actions," states, in part, that measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and non-conformances are promptly identified and corrected.

Contrary to the above, as of October 21, 1994, established measures did not assure that conditions adverse to quality were promptly identified and corrected.

Specifically, the investigations of an unusually dim white control power light for emergency switchgear ventilation fans 2HVZ-FN261A on October 30, 1993, and 2HVZ-FN261B on September 24, 1994, failed to identify that the standby fan would not start if called upon following the loss of the running fan except when started by the emergency diesel sequencer.

Equipment maintenance history was not used to identify that a trend of similar problem descriptions of a dim white control power light has existed since 1989.

This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region I, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation 94-25-01.

This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation:

(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued to show cause why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.

Where good cause is shown, consideration will be given to extending the response time.

Dates at King of Prussia. Pennsylvania this 221h day of November, 1994

U. S. NUCLEAR REGULATORY COMMISSION REGION I Report Nos.

Docket Nos.

License Nos.

Licensee:

94-24 94-25 50-334 50-412 DPR-66 NPF-73 Duquesne Light Company One Oxford Center 301 Grant Street Pittsburgh, PA 15279 Facility:

Location:

Inspection Period:

Inspectors:

Approved by:

Beaver Valley Power Station, Units 1 and 2 Shippingport, Pennsylvania October 11 - November 14, 1994 Lawrence W. Rossbach, Senior Resident Inspector Peter P. Sena, Resident Inspector Scot A. Greenlee, Resident Inspector W. J. Lazarus, Chief Reactor Projects Section 3B Inspection Summary This inspection report documents the safety inspections conducted during day and backshift hours of station activities in the areas of:

plant operations; maintenance and surveillance; engineering; and plant support.

Date

EXECUTIVE

SUMMARY

Beaver Valley Power Station Report Nos. 50-334/94-24 & 50-412/94-25 Plant Operations Good operator performance was demonstrated during response to a loss of pressure in the control room temperature control air system, and to a blown fuse in the Unit 1 solid state protection system.

Troubleshooting of a decrease in vacuum on the 2-1 emergency diesel generator was well planned and documented.

Operators at Unit 1 demonstrated a-strong questioning attitude when they identified a potential relationship between an out-of-service quench spray pump and net positive suction head to the recirculation spray pumps.

However, the recirculation spray pumps were unnecessarily removed from service before it was determined that one quench spray pump will ensure adequate net positive suction head.

Maintenance An unusually dim control power light for emergency switchgear ventilation fans led to identification of a deficiency with the control circuitry.

Specifically, if the running fan was to fail for any reason, the standby fan could not auto-start or be manually started without first placing the failed fan control switch in "pull to lock" unless sequenced on by the emergency diesel sequencer.

Previous troubleshooting efforts did not identify or correct this problem, and maintenance history trending was not used to identify the need for additional investigations of this control circuitry despite a history of work requests with a similar problem description.

Additionally, operations and maintenance personnel, and the system engineer, were unaware that the licensee's Individual Plant' Examination identified the loss of emergency switchgear ventilation as the top ranked initiating sequence contributing to core damage frequency.

The failure to promptly identify the emergency switchgear ventilation control circuitry deficiency is a violation of 10 CFR 50, Appendix B, Criterion XVI, "Corrective Actions."

Operations personnel re-identified a previous deficiency associated with the SLCRS system that had not been repaired for almost three years.

Good management attention has been subsequently focused on the timely repair of this deficiency.

Test data showed that the system still would have performed its function.

Corrective actions to address problems with the diesel speed sensing circuit and the rod control system were also appropriate.

Engineerin The licensee continued to demonstrate leadership in the nuclear industry through the identification of significant generic issues.

Specifically, the licensee identified an AMSAC design deficiency which would have made the system inoperable if feedwater flow on one channel was outside its normal band, and issued a 10 CFR Part 21 notification concerning an anomaly with the test circuits on the Unit I solid state protection system.

The AMSAC issue is still under evaluation for Part 21 applicability.

ii

(EXECUTIVE

SUMMARY

CONTINUED)

Appropriate controls were not in place to prevent placing the plants in an unanalyzed condition if the steam driven auxiliary feedwater (AFW) pump is out of service.

Appropriate controls were promptly put in place pending a revision to the Technical Specifications.

Additionally, the inspectors found that the emergency operating procedures (EOPs) did not reflect the minimum AFW flow required during small break loss of coolant accident conditions.

The issue of AFW flow requirements for the EOPs is an unresolved item (50-334/94-24-02 and 50-412/94-25-02) pending further review by the NRC.

Plant Support Health physics and security programs continue to be effectively implemented.

Improvements in plant housekeeping and management attention on this subject have been noted.

iii

TABLE OF CONTENTS EXECUTIVE

SUMMARY

ii TABLE OF CONTENTS.........................................................

iv 1.0 MAJOR FACILITY ACTIVITIES...........................................

1 2.0 PLANT 2.1 2.2 2.3 2.4 2.5 OPERATIONS (71707).............................................

Operational Safety Verification...............................

Loss of Control Room Temperature Control Air Pressure.........

Unit I Quench Spray Pump Maintenance...........................

Operator Response to Unit 1 Solid State Protection System.

Unit 2 Emergency Diesel Generator Troubleshooting.............

3.0 MAINTENANCE (62703, 61726, 71707)...................................

3.1 Maintenance Observations.......................................

3.1.1 Unit 2 Rod Control.......................................

3.1.2 Unit 2 Emergency Switchgear Ventilation.................

3.2.

Surveillance Observations.....................................

3.2.1 Supplemental Leak Collection System (SLCRS)

Duct Damage at Unit 1.........................................

3.2.2 Unit I Emergency Diesel Generator Speed Sensing Circuit Failures.........................................

4.0 ENGINEERING (71707, 37551, 92903)...................................

4.1 AMSAC Design Omission.........................................

4.2 Calibration of CREBAPS Pressure Switches (Unresolved Item 50-334/94-17-01) (closed).....................................

4.3 Solid State Protection System 10 CFR Part 21 (closed).........

4.4 Auxiliary Feedwater Flow Margin...............................

5.0 PLANT 5.1 5.2 5.3 SUPPORT (71750, 71707).........................................

Radiological Controls.........................................

Security.......................................................

Housekeeping...................................................

6.0 ADMINISTRATIVE.......................................................

6.1 Preliminary Inspection Findings Exit...........................

6.2 Attendance at Exit Meetings Conducted by Region-Based Inspectors.....................................................

6.3 NRC Staff Activities...........................................

1 2

2 3

3 4

4 5

5 7

8 9

10 10 11 12 12 13 13 13 14 14 14 14 14 iv

DETAILS 1.0 MAJOR FACILITY ACTIVITIES Both units operated at full power for the duration of the period.

2.0 PLANT OPERATIONS (71707) 2.1 Operational Safety Verification Using applicable drawings and check-off lists, the inspectors independently verified safety system operability by performing control panel and field walkdowns of the following systems:

supplemental leak collection and release, control room ventilation, temperature control air pressurization, and emergency switchgear ventilation.

The emergency switchgear ventilation walkdown was a semi-annual engineered safety system inspection and resulted in safety significant findings as described in Section 3.1.2.

These systems were properly aligned.

The inspectors observed plant operation and verified that the plant was operated safely and in accordance with licensee procedures and regulatory requirements.

Regular tours were conducted of the following plant areas:

a Control Room Safeguards Areas Auxiliary Buildings a

Service Buildings 0

Switchgear Areas Turbine Buildings 0

Access Control Points Intake Structure Protected Areas Yard Areas Spent Fuel Buildings Containment Penetration Areas Diesel Generator Buildings During the course of the inspection, discussions were conducted with operators concerning knowledge of recent changes to procedures, facility configuration, and plant conditions.

The inspectors verified adherence to approved procedures for ongoing activities observed.

Shift turnovers were witnessed and staffing requirements confirmed.

The inspectors found that control room access was properly controlled and a professional atmosphere was maintained.

Inspectors' comments or questions resulting from these reviews were resolved by licensee personnel.

Control room instruments and plant computer indications were observed for correlation between channels and for conformance with technical specification (TS) requirements.

Operability of engineered safety features, other safety related systems, and onsite and offsite power sources were verified.

The inspectors observed various alarm conditions and confirmed that'operator response was in accordance with plant operating procedures.

Compliance with TS and implementation of appropriate action statements for equipment out of service was inspected.

Logs and records were reviewed to determine if entries were accurate and identified equipment status or deficiencies.

These records included operating logs, turnover sheets, system safety tags, and the jumper and lifted lead book.

The inspectors also examined the condition of various fire protection, meteorological, and seismic monitoring systems.

2 2.2 Loss of Control Room Temperature Control Air Pressure On November 14, 1994, at 3:25 p.m., the plant operators at Unit 1 received a control room temperature control air pressure low alarm.

The air system pressure was found at 15 psig.

Normal system pressure is between 50 and 70 psig.

The alarm response procedure refers the operators to the control room emergency habitability system technical specification (3.7.7.1) and Updated Final Safety Analysis Report (UFSAR)

Section 9.13.4 "Main Control Area."

After reviewing these references, the Shift Supervisor concluded that he could not be assured of operability of the Unit I control room supply and exhaust dampers.

These dampers, VS-D-40-1A through D, have a flexible boot seal which provides for air-tight isolation of the control room during accident conditions.

The control room temperature control air system supplies air to these seals.

Consequently, at 4:10-p.m., it was identified that both Units I and 2 were required to enter Technical Specification 3.0.3, which requires action within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to initiate plant shutdown.

Both units were in Mode 1 and both units began preparations for plant shutdown.

The operators determined that the loss of air pressure was due to-a stuck open automatic moisture blowdown valve.

The valve was isolated and the low pressure alarm cleared at 4:27 p.m.

The units exited Technical Specification 3.0.3 at 4:34 p.m.

Neither unit progressed to the point of reducing power.

The inspectors reviewed this event and concluded that-the operators took appropriate response actions.

The inspectors did note that the event indicated a potential single failure vulnerability in the safety-related control room temperature control air system.

The vulnerability is "potential" because the damper seals have backup accumulators and isolation check valves which may allow the seals to work even with a loss of pressure in the rest of the system.

However, the accumulators and the check valves are apparently not tested to ensure this capability.

The licensee was still evaluating this failure vulnerability when the report period ended.

2.3 Unit 1 Quench Spray Pump Maintenance During a routine control room walkdown, the inspectors noted that the licensee had removed the Unit 1 'A' train recirculation spray and quench spray pumps from service.

The pumps were taken out of service by a clearance for maintenance on the quench spray pump (oil leak repair).

The inspectors asked why the recirculation spray pumps were included on the clearance.

The inspectors found that'the night-shift crew had a concern about net positive suction head to the recirculation spray pumps when-removing a quench spray pump from service.

Some of the flow from the quench spray pumps is diverted directly to the containment sump.

This provides added cooling for the sump water to ensure adequate net positive suction head for the recirculation spray and low head safety injection pumps under all design basis conditions.

The night-shift operators were concerned that removing one quench spray pump from service, while leaving all the recirculation spray pumps in service, might leave the opposite train recirculation spray pumps without sufficient net positive suction head.

3 The inspectors researched the operators' concern and found that -the analysis for containment sump net positive suction head adequately accounted for the loss of one quench spray pump.

Additionally, the analysis document stated that the cooling water from the quench spray pumps was only needed under certain conditions, primarily large break loss of coolant accidents.

Consequently, taking the recirculation spray pumps out of service was not necessary.

The licensee's Nuclear Safety Department confirmed this assertion shortly after the inspectors questioned the licensee's actions, and told the operators that the pumps should be placed back in service.

The inspectors complemented the operators questioning attitude, but noted that their actions unnecessarily increased the risk of system failure during an accident.

Furthermore, the implications of taking multiple pieces of safety'equipment out of service at the same time must be carefully evaluated.

The analysis for containment sump net positive suction head did not specifically address the condition of one quench spray pump and two recirculation spray-pumps out of service at the same time (without a low head pump out of service).

The licensee has since determined that the analysis does bound the condition.

The inspector's observations were discussed with the Unit 1 Operation Manager, who had already reached similar conclusions, and had discussed the issue'with the personnel involved.

2.4 Operator Response to Unit 1 Solid State Protection System The inspectors observed the operator response to a partial failure the Unit 1 solid state protection system (SSPS).

The control room received simultaneous annunciators for reactor coolant pump IA undervoltage, underfrequency, breaker trip, turbine stop valve closure, and turbine auto-stop low oil pressure.

Operators immediately evaluated these annunciators and noted that normal operating parameters existed for the reactor coolant pump and main turbine and that the plant was in a safe condition.

It was concluded that an off-normal condition existed with the SSPS and immediate assistance was provided by instrumentation and controls engineers.

Subsequent troubleshooting activities are discussed in Section 3.1.

2.5 Unit 2 Emergency Diesel Generator Troubleshooting The 2-1 diesel generator has experienced a reduction of crankcase vacuum over the past several months from 1.1 to 0.8 inches water.

Under normal conditions, the crankcase operates with a slight vacuum to prevent the buildup of flammable vapors.

A positive pressure can result from the failure of the crankcase ventilation system or excessive combustion gases passing-the piston rings.

Operations and maintenance personnel developed a troubleshooting plan to investigate this degrading trend.

Through these efforts, it was identified that a flow restriction exists in the discharge line of the crankcase blower.

The licensee will continue to monitor crankcase pressure and plans on correcting this restriction during the upcoming refueling outage.

The inspector found this to be acceptable, since there is no actual degradation of the diesel engine, a vacuum still exists, and there exists a safety-risk associated with removing an operable diesel from service.

Additionally, the inspectors considered the troubleshooting efforts to be well planned and documented.

4 3.0 MAINTENANCE (62703, 61726, 71707) 3.1 Maintenance Observations The inspectors reviewed selected maintenance activities to assure that:

the activity did not violate-Technical Specification Limiting Conditions for Operation and that redundant components were operable; required approvals and releases had been obtained prior to commencing work; procedures used for the task were adequate and. work,was within the skills of the trade; activities were accomplished by qualified personnel; radiological and fire prevention controls were adequate and implemented; QC hold points were established where required and observed;- and equipment was properly tested and returned to service.

The maintenance work requests (MWRs) listed below were observed and reviewed.

Unless otherwise indicated, the activities observed and reviewed were properly conducted.

MWR 035464 No. 2 EDG Jacket Water Pressure Alarm Troubleshoot and Repair See Section 3.2.2 of this report.

MWR 036230 Troubleshoot and Rep.

SSPS Alarms On November 4, 1994, plant operators at Unit I received several intermittent alarms and indications associated with the solid-state protection system (SSPS).

The intermittent nature of the alarms told;the. operators that the problem was associated with only one channel of the, SSPS (because of the multiplexing arrangement; a problem with only one-channel of the SSPS will cause the indications to-flash in and out).

The problem was quickly isolated to a blown fuse in channel 1-of train 'B' in the SSPS.

The inspectors observed the licensee's efforts to verify and replace the fuse.

The inspectors observed excellent coordination between the operations and maintenance personnel.

Part of the maintenance included removing power from the affected channel of the SSPS.

This evolution was very thoroughly researched and briefed.

The Unit I Operations Manager reminded everyone of the importance of'self-checking, and the pitfalls of haste.

This was particularly appropriate since the plant entered a 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Technical Specification action statement.

MWR 036371 Troubleshoot and Repair SSPS Intermittent Alarms MWR 035759 Investigate Emergency Switchgear Ventilation Relay 162-HVZBB MWR 036084 Emergency Switchgear Ventilation Fan 2HVZ-FN261A Troubleshooting MWR 036084 Emergency Switchgear Ventilation Fan 2HVZ-FN261B Troubleshooting MWR 036447 Blocking Diode Installation Per DCP 2124 MWRs 035759, 036084, 036084, and 036477 are discussed in Section 3.1.2.

5 3.1.1 Unit 2 Rod Control Unit 2 has experienced three rod control system "urgent" failure alarms over a recent one-week period.

Any failure that affects the ability of the system to move rods is considered urgent.

An urgent alarm will automatically de energize the lift coil and energizes both the stationary gripper coils and the movable gripper coils at reduced current.

On each occasion, the urgent failures were generated by rod control power cabinet 2BD.

This power cabinet is associated with Group 2 rods for-control banks 'B' and 'D' and shutdown bank 'B'.

Each alarm was received when no rod movement was demanded, and operators were able to reset the alarm.

Proper rod movement was verified following alarm reset in order to verify operability.

The lift regulation circuit board and the failure detector circuit board were replaced in an attempt to correct the spurious alarms.

Subsequent investigation of the boards by Westinghouse determined that no deficiencies existed with these boards.

Brainstorming sessions between Westinghouse and licensee engineers lead to a suspicion involving the -24VDC power supplies.

Monitoring of the power supplies found the primary power supply (Number 3) had drifted to -30VDC.

This was determined to be the cause of the spurious alarms.

As corrective action, the voltage on the primary power supply has been lowered so that it has now become the backup power supply.

The former backup power supply (Number 4) has now become the primary power supply.

The power supplies are auctioneered.

The licensee is currently evaluating the replacement of the Number 3 power supply-for the next outage.

Since swapping the two power supplies, no additional rod control urgent alarms have occurred.

The inspectors considered the licensee's resolution of this issue to be timely and thorough.

3.1.2 Unit 2 Emergency Switchgear Ventilation The inspectors performed a walkdown of the safety related emergency switchgear ventilation system in order to identify if any conditions existed that could degrade system performance.

The Beaver Valley Unit 2 Individual Plant Examination (IPE) determined that the top ranked sequence contributing to core damage frequency is initiated by a complete loss of both trains of emergency switchgear ventilation.

The consequential events if operators fail.to establish alternate room cooling within a prescribed time include:-loss of emergency AC power; loss of vital bus instrumentation; and a reactor coolant pump seal loss of coolant accident without high head safety injection.

During the inspector's walkdown of the control panel on October 21, the inspectors noted that the control power light for emergency switch gear supply fan 2HVZ-FN261B did not appear to be energized.

Per normal system alignment, the 'A' fan was running and 'B' fan was in standby.

A normal white light indicates that the fan is ready to auto-start if needed.

Upon removal of the lens cover by an'operator, -the light bulb was noted as being unusually dim.

The inspectors questioned why this condition existed.and whether there was a deficiency with the fan control circuitry.

Upon further review of the'control circuitry, the reactor operator demonstrated excellent system knowledge by determining that a sneak circuit path existed which was maintaining relay

6 162-HVZBB energized with the fan in a standby condition.

The inspectors and licensee personnel physically verified that this relay was indeed energized.

This relay should be de-energized when the fan is in standby.

The consequence of this relay being energized is that fan 2HVZ-FN261B will not auto-start as designed upon loss of the 'A' train fan.

Operators would also be unable to manually start the "B' fan since relay 162-HVZBB is maintaining the "anti pump" and trip coils of the fan breaker energized.

The inspectors observed various fan manipulations which verified that the 'B' fan would not auto start if a very dim white-light condition existed.

It was possible to clear this locked-up relay and obtain a normal white control power light by first placing the control switch in "pull to lock," then back to auto.

Some operators knew of this condition and considered it to be a "workaround."

Current operating and alarm response -procedures (fan auto-stop and high switchgear area temperature) did not specify the need for this control switch manipulation upon failure of the running fan.

Further review, of-the fan start circuitry with relay personnel determined that both trains of, fans would properly auto start with the emergency diesel sequencer if called upon during a loss of power to the respective emergency bus.

The inspectors reviewed the maintenance history (since 1993) for both'trains of emergency switch gear supply ventilation fans and noted that three recent MWRs were generated to investigate the dim white light condition.

Each MWR is summarized below:

MWR 015912 was opened on January 14, 1993, and worked on October 10, 1993, to investigate the dim white control power light for fin 2HVZ-FN261A.

Since the control switch was in pull to lock during this maintenance, no problems were found and post maintenance testing verified proper fan operation.

MWR 032143, was opened on June 11, 1994, to investigate the dim white control power light for fan 2HVZ-FN261A.

This MWR was scheduled to be worked during the upcoming refueling outage.

MWR 35001 was opened September 24, 1994, to investigate relay 162-HVZBB following observation of a dim white control power light.

This MWR was voided the same day by the Nuclear Shift Supervisor who was subsequently able to auto start both trains of fans byflrstplacing the control switch in "pull to lock."

The shift supervisor attributed this condition to "system design, not equipment deficiency."

However, no additional follow-up action was pursued.

To eliminate the sneak circuit path, Design Change 2124 has been implemented to install a blocking diode which will allow relays 162-HVZAB/BB to drop out as required with the fans in standby.- The licensee's troubleshooting, as found testing, design change implementation, and post-modification testing during this inspection period were considered by the inspectors to be thorough and adequate to preclude future auto-start circuitry problems.

7 The inspectors interviewed shift supervisors, the responsible system engineer, and maintenance personnel regarding the emergency switchgear ventilation system.

These individuals had either limited or no knowledge of the plant's IPE and could not identify the dominant core damage sequence or the most important safety system reported in the IPE.

Upon the request of operating personnel, the inspectors provided the Unit 2 crew with a copy of the executive summary of the licensee's IPE.

The training department is-scheduled to provide formal training to the operators on PRA in early 1995.

At the end of this inspection period, an additional summary document was provided to operators and maintenance personnel by the licensee's engineering department.

The inspectors also reviewed the status of the licensee's enhancements to resolve the loss of emergency switchgear ventilation as identified by the IPE.

Section 6.3.1.1 of the IPE states that alarm response procedures are being reviewed to determine if they can provide more explicit guidance on how to establish sufficient alternate cooling in the event of a failure of both trains of emergency switchgear fans.

Per the licensee's IPE, "simply opening doors will not produce a chimney effect."

The inspectors previously noted (see NRC inspection report 50-412/94-14) that little progress was evident to resolve this vulnerability.

Engineering memorandum (EM) 108125 was

subsequently issued on June 24, 1994, for engineering to provide information on the number of temporary fans needed to maintain adequate room cooling, their locations, and source of supply air.

This EM was completed October 21, 1994.

No interim guidance had yet been provided to operators, but the alarm response procedure is currently on schedule for completion by December 31.

The inspector also noted that Quality Assurance (QA) audit (BV-C-94-09),

issued October 10, 1994, stated that IPE Vulnerability 6.3.1.1, "Loss of Emergency Switchgear Ventilation," has not been scheduled for corrective actions or engineering analysis.

This QA observation was.written against the Nuclear Safety Department.

The inspectors, however, noted that the QA observation could have been more accurate, since the procedure group and engineering were taking proper action following the previous observations by the NRC.

Overall, the inspectors concluded that licensee personnel had prior opportunities to identify the potential problem with the start capability of the emergency switchgear ventilation fans.

Equipment maintenance history was not used to identify the multiple MWRs (including pre 1993 work requests) that had been generated due to the dim white light condition, or that additional investigation was warranted.

The inspectors concluded that the lack of awareness of the importance of this system (in terms of probabilistic risk assessment) also contributed to the failure to thoroughly-follow-up on the suspected control circuit deficiency by operations.

Although licensee personnel identified the sneak circuit-path, it required the prompting of the inspectors regarding the adequacy of the fan control circuitry.

The failure to promptly identify the emergency switchgear ventilation system control deficiency and thus take corrective action to preclude repetition is a violation (50-412/94-25-01) of 10 CFR 50, Appendix B, Criterion XVI, "Corrective Actions."

8 3.2.

Surveillance Observations The inspectors witnessed/reviewed selected surveillance tests to determine whether properly approved procedures were in use, details were adequate, test instrumentation was-properly calibrated and used, technical specifications were satisfied, testing was~performed by qualified personnel, and test results satisfied acceptance criteria or were properly dispositioned.

The operational surveillance-tests.(OSTs), loop calibration procedures (LCPs),

and relay calibration procedures (RCPs) listed below were observed and reviewed.

Unless otherwise indicated, the activities observed and reviewed were properly conducted without any notable deficiencies.

OST 1.43.6 Containment High Range Monitors Functional Test OST 1.43.7 Noble Gas Monitor Functional Test OST 2.47.1 Containment Airlock Test LCP-2-44F-P21B Emergency Switchgear Area Supply Pressure Loop Calibration 1/2RCP-30A-PC Calibration of ATC and Agastat Timing Relays 3.2.1 Supplemental Leak Collection System (SLCRS) Duct Damage at Unit 1 On October 16, 1994,: the licensee's Operations Department identified some large holes (several square feet in area) in the SLCRS duct leading to the Unit 1 waste gas storagevault.

The licensee also recognized that the deficiency had an outstanding maintenance work request (MWR) that was written in October of 1991., The function of this part of the SLCRS is to maintain~a negative pressure on the waste gas storage vault, in order to reduce the magnitude of a radioactive release from a leak in one of the waste gas storage tanks.

Any release from the waste gas storage tanks would also be changed to an elevated (vice a ground) release because of the SLCRS.

The inspectors reviewed this issue'to determine why the licensee had not repaired the damaged duct after almost 3 years, and to evaluate the impact of the damaged duct on the performance of the SLCRS.

The original MWR was categorized as a Priority 2 (urgent/highly desirable),

but was downgradedithe day after it was written to a Priority 3 (expedite/desirable).

The deficiency was not repaired immediately because proper work instructions were not readily available.for the repair.

Construction'maintenance personnel informally told the Engineering Department that they needed a Plant Installation Process, Standard (PIPS) to repair the duct.

The need for the PIPS was never formally communicated to engineering management personnel, and, thus, a high priority was never given to completing this document- -The SLCRS System Engineer was aware of the deficiency, and had adequate test data to demonstrate that SLCRS would perform its design basis functions even with the hole.

The test data also showed that the condition was not degrading.

Because of the test data, the maintenance engineering and planning personnel did not place a high priority on the repair, and did not

9 pursue the delay in generating a PIPS.

Based on this test data, the inspectors concluded that SLCRS would have performed its design basis function in this degraded condition.

This portion of the SLCRS is not routinely accessed because it is in the lower level of the east valve trench, which is a contaminated, high radiation area.

Consequently, plant operators were not routinely reminded of the existence of the deficiency.

Although this deficiency did not receive appropriate attention in the past, the inspectors observed very good management attention since the Operations Department re-identified the SLCRS deficiency in October, 1994.

The PIPS has been completed and approved for use.

Repair of the deficiency is scheduled to begin November 16.

Although the deficiency did not receive appropriate attention, management attention to deficiencies in safety related systems has been very timely in the recent past.

The inspectors have noted that plant management is better focused on safety-related plant deficiencies since recent management changes, and plan of the day meeting changes were implemented.

The licensee is going to discuss the SLCRS issue with all system engineers and will emphasize the need to raise any similar issues to an appropriate level of management.

3.2.2 Unit 1 Emergency Diesel Generator Speed Sensing Circuit Failures On October 6, 1994, during the monthly surveillance on the No. 1-2 Emergency Diesel Generator (EDG),

the low jacket water pressure alarm was received with the diesel at idle speed (approximately 490 rpm).

The alarm cleared before the unit reached normal operating speed (approximately 900 rpm).

This~was the only deficiency noted during the surveillance.

According to'the alarm response procedure (ARP), the alarm is set to occur at <20 psig if the diesel is operating at >870 rpm.

Since the alarm cleared prior to the EDG reaching 870 rpm, and none of the problems outlined in the ARP were apparent, the operating crew assumed that the associated pressure switch was somehow malfunctioning.

The surveillance test was determined to be satisfactory, and a maintenance work request was written to determine the cause of the low jacket water pressure alarm.

On October 10, the EDG System Engineer recognized that the problem with the low pressure alarm might be associated with the diesel speed sensing circuits.

One of the functions of the circuits is to block the low pressure alarm when the diesel is below 870 rpm.

Since a malfunction in a speed sensing circuit could affect EDG operability, the No. 2 EDG was declared inoperable and troubleshooting was initiated.

The licensee found the cause of the problem was associated with one of the speed sensing relays.

The relay had drifted from its setpoint of 870 rpm to less than 490 rpm.

Each EDG has two identical speed sensing circuits with three relays per circuit.

The relays are set at 40 rpm, 140 rpm, and 870 rpm.

The licensee checked all of the relays for proper operation, and found that all of the 140 rpm and 870 rpm relays were outside of their required +/- 20 rpm setpoint tolerance band.

Two of the relays (including the one-which drifted below 490 rpm) were replaced because of repeatability problems.

The 140 and 870 rpm relays were adjusted, and all of the relays were verified to operate properly during a post-maintenance test.

10 The inspectors observed selected parts of the relay calibrations and the post maintenance test.

The maintenance and testing was adequately controlled.

However, the licensee was not using calibrated instrumentation to verify the relay set points during the post-maintenance test.

The post-maintenance test procedure specified using the diesel skid-mounted tachometer which is not in the licensee's calibration program.

This was pointed out by the inspectors, and the licensee obtained a calibrated stroboscope to ensure the set-points were accurate.

Because of the problems-with the No.

1-2 EDG, the licensee checked the operation of the No.

1-1 EDG speed sensing relays during its next regularly scheduled surveillance test.

All of the 140 and 870 rpm relays were found slightly out of tolerance, and were adjusted prior to returning the unit to service.

The licensee has determined that the repeatability problems with the relays on the No. 1-2 EDG were due to contact corrosion.

Other licensee's with the same type of EDGs were contacted, and reported similar problems with the diesel speed sensing circuits.

The speed circuit vendor (MKS Power Systems) does not sell a safety-related version of the circuit any more because of the-lack of long-term-relay reliability.. The licensee is going to monitor the performance of the relays during every EDG surveillance test until the next refueling outage.

During the refueling outage, the licensee plans to replace the speed sensing circuits with newer, more reliable circuits (similar to the circuits installed at Unit 2).

The inspectors concluded that the licensee's corrective actions to address the problems with the-speed sensing circuits were appropriate.

The as-found relay set-points would-not-have affected the operation of the EDGs under design basis conditions.

In general, deviations which would have affected EDG operability would have been noted during surveillance testing.

The 870 rpm relay which drifted below 49o rpm was also determined not to affect operability.- This relay has a close-permissive function for the EDG output breaker; however, the licensee's test data shows that the diesel will reach rated speed before the generator reaches rated output voltage.

Therefore, the voltage permissive would have prevented the EDG output breaker from closing early.

The initial actions to address the jacket water, low pressure alarm could have been more aggressive.

The deficiency was allowed to exist for 4 days before anyone recognized that it might impair operabilityoof the EDG.

The licensee's ARP for low jacket water pressure was a contributing factor to the lack of attention to the alarm.

The ARP did not consider problems with the speed sensing circuits as a possible cause, and all theverifications required by the procedure led the operators to conclude that the pressure detector-had malfunctioned.

This observation was discussed with the Unit 1 Operations Manager.

The Operations Manager had already arrived at a similar conclusion and was discussing~the event at licensed operator retraining.

4.0 ENGINEERING (71707, 37551, 92903) 4.1 AMSAC Design Omission At Beaver Valley Units 1 and 2, the Anticipated Transient Without Scram (ATWS)

11 Mitigation Actuation Circuitry (AMSAC) system was found to contain a design omission which could render the system inoperable under certain conditions.

The system is required by 10 CFR 50.62 and is designed to limit reactor coolant system pressure, diverse from the reactor protection system, by automatically initiating the auxiliary feedwater system and a turbine trip under conditions indicative of an ATWS.

Both Beaver Valley Units have an AMSAC system based on the Westinghouse Owners Group WCAP-10858P-A, Revision 1, "AMSAC Generic Design Package."

The system is designed to initiate auxiliary feedwater flow and trip'the main turbine whenever the unit is above 40 percent power and 2 of 3 normal feedwater loops are below 25 percent of full flow.

The AMSAC system at Beaver Valley is a Foxboro Spec 200 Micro Control System.

As discussed in-WCAP-10858, the frequency of inadvertent AMSAC actuations shall be minimized.

In order to satisfy this aspect of the design, AMSAC logic monitors the feedwater.flow signals entering the AMSAC cabinets for levels indicative of an instrument loop failure.

If any of the feedwater input channels deviate outside-the normal range (i.e., indicating a failed low channel), then the AMSAC actuation output is automatically blocked.

Design requirements include trip switches for the three feedwater flow channels on the AMSAC control panel. -Placing a feedwater flow channel in a tripped condition is supposed to remove the automatic block feature in the logic created when AMSAC sensed the'bad feedwater flow input and create a logic condition where AMSAC would actuate on a 1 of 2 low feedwater flow condition.

During a review of the AMSAC logic, the licensee has found that these trip switches do not remove the automatic blocking feature.

Thus, AMSAC is-rendered inoperable at any time one of the three feedwater flow inputs is outside their normal range.

This omission was not identified during the system acceptance tests performed at the vendor facility or during the initial installation testing since this unblock feature was not specifically examined during these tests.

Based on the vendor's recommendations, a minor design change is currently being developed so that placing the bad feedwater flow channel in a tripped condition will remove the AMSAC block as originally designed.

For the interim, if a feedwater channel fails 'low, the licensee has developed a pre approved temporary modification which will insert a flow signal of less than 25 percent for the appropriate channel.

This will remove the actuation block signal and produce a remaining coincidence logic of 1/2.

The inspectors reviewed the adequacy of the licensee's translation of~the design basis of AMSAC into the design requirements for the AMSAC vendor.

The inspectors found Purchase Specification 8700-DES-0162, Revision 3, contained the sufficient information for the vendor on removing a low main feedwater flow input from AMSAC.

The licensee has determined that the failure to incorporate this aspect of the system design was due to an oversight by Foxboro.

The inspectors were satisfied with the licensee's corrective actions and considered the identification of this design omission by engineering personnel to be noteworthy.

The licensee is currently evaluating this issue for 10 CFR 21 reportability since AMSAC is considered to be a "basic component."

I___________

12 4.2 Calibration of CREBAPS Pressure Switches (Unresolved Item 50-334/94-17-01) (closed)

During a routine walkdown of the control room emergency bottled air pressurization system (CREBAPS),

the inspectors noted that several pressure switches, which protect the system from an over-pressure condition, had not been calibrated since 1987.

The switches sense a high pressure condition in the piping downstream of the pressure regulators.

The licensee initiated calibration checks and an analysis of the failure modes of these switches.

The issue was identified as an unresolved item (50-334/94-17-01) pending review of the licensee's failure analysis and the calibration data.

The calibration checks showed that all of the switches would have operated as intended.

The licensee's failure modes analysis showed that failure to isolate one of the air lines on a high pressure condition would not challenge the CREBAPS or the control room pressure boundary.

However, the licensee found, through-recent operating experience, that if a switch fails low, CREBAPS system operationcan be degraded (the associated discharge line is disabled).

Consequently, the switches will be entered into the licensee's safety-related component calibration program.

This issue is closed.

4.3 Solid State Protection System 10 CFR Part 21 (closed)

On September 1, 1994, the Duquesne Light Company submitted a 10 CFR Part 21 report to the NRC concerning the Beaver Valley Unit 1 Solid State Protection System (SSPS).

The report concerned an anomaly with the train "B' SSPS semi automatic tester.

The semi-automatic tester is used to test various logic card circuits.

The licensee found that the tester card was producing extra test pulses.

The extra pulses could prevent testing some logic combinations, which could mask a logic card failure.

This problem was discovered by the licensee during troubleshooting of an unrelated logic card failure indication.

An observant engineer noticed that the test pulse train on the input of the logic card (with the unrelated failure indication) was not correct.

The licensee found that the system clock counter for the semi-automatic tester was causing the additional pulses.

This card was replaced and train 'B' of the SSPS was successfully tested.

The Unit 1 train 'A' and the Unit 2 SSPS logic testers were also checked for proper operation,. and no further problems were noted.

The licensee has initiated periodic surveillance checks to verify proper operation of all SSPS logic test circuits.

Westinghouse has issued a Nuclear Safety Advisory Letter as a resultoof the Duquesne Light Company findings.

The letter recommends that all utilities with Westinghouse solid state protection systems check the semi-automatic test circuits, as a minimum, during each refueling outage.

The inspectors concluded that the licensee demonstrated a strong questioning attitude in the, identification of the SSPS semi-automatic tester anomaly, and took appropriate, conservative actions to report and correct the deficiency.

This 10 CFR Part 21 issue is considered closed for Beaver Valley.

13 4.4 Auxiliary Feedwater Flow Margin During a review of the Offsite Review Committee meeting minutes, the inspectors discovered that the licensee's analysis for a small break loss of coolant accident (SBLOCA) did not bound all of the conditions which are allowed by the Unit 1 and Unit 2 Technical Specifications.

Specifically, any time the steam driven Auxiliary Feedwater (AFW) pump is out of service, both high head safety injection (HHSI) pumps and both motor driven AFW pumps must be in service.

The Technical Specifications at both units allow the steam driven AFW pump and a motor driven AFW pump to be out of service for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and place no restrictions on taking a HHSI pump out of service at the same time as the steam driven AFW pump.

The inspectors asked several shift supervisors if they were-aware that taking a HHSI pump or a motor driven AFW pump out of service at the same time as the steam driven AFW pump was an unanalyzed condition.

The inspectors found-that none of the shift supervisors were aware that this condition was unanalyzed, and no controls were in place to prevent placing the plant in-such a condition.

The inspectors reviewed the Quality Services Unit Technical Specification data base for both units.

No instances were found where a steam driven AFW pump and a HHSI pump or a motor driven AFW pump were out of service at the same time with a Plant in Mode 1.

The inspectors were not able to determine exactly why plant operators were not aware of the required controls on AFW and HHSI pumps.

The requirements were known to the Nuclear Safety Department in early 1993, and were communicated to the Operations Department in the form of letters and a "basis for continued operation" determination.

Additionally, the Operations Department was told that the Emergency Operating Procedures (EOPs) must be revised immediately to reflect the required AFW flow rates.

Apparently, there was some internal disagreement/questions concerning the necessity to implement more controls or change the EOPs.

The disagreement/questions were not fully resolved and no changes were made.

After the inspectors identified that controls were lacking to prevent placing the plant in this unanalyzed condition, the licensee implemented appropriate controls at both units.

The licensee was already working on Technical Specification changes to reflect the required controls.

The EOPs, however, have not been changed to reflect the required AFW flows.

The licensee is still evaluating the necessity for the change.

The issue of reflecting design basis AFW flows in the EOPs is an unresolved Item (50-334/94-24-02 and 50-412/94-25-02) pending NRC review of the licensee's determination.

5.0 PLANT SUPPORT (71750, 71707) 5.1 Radiological Controls Posting and control of radiation and high radiation areas were inspected.

Radiation work permit compliance and use of personnel monitoring devices were checked.

Conditions of step-off pads, disposal of protective clothing, radiation control job coverage, area monitor operability and calibration (portable and permanent), and personnel frisking were observed on a sampling

14 basis.

Licensee personnel were observed to be properly implementing the radiological protection program.

5.2 Security Implementation of the physical security plan was observed in various plant areas with regard to the following:

protected area and vital area barriers were well maintained and not compromised; isolation zones were clear; personnel and vehicles entering and packages being delivered to the protected area were properly searched and access control was~in accordance with approved licensee procedures; persons granted access to the site were badged to indicate whether they have unescorted access or escorted authorization; security access controls to vital areas were maintained and persons in vital areas were authorized; security posts were adequately staffed and equipped, security personnel were alert and knowledgeable regarding position requirements, and that written procedures were available; and adequate illumination was maintained.

Licensee personnel were observed to be properly implementing and following the Physical Security Plan.

5.3 Housekeeping Plant housekeeping controls were monitored, including control and storage of flammable material and other potential safety hazards.

The inspectors conducted detailed walkdowns of accessible areas of both Unit 1 and Unit 2.

There has been improvement in housekeeping since the last inspection period, and the inspectors have noted management attention to housekeeping.

6.0 ADMINISTRATIVE 6.1 Preliminary Inspection Findings Exit At periodic intervals during this inspection, meetings were held with senior plant management to discuss licensee activities and inspector areas of concern.

Following conclusion of the report period, the resident inspector staff conducted an exit meeting on November 16, 1994, with Beaver Valley management summarizing inspection activity and findings for this period.

6.2 Attendance at Exit Meetings Conducted by Region-Based Inspectors During this inspection period, the inspectors attended the following exit meetings:

Inspection Reporting Dates Sujc Reot o Inspector October 14, 1994 Engineering 94-22/23 R. Paolino October 14, 1994 Unit-1 SRO Exams 94-21 P. Bissett October 28, 1994 EDSFI Open Items 94-25/26 R. Bhatia November 10, 1994 MOV Open Items 94-23/24 F. Bower I

15 6.3 NRC Staff Activities Inspections were conducted on both normal and backshift hours: 18.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of direct inspection were conducted on backshift; 20.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> were conducted on deep backshift.

The times of backshift hours were adjusted weekly to assure randomness.

W. Lazarus, Chief, Region I Section 3B, visited the site on October 27 and 28, and J. Linville, Chief, Projects Branch 3, on November 1 and 2, 1994.

During both visits, discussions were held with the inspectors and utility management and tours were conducted of the site.

Westinghouse Technology Advanced Manual Chapter 5 TRANSIENTS

Westina'house Tecbnololpv Advanced Manual Wsigos orLo einTaset TABLE OF CONTENTS 5.0 WESTINGHOUSE FOUR-LOOP DESIGN TRANSIENTS 5.1 Introduction 5.2 Transient Analysis.............................................

5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 Energy Equilibrium....................

Reactivity Balance.....................

Steam Generators Instrument Failures....................

A ccidents...........................

5.3 Parameter Behavior during Transients...............

5.3.1 Pressurizer Pressure 5.3.2 Bank D Rod Position............................

5.3.3 Nuclear Power................................

5.3.4 Generator Load................................

5.3.5 Tavg/Tref 5.3.6 Pressurizer Level 5.3.7 Charging Flow................................

5.3.8 Steam Dump Demand 5.3.9 Steam Flow..................................

5.3.10 Feedwater flow................................

5.3.11 Steam Generator Level...........................

5.3.12 Steam Pressure................................

LIST OF TABLES 5-1 Transient Information.............................................

LIST OF FIGURES 5-1 NSSS Response................................................

+/-~~~i I..

1Of)

OA

£.

5.0-1 5.0-1 5.0-2 5.0-2 5.0-4 5.0-5 5.0-6 5.0-6 5.0-7 5.0-7 5.0-7 5.0-8 5.0-8 5.0-8 5.0-9 5.0-9 5.0-9 5.0-9 5.0-9 5.0-10 5.0-10 5.0-11 5.0-15 Z.V-I Westinghouse Four-Loop Design Transients

o.

e-.- _o P*.*

1*ev USNRC Technical Training Center

Westinghouse Technology Advanced Manual Westinghouse Four-Loop Design Transients LIST OF TRANSIENTS 5.0 Power Changes 5.01 Ramp Load Increase: 50% - 100%, 5%/min 5.02 Ramp Load Decrease: 100% - 50%, 5%/min 5.03 Rapid Load Decrease: 100% - 90%

5.04 Rapid Load Decrease: 100% - 15%

5.1 Power Changes with Complications 5.11 Manual Reactor Trip 5.12 Rapid Load Decrease: 100% - 50%, Rods in Manual 5.13 Rapid Load Decrease: 100% - 50%, Steam Dumps Off 5.14 Rapid Load Decrease: 100% - 50%, Steam Dumps Off, Rods in Manual 5.2 Control Rod Transients 5.21 Dropped Rod (Shutdown Bank A Rod M-14) 5.22 Fast Rod Withdrawal, 45% Load 5.23 Fast Rod Withdrawal from Source Range 5.3 Instrument Failures Affecting Rod Control and Steam Dumps 5.31 Loop #1 Cold-Leg RTD Fails High 5.32 Loop #1 Hot-Leg RTD Fails High, 25% Load 5.33 Power Range Channel NI-41 Fails High 5.34 Steam Dump Loss-of-Load Controller Fails to Maximum Demand 5.35 Impulse Pressure Channel PT-505 Fails Low 5.36 Impulse Pressure Channel PT-505 Fails High 5.4 Instrument Failures Affecting Pressurizer Pressure and Level 5.41 Controlling Pressurizer Pressure Channel Fails High 5.42 Controlling Pressurizer Level Channel Fails Low 5.43 Controlling Pressurizer Pressure Channel Fails Low USNRC Technical Training Center Rev 1296 Rev 1296 I

Westinghouse Technology Advanced Manual Westinghouse Four-Loop Design Transients USNRC Technical Training Center

LIST OF TRANSIENTS (CONT'D) 5.5 Instrument Failures Affecting Steam Generator Water Level Control 5.51 Controlling Steam Generator Level Channel Fails Low 5.52 Controlling Steam Generator Level Channel Fails High 5.53 Controlling Steam Generator Feed Flow Channel Fails Low 5.54 Controlling Steam Generator Feed Flow Channel Fails High 5.6 Equipment Failures 5.61 Trip of #1 Main Feed Pump 5.62 Inadvertent MSIV Closure 5.63 RCP Trip 5.7 Accidents 5.71 Atmospheric Relief Valve Fails Open 5.72 Large Steam Break Inside Containment with Loss of Offsite Power, 10-9 amps in I.R.

5.73 Large Steam Break Inside Containment, 100% Power 5.74 Large Steam Break Downstream of MSIVs, 10-9 amps in I.R.

5.75 Steam Generator Tube Rupture in SG #1 5.76 6-in. Cold-Leg Break 5.77 Loss-of-Feedwater ATWS U"

V.,- 170i.

USNRC Technical Training Center Westinghouse Four-Loop Design Transients Westinghouse Technology Advanced Manual

0...

U-I

W-.tjn ho~use Tec'hnology Advanced Manual VsihoeFurLpDsgnTaint 5.0 WESTINGHOUSE FOUR-LOOP DESIGN TRANSIENTS Learning Objectives:

1. Given a set of transient curves and Table 5-1, demonstrate an understanding of plant characteristics and control, protection, and safeguards systems by:
a. Explaining why the parameter values are trending as shown at selected numbered portions of the curves,
b. Explaining plant effects caused by param eters reaching certain values at selected numbered points, and
c. Explaining the cause(s) of the reactor trip and/or engineered safety features (ESF) actuation, if either occurs.

5.1 Introduction The transient curves contained in this chapter were compiled and analyzed by staff members of the NRC's Technical Training Center (TTC).

They were produced from the dynamic responses of the Trojan (a Westinghouse four-loop reactor plant) training simulator. Specific parameter responses of the simulator were recorded by a data acquisition program and then graphed with a graphics program.

The instructor explanations provided in class for these curves are the results of analysis by the TTC staff during the actual simulator "runs" and during subsequent staff seminars.

For each transient, the sequence of numbered points has been established to aid the instructor's classroom presentation.

Caution is advised when trying to apply these simulator curves to any operating plant. Even relatively minor changes in setpoints, capacities, or plAnt configurations could cause significant differences in indicated responses.

During analysis and study of the curves, the student should concentrate on explaining the changes in various parameters caused by the initiating event and by the subsequent operation of control, protection, and safeguards systems.

When explaining a numbered point, the student should always try to relate "cause" and "effect" (e.g., pressurizer level is increasing because the reactor coolant system [RCS] average tempera ture is increasing, and the coolant is expanding into the pressurizer). Do not place too much emphasis on an isolated portion of or a minor deviation in the graph of a particular parameter unless it is associated with a numbered point.

Generally, a numbered point will bracket a portion of a curve, indicating that the student should try to explain why a parameter is trending or changing in the bracketed area. If a numbered point is associated with a reactor trip or engi neered safety features actuation, the student should attempt to explain not only that the protec tive action has occurred but also what reactor trip signal or ESF actuation signal is present.

The following general notes are applicable to all transients unless other information is provid ed:

1. Pressurizer pressuire is from one of the four pressuirizer pressuie instruments. In a few traniients, wide-range RCS pres sure from one of the pressure detectors on the residual heat removal (RHR) system suction line is also provided.
2. Bank D rod position is from the digital rod position indication system.

.lZ.1 Rev 1296 USNRC Technical Tralning Center

Westn~buse echoloa Adance MaualWestinizhouse Four-Loon Design Transients

3. Nuclear power is from one of the four excore nuclear instruments.
4. Generator load is in electrical MW.
5. Average RCS temperature (Tayg) is the Tavg from one of the four coolant loops, derived from the narrow-range resistance temperature detectors (RTDs) in the bypass manifold. The programmed Tavg for a particular turbine load (Tref) is a function of turbine impulse pressure.
6. Pressurizer level is from one of the three pressurizer level detectors.
7. Charging flow is from the flow transmit ter downstream of the'charging pumps and includes flow supplied to both the normal charging line and to reactor coolant pump seal injection.
8. Steam dump demand is the ouput of either the loss-of-load, the turbine trip, or the steam pressure controller, whichever is in service.
9. Steam flow (W,) is the flow in one of the four main steam lines but is indicative of total steam flow.
10. Feedwater flow (Wf) is the flow supplied to one of the four steam generators but is indicative of total feedwater flow.
11. Steam generator level is from one of the three narrow-range level detectors on one of the four steam generators but is indica tive of the level in any steam generator.
12. Steam pressure (Pstm) is from one of the three pressure detectors on one of the four main steam lines but is indicative of the pressure in any steam line.
13. Additional parameters are monitored and graphed if they are pertinent to the tran sient analysis.
14. When a transient is caused by a control system response to an instrument failure, the output of a redundant instrument is graphed to display the actual changes in the parameter of interest.
15. Initial plant conditions not available from the transient curves are given by the instructor during the introduction to the transient and listed in a box adjacent to the transient curves. For transients used on the final exam, the initial conditions are given as part of the problem state ments.

5.2 Transient Analysis The following sections discuss various aspects of transient analysis.

5.2.1 Energy Equilibrium Transient analysis begins with an examina tion of the stored energy of the reactor coolant.

As shown in Figure 5-1, the internal energy of the reactor coolant is dependent on two factors, the energy input from the core and the energy removal by the secondary system (steam genera tors). If the energy input equals the energy removal, then the internal energy of the reactor coolant is not changing. Therefore, the average coolant temperature is stable. However, if an upset in the energy equilibrium occurs, then the internal energy of the reactor coolant changes, resulting in a change in coolant temperature.

USNRC Technical Training Center 5.0-2 Rev 1296 Rev 1296 I-Westinghouse Technology Advanced Manual USNRC Technical Training Center 5.0-2

Westinghouse Technology Advanced Manual When a change in coolant temperature occurs, the density of the reactor coolant changes. The changes in temperature and density affect several of the' parameters that are shown in the transient curves of this chapter.

Assume that with an initial equilibrium between energy production and energy removal, a transient occurs that results in a reduction in tlie rate of denergy removal (e.g., a turibine load Sreduction).' Since the rate of energy production (reactor power) can not immediately drop, the' internal energy of the reactor coolant increases, and the average coolant temperature increases.

.When the coolant temperature increases, the density of the coolant decreases. This decrease in density results in an increase in the volume of the reactor coolant, causing an insurge into the pressurizer and an increase in pressurizer level.

The pressurizer level insurge compresses the steam bubble, and pressurizer pressure increases.

Now consider an increase in the rate of energy removal by the secondary system (e.g., a turbine load increase) from equilibriium condi tions. Initially, the rate of energy removal from the reactor coolant exceeds the rate of energy production by the reactor, the internal energy of:

.the reactor coolant decreases, and the average.

coolant temperature decreases. When the coolant temperature decreases, the density of the coolant*

increases. The immediate consequence of aii increase in coolant density is an outsurge from' the pressurizer and a corresponding decrease in pressurizer level. When the pressurizer'le'vel decreases, the volume of the steam bubble increases. The expanding steam bubble results in'.

a decrease from the initial pressurizer pressure'.

In each of the examples discussed above, the" reactor coolant temperature and density and the pressurizer level and pressure change as a result Westinghouse Four-Loop Design Transients of a change from an initial equilibrium between "the energy input to and energy removal from the reactor coolant.

A change in the Stored energy of the reactor "coolant-can lý identified by comparing the reactor

-power and'the steam demand on the steam generators. Generally, if the turbine load is less than the reactor power, then the average coolant temperature is increasing, and conversely, if the

'turbine'load is greater than the reactor power, then the average coolant temperature is decreas ing. Any time the turbine is not in service or an additional steam demand from steam dump operation or a steam break is present, a compari son of steam flow and reactor power leads to the same c6nclusion's. 'Once the direction of the energy mismatch is known, the changes in coolant temperature and in pressurizer level and pressure can be explained.

The two examples in the 'previous discussion are representative of two types of transients. In the first type, reactor power exceeds the rate of

'energy rem6val by the secondary; if the mismatch is extreme, the'transient is referred to as an overheiting event. This type of transient in cludes turbine trips, load rejections, and normal pow'er decreases. In the second type, the rate of energy removal by the secondary excieeds reactor pbwer;'if the mismatch is extieme, the transient is referred to as an', overcooling or excessive heat transfer event. Examples of this' type of transient "are normal power increases, steam dump opera tion, steam generator power-operated relief valve (PORV)openings, turbine valve failures, and steam line breaks.

In addition to determining the direction and

- m fgiitude of the-energy input/energy removal mismatch, the student must analyze the responses of the control systems. If nuclear power exceeds

'USNRC Technical Training Center,

+/-.Ii-i RV iYb Rtev 1296

5. 0-.5

"-USNRC Technical Training Center,

Westinghouse Technology Advanced Manual Westinghouse Four-Loop Design-Transients turbine load, Tavg increases.: If Tavg increases above Tref, then the' control rods are inserted by the rod control system (assuming automatic operation). Also, the pressurizer level increases.

If the increase in level exck'eds the increase in the pressurizer level setpoint, the pressurizer level control system decreases charging flow. The accompanying increase in pressurizer pressure is compared to the pressure setpoint in the pressur izer pressure control system. The 'control system reduces the output of the proportional heaters and, if the pressure error is large enough, opens the spray valves. Finally, if the increase in pressurizer pressure is large enough, the pressur izer PORVs open. The rod control system and the pressurizer level and pressure control systems will react in similar but opposite fashions to a transient in which turbine load exceeds nuclear power.

5.2.2 Reactivity Balance Transient analysis also involves an examina tion of the reactivity balance The transients in this section can involve changes'in fuel tempera ture, moderator temperature, '1and control rod position, any, of which can 'idd positive or negative reactivity to an initial statelof equilibrium reactivity (p = 0). For the transients of this section, the fuel and moderator temperature coefficients of reactivity are always negative. No transient time span is l6ng enough' fr changes in fission product (poison) concentrations to signifi cantly, affect reactivity, and no transient involves

,an operator-controlled change in boron concen tration. If the transient, terminates at a new steady-state endpoint witiou't 'a plant trip, the positive reactivity added by one source must be completely balanced by the niegative reactivity added by another.,

During a normal load change, reactivity will be added by the power defect and compensated by a change in control rod position. The power defect (the power coefficient integrated over a power change) accounts for the change in reactiv ity associated with the'changes in fuel tempera ture and moderator temperature, with the modera tor temperature assumed to be-maintained at programmed values. When the operat'or changes the turbine load at the turbine electrohydraulic control (EHC) station, the resulting primary-to secondary mismatch causes the average coolant temperature to initially increase or decrease. The rod control system (if in automatic) responds to the Tavg/Tref error and the power mismatch associated with the load'change by inserting or withdrawing rods.' When the new steady state has been reached at the end of the load change, the reactivity balance (p = 0) is restored, with the reactivity 'associated with the power defect completely balanced by the reactivity added by the change in control rod position.

As an 'example, consider a turbine load reduction with the rod control system in automat ic. Initially, the drop in load relative to the unchanged nuclear power causes the average reactor coolant temperature to increase, and the temperature and power mismatch circuits of the rod control system call for control rod insertion.

The control rod insertion suppresses nuclear power and drives down Tang to match the de creasing tref. Meanwhile, the fuel temperature is decreasing with the decrease in nuclear power.

When the load change is complete, the primary power again equals the secondary load, and the positive reactivity addition associated with the power defect (both fuel and moderator tempera tures are lower at the transient endpoint) is completely balanced by the negative reactivity added by the control rod insertion.

Next, consider the load reduction with the



A ii.

i-me USNRC Technical Training Center ztv iu a

Westinghouse Technoldgy' Advanced' Manual Westinghouse Four-Loop Design-Trilnsients

.3.U-4 Rev 1276O USNRC Technical Training Center

Westin2house Tecbnoloy Advanced Manual Westinghouse Four-Loop Design Transients rod control system in manual. The primary-to secondary power mismatch increases the coolant temperature and thereby adds negative reactivity..

The negative reactivity addition decreases reactor power. The decrease in reactor power adds, positive reactivityyia the fuel temperature coeffi-.

cient (the fuel temperature is decreasing), result ing in a dampening of the power decrease. As long as the rate of reactor energy production is greater than the rate of energy removal by the turbine, the coolant temperature continues to rise.

-The transient is terminated when the rate of

.energy input to the coolant by the reactor exactly

_matches the rate of energy, removal by the sec ondary system, and the positive reactivity addi tion associated with the decrease in fuel tempera

-ture exactly matches the negative reactivity addition associated with the increase in coolant temperature. The endpoint conditions are equal values of reactor and secondary power and a Tavg that is higher than that at the start of the transient.

The-examples discussed above involve changes initiated by the secondary plant. How S,

ever, transients can be initiated in the primary system. An uncontrolled rod withdrawal and a

,dropped rod are -two examples.- However, the considerations of any existing energy mismatch, control system actions, and the effects of reactivi

',ty coefficients remain applicable. For the tran sients in this section, the moderator and fuel

£_ temperature coefficients and the reactivity chang es associated with rod motion account for the changes in reactor power. In actual plant opera tion, long-term changes in the concentrations of fission product poisons and operator-controlled changes in the boron concentration must also be considered.

5.2.3,Steam Generators Another consideration in the analyses of transients involves-the changes that occur in steam generator level and pressure. The initial changes in steam generator level that are caused by changes in steam flow from'the steam genera tor are,called "shrink" and "swell."

Many explanations are used to characterize these phenomena. According to one such explanation, a load change causes a change in the pressure of the-saturated steam generators, resulting in changes in the boiling rate and steam d6nsity. As a result, the steam volumes within the tube bundle and riser regions of the steam generators either increase or decrease, with an accompany ing change inthe feedwater flows from the downcomer regions (where steam generator levels are measured).

For example, during a turbine load increase, the increased steam flow decreases the pressure in each steam generator. The pressure is now lower ihan the saturation pressure for the prevail ing steam generator temperature, resulting in an increase in the boiling rate and an accompanying expansion of the steam volume in the tube bundle region. This" epansi6n Irestricts' flow from the downcomer region to the tube bundle region, resulting in an increasing level. In addition, the increased steam flow causes an increase in moisture removal in the moisture separators and a corresponding increase in recirculation of feedwater'from the moisture separators to the downcomei, which contribute's to the increase in downcomer level. This le',el increase is referred to as a swell. Following the initial change in level, the steam generator water. level control Ssysteni' (SGWLCS) returns the level to the

-normal progriammed value through a reduction in feedwatef flow.

Conversely, a decrease in steam demand results in a temporary steam generator level decrease. The decreased steam flow increases USNRC Technical Training Center--,

-5.0-5

-1 In Ir Westinighouse Technolog~y Advanced Manual Westinghouse Four-Loop Design Transients ev L*'

Wetnhos ecnlv AdacdMnalWsigos Fu-opDsinTaset steam generator pressure. The increased pres sure now exceeds the saturation pressure for the prevailing steam generator temperature, and the boiling rate decreases, resulting in a contraction of the steam volume in the tube bundle region.

The decreased steam volume in the tube bundle region permits increased flow from the downcomer region, resulting in an initial de crease in level in the*downcomer region. Also, the decreased steam flow causes a decrease in moisture removal in te moisture separators and a corresponding decrease in recirculation of feedwater from the moisture separators to the downcomer, which contributes to the decrease in downcomer level. This initial level decrease is referred to as a shrink.

5.2.4 Instrument Failures A knowledge of control system functions and actions that are taken at particular setpoints is necessary to analyze instrument failure transients.

A failure of an instrument which feeds an input to a control systemrcan be analyzed by asking the following questions:

1. What is the-function of the control sys tem?
2. What actiohs does the control system take to accomplish its function?
3. What actions are taken if the ictual value of the parameter is above or below the setpoint value?

In short, if the output of a failed instrument is supplied to a control system, the student should determine the response of the control system and how the controlled component changes plant conditions.

As an illustration of this technique, consider the case of a controlling steam generator level transmitter failing low. The inaccurate level is provided to the SGWLCS; the function of the SGWLCS is to maintain the steam generator level at the setpoint'value. The first question in the above list is now answered. The SGWLCS controls'the steam generator level at setpoint by controlling the 'psition of the main feedwater regulating valve. The second question is now answered. Finially, if the steam generator level is low, the feedwater regulating valve opens further to increase the level in the steam generator. Since the SGWLCS has no way of "knowing" that it has a faulty input, this response occurs even with an initially normal, steam generator level. Now consider the resulting effects. Feedwater flow now exceeds steam flow, and the steam generator level increase's: This example illustrates the basic questiojs to' be' kept in mind for analyses of transients initiated by instrument failures.

5.2.5 Accidents Analyses of accidents generally involve the trends in primary and secondary levels and pressures and the responses of plant safeguards systems. Iri the case of a loss of coolant accident (LOCA), the pressurizer pressure and level drop, but the steam generator pressures and levels are largely unaffected. Since a steam generator tube rupture (SGTR) is a special form of LOCA, the primary conditions will change similarly during an SGTR, while the level in the affected steam generator increases with the influx of reactor coolant through the rupture. Steam line breaks "can be-groUped into breaks upstream of the main steam isolation'valves (MSIVs) and downstream of the MSIVs. During a break upstream of the isolation valves, the steam pressure in the affect ed steam generator decreases more rapidly than the pressures in the unaffected steam generators.

Following isolation of the faulted steam generator by its check,alve, the pressures in the intact USNRC Technical Training Center Key Lhb USNRC Technical Training Center Wistinahouse Teclinology Advanced Manual Westinghouse Four-Loop Design Transients b.U-D K ev 1296

Westinehouse Technoloey Advanced Manual Wsicos orLo einTaset steam generators should recover, while the affected steam generator blows down to atmo spheric pressure. A break downstream of the MSIVs results in,equal pressure drops in all steam generators, which are terminated by MSIV closure.

Of course, the overcooling of the reactor coolant caused by a steam break also lowers pressurizer pressure and level.

For any accident, an ESF actuation is indicat ed by the change in charging flow upon the isolation of normal charging and the initiation of high head injection, and by the change in, feedwater flow upon the isolation of main feedwater and the initiation of the auxiliary feedwater system. During steam line breaks and some small LOCAs, high head injection eventual ly reverses the drop in pressurizer level caused by overcooling of the reactor coolant or by inventory loss. For some transients, plots of high, intermediate, and low head injection are provided to illustrate the responses of the emer gency core cooling systems to an ESF actuation and plant conditions, and plots of containment pressure are provided to illustrate the progress of the accident and the response of containment pressure suppression systems.

In an actual reactor, plant, indications of accidents would include the responses of radia tion detectors. Elevated containment radiation levels would result from a LOCA, and higher secondary radiation indications would result from a primary-to-secondary leak.

No radiation indications are included as part of the transient curves provided in this manual.

5.3

-Parameter Behavior during Tran sients The following descriptions of parameter behavior during transients are provided in ihe order with which the graphs of the parameters are presented.

5.3.1 Pressurizer Pressure

1. Pressurizer pressure is affected by components controlled by the pressurizer pressure control system. This is particu larly evident during transients involving the failure of the controlling pressure channel.
2. AK rapid change in pressurizer level can have such a large effect on the dimen sions of the pressurizer steam bubble and, as a result, on pressurizer'pressure that the pressurizer pressure control system cannot 'immediately restore pressure to setpoint.
3. This parameter is an input into the OTAT trip and turbine runback setpoint calcula tions and can cause the sei46ints to increase or decrease. -Evidence of a turbine runback can ebe seen on the generator load plot.

5.3.2 Bank D Rod Position'

1. Bank D rod position is affected by the powermismatch and temperature mis match inputs t6the rod control system.
2. It is" possible for the power mismatch circuit output to be equal and opposite to e temperature mismatch circuit output.

Thiscon'dition results in'no rod motion, even thobugh" a Tref-Tavg difference exists.

3. Thef ailure -of an the input to the power mismatch circuit causes rapid rod motion initiallydu'e t6othe high rate of change of nuclear powei relative to turbine load; the output of the power mismatch circuit then decays 'exponentially, allowing any a

'want RiCY LYO "USNRC Technical Training -Center

Westnahuse echolo~

Adance MaualWestinehouse Four-Loon Design' Transients existing temperature mismatch to gradual ly increase its impact on rod control.

4. A step drop in bank D rod position to 0 steps is indicative of a reactor trip.

5.3.3 Nuclear Power Nuclear power responds to reactivity effects associated with fuel temperature, moderator temperature, and control 'rod, position.

No transient time span is long enough for changes in fissi6n product (poison) concentrations to signifi cantly affect reactivity.' No transient involves an operator-controlled change in'boron concentra tion; changes in the coolant boron concentration occur only during transients involving significant injection of the refueling' water storage tank contents.

5.3.4 Generator Load

1. During power level changes, the change in generator load is usually the initiating event.

A load change can be input gradually by the operator with the selec tion of a new demanded load and loading rate or rapidly via operation of the control valve position limiter.

2. The Trojan GE turbine EHC system generates a demanded control valve position for a giveh demanded load and does not incorporate impulse pressure feedback. Thus, once the control valves reach their'deman'ded positions, they will not respond to loadz changes if the de manded load remains unchanged. With the control valves in fixed positions, the generator load varies with the secondary side steamr1pressure.
3. The Trojan GE EHC system includes an initial pressure limiter Which closes the control valves' when -throttle pressure drops below 90% of the throttle pressure for rated power. The response of this EHC system featur'e is evident in certain generatoi load reductions in some tran sients:*
4. A turbine runback is indicated by an abrupt change in load to a new lower value. "
5. A step drop in generator load to 0 MW is indicative of a turbine trip.

5.3.5 Tref/Tavg

1. Since Tref varies linearly with impulse pressure, it reflects changes in generator load:
2. Tavg is generated 'from the hot-leg and cold-leg'temperatures (TH and Tc) mea sured inr the resistance temperature detectoi (RTD) bypass manifolds. This arrangement contributes to the inherent dela~y between the time a Tavg change occurs'and the time the Ta.g change is indicated. The delay involved is due to the coolant loop transport time and the time required for coolant to flow through the brpass manifold to the narrow-range RTD locations. Therefore, during a rapid transient the pressurizer level provides a better initial 'indication of a coolant temperitu're change (see section 5.3.6 below).
3. Tavg is a reflection of the balance between the rate of energy production in the primary 'and the rate of energy removal by the secondary. If the two are equal, Tayg will remain constant. Any imbalance, whether initiated in the primary or sec ondary, causes a change in Tayg.

USNRC Technical Training Center Rev 1296

' Westing house Technology Advanced Manual 5.0-8

Westinbouse TechnoIoy Advanced Manual Westinghouse Four-Loop Design Transients 5.3.6 Pressurizer Level

1. A change in pressurizer level is often a direct reflection of a change in reactor coolant density and thus provides an indication of a primary temperature change.
2. A decrease in pressurizer level can be indicative of a loss of coolant inventory.
3. A somewhat small but visible change in pressurizer level can result from a change in coolant density associated with a moderately large pressure change.

5.3.7 Charging Flow

1. Generally, charging flow varies with the position of charging flow control valve FCV-121, which responds to the output of the pressurizer level control system (all transients begin with charging flow supplied by one centrifugal charging pump). Charging flow increases when the pressurizer level is less than the level setpoint and decreases when the level is greater than the setpoint. Often during a transient the pressurizer level and the level setpoint (a function of auctioneered high Tavg) are changing in the same direction simultaneously but not in step, so that charging flow undergoes "swings" in which it first increases and then decreases, or vice versa.
2. An ESF actuation signal causes a charac teristic perturbation in charging flow during which the second centrifugal charging pump starts, the normal charg ing line isolates, and charging flow becomes seal injection only. This pertur bation appears on the charging flow plot as a "zigzag." The steady-state charging flow after an ESF actuation depends on the RCS pressure and the position of FCV-121, which continues to modulate in response to pressurizer level control system commands.

5.3.8 Steam Dump Demand During power operation a steam dump demand indication reflects a Tavg - Tref difference of greater than 5 F (the loss-of-load controller is in service). Following a turbine trip, an existing demand indicates that Ta'g exceeds the no-load Tavg (the turbine trip controller is in service).

During plant heatups and startups, an existing demand indicates that steam pressure exceeds the no-load steam pressure setpoint of 1092 psig. A demand indication does not necessarily mean that the steam dumps are opening; an arming signal must also be present. The best confirmation of steam dump operation is a change in steam flow.

When steam dump demand is indicated, an increase in steam flow indicates that dump valves are open.

5-.3.9 Steam Flow Steam flow responds to changes in turbine control valve position, steam generator PORV operation, steam generator safety valve opera tion, and steam dump operation.

5.3.10 Feedwater Flow 1.,,Feedwater flow6 is governed by the "position of the main feedwater regulating valve,, which is controlled by the SGWLCS' 2.,,At the 6outset of a transient, the change in feedwater flow is governed by the feed flow/steam flow mismatch.

As the transient ' progresses and the level error has a chance to build, the level error z'.vv 17o USNRC Technical Training Center

, D.U-7 Westing~house Technology Advanced Manual Westinghouse Four-Loop Design Transients ReCv Jld,7

Westinghouse Technology Advanced Manual Westinghouse Four-Loop Design Transients signal will dominate feedwater flow changes.

3. Feedwater' flow often undergoes many oscillations during i transient. Large swings in feed flow correspond to significant changes in main feed regulat ing valve position; small-amplitude fluctuations in feed flow may be consid ered as normal steady-state operation.
4. The feedwater flow indication following the isolation of main feedwater reflects auxiliary feedwater addition to the steam generator. In'the control room, main feedwater flow and auxiliary feedwater flow are indicated on separate meters.

5.3.11 Steam Generator Level

1. A rapid change in steam demand causes a shrink or swell to '6ccur (see section 5.2.3).
2. A change in the reactor coolant tempera ture, especially a decrease,-can result in a change in the secondary temperature of the steam generators' and changes in steam density and steam generator level.
3. Following the isolation of main feedwater, level is affected by auxiliary feedwater addition.

5.3.12 Steam Pressure

1. In general, steam pressure increases with a load decrease and decreases with a load increase.
2. Steam pressure can be affected by-a change in Tavg if the'change is large enough to affect the conditions governing primary-to-secondary heat transfer (see section 5.3.11).
3. A rapid drop in steam pressure can reflect operation'of the steam generator PORVs USNRC Technical Training Center 5

and safety valves and steam line breaks.

u4i Rev.1296 Wistinghouse Technology Advanced -Manual Westinghouse Four-Loop Design Transients

.U-JLU Rev 1296

Westinghouse Technology Advanced Manual Westinghouse Four-Loop Design Transients TABLE 5-1 TRANSIENT -INFORMATION I. Setpoints A. Reactor Coolant Temperature (*F) 564 557 - 584.7 553 Low Tavg Tavg program from 0% to 100% power Low-low Tavg (P-12)

B. Pressurizer Level (% level)

High level reactor trip Level program from 0% to 100% power Low level heater cutoff and letdown isolation C. Pressurizer Pressure (psig) 2485 Code safety valves open 2385 High pressure reactor trip 2335 PORVs open w

2310 Spray valves full open, 2260 Spray valves begin to open 2250 Variable heaters full off 2235 Nominal operating pressure 2220 Variable heaters full on 2218 Backup heaters off 2210 Backup heaters on 1915 Low pressure ESF block permissive (P-1 1) 1865 Low pressure reactor trip 1807 Low pressure ESF actuation D. Steam Generator Level (% level) 69 44 44 25.5 11.5 High level turbine trip, feedwater isolation, trip of main feed pumps (P-14)

Program level from 20% to 100% power

'Level program from 0% to 20% power, Low level reactor trip (with steam flow > feed flow by 1.51 X 106 lbm/hr)

Low-low level reactor trip, AFW actuation KY LYD

-.... USNRC Technical Training Center I

92 25 - 61.5 17 Westinghouse Technology Advanced Manual Westinghouse Four-Loop Design Transients Rev 1296 5.,U -11

Wesingoue Tchnloy AvanedManalWestinphouse Fniur-Tnn flhivsa -

r-E. Steam Dump System Controller Inputs (*F) 5 - 16.4 0 - 27.7 Generates 0 - 100% output from loss-of-load controller Generates 0 - 100% output from turbine trip controller F. Nuclear Instrumentation

1. Source Range (cps) 105 High flux reactor trip
2. Intermediate Range 25% current equivalent 20% current equivalent 10-10 amps
3. Power Range (% power) 109 103 39 25 10

+5 (w/ 2-sec time constant)

-5 (w/ 2-sec time constant)

G. Main Steam Pressure (psig) 1170-1230 1125 600 High flux reactor trip High flux rod stop Source range block permissive (P-6)

High flux, high setpoint reactor trip High power rod stop, Loss of loop flow permissive (P-8)

High flux, low setpoint reactor trip Nuclear at-power block perm'hissive (P-10)

Positive high flux rate reactor trip Negative high flux rate reactor trip Range of code safety valve lift setpoints Atmospheric relief valve lift setpoint Low steam pressure ESF actuation (with high steam flow)

H. ESF Actuation Signals High steam flow (variable setpoint) coincident with low steam pressure (600 psig) or low-low Tavg (553"F)

High steam line AP: I steam line 100 psig lower than at least 2 of the remaining 3 Low pressurizer pressure: 1807 psig High containment pressure: 3.5 psig Manual USNRC Technical Training Center 5.0-12 Rev 129 i I

Westinghouse Technology Advanced Manual

Westinghouse Technology Advanced Manual I. Containment Spray System Actuation Signals High-high containment pressure: 30 psig Manual II. Significant Parameters (Typical Values)

A. Reactivity Values

1. Moderator Temperature Coefficient (no-load)

BOL: -4 pcmFF (1500 ppm boron)

EOL: -26 pcm/*F (0 ppm boron)

2. Doppler-Only Power Coefficient BOL: -13 pcm/% power EOL: -11 pcm/% power
3. Power Defect at 100% power BOL: -1500 pcm EOL: -2400 pcm
4. Control Rod Worths Bank:

1000 pcm Individual:

150 pcm Differential worth: 4 to 12 pcnrlstep

5. Xenon Reactivity (BOL)

Equilibrium at 100% power: -2741 pcm Peak following reactor trip:

-5200 pcm

6. Reactor Makeup Parameters Boric acid worth:

8 pcm/ppm (BOL)

Maximum dilution rate:

120 gpm Maximum boration rate:

40 gpm (4 weight % boric acid)

Automatic makeup rate:

80 gpm total blended flow in 12*

R ev 1296 USNRC Technical Training Center

,Westinghouse Four-Loop Design Transients 1

Westinghouse Technology Advanced Manual Westinehouse Four-Loon Desien Transients B. System and Component Parameters

1. RCS Range of AT from 0% to 100% power: 0 - 59*F
2. Pressurizer 1% change in level per "F change in Tavg 130 gal per % level 10 psi change in pressure per % change in level 10 psi change in pressure per "F change in Tavg
3. Main Steam System No-load pressure (corresponds to Tavg of 557"F):

Full-load pressure:

Steam flow per generator (100% power):

Total steam flow (100% power):

4. ECCS Maximum Pressures for Injection (psig) 2670 1520 650 200 1092 psig 792 psig 3.77 X 106 ibm/hr 15.07 X 106 lbm/hr HPI pumps SI pumps Cold-leg accumulators RHR pumps USNRC Technical Training Center 5.0-14 Rev 1296 Westinghouie Technology 'Advanced Manual

-. 'Westinehouse Four-Loop Design Transients

74 Ir z V)

C" Cl)

Cl)

ý:V Ul CD CD

Westinghouse Technology Advanced Manual Chapter 6 PLANT DIFFERENCES (Later)

Westinghouse Technology Advanced Manual Chapter 7 PLANT EVENTS Section 7.1 Zion Loss of DC Power 7.2 V. C. Summer Inadvertent Criticality 7.3 Water Hammer at San Onofre 7.4 Salem Load Reduction 7.5 Sequoyah Incore Thimble Tube Ejection Event

Westinghouse Technology Advanced Manual Section 7.1 Zion Loss of DC Power

Wac*;

lnahnups Technolocry Advanced ManualZinLsofD Pwe TABLE OF CONTENTS 7.1 ZION LOSS OF DC POWER........................................

7.1.1 Introduction 7.1.1.1 PlantStatus.......................................

7.1.1.2 Description of Zion Electrical Distribution...................

7.1.2 Loss of DC Control Power 7.1.3 Problems and Corrective Actions Taken............................

7.1.4 Sum m ary 7.1.5 Reference................................................

LIST OF TABLES 7.1-1 Sequence of Events: Zion Unit 2 Loss of DC Control Power September 1976.....

LIST OF FIGURES 7.1-1 Zion Unit 2 Electrical Distribution Rev 0196 7.1-1 7.1-1 7.1-1 7.1-1 7.1-2 7.1-2 7.1-2 7.1-3 7.1-5 7.1-7 Zion Loss of DC Power 4.

II--lt USNRC Technical Training Center

Westinghouse TecbnoloEv Advanced Manual Zion Loss of DC Power 7.1 ZION LOSS OF DC POWER Learning, Objectives:

1. State the cause of the loss of dc power

" Zion.

,2.- Explain how the loss of dc control poim affected the following:

a. Main control board indications.
b. Ability to control and/or trip equipmc

-'-automatically, remote manually,- a

-locally.

3.: Discuss the causes of the reactor trip and 1 engineered safety features (ESF) actuati signal.

4. Discuss the cbrrective-measures taken a!

result of this incident.

7.1.1 Introduction Zion Unit 2 is a fou'r-loop Westinghoi design plant located in Zion,; Illinois. It is ral at 3250 MWt and 1098 MWe.

7.1.1.1 Plant-Status At the time of the incident, September 19 the unit was operating at 25% reactor power v the load being increased. The 2C main feedwE pump and the main feedwater regulating val were in automatic, and the main feedwa regulating bypass.valves were in the process being closed (2A and 2B bypass valves w partially open).

Electrically, the main'generator was synct.

nized with the grid. The 4.16-kV buses 243 245 were being supplied by unit auxiliary trg former 241, and 4.16-kV buses 242 and 244 were being supplied by system auxiliary trans former 242. Diesel generator 2A was tied to the system through 4.16-kV bus 248 and was loaded at to approximately 3300 kW while undergoing an extended test run. Battery 211 was.undergoing a monthly equalizing charge and was disconnected ier from 125-Vdc,control -bus 211, :which was powered from the Unit 1 125-Vdc control bus 111 via a cross-tie.

-nt.7.1.1.2 Description -of Zion Electrical nd -

Distribution

-7The Zion electrical distribution is shown in the.

Figure 7.1-1. The nonsafety-related electrical

.on distribution system for Zion -Unit 2 consists of Sfive 4.16-kV service buses. The normal power supply to the service buses is the unit auxiliary s a transformer, with the reserve supply from the

-system auxiliary transformer. The unit auxiliary transformer is located on the output side of the main generator, and the system auxiliary trans former is connected to the main grid. Bus 241 ise supplies the electric driven main feedwater pump ted and is the reserve supply for Unit 1 safeguards buses. The otheroservice buses carry the large

- non-emergency loads associated with the plant, such as circulating water pumps, reactor coolant

-pumps, condensate pumps, etc.

Also, buses 76,,.242, 243, and 244 supply normal power to the 6ith

--Unit 2 safeguards buses.

Lter, ves The safeguards buses consist of three 4.16 Lter kV buses, which are normally supplied from the of three service buses mentioned above.

The ere reserve power supply for these buses is bus 141 from Unit 1. :Theo emergency power is supplied S--by diesel generators, one of which is a swing Lro-diesel (can be used to supply Unit 1 or Unit 2).

and mns-, -

-~The 125-Vdc buses receive their power from S-D A109 USNRC Technical Training Center Westinahouse Technolosy Advanced Manual Zion Loss of DC Power

/.l-J.

Westinghouse Technology Advanced Manual Zion Loss of DC Power battery chargers powered from the 480-Vac vital buses.

Each of these buses supplies two inverters, which power the 120-Vac instrument buses. The 120-Vac buses can also receive power directly froffi the 480-Vac vital buses via 480/120-Vac transformers: The system normally uses the inverters to power the 120-Vac buses, with the transformers as a backup power supply.

7.1.2 Loss of DC Control Power The loss of dc control power was the result of an operator improperly opening the tie breaker between 125-Vdc bus 111 and 211 prior to reconnecting battery 211 to bus 211. The result was a loss of dc power to the loads supplied from bus 211. The results of the loss of these loads are discussed in the attached sequence of events.

7.1.3 Problems and Corrective Actions Taken The first measure to be considered was a key lock system on the dc breakers which would require the breakers to be operated in the proper sequence during realignment: This idea was rejected due to personnel safety considerations.

The diesel generator which was destroyed by fire was removed and repaired. Tlhe diesel was then tested to ensure it met the original specifica tions. The outage required for this repair was approximately 6 weeks.

The procedure-for aligning the 4.16-kV service buses was 'riised to place two buses with the same source of dc control 'power on different transformers. The service buses which provide power to the 4.16-kV ESF buses (except for the bus supplied by the 0 diesel generator) would be supplied by the system transformer.

This results in a lineup of buses 242 and 245 on auxiliary transformer 241 and buses 243 and 244 on system auxiliary transformer 242. This alignment would prevent more than one bus from being de-energized on a loss of dc power and prevent overloading a diesel generator that was paralleled to the system during a loss of a dc bus.

A separate procedure was to be developed for the O diesel generator.

The possibility of eliminating the trip of all reactor coolant: pumps on two-out-of-four underfrequency was examined. After a discus sion with Westinghouse, this was ruled out due to the possibility of causing a sequential loss of flow accident, which is an unanalyzed accident.

The installation of an automatic transfer switch to change the computer power supply from the battery fed inverter to regulated ac power was to be performed. This would be done rapidly enough to ensure no loss of data from the computer.

Two modifications associated with the main control board annunciators were performed.

First, annunciators for the ac buses were sup plied from ac power from the opposite unit.

Secondly, mimic buses were added to the control board to provide indication of power status for the dc distribution system.

7.1.4 Summary This incident is important in that it demon strates the importance of maintaining proper dc control power in the plant, and the consequences of a loss of the dc control power. In this case, the loss resulted in a reactor trip and an ESF actuation, filling the pressurizer relief tank to the point of breaking the rupture disk, and causing significant, damage to an emergency diesel USNRC Technical Training Center 1.1-h Key UIYO Rev 0196 Westinghouse Technology Advanced Manual Zion Loss of DC Power USNRC Technical Training Center I. I-ZO

,Y 3tSflt 6 Z5tA3

      • E*%''J



generator.

It should be noted that each plant could have a different response to a loss of dc control power due to differences in the designs of their electrical distribution systems. The incident at Zion Unit 2, however, demonstrates the importance of this source of power to safe operation.

7.1.5 Reference Nuclear Power Experience Manual, Volume PWR-2,Section XI, Subsection A, entries 166 and 192.

USNRC Technical Training Center 7.1-3 Zion Loss of DC Power Riv 0196 Ca air, W"O' 11 -

Sj IV 4:

U fr h -In Advanced Manual Rev 0196

"TABLE 7.1-1 Sequence of Events: Zion Unit-2 Loss of DC Control Power September 1976

-I Equipment operator opens the tie breaker between 125-Vdc control bus 111 and bus 211

- prior to paralleling bus 211 with battery 211.,

2. DC control power lost to the following loads:
a. 4.16-kV buses 241, 243, 245, and 248,
b. All generator and transformer relaying and -metering, and c: All main control board annunciator windows and horns.
3. Underfrequency relays on 2B and 2D RCPs drop out, generating a reactor coolant pump
  • -trip signal to all reactor coolant pumps. 2A and 2C RCPs trip (pumps 2B and 2D do not trip due to loss of dc control power to their breakers).
4. -Reactor trips on loss'of two reactor coolant pumps with power greater than 10% (P-7).
5. 'Reactor trip causes a turbine trip. However, the main generator does not automatically trip "dtie to loss'of the dc power. Main generator motorizes.
6. Running main feed pump does not automatically trip due to loss of generator relaying (main

- feed pumps at Zion tripon 'a main generator trip) and cannot be tripped from the main control board. Due to the shrink in the steam generators, the pump goes to full speed in response to the low steam generator levels. 2A and 2B steam generators refill rapidly due to the partially open main feedwater bypass valves (about 3000 gpm for approximately 1.5 minutes).

7. The rapid cooldown caused by the overfeeding causes a drop in the steam pressure in the 2A and 2B steam generators. This results in an ESF actuation on 100 psid differential pressure. The ESF signal causes a feedwater isolation signal and shuts the bypass valves.
8. The main generator output breakers and the field breaker are opened manually at the control board (dc control power to the breaker trip coils is transferred to another source).
9. 4.16-kV buses 243 and 245 do not automatically transfer from the unit auxiliary transformer to the system auxiliary transformer because of loss of DC power.

USNRC Technical Training Center

7. 1 - 5 Rev 0196 SZion Loss of DC Power

Wetin house

- Techno1ov Advanced Manual Zion Loss of DC Power 4

n.nr Rcv UlYD USNRC Technical Training Center TABLE 7.1-1 (CONTINUED)

Sequence of Events: Zion Unit 2 Loss of DC Control Power September 1976,

10.

Diesel generator 2A attempts to carry the loads of buses 243 and 245 through transformer 241. Since the diesel is only sized for ESF loads, these buses overload the generator. The overload condition results in the diesel generator overheating and catching on fire.

11.

Running main feedwater pump is manually tripped by the shift engineer at the EHC station.

12.

Attempts are made to manually trip the running diesel generator; however, the smoke and fire prevent success. Eventually; the generator windings burn open, and the components powered from the affected buses coast to a stop. Cardox is initiated to extinguish the fire.

13.

The pressiirizer safety valves lift (maximum RCS pressure of 2550 psig) and continue to lift several times. The pressurizer relief tank rupture disk breaks, resulting in about 2500 gallons of water spilling into the containment. The safeties are lifting due to the input of water from the ECCS equipment (high head injection) which started with the ESF actuation.

14.

DC bus 211 is reenergized. Control board annunciators are restored, 2B and 2D RCP breakers are opened, and the 4.16-kV buses are-re-energized from the unit auxiliary transformer (inoperable for about 20 minutes).

15.

ESF signal is reset and diesel 2A is tripped. All safeguards pumps are stopped. About 7650 gallons of water was injected into the plant.

Westinghouse TechnoloLv Advanced Manual

'_ Zion Loss of DC Power ReCv UJ17

I UNIT

~~~1~~

241 NO NO NO 0

LN NO NIO I

MA1 J

1 ESF 247 ESF 248 ESF 249 From UniS1F2__3-00 GEERTO 11,--kNOtw Baet

3ry r

r yc*

  • ,c,

_J 480Batt;FROM 480Catter r

Jy UNIT qI Ty1c1 Di2l12, CoInvrt Per bL L

Westinghouse Technology Advanced Manual Section 7.2 V. C. Summer Inadvertent Criticality

Wactin hnuicq Tpechnoloar Advanced ManualV..Sm e Ind rttCiicit TABLE OF CONTENTS 7.2 V. C. SUMMER INADVERTENT CRITICALITY 7.2.1 Introduction 7.2.2 Causes................................

7.2.3 Safety Implications........................

7.2.4 Generic Implications.......................

7.2.5 Corrective Actions........................

7.2.6 Summ ary..............................

LIST OF TABLES 7.2-1 Incorrect ECRPs..............................................

ew

-

Rv 0191 I.. h1 USNRC Technical Training Center 7.2-1 7.2-1 7.2-1 7.2-2 7.2-2 7.2-3 7.2-3 7.2-5

/.,A-!

V.C. Summer Inadvertent Criticality

°..............

°°.......

.... °..°°°........

Rev 0196

,7.2 V. C. SUMMER INADVERTENT.

mined to be 168 steps on control bank D (CBD).

CRITICALITY Learning Objectives:

1. Briefly discuss the V. C. Summer start accident.-

2.- Explain the causes of the accident.

3. Explain the, safety implications of the acci dent.

I I

4. Explain what procedural limitations and administrative controls should have prevented this accident.

"7.2.1 Introduction V. C. Summer Nuclear Station is a single unit three-loop Westinghouse plant located in

--Fairfield County, South Carolina, and operated by South Carolina Electric and Gas Co. The plant began commercial operation on January 1, 1982.

The trainee 'was, instructed to withdraw the control banks until the CBD position reached 100 steps. It was thought that this would provide a convenient. stopping point with a sufficient margin prior to criticality. Based on calculations after the event, the reactor actually went critical when CBD reached about 40 steps, but no one in the control room realized that the reactor had attained criticality. The trainee continued to add positive reactivity after the reactor was critical with continued rod withdrawal. The SRO blocked the source range reactor trip when the P 6 permissive was received without noticing the rate at which reactor power was increasing.

- Without the 105 cps trip from the source range instruments to stop the power increase, reactor power increased to approximately 6% of rated thermal power with a startup rate of about 16-17 Sdpm (based on post-accident calculations) before the reactor tripped on high positive flux rate in the power range. -Control bank D was at about 76 steps when the trip occurred.

-7.2.2.Causes On February 28, 1985, during a startup, the The reactor startup which took place around reactor experienced an inadvertent criticality 1:30 p.m. on February 28 followed intermittent which resulted in a reactor trip. A combination operation of the unit during the previous month.

of errors associated with improper, operation,,,,,, One of the primary causes of the inadvertent "inadequate supervision of an operator trainee; -:,criticality was the incorrect calculation of the and miscalculation of the estimated critical rod-ECRP. The calculation for the startup used the position (ECRP) led to the inadvertent criticality..',, power block,method of predicting xenon and The event could have been easily prevented by':: samarium reactivity worths, which can produce better.- training, supervision and procedural -, ;significant errors.if the power history is intermit control. The reactor protection system func-:

tent. The ECRP calculation was made based on a tioned as designed to shut the reactor down brief period (three hours) of power operation before any fuel damage was-experienced.

earlier in the day rather than on previous periods

"..of extended operation. -Another problem with the The startup was being conducted by a reactor calculation involyed using middle of life (MOL) operator trainee under the supervision of a senior rod worth curves rather than beginning of life reactor operator (SRO). The ECRP was deter-(BOL) curves, which would have been more

-Y

~1

~

),...

Ain,<Z~Y L~

SUSNRC Technical Training Center -

.I

/. 15 - I -

Westing~house Technology -Advanced Manual V.C.- Summer Inadvertent Criticality ev tLI UFJ.

Westinghouse Technology 'Advanced Manual V.C. Summer Inadvertent Criticality appropriate. The licensee's pr6cedure lacked any guidance regarding when the change should have been made to the MOL curves:

The operator performing the startup was a trainee and did not have an NRC license. This is allowable if the trainee has received sufficient training to be able to perform the task normally performed by licensed personnel and is directly supervised by a licensed operator. The trainee apparently had not received appropriate training because he did not know what the indications of reactor criticality are and he did' not know that plant procedures required that the Excore instru mentation should be moniiored for indications of criticality any time positive reactivity is being added to the core.

Supervision of the trainee was inadequate, even though several reactor operators and senior reactor operators were' in the control room performing other tasks related to the startup.

None of the licensed' operators recognized criticality and the supervising senior operator even blocked the source range trip as reactor power was increasing into the intermediate range.

7.2.3 Safety Implications An event more severe than the February 28 inadvertent criticality is analyzed in the V. C.

Summer final safety analysis report. The uncon "trolled rod cluster control assembly bank with d**wal from a subcritical condition (a Condition "II fault'of moderate freqtency) is' analyzed to determine if acceptable fuel limits are maintained during the transient. The event is initiated with a simultaneous withdrawal of two sequential "control banks having a maximum combined worth at a maximum speed of 105 pcm/sec (the addition rate was deiermined to be 10 pcm/sec for the 2/28/85 event). The analysis determined that the power range neutron flux trip (low setpoint) would activate at 35% power (the positive rate trip is not assumed to activate). The peak power attained, limited by the fuel doppler coefficient, is about 600% of rated thermal power (the energy release from an instantaneous power pulse would be very low). No fuel or clad damage results, and the departure from nucleate boiling ratio remains greater than 1.3, according to the analy sis. The V. C. Summer inadvertent criticality event was bounded by the accident analysis with considerable margin.

7.2.4 Generic Implications The inability to accurately predict criticality is a safety concern because technical specifications require that the calculation be performed to verify that the reactor will be critical with rods with drawn above the rod insertion limit. This is necessary to ensure that there is enough negative reactivity available from the control rods that the "reactor can be made subcritical from all operating conditions assuming the worst case conditions.

Even though the inadvertent criticality event was bounded by an aiialyzed accident, it demon strated significant weaknesses in the utility's procedures and training for licensed operators.

The plants procedure did-not provide adequate guidance for the calculation of an ECRP during a period of unstable or unpredictable xenon behav ior. Adequate guidance on the correct source of data was not available as demonstrated by the use of the incorrect rod worth curves.

-The major contributor to the incorrect ECRP calculation at Summer was the incorrect determi nation of the reactivity worth of xenon. Summer and other licensees typically used the power block history method to calculate the equivalent power for determining xenon and samarium USNRC Technical Training Center 7.2-2 Rev 0196 1

Rev 0196 V.C. Su mer Inadvertent Criticalitv Y

USNRC Technical Training Center 7.2-2

U1ectin housei Technology AdIvanced ManualV..Sm e

Iadetn Crialt reactivity worths. With this method the core power level readings are logged periodically in order to describe the previous core power histo ry. Xenon reactivity is based on the hourly average core power for the 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> prior to shutdown. Samarium reactivity is based on the daily average power for the eight days prior to shutdown. In determining the reactivity worth of xenon and samarium, each logged entry has a different coefficient or multiplier associated with it. The entries nearest to the time of shutdown are the most heavily weighted. The power block method of determining the equivalent power level for estimating xenon and samarium reactivities is not very accurate when previous reactor opera tion is intermittent at widely varying power levels. It was determined that some of the ECRP calculations were in error by more than 50 rod steps when non-equilibrium critical data were used.

Other methods, such as computer programs, are available to determine xenon and samarium worths for use in ECRP calculations. Although potentially more accurate and not subject to calculation errors, problems are still possible with computer programs. Improper data input and software errors during development and updating of the software can introduce problems during use.

Similar instances of incorrect ECRP calcula tions have occurred on numerous occasions at Westinghouse plants, but proper monitoring of available indications have prevented uncontrolled criticalities and power excursions. Table 7.2-1 is a partial listing of similar events.

7.2.5 Corrective Actions Following the incident at V. C. Summer, the licensee initiated corrective actions to prevent recurrence.

Procedural inadequacies were addressed, and inverse multiplication plots were used for subsequent startups to predict criticality and to verify the accuracy of ECRPs. These actions did not prevent the problem that occurred on 5/11/85.

Administrative controls on the conduct of training were improved to ensure proper supervision of on-the-job training.

Following a special inspection by USNRC Region II, enforcement action was taken for the procedural violations and inadequacies.

In additon, the licensed operator supervising the evolution received a letter of reprimand.

7.2.6 Summary The major contributor to the incorrect ECRP calculation at Summer was the incorrect determi nation of the reactivity worth of xenon. Similar instances of incorrect ECRP calculations have occurred on numerous occasions at Westing house plants. The use of inverse multiplication plots to predict criticality and to verify the accura cy of ECRPs and the proper monitoring of available indications help to prevent uncontrolled criticalities and power excursions.

,7 2

R ev 0196E

. A.,

USNRC Technical Training Center

_V.C. Summer Inadvertent Criticality

Westin husec Technoloav Advanced ManualVC.Sm eIadretCrialy 1D--

fl1o TABLE 7.2-1 Incorrect ECRPs Date Plant Primary Cause 5/11/85 V.C. Summer Incorrect ECRP, went critical below the RIL, inverse multiplication plot failed to identify error.

5/17/85 McGuire 2 Incorrect ECRP, went critical below the RIL, error caused by incorrect Xenon worth program.

8/23/84 Turkey Point 3 Incorrect ECRP, went critical 85 steps below ECRP, calculation error.

5/12/84 Turkey Point 3 Incorrect ECRP, went critical 145 steps below ECRP, calculation error.

10/31/84 Turkey Point 4 Unable to achieve criticality, calculation error resulted in improper boron addition to RCS.

5/15/85 Turkey Point 3 Incorrect ECRP, used wrong RCS temperature in calculation (525"F vs. 535"F) 4 *.,, -

US-NRC Technical Training Center V.C. Summer Inadvertent Criticality INkl* *g U,Ik J V

Westinghouse Technology Advanced Manual Section 7.3 Water Hammer at San Onofre

Westinahn,,sp Technology Advanced Manual WtrHme tSnOor

"" TABLE OF CONTENTS 7.3 WATER HAMMER AT SAN ONOFRE................................

".7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 History of Water Hammer at Nuclear Power Plants...........

Water Hammer

.I..

San Onofre Water Hammer Incident Plant Conditions Leading to Water Hammer..........................

Water Hammer-Induced Damage 7.3.5.1

-7.3.5.2 7.3.5.3 7.3.5.4 Piping and Piping Support Damage...............

Feedwater Loop B Flow Control Station Damage..............

AFW Piping Damage...............................

Valve M alfunctions........................

7.3.6 Valve In-Service Testing...............

7.3.7 Valve Failure Findings 7.3.8 Flash Evaporator Unit.................

7.3.9 Turbine Breakable Diaphragms (Rupture Disks) 7.3.10 Summary.........................

LIST OF TABLES 7.3-1 Description of Feedwater Pipe Damage Following SONGS-I Water Hammer 7.3-2 Inspection Findings...........................................

7.3-1 7.3-1 7.3-2 7.3-3 7.3-4 7.3-6 7.3-6 7.3-7 7.3-7 7.3-7 7.3-7 7.3-8 7.3-9 7.3-9 7.3-10 7.3-11 7.3-12 92&

y ft0196 USNRC Technical Training Center,

I Water Hammer at San Onofre

.*..............o..-...

W-.ct;n ohnuse Technoloov Advanced Manual WtrHme tSnOor LIST OF FIGURES 7.3-1 Filling of a Voided Feedwater Line.................................

7.3-13 7.3-2 San Onofre Electrical System.....................................

7.3-15 7.3-3 Condensate System...........................................

7.3-17 7.3-4 M ain Feed System............................................

7.3-19 7.3-5 Auxiliary Feedwater System.....................................

7.3-21 7.3-6 SONGS-1 Feedwater Flow Diagram................................ 7.3-23 7.3-7 SONGS-1 Loop B Steam Generator Flow Control Station -.................

7.3-25 7.3-8 SONGS-i Auxiliary Feedwater System..............................

7.3-27 7.3-9 FW Loop B Piping and Support Layout 7.3-29 7.3-10 Overview of Feedwater Piping and Support Damage Due to Water Hammer 7.3-31 7.3-11 Typical Swing Check Valve 7.3-33 7.3-12 Check Valve FWS-346.........................................

7.3-35 7.3-13 Check Valve FWS-348.........................................

7.3-37

'v 2*

1 a.,

nil-I Olt I..-

lI Water Hammer at San Onofre USNRC Technical Training Center

  • ,CV UJ~l

Wptinphn,,q

TrhnnIov Advanced Manual Water Hammer at San Onofre 7.3: WATER HAMMER AT SAN ONOFRE Learning Objectives:

1. Describe three types of water hammer their causes.
2. -Describe corrective actions that were take prevent previous' steam generator w hammer problems.
3. Describe the damage caused by the w hammer event at San Onofre Nuclear Ge 4.+ Describe how multiple check valve fail contributed to the initiation of the m

, hammer at SONGS-I

5. Discuss how check valve testing require the-American Society of Mechanical l neers Boiler and Pressure Vessel Code c

' have prevented the SONGS-i water har incident.

7.3.1-History of Water Hammer at IS clear Power Plants, During the early 1970s, the NRC be' aware of the increasing frequency of hammer events in nuclear power plant sy.

  • - "and became concerned about-the potential "lenges to system integrity and operabilit]

could result from these incidents. For prc ized water reactors, the major contributor to incidents was a phenomenon called steam g¢

.tor. water,.hammer (SGWH).. Althoug significance of these events varied from pl

-plant, the NRC 'was concerned that a ls

- SGWH could cause a complete loss of feed and affect the ability of a plant to remove heat and cool down after a reactor trip.

lFollowing the SGWH that occurred at Indian

,Point Unit 2,in 1972, which resulted in a circumferential weld failure in one of the and feedwater line's, the NRC required all utilities to submit design and operational information describing design features for avoiding SGWH.

n to In 1978, the generic subject of water hammer

'ater, was classified as-an unresolved safety issue (USI A-I) and received increased NRC and industry attention.

'ater

.ner-SGWH can occur -following a reactor trip when the steam generator top feedring drains and refills with cold auxiliary feedwater. NRC ures attention was directed at t&e f'eedring design and eater internal steam generator (SG) components near "the feedwater (FW) nbzzle. Experience had revealed that internal damage to the feedring and d by.

supports could occur. Modifications implement

'ngi-ed to prevent SGWH genierally inv6lied installa

-ould tion of J-tubes to prevent _the draindown of amer

. feedrings, short horizontal runs of FW piping adjacent to SG feedwater nozzles to minimize the magnitude of water hammerfs, and limits on

[u-auxiliary feedwater (AFW) system flow rates to avoid the rapid refill of SGs. with cold water. In general, attentio'n focused on the internal struc came

-ture and design of the sieam generator rather than water on conditions in the FW lines and flow control

tems components.,

chal-.

Y' that The NRC was dware'of the 'iossibility of

.ssur-developing c6ndensation-induced water hammer these

'extending back into the 'feedwater'piping as a enera-result of line voiding because of a water hammer h the occurrence at the KRSKO plant in Yugoslavia in ant to, 1979. Limriitd 'information on that event sug evere

'gests that leaky checlk valves 'or pre-operation

[water pump testing (i.e6.,'start anid trip test), or both,

decay, were'the underlying,causes. Similar occurrences I.-,-'

'1 Vw (11Q1 USNRC Technical Training Center _

Water Hammer at San Onofre Westinahonse Technology Advanced Manual Rev 0196

Westinghouse Technology Advanced Manual Water Hammer at San Onofre had not been reported for U.S. plants, and apparently check valve failures were not consid ered a significant contributor to feedwater system water hammer by'the NRC. Implicit in the reliance the NRC placed on J-tubes to prevent steam generator feedring voiding to prevent SGWH, was the assumption that,feedwater system check valves do not leak. It appears that the NRC did not consider feedwater piping water hammer due to failed check valves to be a sub stantial contributor and did not pursue this issue further.

7.3.2 Water Hammer This section discusses the water" hammer which occurred at'SONGS-il, its underlying causes, and the damage incurred. Since failed check valves' ifi the feedwater pipiig' were the underlying cause,' this section also discusses valve nfiaintenance and in-service testing related to these valves. To clarify' the discussions that follow, a brief review of water hammer phenom ena and commonly accepted definitions are provided.

Hydraulic instabilities occur frequently in pipifig networks'as a result of changes in fluid velocity or pressure. Some of the better under stood occurrences include induced flow tran sients due to starting and stopping pumps, opening and closing valves, water filling voided (empty) lines, and pressure changes due to pipe breaks or ruptures. 'As a consequence 'of the change in fluid velocity or pressure, pressure waves are creafed'which propagate throughout the fluid within the piping network and produce audible noise, line' vibrations and, if sufficient energy transfer occurs between" the pressure wave and the pressure boundary, structural damage to piping, piping'supports, and attached equipment.

More' specifically, this pressure transient is a'fluid shock wave in -which the pressure change is the result of the conversion of kinetic energy into pressure waves (compression waves) or the conversion of pressure into kinetic energy (rarefaction waves). Regardless of the underlying causes, this phenomenon is generally referred to as water hammer.

A water hammer event can be characterized as one of the following three major types:

1. "Classical water hammer" generally identifies a fluid shock, accompanied by noise, which results from the sudden, nearly instantaneous stoppage of a moving fluid column. Unex pected valve closures, backflow against a check-valve, and pump startup into voided lines where valves are closed downstream are common underlying causes of classical water hammer and are generally well understood.

Analytical methods have been developed to predict loads for this type of fluid hammer and include the effects of initial pressure, fluid inertia, piping dimensions and layout, pipe wall elasticity, fluid bulk modulus, valve operating characteristics (time to open or close), etc.

2. "Condensation-induced water hammer" resul& when cold water (such as auxiliary feedwater) comes in contact with steam.

Conditions conducive to this type of water hammer are an abundant steam source and a long empty horizontal pipe run being refilled slowly with cold water. The cold water draws energy from the steam, with the rate of energy itrnsfer being governed by local flow conditions. As the steam condenses, addi tional steam will flow countercurrent to the cold water,- and as the pipe fills up (i.e., the void decreases) the steam velocity increases, USNRC Technical Training Center Rev U19t 3-USNRC Technical Training Center Rev 0196

Westinghouse Technology Advanced Manual Water Hammer at San Onofre setting up waves on the surface of the water,,,

eventually, entraining water and causing slug "flow. Slug ýflow entraps steam pockets and

.promotes significant heat transfer between the:

steam and colder water. Figure 7.3-1 illus trates in simplified form the flow conditions which would come about during the refilling of a voided horizontal feedwater line. Once slug flow conditions commence, a steam pocket will suddenly condense, creating a localized depressurization instantaneously.

"The resulting pressure imbalance across the slug (approximately 700 psi at SONGS-i) causes the slug to accelerate away from the source of pressure and toward the region of,-.

condensation.-*

Condensation is extremely rapid, and predict ing its exact location is impossible. When the water slug suddenly strikes water in a previ ously filled pipe, it produces a traveling pressure wave which imposes loads of the magnitude that would be induced by classical water hammer in the piping network. This phenomenon, called condensation-induced water hammer, occurred at SONGS-1.

occurred principally, in pressurized water reactors (PWRs) with,steam generators

,,,having top feedrings for feedwater injection.

The underlying causes are similar to those

-; discussed above (i.e., the voiding of the horizontal feedring and feedwater piping immediately adjacent to the steam generator and the subsequent injection of cold water).

Damage -from SGWH has generally been confined to the feedring and its supports and to the steam generator feedwater nozzle region. However, damage to feedwater line snubbers and supports has also occurred. An SGWH resulted in a fractured weld in a feedwater line at Indian Point Nuclear Power Plant Unit 2 in 1972.

7.3.3 San Onofre Water. Hammer Inci

  • dent.

San Onofre Nuclear Generating Station Unit 1, operated by the Southern California Edison Company (SCE), is a 450-MWe Westinghouse pressurized water reactor located on the Pacific Ocean, approximately four miles south of San Clemente, California. The plant received an NRC S-

'operating license in
  • I.

Predicting loads associated with this type of water hammer is extremely difficult because.

At 4:51 a.m.-on November 21, 1985, with of the interactive and complex hydrodynaamic the plant operating at 60 percent power, a ground and heat transfer phenomena which precede

-:fault was detected by protective relays associated

-the sudden condensation. Yoid fraction (or,-,

with a transformer which was supplying power how empty the pipe is) and subcooling (or to one of two safety-related 4160-V electrical how much colderthe water is than the satura- -buses (see Figure 7.3-2). The resulting isolation tion temperature of the steam when steam and* 'of the transformer caused the safety-related bus water come in contact) are two important

.to de-energize and, tripped all feedwater and parameters currently used lin models for condensate pumps on the east side of the plant.

predicting this type of water hammer occur-The pumps on the.west side of the plant were rence and its associated loads.-. -

.,unaffected, since their power was supplied from S,.,

..another bus.:The continued operation of the west

3. :."Steam generator water hammer" is a conden-,

feedwater and condensate pumps, in combination Ssation-induced water hammer which has-.with the failure of the east feedwater pump T.....

fl1fl

Rtv U1,,

USNRC Technical Training Center S.... I *.,* -,.* '

.Westinghouse Technology-Advanced Manual -

, Water Hammer at San Onofre Rev 0176

Westinghouse Technology Advanced Manual Water Hammer at San Onofre discharge check valve to close, resulted in the overpressurization and rupture of an east-side flash evaporator low pressure heater unit. The operators, as required by emergency procedures dealing with electrical systems, tripped the reactor and turbine-generator. As a result, the plant experienced its first complete loss of steam generator feedwater and in-plant ac electrical power since it began operation.

The subsequent four-minute loss of in-plant electrical power started 'the, emergency diesel generators (which by design did not load), de energized all safety-related pumps and motors, significantly reduced the number of control room instruments available, produced spurious indica tions of safety injection system actuation, and caused the NRC red phone on thie operator's desk to ring. Restoration of in-plant electric power was delayed by the unexpected response of an automatic sequence that should have established conditions for delayed remote-manual access to offsite power still available in the switchyard.

The loss of steam generator feedwater was the direct result of the loss of p6wer to the two main feedwater and one auxiliary feedwater pump motors, and the designed three-minute startup delay of the steam-powered auxiliary feedwater pump. The loss of the feedwater pumps, in combinationrwith the failure of four additional feedwater check valves to close,

'allowed the loss of ihvdhit6ry from all three steam generators and the partial voiding of the long horizontal runs 6f fe~dwateirpiping Within the containment building. The subseq uent automatic start of feedwater injection by tlie'steam-powered auxiliary feed waier'pmpuni did not result in the recovery of steiam generator levels because the "backflow of steam and water to "the leak in the evaporator carried the'auxiliary feedwater with it.

Later, operators isolated the feedwater lines from the steam generators, as required by procedure, which resulted in refilling the feedwater lines in the containment building. Before all feedwater lines'were refilled, a severe water hammer occurred that bent and cracked one feedwater pipe in the containment building, damaged its associated pipe supports and snubbers, broke a feedwater, control valve actuator yoke, and stretched the studs, lifted the bonnet, and blew the gasket' of a four-in. feedwater check valve.

The damaged check valve developed a significant steam/water leak, the second leak in the event.

Despite these problems, operators later succeeded in recovering level indications in the two steam generators not directly associated with the feedwater piping leak. With the re-establish ment of steam generator levels, the operators safely brought the plant to a stable cold shutdown condition, without a significant release of radio activity to the environment (an existing primary to-secondary' leak was not exacerbated) and without significant additional damage to plant equipment.

A brief description of how the SONGS-1 mechanical-and electrical systems involved in this event function-and interact is provided. Under standing the major differences between this plant and more recently designed pressurized water reactors will clarify the basis for operator actions.

7.3.4 Plant Conditions Leading to Water Hammer The plant conditions at SONGS-I which led to a steam condensation-induced water hammer included the voiding of long horizontal lengths of feedwater lines, which allowed the backflow of steam from all steam generators before operators isolated the FW lines (by closing motor-operated USNRC Technical Training Center 7.3-4 Rev 0196 USNRC Technical Training Center Westinghouse Technology Advanced Manual Water Hammer at San Onofre 7.3-4 Rev 0196

Westin!house Technoloav Advanced Manual Water Hammer at San Onofre valves MOV-20, 21, and 22), and the subsequent refilling of the FW lines with relatively cold (i.e.,

less than 100*F) AFW. Figures 7.3-3, 7.3-4, 7.3-5, 7.3-6, 7.3-7. and 7.3-8 illustrate the Sflowpaths, valves and other equipment affected by this water hammer.

Upon detection of the fault on the C auxiliary transformer, relay-protection de-energized 4.16 kV bus 2C, de-energizing east-side main feedwater - (MFW) pump FWS-G-3A.

The continued operation of west-side MFW pump FWS-G-3B, due to the unusual electrical align-,

ment, combined with the -failure of east-side MFW pump discharge check valve FWS-438 to,,

S K-

,,seat; resulted in the overpressurization and failure of the east flash evaporator tube and shell. The

- -subsequent unit trip de-energized the west-side

.MFW pump and denied power to electric-driven

-AFW pump AFW-G-1OS. -With the cessation of "flow to the steam generators, the failure of check valve FWS-438, and the failure of the check

  • valves in the SG feedwater supply lines (valves FWS-346, FWS-345, and FWS-398), a path was provided for the blowdown of all three

,: -,steam-generators through their respective feedwater lines to the atmosphere through the

'failed flash evaporator.'

The drop in the steam generator water levels

  • , following the unit trip initiated the AFW system, Sbut the electric pump was de-energized, and steam-driven AFW pump AFW-G-10 took 3.5 minutes to deliver flow because of a programmed warmup period for the turbine. Thus, for three to four minutes 'no flow was being provided to the steam generators,,and,the leaking check valves permitted the horizontal feedwater lines to void. Further, the initiation of AFW.flow at a rate of about 135 gpm from the steam-driven pump was not effective in halting the voiding, because flow was being carried away from the steam generators by the steam blowing down through the failed check valves in all three FW control stations and out the leak in the flash evaporator.

Following restoration of unit-power, the motor-driven AFW pump started automatically, increasing the indicated -AFW, flow rate to a preset rate of 155 gpm per steam generator.

However, all three steam generator levels contin ued to drop since the FW check valves remained open, the main steam -system had not been jisolated, and steam generator blowdown had not been isolated.. Subsequently, in accordance with an emergency operating procedure for reactor trip response, operators isolated the failed FW check valves by shutting the three FW control isolation valves, MOV-20, 21, and 22, at approximately 4:55 -a.m.-, Isolation of the feedwater trains occurred before the water hammer in the FW line to SG B.

Subsequent to the,isolation of the main FW lines, and recognition in the control Iroom that

-both AFW pumps were delivering water, the

-operators became concerned about overcooling of the reactor coolant system and the decrease in pressurizer level, The operators decreased the AFW flows from 155 gpm to zero,.and then increased them to 40 gpm. Refilling the FW lines downstream of the flow control stations was thus halted and then resumed at a much lower flow rate.

cnThe slow refilling of the FW lines within the "containment building continued from when AFW flow was first throttled to when the water ham mer was reported to have occurred seven minutes later by a plant equipment operator. As noted previously, conditions conducive to steam condensation-induced water hammer in the

feedwater lines were present for quite some time.

S.

P

.l*_. a i rflt R*e¥ U17LY0 USNRC Technical Training Center

=..-

Westinghouse Technologiy Ailvanced Manual

-,Water Hammer at San Onofre

Westinghouse Technology Advanced Manual Water Hammer at San Onofre The gross failure of upstream check valves, which permitted water to, drain from the feedwater lines and be replaced with steam, was the underlying cause for water hammer. Leaky check valves have been previously cited in reports of other water hammer occurrences. Five check valves are known to have been failed during the SONGS-I event.

7.3.5 Water Hammer-Induced Damage The following sections detail water hammer induced damage to loop B feedwater piping and supports, to the loop B FW flow'control station, and to the loop B AFW piping and-describe the existing damage to feedwater system check valves.

7.3.5.1 Piping and Piping Support Damage Damage to the loop B FW piping was con fined to plastic yielding of the-northeast elbowv and to a visible crack on the outside of 'the pipe, extending approximately 80 inches axially. The crack penetrated approximately 30 percent of the pipe wall at its deepest point froim the outside and approximately 25 percent on average.' Damage to supports was severe in some instafi6es. This siction provides a description of the damage visible after the FW' piping insulation was re moved.

Figure 7.3-9 shows the loop B FW piping layout and identifies the piping support stations where damage occurred. This figure also pro vides directional orientation and indicates piping dimensions.

Figure 7.3-10 shows principal areas' of damage and indicates how the pipe moved.

The water hammer forces were sufficiently large to damage pipe supports and piping and to transmit loads through the containment building penetration structure outward to the'loop B feedwater regulating station. No damage was evident tO-the steam generator B feedring or nozzle region that can be attributed to water hammer, nor was there evident damage to or movement of the piping between support HOOC and the steam generator B feedwater nozzle.

Table 7.3-1 and Figures 7.3-9 and 7.3-10 illustrate the piping and support damage.

7.3.5.2 Feedwater Loop B Flow Con trol'Station Damage Figure 7.3-11 shows the typical internal arrangement of a swing check valve.' The water hammer originating in the feedwater line within the containment building generated a'water slug which transmitted a pressure wave upstream to the loop Bflow control station. Check valves FWS-346 and FWS-378, downstream of the control valves, were designed to prevent backflow,' although post-event inspection re vealed that the closure disk for FWS-346 (see Figure 7.3-12) was lying in the bottom of the valve chamber. Thus, any closed valve upstream of the check valve would be subjected to the water hammer loads. In addition to check valve FWS-378, flow control valve FCV-457 and m~tor-operated valve MOV-20 were subjected to the water hammer loads; because they had been closed' by operators following the emergency operating procedures.

Because check valve FWS-378 was intact and operational, it was subjected to water ham mer'loads and absorbed much of the water hammer energy,' whereupon the bonnet studs yielded and the gasket was forced outward against the studs. The failure of the gasket relieved much of the internal pressure, thereby USNRC Technical Training Center 7.3-6 Rev 0196 Rev 0196 I

Westinghouse Technology Advanced Manual Water Hammer at San Onofre USNRC Technical Training Center 7.3-6

Wesingous TehnoogyAdvnce Maual-

-Water Hammer at San Onofre

- minimizing damage. to other equipment and valves at this station. Valve FCV-457 did incui

. damage to the flow-actuator yoke and a ben,

-valve stem.,

7.3.5.3 AFW Piping Damage The AFW injection points to the mair

-feedwater piping at SONGS-1 lie in the "breeze way" upstream of the containment building steel shell. The AFW, lines run horizontally and ther vertically to tie into the main feedwater lines, Water hammer loads were imposed on AFW loo1 B piping.. Although pipe movement extended several -hundred feet upstream, there was nc evidence of piping damage.

7.3.5.4 Valve Malfunctions Post-event disassembly and examination ou valves that contributed to water hammer condi.

tions confirmed that check valve failures were the underlying causes forthe occurrence of watel hammer. Inspection findings identified the valvt conditions listed in Table 7.3-2.

7.3.6. Valve In-Service Testing, The ASME Boiler and Pressure Vessel Code Section-XI, which specifies valve in-service testing, (IST), requirements for valves like tht SONGS-1 feedwater check valves, states:

Valves shall be.exercised to the positior required to fulfill their function unless sucl operation is not practical during plant opera.

tion.... Valves that cannot be exercisec during plant operation shall be specificall3

. identified by the owner and shall be full stroke exercised during cold shutdowns Full-stroke exercising during cold shutdown for all valves not full-stroke exercised durinf I

plant operation shall be on -a frequency r

determined by the intervals between shut t

-downs as follows:, for intervals of 3 months or longer, exercise during each shutdown; for intervals of less than 3 months, full-stroke

, -.exercise is not required unless 3 months have passed since last shutdown exercise.

Additionally, the NRC staff position on cold 1

shutdown testing of valves is as follows:

  • 1. -The licensee is to commence testing as soon-as the cold shutdown condition is I

achieved, but not later than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after shutdown, and continue until complete or until the plant is ready to return to power.

- 2. Completion of all valve testing is not a prerequisite for returning to power.

f

3. Any testing not completed during one cold shutdown should be performed r

-: during any subsequent cold shutdowns, S

5starting from the last test performed at the S

previous cold shutdown.

All feedwater system check valves are period ically tested in the closed position. The main and bypass feedwater regulating check valves are normally tested in cold shutdown (mode 5) and

.the feedwater pump discharge check valves are tested in hot standby (mode 3).

1-7 !

There are 121 valves that are subject to IST h, during. cold shutdown.

Although IST was performed during each outage, all of the valves I

were not tested. Consequently, the feedwater

-,valves had been tested only one time since October 1984. The available opportunities for valve 1ST were not always fully utilized due to s

higher priority operational requirements.

USNRC Technical Training Center 7.3 Rev 0196 7.3 m

-Rev.

0196 Westinghouse Technology -Advanced Manual,

  • I

_..."USNRC Technical Training Center

Westinghouse Technology Advanced Manual Water Hammer at San Onofre Surveillance' test procedures for verification of check valve closure for the main feed pump discharge check valves, (FWS-438 and FWS 439) require one main feed pump to be running while the other pump is stopped. The discharge valve at the idle pump is then opened and the pressure is monitored between' the pump and its discharge check valve. An increase in pressure or an operator observation that the pump is rotating backwards would indicate that the check valve is not closed. While providing reasonable assurance of check valve cl6oure, this testing method also subjects the' low pressure pump suction piping to some relatively high pressures if the check valve fails to close (as in the Novem ber 1985 event), and thus'damage is possible to such components as the flash evaporator.

Testing with the idle pump suction valve shut would provide a more rigorous test.

Surveillance test procedures for verifying closure of other main feedw'ater check valves require testing to be performed during cold shutdown with the steam generators filled to a level above the feedrings. The motor-operated valve upstream of each check valve is closed, and the drain valve between this valve 'and the associ ated check valve is opeiied. 'The column of water in the steam generator -provides approximately 4.5 psi of differential pressure across the valve to provide the closing force on the check valve disc.

The procedure states that the 'section of piping between the motor-operated valve and check valve is to be drained, and that "little or no flow" from the drain should be v-erifie'd.

This test procedure leaves the 'surveillance operator to "make the decision about how much flow is "little" and thus indicative of positive verification of chieck valve closure. The IST records do not provide a means of determining whether flow occurs or its extent, or for verifying complete valve cavity drainage before a determination is made that "little or no flow" has occurred.

Valves FWS-345 and FWS-346 failed the IST on February 24, 1985, when tested during mode 5 (cold shutdown). Maintenance work orders were prepared to repair both valves.

However, on February 26, 1985, "Non-routine and Increased Frequency IST" was performed during mode 3 (hot standby), and' the valves passed. During mode 3 the steam generator pressure increased the differential pressure available to seat the check valves (to approxi mately 700 psi) and thereby enabled them to pass. The work orders were then cancelled, and no corrective maintenance was performed.

7.3.7 Valve Failure Findings Check valve failures caused by partial disas sembly 'while in service do not appear to be unique to SONGS-1 or to the valve manufacturer (MCC Pacific). A limited review of licensee event reports (LERs) indicates that these valve failures are not unique.

Failures of FWS-438 and FWS-439, the main feed pump'discharge check valves, may have been due to inadequate valve design, since the disc-retaining nut of each valve was not provided with a positive locking device that should have reduced the probability of the disc working loose, wedging into the valve seat, and failing open. Additionally, excessive clearances between the hinge and disc assemblies allowed the discs to rotate past the anti-rotation devices.

The, failure of FWS-346, the B feedwater header check'valve, may have been caused by the inadequate hardness of the disc-attaching stud, which allowed the threads to strip and the end to mushroom over, conditions contributing to the ultimate valve' failure. However, the service n7.3-8 Rev 0196 USNRC Technical Training Center Westinghouse Techiiology Advanced Manual, Water Hammer at San Onofre

Westinzhouse Technolov Advanced Manual Water Hammer at San Onofre conditions (i.e., flow-induced vibration) experi-.

enced by this valve may also have been a major contributor to failure. The failures of FWS-345, and FWS-398, the A and C feedwater header check valves, may have been due to similar service conditions.

The cracks in the seating surface of FWS 378, the four-in, check valve in the B loop bypass line, appear to be service related. How ever, these cracks may have been caused by the significant forces on the valve from the water hammer.

Failure of the yoke of FCV-457, the loop B feedwater regulating valve, was probably due to lack of sufficient support or bracing of the valve operator during the pipe movement caused-by water hammer loading.

7.3.8 Flash Evaporator Unit During the event, the east condensate header was overpressurized, resulting in catastrophic failure of the east flash evaporator tubes and shell. The evaporator unit is in a shell which also houses two stages of low pressure feedwater heaters and drain coolers. The flash evaporators had not been used for several years, and extrac tion steam to them had been isolated. The evaporator condenser is part of the condensate system flowpath. The design pressure of the flash evaporator condenser and fourth-and fifth point low pressure feedwater heater tubes is 350 psig, while the shell-side design pressure is 15 psig. The low pressure feedwater heaters were in service during the water hammer event.

When bus 2C was de-energized and the east main feed pump tripped, failed discharge check valve FWS-438 allowed the west main feedwater pump to pressurize the east condensate header.

This pressure caused a tube failure in the east evaporator condenser. The flash evaporator shell was subsequently, overpressurized, resulting in the failure of the shell.. After the loss of all in plant ac power, the remaining (west) main feed pump coasted down, and the failed main feedwater regulating valve check valves (FWS 345, 346, and 398) allowed backflow from all steam generators through failed valve FWS-438 to the failed-tube in the east flash evaporator condenser. This backflow continued until the

.operators closed motor-operated,feedwater header isolation valves MOV-20, 21, and 22, and main feedwater regulating valves FCV-456, 457, and 458.

Helium leak checks were performed on all east feedwater heaters, revealing no leakage beyond that expected from normal operation.

The west feedwater heaters were leak tested before the unit was returned to service. The failure of the flash evaporator had no direct safety significance.

-7.3.9 Turbine Breakable -Diaphragms (Rupture Disks)

During the event, steam was observed issuing from the low pressure turbine breakable diaphragms. Each low pressure turbine has four breakable diaphragms designed to protect the turbine casing from overpressurization. The diaphragms, made of thin lead, are designed to break if the turbine exhaust pressure, normally subatmospheric, reaches 5 psig. The diaphragms are supported against external atmospheric pressure and normally seal the turbine casing against air in-leakage.

All diaphragms were intact prior to the water hammer event.

Four of the diaphragms ruptured during the event, three on low pressure turbine 1 and one on USNRC Technical Training Lenter I

  • 3 - 7.

I o

USNRC Technical Training C~enter.,

W~ater Hammer-at San Onofre

- -, Westinehouse -Technology Advanced Manual Rev A106

Westinghouse Technology Advanced Manual Water Hammer at San Onofre low pressure turbine 2.

Rupture of the dia phragms is not considered unusual for conditions existing after a loss of all ac power with contin ued energy addition into the main condenser, and is of no safety significance.

7.3.10 Summary On November 21, 1985, Southern California Edison's San Onofre Nuclear Generating Station Unit 1, located south of San Clemente, Califor nia, experienced a partial loss of in-plant ac electrical power while the'plant was operating at 60 percent power. Following a'manual reactor trip, the plant lost all in-plant AC power for four minutes and experienced a severe incidence of water hammer in the feedwater system which caused a leak, damaged plant equipment, and challenged the integrity of the plant's heat sink.

The most significant aspect of the event involved the failure of five safety -i'elated check valves in the feedwater system. These failures appeared in less than a year, without detection, and jeopar dized the integrity of safety systems. The event involved a number of equip'ment 'malfunctions, operator error, and proceduial deficiencies.

'2 1Ab R

uD.W filaIr X_

USNRC Technical Training Center J -.

3 A1

TABLE 7.3-1

-Description of-Feedwater Pipe-Damage Following SONGS-1 Water Hammer Support

-Description of Component, Locations

- Damage. Motion, Etc.

HOOC',-

This snubber station, the closest to the SG B, showed no visible damage or HOOB pipe movement. The feedwater pipe turns vertically, and at an angle, to rise HOOA approximately 10 feet to mate with the SG feedwater inlet nozzle.

HOOD

. These support stations were the first that showed damage (or movement)

H005

'caused by water hammer. Dent in pipe that resulted when the pipe hit the H006 concrete comer and then rebounded.

HOOG Movement of approximately 12 inches, slippage of vertical support pads off channel beam structures and downward drop of FW pipe.

HOOH, Horizontal and vertical support pads displaced southward approximately 12 inches.

120 Evidence of first lateral motion (eastward); deformed vertical structure, and then axial rebounding which displaced pipe supports approximately 12 inches southward.

HOOK Damage incurred at the support structure downstream of the southeast elbow.

The damage incurred by the structure illustrates the magnitude of pipe motion which occurred during the water hammer pulse.

HOOL Lateral movement (westward) of pipe which resulted in sheared vertical support structure.

Concrete and support plate damaged by water hammer, nuts were loosened and bolts were missing in wall plates.

HOOM Piping and support damage just downstream of where FW B line takes a 90 degree bend to exit the containment building.

Rev 0196 USNRC Technical Iraining C.,enter

.Westing~house"'Teehnology Advanced Manual

-Water Hammer at San Onofre

TABLE 7.3-2 Inspection Findings Valve Description As Found FWS-345 MFW Reg Check Disc separated from hifige arm, SGA disc stud broken (threaded portion).

FWS-346 MFW Reg Check Disc separated from hingearm, SG B disc stud deformed.

FWS-398 MFW Reg Check Disc nut loose. Disc partially SG C open.

Disc caught inside of seat ring.

FWS-438 FWP Discharge Check Disc nut loose. Disc partially open. Disc caught inside of seat ring. (Figure 7.3-13)

FWS-439 FWP Discharge Check Disc nut loose. Disc partially open. Anti-rotation lug lodged under hinge arm.

USNR T

chiclTrinn Cntr02 USNRC Technical Training Cente Water Hammer at San Onofre A*.*V UA31*

/...j - 1/-

0988 CONDENSATION SURI SI E

t fl

a. Stop Valve Has Closed and Refill Starts W

b

b. Cold Water Has Filled Bottom of Pipe AFW
c. Pipe is Nearly Full and Surface Waves Form FEASW
d. Slug Flow Conditions are Established I-.FW Figure 7.3-1 Filling of a Voided Feedwater Line 7.3-13 SllU V=*

a2LN2

OUkMO

  • 015 C

.0W WIU IS21U C.5W *1LW2

joalso, Solos

=S Sl

  • isita4d
  • gMoIst A OiW I =i412

4,,

-"S

.pon Figure 7.3-2 San Onofre Electrical System 7.3-15 PHS S1 a

0988 I I'11!a 2"=

N I 2

N I 2

S=

II I

S I

U' IN$!

ii a

Figure 7.3-3 Condensate System 7.3-17 ia I

I' If U

C 5 I

U

0988 Figure 7.3-4 Main Feed System 7.3-19

0988 Figure 7.3-5 Auxiliary Feedwater System 7.3-21

-n CY CO, (0

0 z CD CD CD OL m

-n 0

FWS IM3 0

(D co 01)

0988 La I

L.a E

I E

Figure 7.3-7 SONGS-1 Loop I

B Steam Generator Flow Control Station 7.3-25

0988

=L rVlc Figure 7.3-8 SONGS-1 Auxiliary Feedwater System 7.3-27

0988 40 S

U 6

11 4

4%

/

Ira

\\Z FLd i1i Fiur

.39 WLop ipngad upot ayu 7.3-29

0988 2

3 I

£ "IL I

!=

BE

-5 A

I

/

/

/

/

S!'

IS ii i Figure 7.3-10 Overview of Feedwater Piping and Support Damage Due to Water Hammer 7.3-31

09BB VALVE SONNET BONNET STUD j

VALVE BODY Figure 7.3-11 Typical Swing Check Valve 7.3-33

0981 ANTI-ROTATION BARS VALVE FWS-346 AS ASSEMBLED WORN PIN HOLE PACTED PIN WORN THREADS VALVE FWS-34" AS FOUND Figure 7.3-12 Check Valve FWS-346 7.3-35 i

VALVE FWS-438 AS ASSEMBLED S*~ROT*ATE:

VALVE FWS-438 AS FOUND Figure 7.3-13 Check Valve FWS-348 7.3-37 0988

.9

Westinghouse Technology Advanced Manual Section 7.4 Salem Load Reduction

W,._

h-..~nuc Tr.ýh~nnl Ad~vanced Manual Sae od euto TABLE,OF CONTENTS 7.4 SALEM LOAD REDUCTION...........................................

7.4-1

.7.4.1 Introduction 7.4-1 7.4.2 Load Reduction............................................

7.4-1 7.4.2.1 Feedwater Heater and Moisture Separator Reheater Drain Tank Level Control System Failure 7.4-1 7.4.2.2 Urgent Failure of the Rod Control System...................

7.4-1 7.4.2.3 Operation of the Steam Dump System......................

7.4-1 7.4.2.4 Main Steam Isolation Valves Knocked off Open Seats...........

7.4-2 7.4.2.5 Stuck-Open Spray Valve 7.4-2 7.4.2.6 Stuck-Open Steam Generator Safety Valve 7.4-2 7.4.3 Areas of Concern and Corrective Action Taken.......................

7.4-2 7.4.3.1 Operation with Elevated Reactor Coolant System Temperature.....

7.4-2 7.4.3.2 Loss of Feedwater Pump Suction Pressure..................

7.4-3 7.4.3.3 Resetting of Steam Dumps.............................

7.4-3 7.4.3.4 Operation with Stuck-Open Steam Generator Safety Valve........

7.4-3 7.4.4 Main Steam Isolation Valve Operation.............................

7.4-3 7.4.5 Summ ary 7.4-3 7.4.6 References 7.4-4 LIST OF TABLES 7.4-1 Sequence of Events: Salem Unit 2 Load Reduction of January 14,1982 7.4-5 USNRC Technical Training Center I

Salem. Load Reduction vv

.OLaLaI Lt UO.

it b.7 ID AlW 04 k

k

Westinghouse Technology Advanced Manual Salem Load Reduction LIST OF FIGURES 7.4-1 Simplified Condensate and Feed System..............................

7.4-2 Primary Parameters during Load Rejection.............................

7.4-3 Plant Parameters during Load Rejection..............................

7.4-4 Code Safety Valve............................................

7.4-5 Main Steam Isolation Valve......................................

USNRC Technical Training Center 7.4-ii 7.4-7 7.4-9 7.4-11 7.4-13 7.4-15 Rev 0196 Westin'ghouse Technology Advanced Manual Salem Load Reduction

Westin2house Technolo2v AIvanced Manual Salem Load 'Reduction 7.4 SALEM LOAD.REDUCTION "Learning Objectives:

1 1. Briefly discuss the cause of the'load re tion at Salem.

2. Explain the validity of the decision to co ue operation with a stuck-open steam gei "t6i safety valve.
3. Discuss the changes in plant proced

" which'resulted from this incident.

' 7.4.1Intfroduction Salem Unit 2 is a four-loop Westingh "design plant. It is rated at 3411'MWt and MWe. At thý time of the incident,,Januar 1982, the unit was operating at 97% re power with an electrical load of 1060 MWe.

'condensate polishing system was in service steam generator feed pump suction pressure 330-340 psig..(Refer to Figure 7.4-1.)

Due to previous problems associated wil heater drain system and the main feedwater I

'suction pressure, a temporary low su pressure alarm was installed to give the opei a warning of a problem at 300 psig. 'The o tors w~re'to take action accordifig to establ guidelines 'for the low suction'pressure receiving the alarm.

The feedwater p o tripped if suction pressure reached 215 psig 7.4.2 Load Reduction The lbad reduction'transient was the res five separate and unrelated failures in the There were two operator actions which wer of importance. The following paragraph provide'a brief discussion of the failure

'resulting transient, and the operator actions.

.,Refer to Figures 7.4-2 and 7.4-3 for graphs of various parameters during the load reduction.

duc-

,7.4.2.1 Feedwater Heater and Moisture Separator Reheater Drain Tank

-Level Control System Failure ntin-nera-The initiating event was a failure of the level

,control.system in the 21,feedwater heater and moisture, separator -reheater drain tank. This lures failure resulted in a decrease in.-the suction pressure of the main feedwater pumps. When the temporary alarm was received, the operator took action in accordance with the guidelines by' reducing turbine power (by reducing the turbine ouse

'governor valve position limit setpoint using the 1158 control pushbutton) and by bypassing the con y 14, densate polishing system.

actor

-.I

.I The 7.4.2.2., Urgent Failure of -the Rod and Control System Swas Upon the -reduction of secondary load, primary temperature started to increase. The th the operator manually inserted control rods to reduce pump temperature. When he did, he received an urgent ction.

failure in the power cabinet, which placed a hold

rators, signal on all rods, including control bank D rods, pera- - controlled by that power cabinet. Since bank D ished rods are the first to insert into the core, no rod upon

.motion other than a trip was available. The umps

. operator took action to borate at 10 gpm to reduce

. Tavg in accordance with procedure.

7.4.2.3 Operation of, the Steam Dump System

,ult of plant.

Due to the load decrease on the turbine, the e also steam dumps were armed. When Tavg increased s will-tofive degrees above Tref, the steam dumps s, the- -opened to maintain Tavg. At this time, reactor



AIdf

£vv ULYIJ USNRC Technical Training Center 7

1. 7.4-1 R~ev 019.6

"-Westin-rhousi* 'Technology Advanced Manual

-Salem Load -Reduction

Westinghouse Technology Advanced Manual Salem Load Reduction power was approximately 89%, turbine load was 21%,'and the flow to the steam dumps was 53%

of total steam flow. Upon entering the control room, the shift supervisor noticed the primary-to turbine load imbalance and ordered the operator to increase the turbine load., As turbine load was increased, the dump valves started to modulate closed, and Tayg became steady. The operator believed the plant to be in a stable condition and reset the steam dumps., When the dumps were reset, primary power was 84%, turbine load was 38%, and the flow to the steam dumps was 20%

of total steam flow (four dumps were full open, and the other eight duimps-were modulated).

Resetting the steam-dumps removed the loss-of load arming signal, which caused all steam dump valves to rapidly shut. Tavg peaked at 592°F, which resulted in an increase in pressurizer level from 54% to 78%, and an increase in pressurizer pressure from 2200 psig to 2340 psig. The pressurizer spray valves opened'to reduce prima ry pressure.

7.4.2.4 Main Steam Isolation Valves Knocked 'off Open Seats The increase in primary Tavg which resulted from shutting the steam dumps caused an in crease in steam temperature and pressure on the secondary side. This sudden increase in pressure caused two main steam isolation valves (MSIVs) to be knocked 'off their fully open seats. The operator immediately reopened the valves when he noticed the intermediate indication. Refer to section 7.4.4 and Figure 7.4-5 for details con cerning the MSIVs.

7.4.2.5 Stuck-Open Spray Valve The combihed' effects of the increase in turbine'load and boration started to reduce Tavg.

Pressurizer pressure dropped due to the pressur-izer level decrease associated with the dropping Tavg and the influence of the spray valves. When spray valve demand decreased to zero, only one valve indicated shut. The operator took manual control of the second valve and manually shut it.

Pressurizer pressure decreased to a minimum of 2050 psig. Heaters were used to restore pressure to normal.

7.4.2.6 Stuck-Open Steam Generator Safety Valve Steam pressure increased enough to open the steam generator safeties due to the increased Tavg mentioned in section 7.4.2.4. About one hour after the transient, the unit was stable except for one steam generator safety valve which had stuck open. Attempts were made to reseat the safety by varying steam pressure. Lowering Tavg below

'.T ref to reduce steam pressure and cycling the atmospheric relief valve to further reduce steam pressure would not cause the safety valve to shut. The plant was kept at power while the supervisors decided what action to take. It was finally decided to try to reseat the partially open safety valve. A visual check of the valve re vealed that the lifting disc associated with the manual lifting arm had rotated about two full turns down the valve stem and prevented the valve from shutting (refer to Figure 7.4-4). The manual lifting arm was removed, and the valve shut. This action ended the transient.

7.4.3 Areas of Concern and Corrective Action Taken 7.4.3.1 Operation with Elevated Reac tor Coolant System Tempera ture The cause of the rod control system urgent failure was a failed firing card in the power USNRC Technical Training Center 7.4-Z Rev 0196 Westin?-house Technology Advanced Manual Salem Load Reduction 7.4-2 USNRC Technical Training Center Rev 0196

WpC'tin husei~

Tpv-hnnloov Advanced Manual SlmLa euto cabinet.

The rod control system responded properly to this failure in that rods were inhibited from moving. When temperature reached its peak of 592°F, the technical specification for maximum temperature for departure from nucle ate boiling considerations was exceeded. The action taken was to borate and increase turbine power to reduce temperature. Procedures were modified to require a plant trip if the rod control system fails and Tayg exceeds its technical specification limit.

7.4.3.2 Loss of Feedwater Pump Suc tion Pressure The procedures for the loss of feedwater pump suction pressure were updated to provide more guidance to the operator. A second pro posed change was to replace the existing conden sate pumps with pumps of higher head to provide better suction pressure to the main feedwater pumps.

7.4.3.3 Resetting of Steam Dumps Procedures for the operation of the steam dump system were not properly reviewed by the onsite review committee. Operator training was scheduled to retrain the operators on the proper operation of the steam dump system.

7.4.3.4 Operation with Stuck-Open Steam Generator Safety Valve The decision to continue operation with a stuck-open steam generator safety valve was a valid decision. If the plant had been shut down, it would have cooled down in an uncontrollable manner, since a stuck-open safety valve consti tutes a small, unisolable steam break.

7.4.4 Main. Steam Isolation Valve Opera tion Refer to Figure 7.4-5. The valves are 32 x 24 x 32-in. Hopkinson parallel slide gate valves with double discs. Each is operated by means of an integral piston and cylinder, utilizing steam within the valve and piping. -The piston, attached

,to the valve stem, is at the lower.end of the cylinder when the valve is in the open position.

It has a small orifice to permit pressure equaliza tion in the open position. A vent line from the upper end of the cylinder branches to two dia phragm-operated dump valves, which are con nected in parallel to provide redundant control of the main valve.

Upon receipt of a closure signal, the dump valves open and release steam from the upper side of the main valve piston, closing the valve.

The valve is designed to close within five sec onds. The movement of the valve is damped at the upper end of its travel by a hydraulic cylinder and piston (snubber) mounted integrally on the valve. The snubber incorporates an integral electric motor-operated hydraulic power unit, which permits remote manual operation of the main valve at conventional speed.

Each MSIV has detent mechanisms which maintain the valve in the closed or open position, yet permit operation when a sufficient differential pressure across the steam piston is established (a minimum of 100 psi) or when the valve is operated hydraulically.

7.4.5 Summary This transient did not result in any safety concerns for the NRC. However, it does pro vide a good example of how an operator can act either to solve or to compound a problem.

USNRC Technical Training Center

  • 'I -3

'D njog 4.4-.5,

-Salem Load Reduction

..Westinghouse Technology Advanced Manual Salem Load Reduction Resetting the steam dumps caused the transient to last longer, and the decision to operate with the stuck-open steam generator safety valve prevent ed an unnecessary transient on the plant.

7.4.6 References

1. PSEG "Sequefice'of Events Report for Salem Unit 2 Load Reduction," January 14, 1982.
2. Resident inspector report on Salem load reduction.
3. NUREG/BR-0051, "Power Reactor Events,"

May 1984; Vol. 5, No. 6.,

4. NUREG/BR-0051, "Power Reactor Events,"

Sept. 1984, Vol. 6, No. 2.

USNRC Technical Training Center 7.4-4 i(CV UIYO I

7.4-4 Rev Ul96 USNRC Technical Training Center

Westin housep Tecthnoloov Advanc~ed Manual Sae od euto TABLE 7.4-1 Sequence of Events:

Salem Unit 2 Load Reduction of January 14, 1982 Time Event 0104 Slight dip in heater drain pump flow on recorder chart.

0105 Heater drain tank high level alarm.

0106 Intermittent, then steady main feedwater pump low suction pressure alarm (300 psig).

Operator' initiated manual load reduction at EHC panel by intermittently reducing the governor valve position limit.

Bypassed condensate polishers.

Tried to manually insert rods, but received an immediate urgent failure alarm.

This prevented further rod motion in automatic or manual.

Commenced manual boration at 10 gpm.

0107 Low suction pressure alarm cleared when polishers were completely bypassed.

Turbine load reduction stopped at 450 MWe, continued to decrease to 230 MWe.

0108 High steam flow alarms due to steam dumps opening. Four steam dump

'valves were fully open and the remaining eight valves were modulating.

0109 Tavg decreasing from 582"F.

Main feedwater pump low suction pressure alarm (300 psig).

Shift Supervisor entered control room. Ordered turbine load increase to reduce Sprimary-to-secondary load mismatch.

0110 Low suction pressure alarm cleared.

0113 Began turbine load increase.

Steam dumps holding Tavg steady at 574"F.

A P

D..

A1O

- RY OLU USNRC Technical Training Center -

Salem Load Reduction e*v/

LLl

W-fitn house Technoloo-Advanc~ed ManualSamLadRucin.-

TABLE 7.4-1 (CONTINUED) Sequence of Events:

Salem Unit 2 Load Reduction -of January 14, 1982 0117 Operator reset steam dumps. This removes the load rejection arming signal, and all dump valves shut.

MSIV open lights were out for 2 and 4 SGs. Operator tapped the open pushbutton, and the open lights come on.

0118 Primary pressure and Tavg peaked (2340 psig and 592"F). Sprays full open on pressurizer.

0120 Tavg decreasing. Steam generator safety valve lifted.

0123 Stopped boration at 98 gallons.

0135 Spray demand at zero. One spray valve did not indicate shut. Operator took valve to manual, tapped close, and light came on.

0138 Pressurizer pressure at minimum (2050 psig) and increasing. Heaters on.

Sprays shut.

0148 Safety valve still open.

0150 Pressurizer pressure control in automatic.

0210 Conditions stable at 46% power, 480 MWe. Safety valve still open.

0230 Cycled steam generator atmospheric relief valve 3 times to try to seat safety valve. Did not work.

0521 Removed manual operating handle from safety valve. Valve closed.

0730 Restored rod control.

Key ULYD USNRC Technical Training Center Wpcti*hnn*p Salem Load Reduction 7.4-0 Rev 0196

Figure 7.4-1 Simplified Condensate and Feed System 7.4-7 0289 Containment

PZR T

PZR LVL avg PRESS 70 600 2400 60 590 2300 s0 580 2200 40 570 2100 30 560 2000 to 0

o O a T-M a

N N

N N

M C)

C o,

0 0

0 0

0 0

0.

0 0

0 0

0 0

0 TIME --

o Figure 7.4-2 Primary Parameters During Load Rejection (0

0 CO

MWe Pwr, Stm Flow 1000 107.

900 800 700 O00 500 50 400 300 200 100 0

W o

0 n

M t-a N0 CI 00 N

o 0

0 0

0 0

0 0

0 0

0 10 0

0 0

TIME O

0 N

0, WD Figure 7.4-3 Plant Parameters During Load Rejection

-.4

-L

-L

"A TRAIN MOTOR HYDRAULIC CYLINDER 3PUMP U PISTON NORMALLY DE-ENERGIZED AIR TO CLOSE SPEED REGULATOR STEAM CYCLINDER STEAM PISTON MSIV MOTOR OPERATED 3-WAY VALVE VALVE DISCS VENT TO ATMOS.

VENT VALVE NORMALLY IN MID-POSITION "B" TRAIN AIR TO CLOSE

'BA" IR SUPPLY HEADER NORMALLY DE-ENERGIZED VENT TO ATMOS.

NOTE: Schematic shown with the MSIV open, and all vent valves aligned for power operations.

a ClD 0

t-01 C) 013 CO 0

0 z

0289 Figure 7.4-4 Code Safety Valve 7.4-13

Westinghouse Technology Advanced Manual Section 7.5 Sequoyah Incore Thimble Tube Ejection Event

Westinphouse Technololpv Advanced Manual SeuvbIceThmlTbeEetnEet TABLE OF CONTENTS 7.5 SEQUOYAH INCORE THIMBLE TUBE EJECTION EVENT.................

7.5.1 Introduction 7.5.2 Incore Neutron Monitoring System Description.......................

7.5.2.1 7.5.2.2 7.5.2.3 7.5.2.4 7.5.2.5 Transfer Device Assemblies and Isolation Valves Interconnecting Tubing Runs.............

Detector and Drive Cable Assemblies........

Leak Detection System..................

System Summary.....................

7.5.3 Event Background 7.5.4 Event Description...........................................

7.5.5 Event Summary............................................

7.5.6 Similar Event: Zion Unit 1, January 20,1984 7.5.7 Seal Table Leaks: Lessons Learned...............................

LIST OF TABLES 7.5-1 Sequence of events LIST OF FIGURES 7.5-1 Incore Instrumentation System....................................

7.5-2 Typical Incore Drive Unit.......................................

7.5-3 Thimble Tube Cleaning Tool.....................................

7.5-4 Seal Table Design............................................

7.5-5 Sequoyah Incore Instrument Room.................................

7.5-6 Ejected Thimble Tube D-12......................................

7.5-1 7.5-1 7.5-1 7.5-2 7.5-3 7.5-3 7.5-4 7.5-4 7.5-4 7.5-5 7.5-7 7.5-7 7.5-7 7.5-9 7.5-11 7.5-13 7.5-15 7.5-17 7.5-19 7.5-21

  • D A,109 Secuovah _Incore Thimble Tube Ejection Event V T USNRC Technical Training Center 1.z-I

Westinhoue TechnoIov Advanced Manual Seauoyah Incore Thimble Tube Ejection Event 7.5, SEQUOYAH INCORE THIMBLE TUBE EJECTION EVENT "Learning Objectives:

I. 'State the purpose of the incore instrumenta tion system.

12. Briefly describe how the incore flux detector system is designed as part of the reactor coolant system (RCS) pressure boundary.
3. Describe the plant response to the ejected tube "event.

4., Describe how the operators responded to the event and what was required to stop the RCS leak.

5. Describe the radiological hazards created by the ejected thimble tube.,

7.5.1 Introduction Sequoyah Nuclear Plant is a -four-loop Westinghouse plant located in eastern Tennessee.

The'plafit was designed and constructed and is operated'by the Tennessee Valley Authority (TVA). Unit I received an operating license in "February of, 1980. On April 19, 1984, incore instrument thimble D-12 of Unit 1 was forced out of the reactor vessel into the incore instrument room in containment by RCS pressure. Unit 1 was at 30% power, with maintenance in progress for cleaning out the interior of the thimble tube.

The unit was recovering from a refueling outage at the time; and 'personnel were performing restart testing while the maintenance work was.in progress. -Sequoyah,-as well as other Westing house plants, had experienced problems with internal fouling of the incore thimble tubes Wlhich blocked insertion of the incore flux detec-tors required for power distribution measure ments. The ejection of the D-12 thimble tube, which occurred during -the cleaning activity, caused a significant RCS leak requiring a unit shutdown and cooldown.

It also created an intense radiological hazard during the recovery due to radiation from the 12-ft portion of the thimble tube which had been activated by the neutron flux in the core.

This section reviews the design and functions of the incore neutron monitoring system. The Sequoyah incore thimble tube ejection event is described so that the consequences of the event, in terms of its effect on the plant and the hazards of the cleanup and recovery effort, can be exam ined.

7.5.2 Incore Neutron Monitoring System

-Description The purpose of the incore neutron monitoring system isto provide information on the neutron flux distribution at selected core locations. The incore instrumentation system provides data

--acquisition only, and performs no operational plant control functions. The data obtained from the incore instrumentation system, in conjunction with previously determined analytical informa tion, can be used to determine the three-dimen sional fission power distribution in the core at any time throughout core life.

The incore neutron monitoring instrumenta tion consists of-movable miniature incore flux detectors with sufficient sensitivity to permit measurement of localized,-potentially'significant neutron flux distribution,ariations Nfithin the reactor core. The movable nminiature fission chamber detectors contain U308 (uranium oxide) enriched to greater than 90 percenit in U-235 to provide exceptionally detailed flux mapping of I

Re~vfl19Q 1.'11 USNRC Technical Training Center Sequoyah Incore Thimble Tube Ejection Event Westinphouse Technoloty Advanced Manual Rev 0196

Westinghouse Technology Advanced Manual Sequoyah Incore Thimble Tube Ejection Event the reactor core. The fission chamber dimen sions'are 0.199 in. in 'diameter and 2.1 in. in length. A stainless steel detector shell encapsu lates each fission chamber. The stainless steel shell is welded to the leading end'of a helical wrap drive cable. As this drive cable is moved by the drive unit, the attached incore flux detector is positioned to the desired core or storage location.

Figure 7.5-1 shows the basic system for the insertion of the movable miniature fission cham ber detectors into'the core.' Retractable detector thimbles, into which the miniature detectors are driven, are positioned as shown.

Since these retractable detector thimbles are sealed at the leading (reactor) end, they are dry "inside. The thimbles thus serve as a pressure barrier between the RCS' pressure (2500 psig design) and the atmosphere. Mechanical high pressure seals between the retractable thimbles "and the conduits are provided at the'seal table.

Iýnstruimentation penetrations in the bottom of the reactor vessel, which are'essentially extensions of the reactor vessel, allow the insertion of the retractable detector thimbles. -Dhring normal plant operation, these thimblek-are stationary.

The retractable detector thimbles are retracted from the core only' during 'refueling or core maintenance periods, during Which the RCS is depressurized.

The drive system for insertion of the minia ture fission chamber'detectois consists of drive units, limit switch ýssemblies, five-path rotary transfer devices, ten-path rotary transfer devices, "and is1ltion valves, as shown in Figure 7.5-2.

Thý drive units are'mounted permanently on a platform, with the remaining components be tween the drive units and the seal table mounted o a movable support assembly, which can be moved aside when necessary for movement of the retractable detector thimbles.

The drive units push the hollow helical-wrap drive cables, with the miniature fission chamber detectors attached, into the core. The helical wrap cables have small-diameter coaxial cables threaded through their hollow centers for trans mitting the current signals produced by the miniature fission chamber detectors.

The six detectors, a typical number for a Westinghouse four-loop large megawatt unit, are have designations A through F. During normal operation each detector is used to measure the relative neutron flux in the detector thimbles connected to the correspondingly lettered ten-path rotary transfer device; i.e., detector A is normally selected to a core path provided by the A ten-path transfer device. However, by manipulating the appropriate five-path transfer device, the operator can route each detector through several other paths. Each detector can be sent into each path of the next sequentially lettered ten-path transfer device to serve as an operational spare detector for those thimbles (i.e., the A detector can substitute for the B detector, B for C, C for D, etc.). For detector normalization purposes, each detector can be routed separately into a common calibration path; thus providing direct correlation of the detectors. Each detector can also be routed into any path associated with common ten-path transfer device C, or to a shielded area for storage.

7.5.2.1 Transfer Device Assemblies and Isolation Valves Five-Path Rotary Transfer Devices and Limit Switches

1. One five-path rotary transfer device is USNRC Technical Training Center

ev uio "I Z -

We'stinghouse Technology Advanced Manual Sequoyah Incore Thimble Tube Ejection Event Rev 0196

Westinghouse Technoloffi Advanced Manual SeovbnceThmlTueEctnEet provided with each drive unit for rou the detector into one of the five poss detector paths. The five-path tran device consists of an S-shaped I mounted in a rotating assembly. 'I assembly is bearing-mounted at each and can be aligned with any one of five outlet paths. When an electi signal is applied to change the dete path, the S-shaped tube is moved to selected outlet path,position.

C actuated micro-switches send signal the control console for feedback of selection.

2. A °withdrawal limit switch, actuatec the detector, is provided near the ink each five-path transfer device.

7 switch prevents operation of the five rotary transfer device unless the dete

-and cable are in the withdrawn posi, The switch also stops automatic v drawal when the detector reaches withdrawal limit switch.

Wye Units Wye unit assemblies are mounted as reqi to reduce the amount of interconnecting tu "between the five-path and ten-path rotary tral assemblies. Wye units are also installed betN the five-path transfer devices and the calibrn path.

Ten-Path Rotary Transfer Devices Each ten-path rotary transfer device is ca]

of routing a movable incore detector into ea ten selectable flux thimbles.

Cam-actt microswitches send signals to the control coi for feedback of path selection. Detector-acti path indicator switches near the outlets of th, S.

'7 2

  • U-Rev 196 ting path transfer devices-send signals to the path ible display panel on the control console for verifica sfer tion of proper core path.

ube

[his Isolation Valve Assemblies end

  • the Manually operated stainless-steel isolation rical valves (one for each thimble) are provided for ctor closing the retractable detector thimble runs after the removal of the detector and drive cable. When am-closed, the valve forms a 2500-psig barrier to Is to prevent steam leakage from the core in the event path of a thimble rupture.

7.5.2.2 Interconnecting Tubing Runs I by et of Interconnecting tubing runs are supplied for rhis connecting all components of the system from the path drive units to the seal table. The interconnecting Sctor tubing runs between the isolation valves and the tion.

seal table have design requirements of 2500 psig vith-and 650"F.

the 7.5.2.3 Detector and Drive Cable As semblies The carbon-steel drive cables are 0.199 in. in iired diameter with hollow cores and are helically bing wrapped to permit meshing with the detector nsfer drive wheel. A 0.040-in.-diameter coaxial cable

%veen is threaded through the 0.065-in. Inside diameter ation of the drive cable and terminates at the trailing end, with several feed of slack ending in a "Subminax plug. The drive,cables (when new) are approximately 175 ft long. This length allows one or two subsequent cuts of 12-14 ft pable each before they become too short for use. Such ch of cuts may be required for factory replacement of Lated detectors onto existing drive cables.

1.0**,q USNRC Technical Training C.enter Senuovah Incore Thimble Tube Ejection Event Rev 0196

c ASequoah Incore Thimble Tube Ejection Event 7.5.2.4 Leak Detection System The leak detection system consists of a liquid level-actuated switch and a 0.25-in. ac solenoid operated drain valves. Each 10-path transfer device enclosure is aligned to the plant drain system via the drain valve. The enclosures facilitate drainage into the level switch.

Water leaking from a transfer device enters the leak detection system and causs the level to rise.

The level switch' opens'the solenoid operated valve, allowing the leaking water to drain and at the same time sending an alarm to the control cabinet. Where practical, the level switch and drain valve are permanently attached to the transfer device enclosures. The drain line is disconnected during refueling.

7.5.2.5 System Summary Miniature fission chamber detectors can be remotely positioned withinin retractable guide thimbles to provide flux mapping of the core.

Each detector is welded to the leading end of a helical-wrap drive cable and to a sheathed coaxial instrumentation cable. The retractable guide thimbles are closed at their leading ends, and serve as the pressure, boundary between RCS pressure and atmosphere.

The drive assemblies are motor operated, with hobbed wheels engaging the helical drive cables, take-up reels and position encoders. The five-path transfer devices are used to select the mode of operation (normal, calibrate, storage, etc.). A five-path transfer device is provided for each detector/drive assembly. A ten-path transfer device is supplied for each detector/drive assem bly and is used to route a detector into any one of up to ten selectable paths. A "flux mapping" consists of a moving detector scan of each provided core location. The information obtained is collected by the plant computer, which either directly analyzes the data obtained or records it for analysis by more sophisticated computers offsite.

7.5.3 Event Background Sequoyah Unit 1 had experienced plugged incore detector thimble tubes periodically since before initial criticality. The problem had existed since initial system operability checks conducted in about 1978 or 1979. The reason for the blockage had not been conclusively determined by the TVA staff, but it was believed to be related to dirt or excess lubricant contamination during system construction. The Unit 2 incore instru ment'system had not experienced a similar frequency of tube blockage.

Maintenance on the Unit 1 thimble tubes had been extensive. Tube cleaning was conducted on all 58 tubes at least twice prior to initial criticality, on nine tubes during a September 1981 outage, on nine additional tubes during the cycle 2 refueling outage, and on nine tubes (some were being cleaned for the second time) during the cycle 3 refueling outage. Prior to the startup after the latter outage, system testing revealed that 23 of 58 thimble tubes were blocked. Forty-four tubes are required to be operable to meet opera bility and surveillance requirements for core flux mapping, but startup of the unit is permitted with the system inoperable. Operability would have to be demonstrated before surveillance testing and low power physics testing could commence.

Unit 1 entered mode 1 on April 18, 1984, and reached 30% power on the same day.

Preparation was in progress to clean the blocked thimble tubes' Startup test procedures required that power be, held at 30% until equilibrium USNRC Technical Training Center 7.5-4 Rev 0196 Rev 0196 Westinghouse Technology Advanced& Manual USNRC Technical Training Center 7.5-4

Westinahouse Technolo2y Advanced Manual Sequovah Incore Thimble Tube Ejection Event xenon conditions were reached so that flux mapping could be conducted.

This would require about two days, and TVA management intended to have the thimble tubes cleaned during this period. -All previous cleaning had been done during.cold shutdown conditions, so additional.

planning and research was required to support the work with-the RCS-at normal operating pressure and temperature. The plant engineering supervisor had attended a presentation made by the staff of the Trojan Nuclear Plant several years earlier which covered dry brush cleaning of blocked thimble tubes with the unit operating.

The Trojan staff was apparently faced with the prospect of shutting -down the unit because of thimble tube blockage, so it undertook the.

cleaning project to restore the minimum number of detector paths to an operable status to allow flux mapping and prevent a shutdown.

The TVA engineering staff obtained addition al information from several other utilities which supported the Trojan information. It also con tacted a vendor which provided thimble tube cleaning services, but the vendor used a wet brushing method which could not be used, because the high RCS temperatures would cause the flushing water to flash to steam. The incore monitoring system vendor was contacted; it*

indicated that it knew of no restrictions or engi neering reasons why the tubes could not be dry, brushed during operation at power.

Based on the information obtained, plant management directed the tube cleaning to be done with a special tool (see Figure 7.5-3). The tool consisted of a cable similar to an incore flux device mounting platform was rolled out of the way. The hand tool was then attached to the selected tube at the seal table, and the brush cable was driven into and retracted from the tube with a mechanical hand-crank device.

7.5.4 Event Description Tube cleaning commenced while the unit was stabilizing at 30% power. After five thimble tubes were cleaned, the job foreman was unsure if the cleaning brush was being inserted to the ends of the,tubes.

The maintenance group decided to insert the tool into an unblocked thimble tube to determine the number of turns of the hand crank required to completely insert the brush. With the cleaning tool attached to the tube at location D-12, the insertion began during the evening of April 19. The cleaning brush had been inserted approximately 15 ft when the shift change took place. The second-shift cleaning crew took over and began inserting the brush. At the 78th turn (one turn = 10 in.), the tool handler noted that more pressure was required to turn the crank. During the 79th turn, when the brush was about 80 ft into the tube, the personnel perform ing the work noticed water starting to leak out of the high pressure fitting (see Figure 7.5-4) at the seal table.

The cleaning crew immediately evacuated the incore instrument room, noting that

-,the thimble tube was being forced out of the seal table and that water and steam were spraying into the room. At about 9:00 p.m., the crew foreman attempted to contact the control room but was unable to use the telephone in the personnel air lock because of a maintenance problem.

detector cable with a brush attached to the end of In the control room, the pressurizer level the cable. In order to access the thimble tubes," --indication was decreasing, and -the operators mechanical joints (referred to as low pressure responded by increasing charging flow from 85 seals) in the tubes were disconnected at the seal to 130 gpm. This action stopped the pressurizer table in containment, and the 10-path transfer level decrease, and the level began to increase.



(ttflt ziev uiyo USNRC Technical Training Center Westinghouse Technology -Advanced Manual Sequoyah-Incore Thimble Tube Ejection Event

- Rev U0196

Westinghouse Technology Advanced Manual Sequoyah Incore Thimble Tube Ejection Event This indicated that the leak rate was less than the 45-gpm increase in charging flow. Later esti mates showed the leak rate to be approximately 30 gpm.

After frisking out of the contaminated area, the foreman went-to the control room and notified the shift engineer of what had taken place. Table 7.5-1 is a chronology of the event.

A power reduction of one percent/min was initiated, and the radiological emergency proce dure for an RCS leak rate greater than 10 gpm was initiated. With steam generator level control in manual at 12% power, the unit tripped on low low level in steam generator 1.. The NRC was notified of the event. During the event, an ice condenser ice bed temperature recorder, an area radiation monitor, a particulate radiation monitor, two pressurizer level transmitters, two pressuriz er pressure transmitters, and six non-qualified instruments failed, apparently due to high tem perature and high humidity in the incore instru ment room.

On April 20, Unit I entered mode 5, and depressurization of the RCS Was initiated. On

-April 21, the reactor vessel level was lowered to an elevation of 701 ft. Since the elevation of the seal table was 702 ft., the only leakage would be "dut to the nitrogen c6ver gas in the pressurizer.

Later calculations indicated that about 16,000 gal of water were lost from the RCS during this event.

At approximately 9:00 a.m. on April 21, the first post-event entry was made into the incore instrument room.' Personnel ieported that the thimble tube was completely ejected from the conduit and twisted throughout the room.

Radiation surveys indicated levels of two to three rem/hr at the entrance to the seal table area, 200-300 rem/hr at the end of the tube closest to the seal table, and greater than 1000 rem/hr at the center of the ejected tube (see Figures 7.5-5 and 7.5-6). Pictures were taken to aid in later recov ery planning.- Later, a second entry was made to take additional pictures. Two individuals were in the area for only seven minutes and received doses of 1.966 and 1.939 rem.

Once the unit was placed in cold shutdown (mode 5) and depressurized with the vessel water level below the' elevation of the seal table, the event was over from an operational standpoint.

An engineered safety features actuation had been unnecessary because the rate of inventory loss from the RCS was small enough to be'overcome with normal charging flow. Some infstrumenta tion located in the incore instrument room was lost during the event, apparently due to the high temperatures and humidity. The loss of the instrumentation was of no consequence during the event, but the condition and environmental qualification of the equipment had to be evaluated as part of the recovery effort.

Because of the extremely hazardous radiation levels caused by the ejected thimble tube (high range radiation detection equipment later showed the actual level to be up to 4000 rem/hr at the end of the tube), it was immediately concluded that the recovery had to be well planned and executed to ensure that the risk to personnel would be minimized. After evaluating several alternatives, TVA decided to cut off the end of the thimble tube that was activated and move it to a location in the containment 'where it could be cut into pieces by a remotely controlled robot and placed in a shielded container. Once this was accom plished, the cleanup and recovery of the incore instrument room could proceed with minimal radiation exposure to personnel.

USNRC Technical Training Center 7.5-6 Rev 0196 Rey 0196

. Westinghouse Technology Advanced Manual Sequoyah-Incore Thimble Tube Ejection Event

'USNRC Technical Training Center 7.5-6

Westinbouse TechnoIoy. Advanced Manual Sequoyah Incore Thimble Tube Ejection Event 7.5.5 Event Summary Subsequent analysis by TVA indicated that the failure of the high pressure seal (high pres sure Swagelok/Gyrolok fitting) that allowed the RCS pressure to eject the D-12 thimble tube was caused by the dry brush cleaning tool. The cleaning tool had been modified from the original vendor design with the addition of a rigid base, which caused excessive force from operation of the hand crank to be transmitted to the tube and fitting. Repeated stressing of the fitting eventual ly caused it to fail. Subsequent review of the event by a TVA safety review group and by the NRC showed that though the event was not necessarily significant from an operational standpoint, it revealed significant breakdowns in administrative controls in maintenance and procedural areas. The NRC issued Information Notice 84-55: "Seal Table Leaks at PWRs,"

which described the event and a similar event at Zion Generating Station Unit 1, and strongly recommended that all seal table maintenance take place only during cold shutdown conditions.

Enforcement action was later taken against TVA because of the breakdowns that led to the occur rence of the ejected thimble tube.

7.5.6 Similar Event: Zion Unit 1, Janu ary 20, 1984 On January 20, 1984, a reactor coolant leak was observed in the seal table room at Zion Generating Station Unit 1 (reported by LER 50 29511984-005). The unit was in hot shutdown with a plant heatup in progress.

The RCS temperature and pressure were 445"F and 2235 psig, respectively. Inspection of the seal table by plant personnel revealed that a leak was located at a point where the high pressure seal mates to the conduit for incore thimble E-1 1. An attempt to repair the leak was made when the system pressure was reduced to 1000 psig.

These efforts reduced but did not stop the-leak. The system pressure and temperature were reduced to S400 psig and 370'F, and another attempt to repair the leak was made. The -repairmen noticed a slight bowing between the high pressure-seal and the thimble isolation valve. It was believed that this bowing caused the Swagelok fitting to be improperly seated, thus causing the leak. To correct the problem, -two bolts holding the isolation valve to the valve bracket were removed to allow straightening of the thimble tube.

However, the two bolts and bracket were the

,primary support devices holding the fitting in place. When they. were removed, ifie fitting broke loose, causing an.,unisolable reactor coolant leak of approximately, 10 gpm in contain ment. The area was immediately evacuated.

Later, upon examination of the fittings, it was found that the ferrules of all but seven of the thimbles had moved 1/32 to 3/8 in. up from their original positions toward the edges of the con duits.

A review of the procedure for assembly of

-the high pressure and low pressure seals within the Swagelok fittings revealed that the low pressure fittings could pull up the ferrules, causing -improper fitting of the high pressure seals. This is believed to explain the initial leak.

Overtorquing of the fittings during the initial attempt to correct the leak probably overstressed

,the ferrule and allowed it to break loose when the Srestraint was removed....

7.5.7 Seal Table Leaks:, Lessons

.Learned Even though the Sequoyah and Zion inci dents appear to have been caused by different circumstances, both events point out the need for adequate controls and precautions to ensure

~-.

~

Z~XY 1JL7 "USNRC Technical Training Center-7'. z - I Westinghouse Technologv, Advanced Manual Sequoyah,Incore Thimble Tube Ejection Event Rev

Westinghouse Technology Advanced Manual Sequoyah Incore Thimble Tube Ejection Event personnel and plant safety while during mainte nance on high pressure systems, especially activities involving the seal table. Each event occurred with the reactor at elevated temperatures and pressures, and, in'the case of Sequoyah, the plant was at 30% reactor power. In both cases maintenance was conducted on a high pressure system with what was equivalent to single-valve protection. For both plant and personnel safety considerations, maintenance should not normally be performed on high 'pressure systems with the RCS at high pressures and temperatures and with only single-valve protecti6n. To preclude the types of events describeed, in this section from occurring, every effo't should be made to sched ule seal table maintenance during cold shutdown conditions. Also, the need for maintenance of any system under hot, pressurized conditions should be thoroughly evaluated before personnel are alloied to perform the wýork. Licensees were urged to review their maintenance procedures to ensure that maintenance under these conditions is minimized.

No one was injured during the Sequoyah and Zion events, and the operators brought the plants to a cold shutdown condition without undue problems. However, both of these events caused problems associated with the idiological cleanup efforts.

In th6 case of Seqiibyah, a highly radioactive component was ejected from the core.

This required that extra6rdinary -measures be taken'during the decontamination of the room.

Increased personnel exp~osure and downtime of the plant due to the cleanup and repair efforts provide'additiohal incentives for precautions against maintenance under iimilar conditions.

"USNRC Technical Training Center

7. 5-8 Rev 0196

ýWestinghouse Technology Advanced' Manual Sequoyah Incore Thimble Tube Ejection Event

Westinahouse Techno..

v Advanced Manual Senuovah Incore Thimble Tube Ejection Event TABLE 7.5-1 Sequence of Events April 19, 1984 2110 2116 2117 2120 2125 2133 2152 2205 April 20. 1984 0932 1114 1400 April 21. 1984 0715 Pressurizer level was decreasing and charging flow was increased by 45 gpm (from 85 gpm to 130 gpm).

Pressurizer level stopped decreasing, indicating that the leak rate was less than 45 gpm (later estimates showed leakage to be approximately 30 gpm).

Reactor power reduction began at 1 %/min Radiological Emergency Plan initiated Reactor power at 18% (Tavg at 525"F and pressure at 2235 psig)

Unit tripped on low-low level in steam generator 1 (feedwater control in manual)

NRC notified of event as required by 10 CFR 50.72 Controlled cooldown and depressurization of plant begun (Tavg at 500"F and pressure at 1900 psig)

Unit entered mode 5 and depressurization of RCS initiated RCS pressure at 250 psig - leak rate estimated to be 18 gpm RCS pressure at 40 psig - leak rate estimated to be 5.4 gpm Vessel water level lowered to about 1 foot below elevation of seal table (only leakage was due to N2 blanket in the pressurizer). Total leakage later estimated to be 16,000 gallons.

In ID, Al of USNRC Technical Training Center

/.a-VýK; T

k I.

0199-3 "THIMBLE GUIDE TUBE WELD UNION Figure 7.5-1 In-Core Instrumentation

-STORAGE REEL HELICAL WRAP DRIVE CABLE

-DRIVE WHEEL 5-PATH ROTARY TRANSFER

" INTERCONNECTING TUBING WYE UNIT ISOLATION VALVE HIGH PRESSURE SEAL SEAL TABLE "MINIATURE NEUTRON DETECTION Figure 7.5-2 Drive System for In-Core Instrumentation 0199-3

('bIb LOW PRESSURE SEAL Figure 7.5-3 HIGH PRESSURE S Thimble Tube Cleaning Tool 7.5-15 r//////,,o

LOW PRESSURE SEAL THIMBLE TUBE HIGH PRESSURE SEAL THIMBLE GUIDE 1,11 III lIl Eli Fm I :

'II s

-- FULL RCS PRESSURE S7~

SEAL TABILE Figure 7.5-4 Seal Table Design 7.5-17

'1 CD

-4 CiD CD

-.4 0

(D 0

0 CD a;...,

iT i i i

" I \\

I

LLLLL*

4IN 4-__

I -;

I ~

~ -

I I I

-!14

  • -.it it71

I I I

-I I

I j

I 'i

.1 I I'I E1T F7I TPT+/-

i*,i at I

I I

Figure 7.5-6 Ejected Thimble Tube D-12 7.5-21

' i i i

II

° '

I I

i i

I i

i r

I II 1

I I

t

i.

I I

S..

)

I

_! I

-I I

I 1

i I

I i